CN115439100A - Method for supervising comprehensive land improvement project and management information system - Google Patents

Method for supervising comprehensive land improvement project and management information system Download PDF

Info

Publication number
CN115439100A
CN115439100A CN202211201531.8A CN202211201531A CN115439100A CN 115439100 A CN115439100 A CN 115439100A CN 202211201531 A CN202211201531 A CN 202211201531A CN 115439100 A CN115439100 A CN 115439100A
Authority
CN
China
Prior art keywords
land
information
project
supervision
comprehensive
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202211201531.8A
Other languages
Chinese (zh)
Inventor
程向军
杨瑞超
秦及茹
陈涛
奥丽
任姣
冯雅秀
李波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan Branch Of Shanxi Dadi Environment Investment Holding Co ltd
Original Assignee
Taiyuan Branch Of Shanxi Dadi Environment Investment Holding Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan Branch Of Shanxi Dadi Environment Investment Holding Co ltd filed Critical Taiyuan Branch Of Shanxi Dadi Environment Investment Holding Co ltd
Priority to CN202211201531.8A priority Critical patent/CN115439100A/en
Publication of CN115439100A publication Critical patent/CN115439100A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/20Natural language analysis
    • G06F40/279Recognition of textual entities
    • G06F40/289Phrasal analysis, e.g. finite state techniques or chunking
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Tourism & Hospitality (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Primary Health Care (AREA)
  • Data Mining & Analysis (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Artificial Intelligence (AREA)
  • Audiology, Speech & Language Pathology (AREA)
  • Computational Linguistics (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The application provides a method for supervising an integrated land improvement project and a management information system, and relates to the technical field of informatization management. A method for supervising an integrated land improvement project comprises the following steps: acquiring information data of a comprehensive land improvement project, information data of all land to be improved and improvement planning suggestion data corresponding to the information of the land to be improved; inputting and uploading all the acquired information data to the supervision information and accessories for comprehensive land remediation implementation, and realizing electronic storage of the supervision information; and (4) checking and approving project materials in the electronic storage of the supervision information, synchronizing the checking and approving results to the platform server, and supervising the comprehensive land remediation project through the front-end monitoring equipment to realize early warning and online supervision. And the intelligent supervision of the behaviors of the comprehensive land improvement project is realized by sensing and early warning of front-end equipment. In addition this application has still provided a soil integrated remediation implementation supervision management information system, includes: data acquisition module, electron storage module and supervision module.

Description

Method for supervising comprehensive land improvement project and management information system
Technical Field
The application relates to the technical field of informatization management, in particular to a method for supervising an integrated land improvement project and a management information system.
Background
The land global regulation is a system engineering which uses land arrangement, reclamation, development and urban and rural construction land increase and decrease hooks as platforms in a certain area according to the target and the purpose determined by a land utilization overall plan, promotes the comprehensive regulation of the fields, water, roads, forests and villages, improves the production, living conditions and ecological environment of the rural areas, promotes the agricultural scale management, the centralized population living and the industry gathering development, and promotes the urban and rural integrated process.
Before land improvement, related enterprise units can apply for projects according to the project of the improvement project of the unreformed land, the enterprise units in the related technology can apply for the projects in an online application mode, the enterprise units register the project application accounts, complete account data and qualification certification, submit the project application files of the electronic version to the system, after the system receives the project application files, the account information of the submitted application files needs to be manually checked, and after the check is passed, manual examination and approval are carried out through a review group at the background of the system.
The management of land comprehensive project construction is always a difficult problem in the industry. At present, the construction condition of a comprehensive project of land basically depends on manual supervision, and in the actual construction operation of the comprehensive project of land, the situations of border-crossing construction, stealing of earthworks and stones and the like are often prohibited, so that the following defects exist in the construction of the whole project of land caused by manual management: the project supervision is opaque, the human factor and the operation influence are large, the supervision quality is low, the supervision boundary and the supervision range are narrow, and many loopholes exist.
Disclosure of Invention
The application aims to provide a method for supervising and managing comprehensive land improvement projects, which can utilize front-end equipment to sense and early warn and realize intelligent supervision of behaviors of the comprehensive land improvement projects.
Another object of the present application is to provide a soil comprehensive improvement implementation supervision and management information system, which is capable of operating a soil comprehensive improvement project supervision method.
The embodiment of the application is realized as follows:
in a first aspect, an embodiment of the present application provides a method for supervising a comprehensive land improvement project, which includes acquiring information data of the comprehensive land improvement project, information data of all land to be improved, and improvement planning suggestion data corresponding to the information of the land to be improved; inputting and uploading all the acquired information data to the supervision information and accessories for comprehensive land remediation implementation, and realizing electronic storage of the supervision information; and (4) checking and approving project materials in the electronic storage of the supervision information, synchronizing the checking and approving results to the platform server, and supervising the comprehensive land remediation project through the front-end monitoring equipment to realize early warning and online supervision.
In some embodiments of the application, the obtaining of the information data of the comprehensive land improvement project, the information data of all the land to be improved, and the improvement planning suggestion data corresponding to the information of the land to be improved includes: analyzing the obtained land comprehensive improvement project information data, all land information data to be improved and improvement planning suggestion data corresponding to the land information to be improved, and analyzing to obtain the serial numbers and the improvement project plans of the obtained land comprehensive improvement project information data, all land information data to be improved and the improvement planning suggestion data corresponding to the land information to be improved.
In some embodiments of the present application, the above further includes: and carrying out keyword identification on the renovation project plan based on preset keywords to obtain keyword contact ratio, and carrying out data matching on the renovation project plan to obtain data matching degree.
In some embodiments of the present application, the recording and uploading of all the acquired information data to the supervision information and accessories for comprehensive land remediation implementation includes: the method comprises the steps of obtaining an original project range image, laying a line, loading a vector range line by using front-end monitoring equipment, recording and uploading the original project range image to comprehensive land improvement and implementation supervision information and accessories, and achieving electronic storage of the supervision information.
In some embodiments of the present application, the above further includes: and acquiring a project real-time monitoring image, acquiring the project real-time monitoring image by using front-end monitoring equipment, recording and uploading the project real-time monitoring image to the land comprehensive remediation and implementation supervision information and accessories, and realizing electronic storage of the supervision information.
In some embodiments of the present application, the examining and approving project materials in the electronic storage of the supervision information, the examining and approving results are synchronized to the platform server, the front-end monitoring device supervises the comprehensive land remediation project, and the implementation of the early warning and the online supervision includes: and monitoring the comprehensive land improvement implementation progress, judging the land improvement project according to the current position, displaying the project information of the corresponding land improvement project, and inputting site reconnaissance data.
In some embodiments of the present application, the above further includes: and judging whether the site survey data is abnormal or not, if so, sending out early warning information, issuing a patrol task to a worker according to the early warning information, and the worker patrols according to the patrol task, checks, shoots a site picture and uploads the picture to the supervision information for electronic storage.
In a second aspect, an embodiment of the present application provides a land comprehensive improvement implementation supervision and management information system, which includes a data acquisition module, configured to acquire information data of a land comprehensive improvement project, information data of all land to be improved, and improvement planning suggestion data corresponding to the information of the land to be improved;
the electronic storage module is used for inputting and uploading all the acquired information data to the supervision information and accessories for comprehensive land remediation and implementation, so that the electronic storage of the supervision information is realized;
and the supervision module is used for checking and approving the project materials in the supervision information electronic storage, synchronizing the checking and approving results to the platform server, and supervising the comprehensive land remediation project through the front-end monitoring equipment to realize early warning and online supervision.
In some embodiments of the present application, the above includes: at least one memory for storing computer instructions; at least one processor in communication with the memory, wherein the at least one processor, when executing the computer instructions, causes the system to: data acquisition module, electron storage module and supervision module.
In a third aspect, embodiments of the present application provide a computer-readable storage medium having stored thereon a computer program, which when executed by a processor, implements a method as any one of the methods for supervising an earth-based comprehensive improvement project.
Compared with the prior art, the embodiment of the application has at least the following advantages or beneficial effects:
the front-end equipment is used for sensing and early warning, the monitoring content and the early warning information are displayed and transmitted to the background server through the network cable, the switch and the like, and intelligent supervision on the behavior of the land improvement project is realized, including paperless project data, space saving and difficult loss and damage; the project transparent supervision is realized, the project site removing time is saved, and the management quality is improved; the supervision for implementing comprehensive land remediation is realized; the purpose-specific inspection of the project is realized, and the online and offline combination and linkage inspection are realized.
Drawings
To more clearly illustrate the technical solutions of the embodiments of the present application, the drawings needed in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present application and therefore should not be considered as limiting the scope, and those skilled in the art can also obtain other related drawings based on the drawings without inventive efforts.
Fig. 1 is a schematic step view of a method for supervising an integrated land improvement project provided in an embodiment of the present application;
fig. 2 is a detailed step diagram of a method for supervising an integrated soil remediation project according to an embodiment of the present application;
fig. 3 is a schematic diagram of a system module for implementing supervision and management information for comprehensive soil remediation according to an embodiment of the present application;
fig. 4 is an electronic device according to an embodiment of the present disclosure.
Icon: 10-a data acquisition module; 20-an electronic memory module; 30-a supervision module; 101-a memory; 102-a processor; 103-communication interface.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are some embodiments of the present application, but not all embodiments. The components of the embodiments of the present application, generally described and illustrated in the figures herein, can be arranged and designed in a wide variety of different configurations.
Thus, the following detailed description of the embodiments of the present application, as presented in the figures, is not intended to limit the scope of the claimed application, but is merely representative of selected embodiments of the application. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
It should be noted that: like reference numbers and letters refer to like items in the following figures, and thus, once an item is defined in one figure, it need not be further defined and explained in subsequent figures.
It should be noted that the term "comprises/comprising" or any other variation thereof is intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrases "comprising one of 8230; \8230;" 8230; "does not exclude the presence of additional like elements in a process, method, article, or apparatus that comprises the element.
Some embodiments of the present application will be described in detail below with reference to the accompanying drawings. The embodiments described below and the individual features of the embodiments can be combined with one another without conflict.
Example 1
Referring to fig. 1, fig. 1 is a schematic diagram illustrating steps of a method for supervising an integrated land improvement project according to an embodiment of the present application, and the method is as follows:
step S100, acquiring information data of a comprehensive land improvement project, information data of all land to be improved and improvement planning suggestion data corresponding to the land information to be improved;
in some embodiments, all the land information to be remediated and the remediation planning suggestions corresponding to the land information to be remediated are collected, all the land information to be remediated are marked with different numbers, and all the numbers and the land information to be remediated and the remediation planning suggestions corresponding to all the numbers are uploaded to a preset land database. And the land information to be remediated and the remediation planning suggestion corresponding to the land information are downloaded through the land resource system. Receiving a land improvement project application submitted by a land improvement project unit. Verifying the user information and account number conditions of the land improvement project units, marking the land improvement project units passing the verification as normal project units, and marking the land improvement project applications with the normal project units as normal project applications. And analyzing the normal project application to obtain the number of the target land information to be renovated and a renovation project plan, and disclosing the renovation project plan. And taking the number of the target land information to be remediated as an object, and calling a corresponding remediation planning suggestion from the land database to serve as a target remediation planning suggestion. And scoring according to the matching degree of the target improvement planning suggestion and the improvement project plan to obtain a scoring result. Collecting all expert opinions aiming at the treatment project plan, and analyzing all the expert opinions to obtain expert suggestions. And carrying out project approval on the normal project application by combining the expert suggestions and the scoring results.
Step S110, all the acquired information data are recorded and uploaded to the supervision information and accessories for comprehensive land improvement and implementation, and electronic supervision information storage is realized;
in some embodiments, the project information is input and uploaded by the accessory used for uploading project accessories, project information is electronically stored through the project library, on one hand, the project information is convenient to retrieve, on the other hand, the project data is paperless, and in the whole construction process of the project, all data information such as the project information (including supervision information) and the like are stored in the project library, so that the management of the whole construction project is more transparent and standard.
And step S120, checking and approving the project materials in the electronic storage of the supervision information, synchronizing the checking and approving results to the platform server, and supervising the comprehensive land remediation project through the front-end monitoring equipment to realize early warning and online supervision.
In some embodiments, the original project area image is acquired: laying a line, and loading a vector range line by using front-end monitoring equipment; secondly, acquiring a real-time monitoring image of the project: acquiring a real-time monitoring image of the project by using front-end monitoring equipment, wherein the acquisition cycle of the real-time monitoring image can be set and is not described herein; in real-time supervision, comparing an original project range image with a project real-time monitoring image, if no abnormality exists, not processing, and if the abnormality is found, sending out early warning information; then, issuing a patrol task to the staff according to the early warning information; the staff patrols according to the patrol task, checks and takes the scene picture to upload, and the manager judges according to the patrol result and the uploaded scene picture and makes a processing suggestion.
Example 2
Referring to fig. 2, fig. 2 is a detailed step diagram of a method for supervising an integrated soil remediation project according to an embodiment of the present application, which is shown as follows:
and S200, analyzing the obtained land comprehensive improvement project information data, all land information data to be improved and improvement planning suggestion data corresponding to the land information to be improved, and analyzing to obtain the serial numbers and the improvement project plans of the obtained land comprehensive improvement project information data, all land information data to be improved and the improvement planning suggestion data corresponding to the land information to be improved.
Step S210, carrying out keyword recognition on the renovation project plan based on preset keywords to obtain keyword overlap ratio, and carrying out data matching on the renovation project plan to obtain data matching degree.
And S220, acquiring an original project range image, laying a line, loading a vector range line by using front-end monitoring equipment, recording and uploading the original project range image to the land comprehensive improvement implementation supervision information and accessories, and realizing electronic storage of the supervision information.
And step S230, acquiring a project real-time monitoring image, acquiring the project real-time monitoring image by using front-end monitoring equipment, recording and uploading the project real-time monitoring image to the land comprehensive improvement implementation supervision information and accessories, and realizing electronic storage of the supervision information.
And S240, monitoring the implementation progress of the comprehensive land improvement, judging the land improvement project according to the current position, displaying the project information of the corresponding land improvement project, and inputting site reconnaissance data.
And S250, judging whether the site survey data is abnormal or not, if so, sending out early warning information, sending out a patrol task to a worker according to the early warning information, carrying out patrol by the worker according to the patrol task, carrying out inspection, shooting a site picture and transmitting the scene picture to the supervision information for electronic storage.
In some embodiments, the electronic storage of the supervision information is communicated with the platform server, the statistical analysis of information such as project quantity, construction scale, investment scale, newly added farmland quantity, implementation progress, fund transfer progress and the like in different areas, different years and different types is realized by reading the project information stored on the platform server, and the statistical analysis is displayed in visual and concise forms such as charts and the like, so that project implementation conditions can be conveniently looked up anytime and anywhere, the analysis of the number of days of a constructor and a supervisor arriving at a project site each month is realized according to the filling condition of a construction log and a supervision log, the assessment of an institution is assisted, and the intermediary supervises and supervises the establishment responsibility to be fulfilled.
Example 3
Referring to fig. 3, fig. 3 is a schematic diagram of a system module for implementing supervision and management information for comprehensive soil remediation according to an embodiment of the present application, which is as follows:
the data acquisition module 10 is used for acquiring information data of a comprehensive land improvement project, information data of all land to be improved and improvement planning suggestion data corresponding to the land information to be improved;
the electronic storage module 20 is used for inputting and uploading all the acquired information data to the supervision information and accessories for comprehensive land remediation implementation, so as to realize electronic storage of the supervision information;
and the supervision module 30 is used for checking and approving the project materials in the supervision information electronic storage, synchronizing the checking and approving results to the platform server, and supervising the comprehensive land remediation project through the front-end monitoring equipment to realize early warning and online supervision.
As shown in fig. 4, an embodiment of the present application provides an electronic device, which includes a memory 101 for storing one or more programs; a processor 102. The one or more programs, when executed by the processor 102, implement the method of any of the first aspects as described above.
Also included is a communication interface 103, and the memory 101, processor 102 and communication interface 103 are electrically connected to each other, directly or indirectly, to enable transfer or interaction of data. For example, the components may be electrically connected to each other via one or more communication buses or signal lines. The memory 101 may be used to store software programs and modules, and the processor 102 executes various functional applications and data processing by executing the software programs and modules stored in the memory 101. The communication interface 103 may be used for communicating signaling or data with other node devices.
The Memory 101 may be, but is not limited to, a Random Access Memory 101 (RAM), a Read Only Memory 101 (ROM), a Programmable Read Only Memory 101 (PROM), an Erasable Read Only Memory 101 (EPROM), an electrically Erasable Read Only Memory 101 (EEPROM), and the like.
The processor 102 may be an integrated circuit chip having signal processing capabilities. The Processor 102 may be a general-purpose Processor 102, including a Central Processing Unit (CPU) 102, a Network Processor 102 (NP), and the like; but may also be a Digital Signal processor 102 (DSP), an Application Specific Integrated Circuit (ASIC), a Field Programmable Gate Array (FPGA) or other Programmable logic device, discrete Gate or transistor logic device, discrete hardware components.
In the embodiments provided in the present application, it should be understood that the disclosed method and system can be implemented in other ways. The method and system embodiments described above are merely illustrative, for example, the flowcharts and block diagrams in the figures illustrate the architecture, functionality, and operation of possible implementations of methods and systems, methods and computer program products according to various embodiments of the present application. In this regard, each block in the flowchart or block diagrams may represent a module, segment, or portion of code, which comprises one or more executable instructions for implementing the specified logical function(s). It should also be noted that, in some alternative implementations, the functions noted in the block may occur out of the order noted in the figures. For example, two blocks shown in succession may, in fact, be executed substantially concurrently, or the blocks may sometimes be executed in the reverse order, depending upon the functionality involved. It will also be noted that each block of the block diagrams and/or flowchart illustration, and combinations of blocks in the block diagrams and/or flowchart illustration, can be implemented by special purpose hardware-based systems which perform the specified functions or acts, or combinations of special purpose hardware and computer instructions.
In addition, functional modules in the embodiments of the present application may be integrated together to form an independent part, or each module may exist separately, or two or more modules may be integrated to form an independent part.
In another aspect, embodiments of the present application provide a computer-readable storage medium, on which a computer program is stored, where the computer program, when executed by the processor 102, implements the method according to any one of the first aspect described above. The functions may be stored in a computer-readable storage medium if they are implemented in the form of software functional modules and sold or used as separate products. Based on such understanding, the technical solution of the present application or portions thereof that substantially contribute to the prior art may be embodied in the form of a software product stored in a storage medium and including instructions for causing a computer device (which may be a personal computer, a server, or a network device) to execute all or part of the steps of the method according to the embodiments of the present application. And the aforementioned storage medium includes: a U-disk, a removable hard disk, a Read-Only Memory 101 (ROM), a Random Access Memory 101 (RAM), a magnetic disk or an optical disk, and other various media capable of storing program codes.
In summary, the method for supervising the soil comprehensive improvement project and the management information system provided by the embodiment of the application sense and warn by using the front-end equipment, transmit the information to the background server through the network cable, the switch and the like, display the monitoring content and the prewarning information, and realize intelligent supervision of the behaviors of the soil comprehensive improvement project, including realizing paperless project data, saving space and being not easy to lose and damage; the project transparent supervision is realized, the project field time is saved, and the management quality is improved; the supervision for implementing comprehensive land remediation is realized; the purpose-specific patrol on the project is realized, and online and offline combination and linkage patrol are realized.
The above description is only a preferred embodiment of the present application and is not intended to limit the present application, and various modifications and changes may be made to the present application by those skilled in the art. Any modification, equivalent replacement, improvement and the like made within the spirit and principle of the present application shall be included in the protection scope of the present application.
It will be evident to those skilled in the art that the present application is not limited to the details of the foregoing illustrative embodiments, and that the present application may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the application being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (10)

1. A method for supervising an integrated land improvement project is characterized by comprising the following steps:
acquiring information data of a land comprehensive improvement project, information data of all land to be improved and improvement planning suggestion data corresponding to the information of the land to be improved;
inputting and uploading all the acquired information data to the comprehensive land improvement implementation supervision information and accessories, and realizing electronic storage of the supervision information;
and (4) examining and approving project materials in the electronic storage of the supervision information, synchronizing the examination and approval results to the platform server, and supervising the comprehensive land remediation project through the front-end monitoring equipment to realize early warning and online supervision.
2. The method for supervising an integrated land improvement project according to claim 1, wherein the step of obtaining the information data of the integrated land improvement project, the information data of all the land to be improved and the improvement planning suggestion data corresponding to the information of the land to be improved comprises the steps of:
analyzing the obtained land comprehensive improvement project information data, all land information data to be improved and improvement planning suggestion data corresponding to the land information to be improved, and analyzing to obtain the serial numbers and the improvement project plans of the obtained land comprehensive improvement project information data, all land information data to be improved and the improvement planning suggestion data corresponding to the land information to be improved.
3. The method of claim 2, further comprising:
and carrying out keyword identification on the renovation project plan based on preset keywords to obtain keyword contact ratio, and carrying out data matching on the renovation project plan to obtain data matching degree.
4. The method for supervising the soil comprehensive remediation project of claim 1, wherein the step of recording and uploading all the acquired information data to the soil comprehensive remediation implementation supervision information and accessories comprises the steps of:
the method comprises the steps of obtaining an original project range image, laying a line, loading a vector range line by using front-end monitoring equipment, recording and uploading the original project range image to comprehensive land improvement and implementation supervision information and accessories, and achieving electronic storage of the supervision information.
5. The method for supervising an all-terrain rehabilitation project of claim 4, further comprising:
and acquiring a project real-time monitoring image, acquiring the project real-time monitoring image by using front-end monitoring equipment, recording and uploading the project real-time monitoring image to the land comprehensive remediation and implementation supervision information and accessories, and realizing electronic storage of the supervision information.
6. The method as claimed in claim 1, wherein the inspecting and approving project materials in the electronic storage of the supervision information, the inspecting and approving results are synchronized to the platform server, and the monitoring and approval of the comprehensive land remediation project through the front-end monitoring device, the early warning and the online supervision are realized, and the method comprises the following steps:
and monitoring the comprehensive land improvement implementation progress, judging the land improvement project according to the current position, displaying project information of the corresponding land improvement project, and inputting site reconnaissance data.
7. The method for supervising an all-terrain rehabilitation project of claim 6, further comprising:
and judging whether the site survey data is abnormal or not, if so, sending out early warning information, issuing a patrol task to a worker according to the early warning information, and the worker patrols according to the patrol task, checks, shoots a site picture and uploads the picture to the supervision information for electronic storage.
8. The utility model provides a soil is synthesized to be renovated and is implemented supervision management information system which characterized in that includes:
the data acquisition module is used for acquiring information data of a comprehensive land improvement project, information data of all land to be improved and improvement planning suggestion data corresponding to the land information to be improved;
the electronic storage module is used for inputting and uploading all the acquired information data to the comprehensive land improvement implementation supervision information and accessories to realize electronic storage of the supervision information;
and the supervision module is used for checking and approving the project materials in the supervision information electronic storage, synchronizing the checking and approving results to the platform server, and supervising the comprehensive land remediation project through the front-end monitoring equipment to realize early warning and online supervision.
9. The system of claim 8, further comprising:
at least one memory for storing computer instructions;
at least one processor in communication with the memory, wherein the at least one processor, when executing the computer instructions, causes the system to perform: data acquisition module, electron storage module and supervision module.
10. A computer-readable storage medium, on which a computer program is stored which, when being executed by a processor, carries out the method according to any one of claims 1-7.
CN202211201531.8A 2022-09-29 2022-09-29 Method for supervising comprehensive land improvement project and management information system Withdrawn CN115439100A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211201531.8A CN115439100A (en) 2022-09-29 2022-09-29 Method for supervising comprehensive land improvement project and management information system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211201531.8A CN115439100A (en) 2022-09-29 2022-09-29 Method for supervising comprehensive land improvement project and management information system

Publications (1)

Publication Number Publication Date
CN115439100A true CN115439100A (en) 2022-12-06

Family

ID=84252036

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211201531.8A Withdrawn CN115439100A (en) 2022-09-29 2022-09-29 Method for supervising comprehensive land improvement project and management information system

Country Status (1)

Country Link
CN (1) CN115439100A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116681313A (en) * 2023-08-02 2023-09-01 菏泽市国土综合整治服务中心 Land comprehensive renovation project supervision system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116681313A (en) * 2023-08-02 2023-09-01 菏泽市国土综合整治服务中心 Land comprehensive renovation project supervision system
CN116681313B (en) * 2023-08-02 2023-10-10 菏泽市国土综合整治服务中心 Land comprehensive renovation project supervision system

Similar Documents

Publication Publication Date Title
US10740696B2 (en) Compliance management
CN109784758B (en) Engineering quality supervision early warning system and method based on BIM model
CN109902567B (en) Data processing method and system for rapidly evaluating vegetation health condition
CN107077413A (en) The test frame of data-driven
US11676091B2 (en) Product benchmarking
CN110728422A (en) Building information model, method, device and settlement system for construction project
CN115439100A (en) Method for supervising comprehensive land improvement project and management information system
CN113704702A (en) NFT authentication method
CN112990281A (en) Abnormal bid identification model training method, abnormal bid identification method and abnormal bid identification device
McKibben et al. Linking camera‐trap data to taxonomy: identifying photographs of morphologically similar chipmunks
CN115830399A (en) Classification model training method, apparatus, device, storage medium, and program product
CN113535538B (en) Method, device, electronic equipment and storage medium for automatically testing application full link
CN117669943A (en) Intelligent engineering construction project construction progress monitoring method and system based on BIM
CN111831919A (en) Course planning method, device, storage medium and system
CN115034718B (en) Dangerous chemical management method, system, computing equipment and storage medium
CN110689028A (en) Site map evaluation method, site survey record evaluation method and site survey record evaluation device
CN116227854A (en) Method and system for implementing supervision of comprehensive renovation of homeland space
CN115496440A (en) Method and device for determining second-hand car inventory
WO2002099756A1 (en) Unified method for evaluating the efficiency of large-scale systems and automated device for carrying out said method
Derkach et al. Digital agriculture: The experience of Ukraine
CN112329596B (en) Target damage assessment method and device, electronic equipment and computer-readable storage medium
CN110415110B (en) Progress monitoring method, progress monitoring device and electronic equipment
CN114048148A (en) Crowdsourcing test report recommendation method and device and electronic equipment
CN114022114A (en) Data governance platform based on telecommunication industry
CN113987015A (en) Equipment asset state management method, system, equipment and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20221206