CN116562593A CN202310688498.4A CN202310688498A CN116562593A CN 116562593 A CN116562593 A CN 116562593A CN 202310688498 A CN202310688498 A CN 202310688498A CN 116562593 A CN116562593 A CN 116562593A
Authority
CN
China
Prior art keywords
unit
project
target
item
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310688498.4A
Other languages
Chinese (zh)
Inventor
叶少江
叶志源
陈硕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Jiangyida Technology Co ltd
Original Assignee
Shenzhen Jiangyida Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Jiangyida Technology Co ltd filed Critical Shenzhen Jiangyida Technology Co ltd
Priority to CN202310688498.4A priority Critical patent/CN116562593A/en
Publication of CN116562593A publication Critical patent/CN116562593A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a project dispatching method, a project dispatching device and a storage medium, wherein the method recommends a first work unit for executing the target work project in a quotation list; determining a dispatched project of the target project corresponding to the target project; recommending to execute a second work unit of the target work item based on the work information of the dispatched work item and the relevance between the dispatched work item and the target work item; the method and the system can improve project dispatching efficiency by determining the target work unit in the first work unit and the second work unit and dispatching the target work project to the target work unit.

Description

Project dispatching method, device and storage medium
Technical Field
The present invention relates to the field of data processing, and in particular, to a method, an apparatus, and a storage medium for project dispatch.
Background
Along with the progress and development of society, flexible employment scenes are more and more common, a large number of dispatch platforms are derived based on the flexible employment scenes, the dispatch platforms are usually registered on the dispatch platforms by enterprises through submitting registration materials, corresponding employment demands are issued on the platforms, workers register to become skill staff on the platforms through submitting personal relevant skill information, and after the enterprises issue the employment demands, the skill staff can take work through the dispatch platforms.
Generally speaking, enterprise workers have many special requirements, such as skill level, working experience, etc., and the working party has certain requirements on the type of industry, corresponding compensation, etc. where the enterprise workers can engage in, currently, the issuing of the working task requires that the enterprise workers manually select the corresponding working party on the dispatching platform, however, when the project of the enterprise includes a large number of working projects, the enterprise workers are required to select the working party for executing the project among the large number of working parties, and thus, the efficiency of dispatching the project is low.
Disclosure of Invention
The embodiment of the invention provides a project dispatching method, a device and a storage medium, which can improve the project dispatching efficiency.
The embodiment of the invention provides a project dispatching method, which comprises the following steps:
responding to the price inquiring operation for the target work item, sending the target work item to a dispatching platform, and receiving a project quotation for the target work item returned by a candidate work unit in the dispatching platform;
in response to a query operation for the target work item, displaying a quotation list of the target work item according to the item quotation, and recommending a first work unit for executing the target work item in the quotation list;
Determining a dispatched project of the target project corresponding to the target project;
recommending to execute a second work unit of the target work item based on the work information of the dispatched work item and the relevance between the dispatched work item and the target work item;
determining a target work unit in the first work unit and the second work unit, and assigning the target work item to the target work unit.
The embodiment of the invention also provides a project dispatching device, which comprises:
the sending module is used for responding to the query operation of the target project, sending the target project to a dispatching platform and receiving project quotations of the target project returned by candidate project units in the dispatching platform;
the display module is used for responding to the query operation of the target work item and displaying a quotation list of the target work item according to the item quotation;
a first recommending module, configured to recommend a first work unit for executing the target work item in the bill of price;
the determining module is used for determining the dispatched project of the target project corresponding to the target project;
The second recommendation module is used for recommending a second employment unit for executing the target employment item based on the employment information of the dispatched item and the relevance between the dispatched item and the target employment item;
and the dispatching module is used for determining a target work unit in the first work unit and the second work unit and dispatching the target work item to the target work unit.
The embodiment of the invention also provides a storage medium which stores program codes which, when read and run by a processor, execute the project dispatching method.
The embodiment of the invention provides a project dispatching method, a device and a storage medium, which are used for receiving project quotations for target project returned by candidate project units in a dispatching platform, displaying a quotation list of the target project according to the project quotations, and recommending and executing a first project unit of the target project in the quotation list; meanwhile, a dispatched project of the target project corresponding to the target project is determined, then, based on the project information of the dispatched project and the relevance between the dispatched project and the target project, a second project unit of the target project is recommended to be executed, finally, the target project unit is determined in the first project unit and the second project unit, and the target project is dispatched to the target project unit, so that labor parties for executing the project do not need to be selected from a large number of labor parties, and the project dispatching efficiency is improved.
Additional features and advantages of the invention will be set forth in the description which follows, and in part will be apparent from the description, or may be learned by practice of the embodiments of the invention. The objectives and other advantages of the invention will be realized and attained by the structure particularly pointed out in the written description and claims thereof as well as the appended drawings.
Drawings
Fig. 1 is a block diagram of an electronic device applicable to an embodiment of the present invention;
FIG. 2 is a flowchart of a project dispatching method according to an embodiment of the present invention;
FIG. 3 is a diagram of a display interface of a project dispatch method according to an embodiment of the present invention;
FIG. 4 is a diagram of another display interface of the project dispatch method according to the embodiment of the present invention;
FIG. 5 is a diagram of another interface for displaying the project dispatching method according to the embodiment of the present invention;
fig. 6 is a schematic structural diagram of an item dispatching device according to an embodiment of the present invention.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present invention more apparent, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is apparent that the described embodiments are some embodiments of the present invention, but not all embodiments of the present invention. The components of the embodiments of the present invention generally described and illustrated in the figures herein may be arranged and designed in a wide variety of different configurations. Thus, the following detailed description of the embodiments of the invention, as presented in the figures, is not intended to limit the scope of the invention, as claimed, but is merely representative of selected embodiments of the invention. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
It should be noted that: like reference numerals and letters denote like items in the following figures, and thus once an item is defined in one figure, no further definition or explanation thereof is necessary in the following figures. Meanwhile, in the description of the present invention, the terms "first", "second", and the like are used only to distinguish the description, and are not to be construed as indicating or implying relative importance.
Fig. 1 shows a block diagram of an electronic device 100 that may be used in embodiments of the invention. As shown in fig. 1, electronic device 100 may include a memory 102, a memory controller 104, one or more (only one shown in fig. 1) processors 106, a peripheral interface 108, an input-output module 110, an audio module 112, a display module 114, a radio frequency module 116, and an item dispatcher.
The memory 102, the memory controller 104, the processor 106, the peripheral interface 108, the input/output module 110, the audio module 112, the display module 114, and the radio frequency module 116 are electrically connected directly or indirectly to each other to realize data transmission or interaction. For example, electrical connections may be made between these elements through one or more communication buses or signal buses. The project dispatch method includes at least one software function module, such as a software function module or a computer program, which may be stored in the memory 102 in the form of software or firmware (firmware), respectively.
The memory 102 may store various software programs and modules, such as program instructions/modules corresponding to the project dispatch methods and apparatus provided in the embodiments of the present application. The processor 106 executes software programs and modules stored in the memory 102 to perform various functional applications and data processing, i.e., to implement the project dispatch methods of embodiments of the present application.
The Memory 102 may include, but is not limited to, random access Memory (Random Access Memory, RAM), read Only Memory (ROM), programmable Read Only Memory (Programmable Read-Only Memory, PROM), erasable Read Only Memory (Erasable Programmable Read-Only Memory, EPROM), electrically erasable Read Only Memory (Electric Erasable Programmable Read-Only Memory, EEPROM), and the like.
The processor 106 may be an integrated circuit chip with signal processing capabilities. The processor may be a general-purpose processor, including a central processing unit (Central Processing Unit, CPU for short), a network processor (Network Processor, NP for short), etc.; but also Digital Signal Processors (DSPs), application Specific Integrated Circuits (ASICs), field Programmable Gate Arrays (FPGAs) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components. Which may implement or perform the disclosed methods, steps, and logic blocks in embodiments of the present application. A general purpose processor may be a microprocessor or the processor may be any conventional processor or the like.
The peripheral interface 108 couples various input/output devices to the processor 106 and the memory 102. In some embodiments, the peripheral interface 108, the processor 106, and the memory controller 104 may be implemented in a single chip. In other examples, they may be implemented by separate chips.
The input-output module 110 is used for providing user input data to enable user interaction with the electronic device 100. The input/output module 110 may be, but is not limited to, a mouse, a keyboard, etc.
The audio module 112 provides an audio interface to the user, which may include one or more microphones, one or more speakers, and audio circuitry.
The display module 114 provides an interactive interface (e.g., a user-operated interface) between the electronic device 100 and a user or is used to display image data to a user reference. In this embodiment, the display module 114 may be a liquid crystal display or a touch display. In the case of a touch display, the touch display may be a capacitive touch screen or a resistive touch screen, etc. supporting single-point and multi-point touch operations. Supporting single-point and multi-point touch operations means that the touch display can sense touch operations simultaneously generated from one or more locations on the touch display and communicate the sensed touch operations to the processor 106 for computation and processing.
The rf module 116 is configured to receive and transmit electromagnetic waves, and to implement mutual conversion between the electromagnetic waves and the electrical signals, so as to communicate with a communication network or other devices.
It is to be understood that the configuration shown in fig. 1 is merely illustrative, and that electronic device 100 may also include more or fewer components than shown in fig. 1, or have a different configuration than shown in fig. 1. The components shown in fig. 1 may be implemented in hardware, software, or a combination thereof.
In the embodiment of the present invention, the electronic device 100 may be a PC (personal computer) computer, a tablet computer, a mobile phone, a notebook computer, an intelligent television, a set top box, a vehicle terminal, and the like.
Referring to fig. 2, fig. 2 is a flowchart of an embodiment of a project dispatching method of the present invention. The project dispatching method of the present embodiment may be implemented by using the electronic device, and the project dispatching method of the present embodiment includes:
step S201, responding to price inquiring operation for a target project, sending the target project to a dispatching platform, and receiving project quotations for the target project returned by candidate project units in the dispatching platform;
step S202, responding to inquiry operation for a target project, displaying a quotation list of the target project according to project quotation, and recommending a first work unit for executing the target project in the quotation list;
Step S203, determining a dispatched project of a target project corresponding to the target project;
step S204, recommending a second labor unit for executing the target labor item based on the labor information of the dispatched project and the relevance between the dispatched project and the target labor item;
step S205, determining a target work unit in the first work unit and the second work unit, and assigning the target work item to the target work unit.
The project dispatch method of the present embodiment is described in detail below.
In step S201, the employment units may be individuals, teams composed of a plurality of teams, and/or enterprises, i.e., the target employment units of the final project may be composed of individuals, teams composed of a plurality of teams, and/or enterprises. The target task can be composed of a plurality of recruitment items, after the target task is split, a user can trigger price inquiring operation for the recruitment items, after the user triggers price inquiring operation, the recruitment items can be sent to the recruitment platform so as to be known by the recruitment units of the recruitment platform, after the recruitment units generate corresponding item quotations for the recruitment items, the recruitment units are determined to be candidate recruitment units, item quotations returned by the candidate recruitment units in the recruitment platform and aiming at the recruitment items are received, in addition, the estimated recruitment time length and the recruitment number generated by each candidate recruitment unit aiming at the recruitment items can be received under the returned quotations, and when subsequent adjustment is carried out, the corresponding adjustment is carried out according to the estimated recruitment time length and the recruitment number returned by the recruitment units
The user can fill in the project work platform in the project work contained in the target project, such as the interior decoration project including muddy water technical work project, hydropower technical work project and carpenter technical work project, and for each project work, the user can fill in the project work conditions such as project work time, budget and work type, after filling in the project work conditions, the user can trigger the price inquiring operation by clicking the price inquiring button of the project work, as shown in fig. 3. After clicking the price inquiry button, the user sends the target project to the candidate recruitment unit through the dispatching platform, and receives the project quotation for the target project returned by the candidate recruitment unit in the dispatching platform.
In step S202, after receiving the project offers of the plurality of candidate work units, all the project offers may be integrated to generate an offer list, where one offer corresponds to one candidate work unit, the user may query corresponding offer information by clicking the query control of the work item, and meanwhile, when receiving the query operation of the user for the target work item, the first work unit of the target work item is recommended to be executed in the offer list, for example, the recommended first work unit is marked by highlighting or color marking, and of course, the recommended first work unit may also be marked by text description, which may be specifically set according to practical situations, which is not described herein.
Furthermore, the basis for recommending the first work unit is based on the project period and project budget filled by the user, and the reference amount corresponding to the work project, that is, optionally, in some embodiments, step S202 may specifically include: a first work unit for executing the target work item is recommended in the quotation based on the project budget of the work item, the project period of the work item, and the reference amount of the work item.
The project for use is composed of a plurality of project packages, and execution sequence, execution time and other execution information among each project package are preset, so after the project for use is established, a reference amount can be generated according to the information of the project packages in the project for use, and the reference amount is a reference value of an amount required for executing the project for use, that is, optionally, in some embodiments, the project dispatching method of the invention specifically further comprises:
(11) Acquiring candidate project;
(12) Adding the obtained candidate project into the same project;
(13) And setting the association relation between candidate projects in project engineering.
In this embodiment, the work units of the executable target work item are determined to be the first work units in the plurality of candidate units based on the project budget of the work item, the project period of the work item and the reference amount of the work item, and it is understood that the first work units may be one or more according to the setting of the target work item, and when the first work units are more than one, the display order may be random, or may be displayed according to a preset order, and may be specifically set according to the actual situation.
In step 203, the dispatched project refers to the project assigned with the project unit, if the target project includes the project a, the project b and the project c, the project a and the project b have been assigned with the project unit before the project c queries, and then when the project c queries, the project a and the project b are dispatched projects of the target project corresponding to the project c.
In step 204, the present invention uses the labor information of the dispatched project and the association between the dispatched project and the target labor project to secondarily recommend a second labor unit of the target labor project, which is different from the first labor unit in that: the second unit of employment may not conform to project information set by the target unit of employment, such as cost, work kind, and period of employment, so that the user corrects the set project information based on actual conditions, thereby ensuring rationality of the assigned unit of employment.
Further, the association between the dispatched project and the target project may be an association on the process, for example, the project b must be executed after the project a is executed; the method can also be related to the engineering species, such as engineering project a and engineering project b both need water electricians; it may also be that the association on the work content, such as the work item a and the work item b, needs to lay a line, that is, it may be understood that in this embodiment, the recommendation of the second work unit is performed according to the association between the dispatched work item and the target work item in different dimensions, that is, optionally, in some embodiments, step S203 may specifically include:
(21) Acquiring the relevance of each dispatched project and the target project under a preset dimension;
(22) Determining the dispatched items with relevance meeting preset conditions in each dimension as reference items;
(23) Based on the employment information of the reference project, a second employment unit that executes the target employment project is recommended.
The preset dimension may include a process, a labor category, and labor content, and the preset condition may be that the dispatched project has an association with the target labor project, and then the dispatched project may be determined as a reference project, for example, the target project includes a dispatched project a, a dispatched project b, and a dispatched project c, where the dispatched project a is associated with the target labor project in the process, that is, the target labor project may be executed after a certain process in the dispatched project a is completed; the labor category of the dispatched project b comprises water electricians, and the labor category of the target project also comprises water electricians, namely, the dispatched project b is associated with the target project on the labor category; both the dispatched project c and the target project need to lay lines on the floor, i.e. the dispatched project c is associated with the target project in the project content; it can be known that, under the corresponding dimension, the dispatched item a, the dispatched item b and the dispatched item c are all reference items of the target work item, and then, the work information of the reference item is obtained, which may specifically be a work unit selected by the reference item (i.e. a reference work unit), and then, in combination with the historical data of the reference work units, a second work unit for executing the target work item is recommended, that is, optionally, in some embodiments, the step of recommending, based on the work information of the reference item, to execute the second work unit for the target work item may specifically include:
(31) Extracting a reference labor unit for executing the reference project from the labor information of the reference project;
(32) Acquiring historical labor data of a reference labor unit;
(33) Determining candidate labor units of the target labor item;
(34) Recommending a second work unit for executing the target work item in the determined candidate work units based on the historical work data.
Extracting a reference labor unit for executing a reference item from labor information of the reference item, and then acquiring historical labor data of the reference labor unit, wherein the historical labor data can comprise information such as a type, a historical execution period, an execution labor type and the like of a historical item executed in a historical period, the labor unit and the labor unit for cooperation with the reference labor unit in the historical period, and evaluation information for the cooperative labor unit, wherein the evaluation information is evaluation of the labor unit of an item related to the historical item after the reference labor unit executes the historical item, for example, the historical item h1 and the historical item h2 are executed by a labor unit s, wherein the item related to the historical item h is an item g1, the labor unit s can evaluate the labor unit a1 for executing the item g1 after executing the historical item h, the item associated with the history item h is an item g2, the work unit s may evaluate the work unit a2 of the execution item g2 after the execution of the history item h, for example, the work unit s may evaluate the work unit a1 to be excellent, the work unit a2 may evaluate the work unit as a general, when the determined candidate work unit is the unit g1 and the unit g2, and the reference work unit of the execution reference item is the work unit s extracted from the work information of the reference item, it may determine that the matching degree of the work unit s and the work unit a1 is higher than the matching degree of the work unit s and the work unit a2 based on the history evaluation of the work unit s on the work unit a1 and the work unit a2, whereby the work unit a1 may be recommended as a second work unit of the execution target work item, that is, optionally, in some embodiments, the step "based on the history work data, recommending the second work unit for executing the target work item in the determined candidate work unit may specifically include:
(41 generating a degree of match between the reference labor unit and the determined candidate labor unit based on the historical labor data;
(42) And recommending a second labor unit for executing the target labor item in the determined candidate labor units based on the matching degree.
It should be noted that, the matching degree between the reference labor unit and the determined candidate labor unit may be determined not only based on the historical evaluation of the reference labor unit on the candidate labor unit, but also whether the historical item is completed on schedule after the reference labor unit cooperates with the candidate labor unit, for example, if the historical item is completed on schedule after the reference labor unit cooperates with the candidate labor unit, the matching degree between the reference labor unit and the candidate labor unit is generated as a; if the history item is not completed on time after the cooperation of the reference labor unit and the candidate labor unit, generating the matching degree between the cooperation of the reference labor unit and the candidate labor unit, and if the period exceeds 3 days, generating the matching degree between the cooperation of the reference labor unit and the candidate labor unit as B, wherein A is larger than B, and the specific numerical value is set according to the actual situation. Of course, the corresponding matching degree may also be generated based on whether the reference labor unit and the determined candidate labor unit belong to the same company.
The matching degree between the reference labor unit and the determined candidate labor unit may be generated based on the information of the dimensions, that is, the matching degree between the reference labor unit and the determined candidate labor unit may be generated based on the history evaluation of the reference labor unit on the candidate labor unit, whether the history item is completed on schedule after the reference labor unit cooperates with the candidate labor unit, and whether the reference labor unit and the determined candidate labor unit belong to the same company.
For example, specifically, after determining a candidate unit of employment, taking a candidate unit of employment as an example, first, whether the candidate unit of employment and a reference unit of employment have executed different projects in the same project in a history period of time may be detected, if the candidate unit of employment and the reference unit of employment have not executed different projects in the same project in the history period of time, whether the reference unit of employment and the determined candidate unit of employment belong to the same company may be judged, if the reference unit of employment and the candidate unit of employment do not belong to the same company, a first preset value may be generated, and the first preset value may be 0 or 10%, and may be specifically set according to the actual situation.
If the candidate labor unit and the reference labor unit execute different labor items in the same project in the history period, detecting whether the candidate labor unit and the reference labor unit execute different labor items in the same project in the history period, if so, acquiring the history evaluation of the reference labor unit on the candidate labor unit, and simultaneously determining whether the reference labor unit and the candidate labor unit finish the history item on time after cooperation, and whether the reference labor unit and the determined candidate labor unit belong to the same company, if the history evaluation of the reference labor unit on time after cooperation of the reference labor unit and the candidate labor unit is excellent, and the reference labor unit and the determined candidate labor unit belong to the same company, generating a matching degree between the reference labor unit and the candidate labor unit as a second preset value, wherein the second preset value can be 100% or 90%, and the matching degree can be specifically set according to practical conditions. In addition, when the candidate labor unit and the reference labor unit are associated with different labor projects in the same project in the history period, the history evaluation of the reference labor unit on the candidate labor unit is general, the reference labor unit and the candidate labor unit are cooperated to finish the history projects on schedule, and the reference labor unit and the determined candidate labor unit belong to the same company, and the matching degree between the reference labor unit and the candidate labor unit can be generated to be a third preset value; for example, when the candidate work unit and the reference work unit are associated with different work items in the same project in the history period, the reference work unit may have excellent history evaluation on the candidate work unit, the reference work unit and the candidate work unit cooperate to complete the history item on schedule, and the reference work unit and the determined candidate work unit belong to the same company, or the matching degree between the reference work unit and the candidate work unit may be generated to be a third preset value. It can be understood that, in this embodiment, the value of the third preset value is determined based on the weights corresponding to the information of different dimensions, for example, the weight corresponding to the evaluation dimension is 0.4, the weight corresponding to the construction period dimension is 0.4, the weight corresponding to the dimension of the company is 0.2, in this case, the company has smaller matching degree between the reference work unit and the candidate work unit, and focuses more on the historical evaluation of the reference work unit on the candidate work unit and the information of whether the two dimensions are out of date; for example, the weight corresponding to the evaluation dimension is 0.8, the weight corresponding to the construction period dimension is 0.1, and the weight corresponding to the company dimension is 0.1, in this case, the historical evaluation of the reference labor unit on the candidate labor unit is focused more, the matching degree of the information of the other two dimensions on the reference labor unit and the candidate labor unit is smaller, and specific weight setting can be set according to the actual situation and will not be described herein. And finally, recommending the candidate labor unit with the highest matching degree or the matching degree higher than the preset matching degree as a second labor unit in the candidate labor units.
For example, the reference items include a reference item a, a reference item b, and a reference item c, each of which is associated with the target work item, wherein the association between the reference item b and the target work item is a strong association, the association between the reference item a and the target work item is a medium association, the association between the reference item c and the target work item is a weak association, the candidate work unit includes a unit h1, a unit h2, and a unit h3, the matching degree between the reference work unit a1 and the unit h1 corresponding to the reference item a is 80%, the matching degree between the reference work unit b1 and the unit h2 corresponding to the reference item b is 60%, and the matching degree between the reference work unit c1 and the unit h3 corresponding to the reference item c is 60%, and in some embodiments, the unit h1 may be determined as a second work unit, that is, the unit with the highest recommended matching degree is the second work unit; in some embodiments, units having a matching degree of greater than 50% may be recommended as the second work unit, i.e., the units h1, h2, and h3 are determined as the second work unit, and ranked based on the magnitude of the matching degree.
In addition, for the same candidate labor unit, there may be a plurality of reference units having corresponding matching degrees, for example, for the candidate labor unit h, the matching degree with the reference unit s1 is 80%, the matching degree with the reference unit s2 is 60%, and the matching degree with the reference unit s3 is 30%, if the reference unit s1 corresponds to the reference item c1, the reference unit s2 corresponds to the reference item c2, and the reference unit s3 corresponds to the reference item c3, the matching degree between the target labor item and the reference item is obtained, the matching degree corresponding to the reference unit corresponding to the reference item with the highest matching degree is selected and determined as the target matching degree, for example, the matching degree between the reference item c1 and the target labor item is a strong correlation, the matching degree between the reference item c2 and the target labor item is a strong correlation and a medium correlation, and the matching degree between the reference item c3 and the target labor item is a weak correlation, i.e., 80% may be determined as the matching degree between the candidate labor unit h and the reference unit s 1; if the association between the reference item c1 and the target work item is a weak association, the association between the reference item c2 and the target work item is a strong association and a medium association, and the association between the reference item c3 and the target work item is a strong association, it may be determined that the target matching degree is the matching degree of the candidate work unit h and the reference unit s3, that is, 30%.
It can be understood that, for the dimension of the same project, the reference projects related to the target project are determined in the same project based on the relevance between different projects, the reference projects are ordered according to the relevance strength of the reference projects, then the corresponding project units are extracted from the project information of each reference project, then the matching degree between the extracted project units and the target project is detected, the extracted project units are ordered based on the strength of the matching degree, and then the ordered project units (namely, the second project units) are displayed.
It should be noted that, the second unit of labor may not be the reference unit of labor, and the second unit of labor may be a unit of labor strongly related to the reference unit of labor, for example, according to the historical unit of labor of the reference unit of labor, a candidate unit of labor having a collaboration number greater than a preset number of times is determined, and when a type of historical item corresponding to a historical item executed by the candidate unit of labor in a historical period matches with a type of item of the target item, the candidate unit of labor is recommended as the second unit of labor for executing the target item.
For another example, an evaluation of the unit of employment for cooperation is extracted from historical unit of employment data of a reference unit of employment, and the unit of employment for which the evaluation satisfies a preset condition is determined as a candidate unit of employment, wherein the preset condition may be: the qualification rate is greater than a preset value, and of course, the qualification rate can also be set as other preset conditions, and can be specifically set according to actual conditions, after determining the candidate employment unit, whether the type of the history item corresponding to the history item executed by the candidate employment unit in the history period is matched with the item type of the target employment item is also required to be judged, and if so, the candidate employment unit is recommended to be a second employment unit for executing the target employment item. In this embodiment, the labor unit may evaluate the labor unit of the preceding item associated with the current item when executing the current item, and then, the labor unit and the labor unit are matched, and the evaluation information may be one of the matching degree considerations.
In actual operation, the reference items corresponding to the target work items often have a plurality of reference items, and different reference items and the target work items can be associated in different dimensions, namely, the reference items are associated with the target work items in the dimension A, the reference items are not associated with the target work items in the dimension B, in addition, the number of reference work units corresponding to different reference items is different, the number of reference work units corresponding to certain reference items is 1, and the number of reference work units corresponding to certain reference items is a plurality of reference work units, so, in order to facilitate the selection of the subsequent user in the recommended second work units, the invention can specifically include the following steps of recommending the corresponding second work units in the corresponding specific recommended columns according to different requirements of the user, so that the subsequent user can select the second work units based on the association and the matching degree, and specifically includes:
(51) Displaying a specific recommendation bar in each dimension;
(52) Ranking the reference items with relevance in each dimension, and ranking the reference labor units of the reference items based on the matching degree;
(53) And displaying a second recruitment unit recommending the execution target recruitment item in the specific recommendation column.
The second work units after sorting are displayed in the specific recommendation column, and the sorting basis is that the work units are sequentially arranged in the order of high item association degree and high matching degree under the corresponding dimension, for example, the matching degree of a reference item a, a reference item b and a reference item c under the same dimension is 50%, the matching degree of a reference unit c2 of the reference item c and the target work item is 10%, the matching degree of a reference work unit a1 of the reference item a and the target work item is 100%, the matching degree of a reference work unit a2 of the reference item a and the target work item is 60%, the matching degree of a reference work unit b1 of the reference item b and the target work item is 60%, the matching degree of a reference work unit b2 of the reference item b and the target work item is 30%, the matching degree of a reference unit c1 of the reference item c and the target work item is 50%, the matching degree of the reference item c2 of the reference item c and the target work item is 10%, and the displaying order of the second unit in the specific recommendation column is the reference work unit a 1-a-2-1-b-2-1-2 work units.
In addition, in some embodiments, a candidate work unit may be displayed in a specific display column, where the candidate work unit is determined according to the history data, and when displaying the candidate work unit, the display basis is that the matching degree of the candidate work unit n1 corresponding to the reference work unit a1 and the target work item is 60%, the matching degree of the reference work unit b2 corresponding to the reference work unit b is 30%, the matching degree of the reference work unit c2 corresponding to the reference work item c is 50%, and the matching degree of the reference work unit c2 corresponding to the reference work unit c is 10%, where the matching degree of the reference work unit a1 and the reference work unit a2 corresponding to the target work item is 30%, and the matching degree of the reference work unit b2 corresponding to the reference work unit b1 corresponding to the reference work item b is determined according to the history data, and the matching degree of the reference work unit b1 corresponding to the reference work item b is 60%, the matching degree of the reference work unit b2 corresponding to the reference work item b2 corresponding to the target work item b is 30%, and the matching degree of the reference work unit c2 corresponding to the reference work item b is 50%, and the reference work unit c2 corresponding to the reference work unit c is 10%, and the reference work unit b is displayed in the specific display column in the first dimension.
Even if the matching degree between the reference work unit a1 and the reference work unit a2 of the reference item a and the target work item is 0%, that is, the matching degree between the candidate work unit corresponding to the reference work unit a1 of the reference item a and the target work item is not matched, when the matching degree between the candidate work unit corresponding to the reference work unit a2 of the reference item a and the target work item is greater than the preset matching degree, or when the matching degree between the candidate work unit corresponding to the reference work unit a2 of the reference item a and the target work item is greater than the preset matching degree, the candidate work unit is displayed in the specific recommendation column, and the reference work unit a1 and the reference work unit a2 are not displayed.
In addition, in multiple dimensions, the second unit of the target work can be displayed through the dimension buttons, so that a user can know that the second unit of the target work is executed in the dimension concerned by the user, for example, please refer to fig. 5, in the display interface shown in fig. 5, the second unit of the target work is recommended to be executed in the dimension of the work, wherein the display interface comprises three dimensions of the work procedure, the work content and the work category, which correspond to the button t1, the button t2 and the button t3 respectively, and when the user clicks the button t1, the specific recommendation column displays the second unit of the target work; when a user clicks a button t2, the specific recommendation column displays a second recruitment unit for recommending and executing a target recruitment item in the recruitment content dimension; when the user clicks the button t3, the specific recommendation column displays a second unit of work for recommending and executing the target work item in the dimension of the work category.
Optionally, in some embodiments, the project dispatching method of the present invention specifically may further include: and receiving feedback information returned by the candidate employment units according to the employment requirements of the target employment project.
The feedback information includes determination information, adjustment information and refusal information, for example, a worker unit can complete a target worker project according to a worker requirement, and then the confirmation information can be fed back; the employment units cannot finish the target employment projects according to the employment demands, corresponding adjustment information such as adjustment operation time, adjustment cost or increase of employment varieties can be returned, and enterprises can adjust the employment demands of the target employment projects according to the adjustment information after receiving the adjustment information, so that the target employment projects can be conveniently allocated to the corresponding employment units. After adjustment, when the enterprise triggers the price inquiring operation of the target project again, the labor unit determines that the adjusted labor requirement can be met, and then confirmation information can be fed back; of course, after receiving the adjustment information, the enterprise may not adjust the labor requirement, and the adjustment information is specific to the actual situation. When the employment unit cannot complete the target employment project according to the employment requirement, the employment unit can return corresponding refusal information, the refusal information can comprise reasons such as working time, expense or unmatched employment varieties, and the like, and likewise, the enterprise can adjust the employment requirement of the target employment project according to the refusal information, can not adjust the employment requirement of the target employment project, and is specific to the actual situation.
Further, after the enterprise adjusts the work demands of the target work items according to the adjustment information and/or the refusal information, the adjusted target work items are sent to the dispatching platform to perform new polling price in response to the polling operation of the adjusted target work items. In this process, a first job entity may appear that recommends that the first poll not appear. For example, specifically, in the first price query, the recommended first work unit includes a unit a1, a unit a2 and a unit a3, and at the same time, the adjustment information fed back by the unit a4 and the refusal information fed back by the unit a5 are received, where the adjustment information of the unit a4 indicates: the operation cannot be performed in the t1 period, and if the time is changed to be in the t2 period, the operation can be performed; the rejection information of unit a5 indicates: the unit a5 does not execute the work species of the work item; the enterprise can modify the labor time of the target labor project from the period t1 to the period t2, and can also increase the labor cost by 30%; when the enterprise modifies the labor time of the target labor item from the period t1 to the period t2, and when the target labor item is subjected to second price inquiry, the first labor unit comprises a unit a4; when the enterprise increases the labor cost of the target labor project by 30%, and the second price inquiry is carried out on the target labor project, the first labor unit comprises a unit a5; when the labor time of the target labor item is changed from the period t1 to the period t2 and the labor cost of the target labor item is increased by 30%, the first labor unit comprises a unit a4 and a unit a5.
In step 205, in the display interface, a list of the first work units and a list of the second work units may be displayed, the user may select a target work unit according to his own requirement, and after determining the target work unit, assign the target work item to the target work unit, and meanwhile, mark the status of the target work item as assigned work, and when assigning a subsequent work item, may perform work assignment according to the work information of the target work item.
Thus, the project dispatch process of the present embodiment is completed.
The embodiment of the invention provides a project dispatching method, which is used for responding to the inquiring operation of a target project, sending the target project to a dispatching platform, receiving project quotations of the target project returned by candidate project units in the dispatching platform, responding to the inquiring operation of the target project, displaying a quotation list of the target project according to the project quotations, recommending a first project unit for executing the target project in the quotation list, simultaneously determining the dispatched project of the target project corresponding to the target project, recommending a second project unit for executing the target project based on the project information of the dispatched project and the relevance between the dispatched project and the target project, and finally determining the target project unit in the first project unit and the second project unit, and dispatching the target project to the target project unit.
The present invention also provides an item dispatching device, please refer to fig. 6, fig. 6 is a schematic structural diagram of an embodiment of the item dispatching device of the present invention, and the item dispatching device of the present invention can be implemented by using the above-mentioned item dispatching method. The project dispatching device 30 of the present embodiment includes a sending module 301, a display module 302, a first recommending module 303, a determining module 304, a second recommending module 305, and a dispatching module 306, which are specifically as follows:
the sending module 301 is configured to send the target project to the dispatch platform in response to the query operation for the target project, and receive a project bid for the target project returned by the candidate work units in the dispatch platform.
A display module 302 for displaying a bid list of the target work item according to the item bid in response to a query operation for the target work item.
The first recommending module 303 is configured to recommend a first work unit for executing the target work item in the bill of price.
The determining module 304 is configured to determine a dispatched project of the target project corresponding to the target project.
The second recommending module 305 is configured to recommend a second unit of labor for executing the target project based on the labor information of the dispatched project and the association between the dispatched project and the target project.
The dispatch module 306 is configured to determine a target work unit from the first work unit and the second work unit, and dispatch the target work item to the target work unit.
Optionally, in some embodiments, the first recommendation module 303 may specifically be configured to: a first work unit for executing the target work item is recommended in the quotation based on the project budget of the work item, the project period of the work item, and the reference amount of the work item.
Optionally, in some embodiments, the second recommendation module 305 may specifically include:
the acquisition sub-module is used for acquiring the relevance of each dispatched project and the target project under the preset dimension;
the determining submodule is used for determining that the dispatched items with the relevance meeting the preset condition under each dimension are reference items;
and the recommending sub-module is used for recommending a second recruitment unit for executing the target recruitment item based on the recruitment information of the reference item.
Optionally, in some embodiments, the recommendation submodule may specifically include:
an execution unit for extracting a reference labor unit for executing the reference project from the labor information of the reference project;
the acquisition unit is used for acquiring historical labor data of the reference labor unit;
The determining unit is used for determining candidate employment units of the target employment project;
and the recommending unit is used for recommending a second recruitment for executing the target recruitment in the determined candidate recruitment based on the historical recruitment data.
Optionally, in some embodiments, the recommendation unit may specifically include:
the generation subunit is used for generating matching degree between the reference labor unit and the determined candidate labor unit based on the historical labor data;
and the recommending subunit is used for recommending a second recruitment for executing the target recruitment in the determined candidate recruitment based on the matching degree.
Optionally, in some embodiments, the recommendation subunit may be specifically configured to: displaying a specific recommendation bar in each dimension; ranking the reference items with relevance in each dimension, and ranking the reference labor units of the reference items based on the matching degree; and displaying a second recruitment unit recommending the execution target recruitment item in the specific recommendation column.
The specific working principle of the project dispatching method of the present embodiment is the same as or similar to that described in the embodiments of the project dispatching method, and please refer to the detailed description in the embodiments of the project dispatching method.
The embodiment of the invention provides a project dispatching method, which is characterized in that a project dispatching device responds to inquiry operation of a target project, sends the target project to a dispatching platform, receives project quotations of the target project returned by candidate project units in the dispatching platform, responds to inquiry operation of the target project, displays a quotation list of the target project according to the project quotations, recommends execution of a first project unit of the target project in the quotation list, simultaneously determines the dispatched project of the target project corresponding to the target project, recommends execution of a second project unit of the target project based on the project information of the dispatched project and the relevance between the dispatched project and the target project, and finally determines the target project unit in the first project unit and the second project unit and dispatches the target project to the target project unit.
The above modules may be implemented by software codes, and in this case, the above modules may be stored in the memory 102. The above units may equally be implemented by hardware, e.g. an integrated circuit chip.
The project-based assignment tool 30 according to the embodiment of the present invention has the same implementation principle and technical effects as those of the foregoing method embodiment, and for brevity, reference may be made to the corresponding content in the foregoing method embodiment where the apparatus embodiment portion is not mentioned.
The present invention provides a storage medium storing program code which, when read and executed by a processor, performs the above-described method.
In the several embodiments provided in the present invention, it should be understood that the disclosed apparatus and method may be implemented in other manners. The apparatus embodiments described above are merely illustrative, for example, of the flowcharts and block diagrams in the figures that illustrate the architecture, functionality, and operation of possible implementations of apparatus, methods and computer program products according to various embodiments of the present invention. In this regard, each block in the flowchart or block diagrams may represent a module, segment, or portion of code, which comprises one or more executable instructions for implementing the specified logical function(s). It should also be noted that in some alternative implementations, the functions noted in the block may occur out of the order noted in the figures. For example, two blocks shown in succession may, in fact, be executed substantially concurrently, or the blocks may sometimes be executed in the reverse order, depending upon the functionality involved. It will also be noted that each block of the block diagrams and/or flowchart illustration, and combinations of blocks in the block diagrams and/or flowchart illustration, can be implemented by special purpose hardware-based systems which perform the specified functions or acts, or combinations of special purpose hardware and computer instructions.
In addition, functional modules in the embodiments of the present invention may be integrated together to form a single part, or each module may exist alone, or two or more modules may be integrated to form a single part.
The functions, if implemented in the form of software functional modules and sold or used as a stand-alone product, may be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention may be embodied essentially or in a part contributing to the prior art or in a part of the technical solution, in the form of a software product stored in a storage medium, comprising several instructions for causing a computer device (which may be a personal computer, a server, a network device, etc.) to perform all or part of the steps of the method according to the embodiments of the present invention. And the aforementioned storage medium includes: a U-disk, a removable hard disk, a Read-Only Memory (ROM), a random access Memory (RAM, random Access Memory), a magnetic disk, or an optical disk, or other various media capable of storing program codes. It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one … …" does not exclude the presence of other like elements in a process, method, article, or apparatus that comprises the element.
The above description is only of the preferred embodiments of the present invention and is not intended to limit the present invention, but various modifications and variations can be made to the present invention by those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
The foregoing is merely illustrative of the present invention, and the present invention is not limited thereto, and any person skilled in the art will readily recognize that variations or substitutions are within the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (10)

1. A method of dispatch of an item, comprising:
responding to the price inquiring operation for the target work item, sending the target work item to a dispatching platform, and receiving a project quotation for the target work item returned by a candidate work unit in the dispatching platform;
in response to a query operation for the target work item, displaying a quotation list of the target work item according to the item quotation, and recommending a first work unit for executing the target work item in the quotation list;
Determining a dispatched project of the target project corresponding to the target project;
recommending to execute a second work unit of the target work item based on the work information of the dispatched work item and the relevance between the dispatched work item and the target work item;
determining a target work unit in the first work unit and the second work unit, and assigning the target work item to the target work unit.
2. The method of claim 1, wherein recommending execution of a second unit of labor for the target labor item based on the labor information for the dispatched item and the association between the dispatched item and the target labor item comprises:
acquiring the relevance of each dispatched project and the target project under a preset dimension;
determining the dispatched items with relevance meeting preset conditions in each dimension as reference items;
and recommending a second labor unit for executing the target labor item based on the labor information of the reference item.
3. The method of claim 2, wherein recommending a second employment unit to perform the target employment based on the employment information of the reference item comprises:
Extracting a reference labor unit for executing the reference project from the labor information of the reference project;
acquiring historical labor data of the reference labor unit;
determining candidate labor units of the target labor item;
recommending a second work unit for executing the target work item in the determined candidate work units based on the historical work data.
4. The method of claim 3, wherein recommending, based on the historical employment data, a second employment unit to perform the target employment in the determined candidate employment unit comprises:
generating a matching degree between the reference labor unit and the determined candidate labor unit based on the historical labor data;
and recommending a second labor unit for executing the target labor item in the determined candidate labor units based on the matching degree.
5. The method of claim 4, wherein recommending, based on the matching degree, a second employment unit to perform the target employment item among the determined candidate employment units, comprises:
displaying a specific recommendation bar in each dimension;
ordering the reference items with relevance in each dimension, and;
Sorting the reference labor units of the reference items based on the matching degree;
and displaying a second unit of labor recommending to execute the target unit of labor in the specific recommendation column.
6. The method according to any one of claims 1 to 5, further comprising:
and receiving feedback information returned by the candidate employment units according to the employment requirements of the target employment project.
7. The method according to any one of claims 1 to 5, further comprising:
acquiring candidate project;
adding the obtained candidate project into the same project;
and setting the association relation between candidate projects in the project engineering.
8. The method of any one of claims 1 to 5, wherein recommending in the manifest a first work unit for performing the target work item comprises:
recommending a first work unit for executing the target work item in the quotation list based on the project budget of the work item, the project period of the work item and the reference amount of the work item.
9. An item dispatch device, comprising:
the sending module is used for responding to the query operation of the target project, sending the target project to a dispatching platform and receiving project quotations of the target project returned by candidate project units in the dispatching platform;
The display module is used for responding to the query operation of the target work item and displaying a quotation list of the target work item according to the item quotation;
a first recommending module, configured to recommend a first work unit for executing the target work item in the bill of price;
the determining module is used for determining the dispatched project of the target project corresponding to the target project;
the second recommendation module is used for recommending a second employment unit for executing the target employment item based on the employment information of the dispatched item and the relevance between the dispatched item and the target employment item;
and the dispatching module is used for determining a target work unit in the first work unit and the second work unit and dispatching the target work item to the target work unit.
10. A storage medium storing program code which, when read and executed by a processor, performs the method of dispatch of items according to any one of claims 1 to 8.
CN202310688498.4A 2023-06-09 2023-06-09 Project dispatching method, device and storage medium Pending CN116562593A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310688498.4A CN116562593A (en) 2023-06-09 2023-06-09 Project dispatching method, device and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310688498.4A CN116562593A (en) 2023-06-09 2023-06-09 Project dispatching method, device and storage medium

Publications (1)

Publication Number Publication Date
CN116562593A true CN116562593A (en) 2023-08-08

Family

ID=87493059

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310688498.4A Pending CN116562593A (en) 2023-06-09 2023-06-09 Project dispatching method, device and storage medium

Country Status (1)

Country Link
CN (1) CN116562593A (en)

Similar Documents

Publication Publication Date Title
CN110223141B (en) Matching method, matching device, computer equipment and storage medium
CN110489481B (en) Data analysis method and device for industry data and data analysis server
US20140122299A1 (en) System and method for facilitating selection of real estate agents
CN112085597A (en) Loan processing method and system
JP2018014029A (en) Recommendation device and program
KR20170142671A (en) Method of and system for on-line construction management based on cloud
CN109146422B (en) Project package generation method and device and storage medium
CN109934631B (en) Question and answer information processing method and device and computer equipment
WO2019055238A1 (en) Search result-based listing generation in a single view
CN104616218A (en) Ordering system and ordering method capable of referring to menu of nearby table
CN116562593A (en) Project dispatching method, device and storage medium
CN109522334B (en) Lack material inquiring party, lack material inquiring system and electronic equipment
CA2907332A1 (en) System and method for simultaneously controlling the elements of parts and labor costs in a facilities management computing environment
US20120035982A1 (en) System For Providing Retail Store Information
CN112446658A (en) Method and device for shunting and shelving storage articles
JP6051425B2 (en) Expert introduction device, method, and computer program based on past estimate
CN113535101B (en) Print file generation method and device, storage medium and electronic equipment
JP5153925B2 (en) Bid object recommendation device, system and method
CN110659919A (en) Data matching method, device, medium and electronic equipment
JP6338758B1 (en) Distribution system, distribution method and program
US20200134710A1 (en) Computer System for Creating Apples to Apples Comparision of Multiple Bids
CN112308262A (en) Service management method and device
CN113469636A (en) Member management system and method for different industry cooperation platform
CN111351556A (en) Electronic weighing information processing method, device and system
CN107168547B (en) Method and device for inputting command

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination