CN114912847A - Land universe renovation online supervision method and system - Google Patents
Land universe renovation online supervision method and system Download PDFInfo
- Publication number
- CN114912847A CN114912847A CN202210721091.2A CN202210721091A CN114912847A CN 114912847 A CN114912847 A CN 114912847A CN 202210721091 A CN202210721091 A CN 202210721091A CN 114912847 A CN114912847 A CN 114912847A
- Authority
- CN
- China
- Prior art keywords
- land
- construction
- area
- land improvement
- planning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
Abstract
The invention discloses an online supervision method for land universe remediation, which comprises the following steps: collecting land information of all areas to be remediated, and configuring corresponding land area remediation planning requirements for each area; the method comprises the steps of realizing the auditing of a land improvement planning suggestion of a region to be improved based on a land improvement planning requirement, and realizing the revision of the land improvement planning suggestion of the region to be improved according to an auditing result; the method comprises the following steps of (1) splitting a land improvement construction project, and configuring corresponding construction qualification requirements and construction quality inspection requirements for each land improvement construction project; the construction qualification requirements and the construction quality inspection requirements of the construction units of the land improvement project are used for realizing the examination and verification of the construction qualification of the construction units of the land improvement project; and generating a corresponding land whole-domain regulation and supervision task based on the construction quality inspection requirement and distributing the task to a corresponding manager and an unmanned aerial vehicle. The invention can realize the on-line examination and the comprehensive supervision of the land improvement project, can avoid the examination careless mistakes as much as possible and provides guarantee for the smooth landing of the subsequent project.
Description
Technical Field
The invention relates to a land universe renovation system, in particular to a land universe renovation online supervision method and a land universe renovation online supervision system.
Background
The land global regulation is a system engineering which uses land arrangement, reclamation, development and urban and rural construction land increase and decrease hooks as platforms in a certain area according to the target and the purpose determined by a land utilization overall plan, promotes the comprehensive regulation of the fields, water, roads, forests and villages, improves the production, living conditions and ecological environment of the rural areas, promotes the agricultural scale management, the centralized population living and the industry gathering development, and promotes the urban and rural integrated process.
Before the land reclamation, related enterprise units can apply for projects aiming at the reclamation project of the unboosted land, the whole auditing process needs to be carried out by human participation, time and labor are wasted, and auditing careless mistakes easily exist, so that the influence on the subsequent project falling to the ground is brought.
Disclosure of Invention
In order to solve the problems, the invention provides an online supervision method and system for land universe renovation, which can realize online examination and comprehensive supervision of a land renovation project, on one hand, the examination careless mistakes can be avoided as much as possible, and on the other hand, the smooth landing of subsequent projects is guaranteed.
In order to achieve the purpose, the invention adopts the technical scheme that:
an online supervision method for land universe renovation comprises the following steps:
s1, collecting land information of all areas to be remediated, and configuring corresponding land area remediation planning requirements for each area;
s2, realizing the auditing of the land improvement planning suggestion of the area to be improved based on the land improvement planning requirement, and realizing the revision of the land improvement planning suggestion of the area to be improved according to the auditing result;
s3, the separation of the internally-loaded land improvement construction projects in the revised land improvement planning suggestions is realized, and corresponding construction qualification requirements and construction quality inspection requirements are configured for each land improvement construction project;
s4, auditing the construction qualification of the construction unit of the land improvement project based on the construction qualification requirement and the construction quality inspection requirement;
s5, generating a corresponding land whole-domain regulation and supervision task based on the construction quality inspection requirement and distributing the task to a corresponding manager and an unmanned aerial vehicle;
and S6, realizing comprehensive supervision of land universe remediation based on the unmanned aerial vehicle cooperative manager.
Further, the land area remediation plan based on each area configuration requires that a corresponding classification code be configured for each area to be remediated.
Further, in step S1, based on the land information of the area to be remediated and the surrounding environment parameters of the remediated area, the corresponding land remediation planning requirements are configured for each area with the goal of highest benefit, taking the surrounding environment parameters not to be affected as constraint conditions.
Further, in step S2, the method of traversing each land improvement planning suggestion is adopted for auditing, and when an unsatisfactory land improvement planning suggestion is audited, the suggestion is automatically sent to the manual expert module for manual expert auditing and revising.
Furthermore, after the construction qualification of the land improvement project construction unit passes the examination, the bidding module is started, each land improvement project construction unit needs to upload a corresponding construction quotation list, the construction quotation list outputs quotation comparison reports through one-to-one examination and comparison of the content loaded in the construction quotation items, and finally the land improvement project construction unit of each area is determined in a manual mode.
Furthermore, managers need to complete the comprehensive supervision of the land whole-area remediation according to the supervision time, supervision places, supervision contents and supervision report compiling requirements carried in each land whole-area remediation supervision task.
Further, unmanned aerial vehicle is used for based on the collection that the track fixed point of predetermineeing is carried out land universe renovation construction image occasionally to realize the feedback record of current construction situation.
The invention also provides an online supervision system for the land universe remediation, and the online supervision method is adopted to realize the supervision of the land universe remediation.
The invention has the following beneficial effects:
on-line examination and comprehensive supervision of the land improvement project can be realized, on one hand, examination careless mistakes can be avoided as much as possible, and on the other hand, a guarantee is provided for smooth landing of subsequent projects.
Based on the land information of the area to be remediated and the surrounding environment parameters of the remediated area, the corresponding land remediation planning requirements are configured for each area by taking the unaffected surrounding environment parameters as constraint conditions and taking the highest benefit as a target, and the rationality and the social benefit of a land remediation project are ensured as much as possible.
The construction qualification of the construction unit of the land improvement project is checked from two aspects of construction qualification and construction quality inspection by splitting the construction project of the land improvement project carried in the land improvement planning suggestion and configuring the corresponding construction qualification requirement and construction quality inspection requirement for each land improvement construction project, thereby providing guarantee for the smooth landing of the subsequent projects.
The mode based on unmanned aerial vehicle cooperative management people supervises jointly carries out the comprehensive supervision of land universe renovation, the problem that exists among the discovery land universe renovation process that can be timely.
Drawings
Fig. 1 is a flowchart of an online monitoring method for land universe remediation according to an embodiment of the present invention.
Fig. 2 is a system block diagram of an online monitoring system for land universe remediation according to an embodiment of the present invention.
Detailed Description
In order to make the objects and advantages of the present invention more apparent, the present invention is further described in detail with reference to the following examples. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
Example 1
An online supervision method for land universe renovation comprises the following steps:
s1, collecting land information of all areas to be remediated, and configuring corresponding land area remediation planning requirements for each area; specifically, based on the land information of the area to be remediated and the surrounding environment parameters of the area to be remediated, configuring corresponding land remediation planning requirements for each area by taking the unaffected surrounding environment parameters as constraint conditions and aiming at the highest benefit, and then configuring corresponding classification codes for each area to be remediated based on the land area remediation planning requirements configured for each area, and storing the classification codes in a database;
s2, realizing the auditing of the land improvement planning suggestion of the area to be improved based on the land improvement planning requirement, and realizing the revision of the land improvement planning suggestion of the area to be improved according to the auditing result; specifically, auditing is carried out by traversing each land improvement planning suggestion, and when the land improvement planning suggestion which does not meet the requirement is audited, the suggestion is automatically sent to a manual expert module for manual expert auditing and revising;
s3, the separation of the internally-loaded land improvement construction projects in the revised land improvement planning suggestion is realized, and corresponding construction qualification requirements and construction quality inspection requirements are configured for each land improvement construction project;
s4, auditing the construction qualification of the construction unit of the land improvement project based on the construction qualification requirement and the construction quality inspection requirement; after the construction qualification of the land improvement project construction units passes the examination, starting a bidding module, uploading a corresponding construction quotation list by each land improvement project construction unit, outputting a quotation comparison report by the one-to-one examination comparison of the content loaded in the construction quotation items of the construction quotation list, and finally determining the land improvement project construction units of each area in a manual mode;
s5, generating a corresponding land whole-domain regulation and supervision task based on the construction quality inspection requirement and distributing the task to a corresponding manager and an unmanned aerial vehicle;
s6, realizing comprehensive supervision of land whole-domain remediation based on the unmanned aerial vehicle cooperative manager, wherein the manager needs to complete the comprehensive supervision of the land whole-domain remediation according to supervision time, supervision places, supervision contents and supervision report compiling requirements carried in each land whole-domain remediation supervision task; unmanned aerial vehicle is used for based on the collection that the track fixed point was patrolled and examined in the presetting carries out land universe renovation construction image at indefinite time to realize the feedback record of current construction situation.
Example 2
As shown in fig. 2, an online monitoring system for land universe remediation includes:
the land area improvement planning requirement configuration module is used for collecting land information of all areas to be improved and configuring corresponding land area improvement planning requirements for each area; specifically, based on the land information of the area to be remediated and the surrounding environment parameters of the area to be remediated, configuring corresponding land remediation planning requirements for each area by taking the unaffected surrounding environment parameters as constraint conditions and aiming at the highest benefit, and then configuring corresponding classification codes for each area to be remediated based on the land area remediation planning requirements configured for each area, and storing the classification codes in a database; the land improvement planning suggestion auditing module is used for realizing the auditing of the land improvement planning suggestion of the area to be improved based on the land area improvement planning requirement and realizing the revision of the land improvement planning suggestion of the area to be improved according to the auditing result; specifically, auditing is carried out by traversing each land improvement planning suggestion, and when the land improvement planning suggestion which does not meet the requirement is audited, the suggestion is automatically sent to a manual expert module for manual expert auditing and revising; the land improvement planning suggestion analysis module is used for splitting the internally-loaded land improvement construction projects in the revised land improvement planning suggestions, and configuring corresponding construction qualification requirements and construction quality inspection requirements for each land improvement construction project; the construction qualification auditing module is used for auditing the construction qualification of the construction unit of the land improvement project based on the construction qualification requirement and the construction quality inspection requirement; the bidding module is started after the construction qualification of the land improvement project construction unit passes the audit, each land improvement project construction unit needs to upload a corresponding construction quotation list, the construction quotation list outputs quotation comparison reports through one-to-one audit comparison of the content loaded in the construction quotation items, and finally the land improvement project construction unit of each area is determined in a manual mode; the supervision task generation and distribution module is used for generating a corresponding land whole-domain regulation and supervision task based on the construction quality inspection requirement and distributing the corresponding land whole-domain regulation and supervision task to a corresponding manager and an unmanned aerial vehicle; the dynamic supervision module is used for realizing the comprehensive supervision of the land whole-domain regulation based on the unmanned aerial vehicle cooperative manager, wherein the managers need to complete the comprehensive supervision of the land whole-domain regulation according to the supervision time, supervision place, supervision content and supervision report compiling requirements carried in each land whole-domain regulation supervision task; the unmanned aerial vehicle is used for collecting land universe renovation construction images at fixed points and in an irregular mode based on a preset routing inspection track, so that feedback recording of the current construction condition is achieved; and the central processing module is used for coordinating the work of the modules.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that those skilled in the art can make various improvements and modifications without departing from the principle of the present invention, and these improvements and modifications should also be construed as the protection scope of the present invention.
Claims (8)
1. An online supervision method for land universe renovation is characterized by comprising the following steps:
s1, collecting land information of all areas to be remediated, and configuring corresponding land area remediation planning requirements for each area;
s2, realizing the auditing of the land improvement planning suggestion of the area to be improved based on the land improvement planning requirement, and realizing the revision of the land improvement planning suggestion of the area to be improved according to the auditing result;
s3, the separation of the internally-loaded land improvement construction projects in the revised land improvement planning suggestions is realized, and corresponding construction qualification requirements and construction quality inspection requirements are configured for each land improvement construction project;
s4, auditing the construction qualification of the construction unit of the land improvement project based on the construction qualification requirement and the construction quality inspection requirement;
s5, generating a corresponding land whole-domain regulation and supervision task based on the construction quality inspection requirement and distributing the task to a corresponding manager and an unmanned aerial vehicle;
and S6, realizing comprehensive supervision of land universe remediation based on the unmanned aerial vehicle cooperative manager.
2. The method as claimed in claim 1, wherein each land area reclamation plan based on each area configuration requires that each area to be remediated is configured with a corresponding classification code.
3. The method as claimed in claim 1, wherein in step S1, based on the land information of the area to be remediated and the parameters of the surrounding environment of the remediated area, the most efficient land remediation planning requirement is configured for each area with the goal of not affecting the parameters of the surrounding environment as constraint condition.
4. The method as claimed in claim 1, wherein in step S2, the auditing is performed by traversing each land improvement plan suggestion, and when the unsatisfactory land improvement plan suggestion is audited, the suggestion is automatically sent to the human expert module for human expert audit and revision.
5. The method as claimed in claim 1, wherein the bidding module is started when the construction qualification of the land improvement project construction unit passes the audit, each land improvement project construction unit needs to upload a corresponding construction quotation list, the construction quotation list outputs quotation comparison reports through one-to-one audit comparison of the content loaded in the construction quotation items, and finally the land improvement project construction unit of each area is determined manually.
6. The method as claimed in claim 1, wherein the manager needs to complete the overall management of the land whole-area reclamation according to the management time, the management place, the management content and the management report of each land whole-area reclamation and management task.
7. The method of claim 1, wherein the unmanned aerial vehicle is configured to collect the land global reclamation construction image based on a preset routing inspection trajectory at fixed points and in variable time, so as to realize feedback recording of a current construction situation.
8. The utility model provides an online supervisory systems of land universe renovation which characterized in that: the method for supervising land whole-area remediation is implemented by the method for supervising the land whole-area remediation in an online mode according to any one of claims 1 to 7.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210721091.2A CN114912847A (en) | 2022-06-24 | 2022-06-24 | Land universe renovation online supervision method and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210721091.2A CN114912847A (en) | 2022-06-24 | 2022-06-24 | Land universe renovation online supervision method and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114912847A true CN114912847A (en) | 2022-08-16 |
Family
ID=82771722
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210721091.2A Pending CN114912847A (en) | 2022-06-24 | 2022-06-24 | Land universe renovation online supervision method and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114912847A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116681313A (en) * | 2023-08-02 | 2023-09-01 | 菏泽市国土综合整治服务中心 | Land comprehensive renovation project supervision system |
-
2022
- 2022-06-24 CN CN202210721091.2A patent/CN114912847A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116681313A (en) * | 2023-08-02 | 2023-09-01 | 菏泽市国土综合整治服务中心 | Land comprehensive renovation project supervision system |
CN116681313B (en) * | 2023-08-02 | 2023-10-10 | 菏泽市国土综合整治服务中心 | Land comprehensive renovation project supervision system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111582697B (en) | Power distribution network fault assessment and scheduling method and system | |
CN106527373B (en) | Workshop Autonomous Scheduling system and method based on multiple agent | |
CN111667230A (en) | Unmanned aerial vehicle autonomous inspection operation monitoring and analyzing system and method | |
CN109829636A (en) | emergency task scheduling planning method based on dynamic priority | |
CN115097788A (en) | Intelligent management and control platform based on digital twin factory | |
CN110751411B (en) | Cloud manufacturing task oriented manufacturing resource matching method | |
CN113822585B (en) | Intelligent smelting factory informatization management system | |
CN111415026A (en) | Unmanned equipment scheduling device, system and method | |
CN114912847A (en) | Land universe renovation online supervision method and system | |
CN112580923A (en) | Scheduling method, system and computer medium for oil field inspection unmanned aerial vehicle | |
CN106600240A (en) | Power grid regulation and control and operation management system of power supply enterprise based on big data lean assistance | |
CN114971356A (en) | Electric power engineering project progress prediction system and method | |
CN106127365A (en) | Quantitative remote sensing On-line Product interactive mode autonomous production method | |
CN116468287A (en) | Intelligent park control system based on digital twinning | |
CN115860410A (en) | WeChat-based large civil engineering construction potential safety hazard management system | |
CN116433040A (en) | Airport transportation management commission flight adjustment system, method, equipment and storage medium | |
CN107274135A (en) | The raw tobacco material overall planning method and system shared based on cooperative information | |
Simonenkova et al. | Optimization of forest road network layout problem | |
CN112085221A (en) | Digital pole and tower intelligent operation and detection method and system | |
CN117094487A (en) | Intelligent overall method and device for bearing capacity production and electronic equipment | |
Akay et al. | Forest transportation planning by using GIS-based decision support system | |
Klenk et al. | Analysis of real-time tour building and scheduling strategies for in-plant milk-run systems with volatile transportation demand | |
CN113516420A (en) | System engineering support system based on machine learning | |
CN106777303B (en) | Passenger flight inquiry behavior classification method and system | |
CN109214685A (en) | A kind of best feasibility evaluation method of heavy-duty diesel vehicle emission-reduction technology |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |