CN116445864A - System and method for monitoring and regulating uniformity of coating - Google Patents
System and method for monitoring and regulating uniformity of coating Download PDFInfo
- Publication number
- CN116445864A CN116445864A CN202310498962.3A CN202310498962A CN116445864A CN 116445864 A CN116445864 A CN 116445864A CN 202310498962 A CN202310498962 A CN 202310498962A CN 116445864 A CN116445864 A CN 116445864A
- Authority
- CN
- China
- Prior art keywords
- evaporation system
- surface resistance
- base film
- temperature value
- value
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000576 coating method Methods 0.000 title claims abstract description 121
- 239000011248 coating agent Substances 0.000 title claims abstract description 118
- 238000000034 method Methods 0.000 title claims abstract description 52
- 238000012544 monitoring process Methods 0.000 title claims abstract description 26
- 230000001105 regulatory effect Effects 0.000 title abstract description 10
- 238000001704 evaporation Methods 0.000 claims abstract description 477
- 230000008020 evaporation Effects 0.000 claims abstract description 430
- 238000010438 heat treatment Methods 0.000 claims abstract description 103
- 230000005540 biological transmission Effects 0.000 claims abstract description 91
- 230000007246 mechanism Effects 0.000 claims abstract description 91
- 238000012360 testing method Methods 0.000 claims abstract description 39
- 238000007747 plating Methods 0.000 claims abstract description 33
- 239000007888 film coating Substances 0.000 claims abstract description 27
- 238000009501 film coating Methods 0.000 claims abstract description 27
- 238000004804 winding Methods 0.000 claims abstract description 9
- 230000001133 acceleration Effects 0.000 claims description 18
- 238000011144 upstream manufacturing Methods 0.000 claims description 7
- 238000009529 body temperature measurement Methods 0.000 claims description 3
- 238000012546 transfer Methods 0.000 claims 2
- 230000001276 controlling effect Effects 0.000 abstract description 48
- 239000000463 material Substances 0.000 description 49
- 230000008569 process Effects 0.000 description 17
- 238000005485 electric heating Methods 0.000 description 12
- 230000033228 biological regulation Effects 0.000 description 8
- 239000000758 substrate Substances 0.000 description 7
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 6
- 229910002804 graphite Inorganic materials 0.000 description 6
- 239000010439 graphite Substances 0.000 description 6
- 239000010410 layer Substances 0.000 description 6
- 238000001816 cooling Methods 0.000 description 4
- 239000011247 coating layer Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 239000007788 liquid Substances 0.000 description 3
- 238000005259 measurement Methods 0.000 description 3
- 238000005086 pumping Methods 0.000 description 3
- 238000004088 simulation Methods 0.000 description 3
- 238000002207 thermal evaporation Methods 0.000 description 3
- 238000001771 vacuum deposition Methods 0.000 description 3
- 239000002699 waste material Substances 0.000 description 3
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 description 2
- 229910052782 aluminium Inorganic materials 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000004422 calculation algorithm Methods 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 229910052802 copper Inorganic materials 0.000 description 2
- 239000010949 copper Substances 0.000 description 2
- 230000007797 corrosion Effects 0.000 description 2
- 238000005260 corrosion Methods 0.000 description 2
- 238000000151 deposition Methods 0.000 description 2
- 230000008021 deposition Effects 0.000 description 2
- 239000011810 insulating material Substances 0.000 description 2
- 239000012774 insulation material Substances 0.000 description 2
- 238000003908 quality control method Methods 0.000 description 2
- 239000007787 solid Substances 0.000 description 2
- 238000004544 sputter deposition Methods 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005137 deposition process Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 230000006698 induction Effects 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000001755 magnetron sputter deposition Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000008018 melting Effects 0.000 description 1
- 238000002844 melting Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 229920006280 packaging film Polymers 0.000 description 1
- 239000012785 packaging film Substances 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 238000004886 process control Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 229920006395 saturated elastomer Polymers 0.000 description 1
- 230000008016 vaporization Effects 0.000 description 1
- 239000002918 waste heat Substances 0.000 description 1
Classifications
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23C—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
- C23C14/00—Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material
- C23C14/22—Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material characterised by the process of coating
- C23C14/24—Vacuum evaporation
- C23C14/26—Vacuum evaporation by resistance or inductive heating of the source
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23C—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
- C23C14/00—Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material
- C23C14/22—Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material characterised by the process of coating
- C23C14/54—Controlling or regulating the coating process
- C23C14/542—Controlling the film thickness or evaporation rate
- C23C14/543—Controlling the film thickness or evaporation rate using measurement on the vapor source
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23C—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
- C23C14/00—Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material
- C23C14/22—Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material characterised by the process of coating
- C23C14/54—Controlling or regulating the coating process
- C23C14/542—Controlling the film thickness or evaporation rate
- C23C14/545—Controlling the film thickness or evaporation rate using measurement on deposited material
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23C—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
- C23C14/00—Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material
- C23C14/22—Coating by vacuum evaporation, by sputtering or by ion implantation of the coating forming material characterised by the process of coating
- C23C14/56—Apparatus specially adapted for continuous coating; Arrangements for maintaining the vacuum, e.g. vacuum locks
- C23C14/562—Apparatus specially adapted for continuous coating; Arrangements for maintaining the vacuum, e.g. vacuum locks for coating elongated substrates
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/10—Energy storage using batteries
Landscapes
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Mechanical Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Physical Vapour Deposition (AREA)
Abstract
The embodiment of the invention provides a system and a method for monitoring and regulating uniformity of a coating, wherein the system comprises the following components: the vacuum winding film plating device comprises an unreeling mechanism, an evaporating mechanism and a reeling mechanism, wherein the evaporating mechanism and the reeling mechanism are used for evaporating a base film; a temperature measuring device for measuring a temperature value of the evaporation mechanism; the surface resistance testing device is used for measuring the surface resistance value of the base film; and the control device is used for controlling the base film transmission speed of the unreeling mechanism and/or the heating power of the evaporating mechanism according to the temperature value of the evaporating mechanism and the surface resistance value of the base film so as to ensure that the thickness of the coating along the moving direction of the base film is uniform. The invention can realize more uniform thickness uniformity of the film coating in the film running direction based on the matching of temperature control and film coating speed.
Description
Technical Field
The invention relates to a film layer uniformity monitoring and controlling system in a vacuum winding film coating process, in particular to a film uniformity monitoring and controlling system and method for verifying the MD direction (film moving direction) of a film transmission direction.
Background
In the field of vacuum coating, in particular to a large-area flexible substrate surface coating equipment system, wherein the coating mode comprises vacuum magnetron sputtering coating and vacuum thermal evaporation system coating. The vacuum thermal evaporation system is generally divided into two aspects, namely, the vacuum thermal evaporation system adopts an evaporation boat to perform film coating, for example, the film coating in the field of packaging films is most common, namely, related wire feeding mechanisms are used for continuously conveying film coating materials to the surface of the evaporation boat in a high-temperature state, when the materials are contacted or nearly contacted with the surface of the evaporation boat, the materials are instantaneously gasified and deposited on the surface of a base film under the condition that the materials are far higher than the melting temperature of the materials, the temperature rising and the temperature lowering processes of the related mechanisms are very fast, but the fatal problem is that serious corrosion pits appear on the surface along with the prolonging of the service time of the evaporation boat, sputtering phenomena are easy to form in the evaporation process after the evaporated materials are placed near the corrosion pits, so that the burning of the flexible base film is caused, and the use of the film coating materials is restrained.
Based on the above problems, another technical means is developed, in which the material to be evaporated is first placed in a high temperature resistant container, the container is located inside an electric heating device and a thermal insulation/temperature measurement system, and when the electric heating device is turned on, the temperature of the high temperature resistant container increases, so that the material to be evaporated in the container is converted from a solid state, a liquid state and a gaseous state, and finally the material is deposited on the surface of the substrate. The method has the remarkable advantages that the state of the material in the evaporation process is relatively stable, and the problem that the related evaporated material generates sputtering and hole burning is not easy to occur, so that the application defect of a film coating product is avoided more remarkably.
However, there are some disadvantages to this method, such as the system heats the container by electric heating and heat conduction, and the container heats the evaporated material again, so as to achieve the effect of vaporizing the evaporated material. The heating process of the whole system is relatively slow, the time for the temperature of the evaporated material in the container and the container/thermal insulation material to reach a relatively stable balance is longer, especially the evaporation amount of the evaporated material along with the temperature rise in the process is larger, and the evaporation amount in the process is unstable, and in an unstable evaporation state, a large amount of the evaporated material is wasted by evaporation, especially the evaporated material is wasted by evaporating onto a coating baffle, which greatly reduces the number of meters and the like of an actual coating which can be coated and is loaded with a certain amount of the evaporated material.
On the other hand, since the electric heating element of the heater also changes its own heat output as the temperature of the hot environment increases, the film thickness uniformity in the MD direction is poor because the evaporation amount in the initial state is unstable, and thus the film is coated at a certain speed by directly opening the shutter.
Disclosure of Invention
Accordingly, an objective of the embodiments of the present invention is to provide a system and a method for monitoring and controlling uniformity of a plating film, so as to solve the problems in the prior art.
In a first aspect, an embodiment of the present invention provides a system for monitoring and controlling uniformity of a plating film, the system including:
the vacuum winding film plating device comprises an unreeling mechanism, an evaporating mechanism and a reeling mechanism, wherein the evaporating mechanism and the reeling mechanism are used for evaporating a base film;
a temperature measuring device for measuring a temperature value of the evaporation mechanism;
the surface resistance testing device is used for measuring the surface resistance value of the base film;
and the control device is used for controlling the base film transmission speed of the unreeling mechanism and/or the heating power of the evaporating mechanism according to the temperature value of the evaporating mechanism and the surface resistance value of the base film so as to ensure that the thickness of the coating along the moving direction of the base film is uniform.
In some possible embodiments, the control device is specifically configured to determine the real-time base film transmission speed of the unreeling mechanism according to a functional relationship between the base film transmission speed under a preset surface resistance threshold value and the temperature value of the evaporation mechanism, and the real-time temperature value of the evaporation mechanism.
In some possible embodiments, the evaporation mechanism comprises a first evaporation system and a second evaporation system, the first evaporation system being disposed upstream of the second evaporation system along the base film transport path;
The temperature measurement device includes: the first temperature detector is arranged on the first evaporation system and is used for measuring a first temperature value of the first evaporation system; the second temperature detector is arranged on the second evaporation system and is used for measuring a second temperature value of the second evaporation system;
the surface resistance testing device comprises: the first surface resistance tester is arranged on a base film conveying path between the first evaporation system and the second evaporation system and is used for measuring a first surface resistance value of a current film coating surface of the base film; and the second surface resistance tester is arranged on the base film conveying path between the second evaporation system and the winding mechanism and is used for measuring the total surface resistance value of a coating formed on the two surfaces of the base film and obtaining the second surface resistance value of the other coating surface according to the difference value of the total surface resistance value and the first surface resistance value.
In some possible embodiments, the control device is specifically configured to determine, when the first surface resistance value reaches a preset surface resistance threshold, a real-time base film transmission speed according to a first functional relationship between a base film transmission speed under the preset surface resistance threshold and a temperature value of the first evaporation system, and a real-time temperature value of the first evaporation system; obtaining an ideal temperature value of the second evaporation system according to a second functional relation between the base film transmission speed under the preset surface resistance threshold and the temperature value of the second evaporation system and the real-time base film transmission speed; and adjusting the heating power of the second evaporation system according to the comparison result between the ideal temperature value of the second evaporation system and the actual temperature value of the second evaporation system.
In some possible embodiments, the control device is specifically configured to:
if the ideal temperature value of the second evaporation system is larger than the actual temperature value of the second evaporation system, controlling to increase the heating power of the second evaporation system, and controlling the heating power of the second evaporation system to be larger than the heating power of the first evaporation system; if the ideal temperature value of the second evaporation system is smaller than the actual temperature value of the second evaporation system, controlling to reduce the heating power of the second evaporation system, and controlling the heating power of the second evaporation system to be smaller than the heating power of the first evaporation system.
In some possible embodiments, the control device is specifically configured to:
when the first surface resistance value reaches a preset surface resistance threshold value before the second surface resistance value, determining a real-time base film transmission speed according to a first functional relation between the base film transmission speed under the preset surface resistance threshold value and the temperature value of the first evaporation system and a real-time temperature value of the first evaporation system; obtaining an ideal temperature value of the second evaporation system according to a second functional relation between the base film transmission speed under the preset surface resistance threshold and the temperature value of the second evaporation system and the real-time base film transmission speed; adjusting the heating power of the second evaporation system according to the comparison result between the ideal temperature value of the second evaporation system and the actual temperature value of the second evaporation system; or,
When the second surface resistance value reaches a preset surface resistance threshold value before the first surface resistance value, determining a real-time base film transmission speed according to a second functional relation between the base film transmission speed under the preset surface resistance threshold value and the temperature value of the second evaporation system and a real-time temperature value of the second evaporation system; obtaining an ideal temperature value of the first evaporation system according to a first functional relation between the base film transmission speed under the preset surface resistance threshold and the temperature value of the first evaporation system and the real-time base film transmission speed; and adjusting the heating power of the first evaporation system according to the comparison result between the ideal temperature value of the first evaporation system and the actual temperature value of the first evaporation system.
In a second aspect, a method for monitoring and controlling uniformity of a plating film is provided, the method comprising:
acquiring a temperature value of an evaporation mechanism;
acquiring the surface resistance of the base film;
and controlling the base film transmission speed of the unreeling mechanism and/or the heating power of the evaporating mechanism according to the temperature value of the evaporating mechanism and the surface resistance value of the base film, so that the thickness of the coating along the moving direction of the base film is uniform.
In some possible embodiments, the controlling the base film transmission speed of the unreeling mechanism according to the temperature value of the evaporating mechanism and the surface resistance value of the base film specifically includes:
and determining the real-time base film transmission speed of the unreeling mechanism according to the functional relation between the base film transmission speed below the preset surface resistance threshold value and the temperature value of the evaporating mechanism and the real-time temperature value of the evaporating mechanism.
In some possible embodiments, the evaporation mechanism comprises a first evaporation system and a second evaporation system, the first evaporation system being disposed upstream of the second evaporation system along the base film transport path; the method specifically comprises the following steps:
acquiring a first temperature value of the first evaporation system and a second temperature value of the second evaporation system;
acquiring a first surface resistance value of a current coating surface of the base film, acquiring a total surface resistance value of a coating formed on two surfaces of the base film, and acquiring a second surface resistance value of another coating surface according to a difference value between the total surface resistance value and the first surface resistance value;
when the first surface resistance value reaches a preset surface resistance threshold value, determining a real-time base film transmission speed according to a first functional relation between the base film transmission speed under the preset surface resistance threshold value and the temperature value of the first evaporation system and a real-time temperature value of the first evaporation system;
Obtaining an ideal temperature value of the second evaporation system according to a second functional relation between the base film transmission speed under the preset surface resistance threshold and the temperature value of the second evaporation system and the real-time base film transmission speed;
and adjusting the heating power of the second evaporation system according to the comparison result between the ideal temperature value of the second evaporation system and the actual temperature value of the second evaporation system.
In some possible embodiments, the adjusting the heating power of the second evaporation system according to the comparison between the ideal temperature value of the second evaporation system and the actual temperature value of the second evaporation system specifically includes:
if the ideal temperature value of the second evaporation system is larger than the actual temperature value of the second evaporation system, controlling to increase the heating power of the second evaporation system, and controlling the heating power of the second evaporation system to be larger than the heating power of the first evaporation system or controlling the temperature acceleration rate of the second evaporation system to be larger than the temperature acceleration rate of the first evaporation system; if the ideal temperature value of the second evaporation system is smaller than the actual temperature value of the second evaporation system, controlling to reduce the heating power of the second evaporation system, and controlling the heating power of the second evaporation system to be smaller than the heating power of the first evaporation system or controlling the temperature acceleration rate of the second evaporation system to be smaller than the temperature acceleration rate of the first evaporation system.
In some possible embodiments, the evaporation mechanism comprises a first evaporation system and a second evaporation system, the first evaporation system being disposed upstream of the second evaporation system along the base film transport path; the method specifically comprises the following steps:
acquiring a first temperature value of the first evaporation system and a second temperature value of the second evaporation system;
acquiring a first surface resistance value of a current coating surface of the base film, and acquiring a second surface resistance value of the double surfaces of the base film;
when the first surface resistance value reaches a preset surface resistance threshold value before the second surface resistance value, determining a real-time base film transmission speed according to a first functional relation between the base film transmission speed under the preset surface resistance threshold value and the temperature value of the first evaporation system and a real-time temperature value of the first evaporation system; obtaining an ideal temperature value of the second evaporation system according to a second functional relation between the base film transmission speed under the preset surface resistance threshold and the temperature value of the second evaporation system and the real-time base film transmission speed; adjusting the heating power of the second evaporation system according to the comparison result between the ideal temperature value of the second evaporation system and the actual temperature value of the second evaporation system; or,
When the second surface resistance value reaches a preset surface resistance threshold value before the first surface resistance value, determining a real-time base film transmission speed according to a second functional relation between the base film transmission speed under the preset surface resistance threshold value and the temperature value of the second evaporation system and a real-time temperature value of the second evaporation system; obtaining an ideal temperature value of the first evaporation system according to a first functional relation between the base film transmission speed under the preset surface resistance threshold and the temperature value of the first evaporation system and the real-time base film transmission speed; and adjusting the heating power of the first evaporation system according to the comparison result between the ideal temperature value of the first evaporation system and the actual temperature value of the first evaporation system.
In a third aspect, a computer-readable storage medium is provided, on which a computer program is stored, which when executed by a processor implements any one of the methods of monitoring and controlling uniformity of a plating film described in the second aspect.
In a fourth aspect, there is provided a computer device comprising:
one or more processors;
a storage means for storing one or more programs;
the one or more programs, when executed by the one or more processors, cause the one or more processors to implement any of the plating film uniformity monitoring and controlling methods as described in the second aspect.
The technical scheme has the following beneficial effects:
the deviation of the surface resistance test values of the single-sided MD direction is within an expected range under the same coating speed, and further the deviation of the surface resistance test values of the double-sided MD direction is within a control range;
coating regulation and control with low evaporation capacity are performed in advance, so that the coating efficiency and the utilization rate of evaporation materials are improved;
the invalid deposited coating of the baffle plate above the high-temperature resistant evaporation container is reduced, so that the phenomenon that the deposited coating below the baffle plate is adhered to the high-temperature resistant container or inconvenient to process in the whole evaporation process is reduced, and finally falls into the high-temperature resistant container to form a splash phenomenon, thereby avoiding damaging the high-temperature resistant evaporation container and damaging the apparent mass of a base material.
Drawings
In order to more clearly illustrate the embodiments of the invention or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, it being obvious that the drawings in the following description are only some embodiments of the invention, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic diagram of a system for monitoring and controlling uniformity of a plating film according to an embodiment of the present invention;
FIG. 2 is a schematic flow chart of a system for monitoring and controlling uniformity of a plating film according to an embodiment of the present invention;
FIG. 3 is a schematic flow chart of a system for monitoring and controlling uniformity of a plating film according to an embodiment of the invention.
Reference numerals illustrate:
a1, unreeling rollers; a2, a wind-up roll;
b1, first passing rollers; b2, second roller passing; b3, third roller passing; b4, fourth roller passing;
c1, a first flattening roller; c2, a second flattening roller; c3, a third flattening roller;
d1, a first film plating cold drum; d2, a second film plating cold drum;
e1, a first evaporation system; e2, a second evaporation system;
e11, a first temperature detector; e21, a second temperature detector;
e12, a first heat-preserving material; e22, a second heat-insulating material;
e13, a first heating electrode; e23, a second heating electrode;
e14, a first evaporation vessel; e24, a second evaporation vessel;
f1, a first surface resistance tester; f2, a second resistance tester.
Detailed Description
Features and exemplary embodiments of various aspects of the invention are described in detail below. In the following detailed description, numerous specific details are set forth in order to provide a thorough understanding of the invention. It will be apparent, however, to one skilled in the art that the present invention may be practiced without some of these specific details. The following description of the embodiments is merely intended to provide a better understanding of the invention by showing examples of the invention. In the drawings and the following description, at least some well-known structures and techniques have not been shown in detail in order not to unnecessarily obscure the present invention; also, the dimensions of some of the structures may be exaggerated for clarity. Furthermore, the described features, structures, or characteristics may be combined in any suitable manner in one or more embodiments.
The technical problems of the existing vacuum coating system in the industry, such as the change of the evaporation amount of the evaporated material of the evaporation source, the waste of the evaporated material and obvious non-uniformity of the coating thickness in the MD direction (film moving direction), are solved. The embodiment of the invention aims to better solve the problems by adopting the following technical scheme, and mainly realizes that the evaporation source system starts the baffle plate film running and coating action as early as possible even in an unsteady evaporation stage through the double regulation and control of the base film transmission speed and the evaporation system temperature, and realizes that the uniformity of the thickness of the MD-direction coating film is more consistent based on the matching of temperature control and coating speed (unreeling end group film transmission speed).
The technical problems to be solved by the embodiment of the invention include the following: how to ensure the thickness consistency of the film layer in the film feeding direction; how to use the coating evaporation system to coat the film with high efficiency and realize the high utilization rate of the coating material; how to avoid the influence on the subsequent production caused by the excessively fast deposition of the film with a considerable thickness on the baffle.
The embodiment of the invention provides a coating uniformity monitoring and regulating system, which comprises a system component with a basic vacuum winding coating function, in particular a temperature measuring device, a non-contact vortex resistance testing device and a coating substrate running speed control device, wherein the temperature measuring device is closest to a high-temperature evaporation source, and the non-contact vortex resistance testing device is arranged near an evaporation system, and the coating substrate running speed control device is used for controlling the coating running speed by collecting temperature data and resistance data.
According to the embodiment of the invention, the high-temperature resistant container is used for containing the coating material, the electric heating device for auxiliary heat preservation is used for heating the coating material, gasifying and evaporating the coating material and then forming a film on the surface of the substrate, the uniformity of the thickness of the coating layer in the MD direction of the coating material is regulated and controlled in an organic combination mode by controlling the coating speed and the temperature of the electric heating device, and a regulation and control instruction of the temperature and the coating speed is sent out by testing and feeding back results of the non-contact type surface resistance tester of the substrate.
The embodiment of the invention provides a plating film uniformity monitoring and regulating system, which comprises:
the vacuum winding film plating device comprises an unreeling mechanism, an evaporating mechanism and a reeling mechanism, wherein the evaporating mechanism and the reeling mechanism are used for evaporating a base film;
the temperature measuring device is used for measuring the temperature value of the evaporating mechanism, and specifically can be used for measuring the temperature value of the graphite heating electrode.
The surface resistance testing device is used for measuring the surface resistance value of the base film;
and the control device is used for controlling the base film transmission speed of the unreeling mechanism and/or the heating power of the evaporating mechanism according to the temperature value of the evaporating mechanism and the surface resistance value of the base film so as to ensure that the thickness of the coating layer along the moving direction of the base film has uniformity.
In some embodiments, a film coating baffle is arranged above the evaporation mechanism, and the control device is further used for controlling the unreeling mechanism to open the base film transmission and open the film coating baffle when the temperature value of the evaporation mechanism reaches a preset film coating temperature threshold value.
In some embodiments, the control device is specifically configured to determine the real-time base film transmission speed of the unreeling mechanism according to a functional relationship between the base film transmission speed under the preset surface resistance threshold value and the temperature value of the evaporating mechanism, and the real-time temperature value of the evaporating mechanism.
As shown in fig. 1, the plating film uniformity monitoring and controlling system includes: unreeling roller A1, first pass roller B1, first flattening roller C1, first coating film cold drum D1, first evaporation system E1, second pass roller B2, third pass roller B3, first surface resistance tester F1, second flattening roller C2, second coating film cold drum D2, second evaporation system E2, fourth pass roller B4, second surface resistance tester F2, third flattening roller C3 and wind-up roller A2.
The first evaporation system E1 is disposed below the first film plating cooling drum D1, and the first evaporation system E1 includes: a first temperature detector E11, a first heat-retaining material E12, a first heating electrode E13 and a first evaporation vessel E14. At least one hole is arranged in the first heating electrode E13, one or more first evaporation containers E14 are arranged in the corresponding holes of the first heating electrode E13, and evaporation materials are arranged in the first evaporation containers E14. The first heat-retaining material E12 may be located at the periphery of the first heating electrode E13 (e.g., graphite heating electrode) and may also be located at the periphery of the first evaporation vessel E14 (e.g., crucible).
The second evaporation system E2 is disposed below the second film plating cooling drum D2, and the second evaporation system E2 includes: a second temperature detector E21, a second thermal insulation material E22, a second heating electrode E23 and a second evaporation container E24. At least one hole is arranged in the second heating electrode E23, one or more second evaporation containers E24 are arranged in the corresponding holes of the second heating electrode E23, and evaporation materials are arranged in the second evaporation containers E24. The second insulating material E22 may be located at the periphery of the second heating electrode E23 (e.g., graphite heating electrode) and may also be located at the periphery of the second evaporation vessel E24 (e.g., crucible).
The film to be coated starts from the unreeling roller A1 and sequentially passes through a first passing roller B1, a first flattening roller C1, a first coating cooling drum D1, a second passing roller B2, a third passing roller B3, a second flattening roller C2, a second coating cooling drum D2, a fourth passing roller B4 and a third flattening roller C3 to reach the reeling roller A2.
The first flattening roller C1 and the second passing roller B2 are respectively arranged at two sides of the first film plating cold drum D1, and the second flattening roller C2 and the fourth passing roller B4 are respectively arranged at two sides of the second film plating cold drum D2. The first pass roller B1 is arranged between the unreeling roller A1 and the first flattening roller C1, the third pass roller B3 is arranged between the second pass roller B2 and the second flattening roller C2, and the third flattening roller C3 is arranged between the fourth pass roller B4 and the reeling roller A2.
In other embodiments, the number of over-rolls and nip rolls described above may be increased or decreased.
The first and second resistance testers F1 and F2 can perform non-contact measurement on the resistance values of one or both sides of the film.
In some embodiments, the evaporation mechanism includes a first evaporation system E1 and a second evaporation system E2, the first evaporation system E1 being disposed upstream of the second evaporation system E2 along the base film conveyance path;
the temperature measuring device includes: the first temperature detector E11 is arranged on the first evaporation system E1 and is used for measuring a first temperature value of the first evaporation system E1; the second temperature detector E21 is arranged on the second evaporation system E2 and is used for measuring a second temperature value of the second evaporation system E2;
the surface resistance testing device comprises: the first surface resistance tester F1 is arranged on the base film conveying path between the first evaporation system E1 and the second evaporation system E2 and is used for measuring a first surface resistance value of the current film coating surface of the base film; the second surface resistance tester F2 is arranged on a base film conveying path between the second evaporation system E2 and the winding mechanism and is used for measuring the total surface resistance value of a coating formed on two sides of the base film and obtaining the second surface resistance value of the other coating surface according to the difference value of the total surface resistance value and the first surface resistance value;
The control device is specifically configured to determine a real-time base film transmission speed according to a first functional relationship between a base film transmission speed under a preset surface resistance threshold and a temperature value of the first evaporation system E1 and a real-time temperature value of the first evaporation system E1 when the first surface resistance value reaches the preset surface resistance threshold; obtaining an ideal temperature value of the second evaporation system E2 according to a second functional relation between the base film transmission speed and the temperature value of the second evaporation system E2 under a preset surface resistance threshold value and the real-time base film transmission speed; the heating power of the second evaporation system E2 is adjusted according to the comparison result between the ideal temperature value of the second evaporation system E2 and the actual temperature value of the second evaporation system E2.
In some embodiments, the control device is specifically configured to:
if the ideal temperature value of the second evaporation system E2 is larger than the actual temperature value of the second evaporation system E2, controlling to increase the heating power of the second evaporation system E2, and controlling the heating power of the second evaporation system E2 to be larger than the heating power of the first evaporation system E1; if the ideal temperature value of the second evaporation system E2 is smaller than the actual temperature value of the second evaporation system E2, the control reduces the heating power of the second evaporation system E2, and controls the heating power of the second evaporation system E2 to be smaller than the heating power of the first evaporation system E1.
In some embodiments, the control device may be further specifically configured to:
when the first surface resistance value reaches a preset surface resistance threshold value before the second surface resistance value, determining a real-time base film transmission speed according to a first functional relation between the base film transmission speed under the preset surface resistance threshold value and the temperature value of the first evaporation system E1 and the real-time temperature value of the first evaporation system E1; obtaining an ideal temperature value of the second evaporation system E2 according to a second functional relation between the base film transmission speed and the temperature value of the second evaporation system E2 under a preset surface resistance threshold value and the real-time base film transmission speed; adjusting the heating power of the second evaporation system E2 according to the comparison result between the ideal temperature value of the second evaporation system E2 and the actual temperature value of the second evaporation system E2; or,
when the second surface resistance value reaches a preset surface resistance threshold value before the first surface resistance value, determining the real-time base film transmission speed according to a second functional relation between the base film transmission speed under the preset surface resistance threshold value and the temperature value of the second evaporation system E2 and the real-time temperature value of the second evaporation system E2; obtaining an ideal temperature value of the first evaporation system E1 according to a first functional relation between the base film transmission speed and the temperature value of the first evaporation system E1 under a preset surface resistance threshold value and the real-time base film transmission speed; the heating power of the first evaporation system E1 is adjusted according to the comparison result between the ideal temperature value of the first evaporation system E1 and the actual temperature value of the first evaporation system E1.
In some embodiments, the control device is further configured to control increasing the base film transmission speed of the unreeling mechanism when the first surface resistance exceeds a preset surface resistance threshold; and if the second resistance is reduced, the heating power of the second evaporation system E2 is increased.
The system can be a single-sided coating mode or a double-sided coating mode; further, if the double-sided coating mode is adopted, the control instruction of temperature regulation and control near each side of coating and calculation of the surface resistance test sending speed are needed. Further, the double-sided coating mode finally obtains the thickness agreement of the coating under the condition of the same coating running speed.
The technical effects achieved by the embodiment of the invention include:
the deviation of the surface resistance test values of the single-sided MD direction is within an expected range under the same coating speed, and further the deviation of the surface resistance test values of the double-sided MD direction is within a control range;
coating regulation and control with low evaporation capacity are performed in advance, so that the coating efficiency and the utilization rate of evaporation materials are improved;
the invalid deposited coating of the baffle plate above the high-temperature resistant evaporation container is reduced, so that the phenomenon that the deposited coating below the baffle plate is adhered to the high-temperature resistant container or inconvenient to process in the whole evaporation process is reduced, and finally falls into the high-temperature resistant container to form a splash phenomenon, thereby avoiding damaging the high-temperature resistant evaporation container and damaging the apparent mass of a base material.
The following is a more detailed description:
in the vacuum coating system shown in fig. 1, when the high temperature resistant container (the first evaporation container E14 and/or the second evaporation container E24) is filled with the predetermined evaporated material and the related equipment status is ready, the vacuum pumping is started, and the vacuum pumping is performed until the vacuum pumping is superior to 5×10 -2 After Pa, the electric heating device (the first heating electrode E13 and/or the second heating electrode E23) starts to start to enable the temperature of the evaporating system (the first evaporating system E1 and/or the second evaporating system E2) to rise gradually, and the baffle plate which is arranged above the high-temperature resistant containers E14 and E24 and used for shielding the base film material is always arranged above the high-temperature resistant containers, so that the evaporated material is mainly prevented from being evaporated on the surface of the base film material under unexpected conditions, or excessive heat is radiated to the base film material. Materials needing evaporation coating, such as Al, ag and the like, are placed in the high-temperature resistant evaporation containers E14 and E24. In the embodiment of the invention, taking Al material as an example, al begins to melt at about 600 ℃, gradually changes from solid state to liquid state, and finally follows an electric heating deviceThe liquid aluminum gradually gasifies, i.e. turns into a gaseous state, and the stable evaporation coating of Al material is usually required to be at about 1200 ℃. In order to make it possible to use the electric heating device for a longer period of time and more safely, it is generally necessary to increase the temperature of the electric heating device (in the vicinity of the high-temperature resistant evaporation vessel) from 600 ℃ to 1200 ℃ in a steady state for a considerable period of time, for example, 60 minutes, and the saturated vapor pressure is higher, that is, the evaporation amount is higher, especially, as the electric heating device is brought closer to a high temperature.
Wherein, the electric heating device or the electric heater can comprise a graphite heating electrode; the evaporation system comprises a graphite heating electrode, a crucible and an evaporation material, wherein the graphite heating electrode is provided with a hole, the crucible is positioned in the hole, and the evaporation material is arranged in the crucible.
Therefore, the technical scheme of the embodiment of the invention is that when the temperature is increased to a certain range, the base film transmission is started, for example, the temperature is about 950 ℃, meanwhile, the film coating running speed of 56m/min is kept, and the shielding plates above the evaporation containers E14 and E24 are opened to carry out film coating. The temperature of the heater is continuously increased to a steady state during the film plating process, namely the evaporation capacity or the deposition rate of the film is continuously increased, and the film plating running speed is continuously increased in the process so as to keep the thickness of the coating in the front and rear MD directions consistent; further, the coating running speed is comprehensively corrected according to the coating thickness of the non-contact vortex resistance testing instrument F1 shown in fig. 1.
As shown in fig. 1, if the single-sided evaporation system is adopted, only the coating speed, the first evaporation system E1, the corresponding first temperature detector E11 and the first non-contact eddy current resistance testing instrument F1 are involved, wherein the non-contact eddy current resistance testing instrument F1 only tests the surface resistance of one side of the non-contact eddy current resistance testing instrument to convert the surface resistance into the corresponding coating thickness.
If the system is a double-sided coating system, a second evaporation system E2, a related second temperature detector E21 and a second non-contact eddy current resistance testing instrument F2 are additionally arranged on the basis of the single-sided coating system, and the coating state is comprehensively adjusted through parameters acquired by the testing instruments. The film plating running speed is determined mainly according to parameters of a first temperature detector E11, a second temperature detector E21, a first non-contact eddy current resistance testing instrument F1 and a second non-contact eddy current resistance testing instrument F2 and the change trend of the parameters. In particular, in the case of a system for simultaneous coating of two sides, in order to ensure that the thicknesses of the coatings on both sides are the same (or the difference is within an acceptable quality control range) and that the running speed of the whole coating is compatible, the parameters of the first temperature detector E11 and the second temperature detector E21 need to be set.
The following parameters need to be determined before the speed regulation mode is determined:
the first temperature detector E11 tests the temperature T10, the coating running speed V1 and the surface resistance test R10 at the initial starting of coating; the first temperature detector E11 tests the temperature T20 during steady-state film coating, the film coating running speed V2 and the surface resistance test R11, namely, the surface resistance test is consistent under the conditions of keeping an initial state and a steady state, namely, the fluctuation range of R10 approximately equal to R11 is in an acceptable range. Under the condition that the coating travelling speed is changed to match the evaporation amount of materials at different temperatures, the relation between the coating travelling speed under the preset surface resistance and the temperature of the electric heater is finally obtained, and the input power and the heating time of the electric heater related to the process are taken as the process control conditions under the mode, and the relation can be obtained by fitting curves through numerical simulation: y1= 0.0623e 0.0057x1 In the relational expression, x1 represents temperature, and Y1 represents unreeling speed. The formula one described below is a formula for the first evaporation system E1, x1 represents a temperature value of the first evaporation system E1, and Y1 represents a unreeling speed corresponding to the first evaporation system E1; the formula II is a formula for the second evaporation system E2, x1 represents a temperature value of the second evaporation system E2, and Y1 represents a unreeling speed corresponding to the second evaporation system E2.
The above relation indicates that when the evaporation baffle is just started to be opened, the coating running speed v1=78m/min reaches the surface resistance R10, and when the evaporation amount is gradually increased along with the increase of the heating temperature, the coating running speed is changed when the surface resistances of R11 and R10 are kept close after coating, for example, when the coating running speed is 1200 ℃, the coating running speed is 125m/min; i.e. y1=125 in this case based on the fitting formula x1=1200.
Based on the same thought, if the embodiment of the invention is to control the double-sided coating, the calculation and simulation of the evaporation rate of the second evaporation system E2 can be performed first. Namely, when the coating running speed of v1=78m/min reaches the R10 surface resistance, the temperature value measured by the temperature detector E21 of the second evaporation system E2 is kept, and the temperatures and the evaporation rates of the different evaporation source systems are different, so that the process is further based on the fact that the same coating running speed is kept when single-sided coating and double-sided coating are performed and the same surface resistance is kept when each surface is independently coated, and the consistency of the surface resistances when double-sided simultaneous coating is obtained. Through a series of data measurement and simulation, the temperature of the second evaporation system E2 is controlled at a coating speed corresponding to the condition of the evaporation system E1, namely, the temperature control of the second evaporation system is determined by reverse fitting.
However, in practice, since it has been mentioned that the electric heater is affected by heat conduction efficiency and heat capacity in a vacuum environment, it is difficult to reach a desired control range in a short time, that is, control of temperature has hysteresis. Therefore, in the actual control process, the embodiment of the invention can utilize a similar algorithm of the temperature control PID to synchronously control the temperature of the first evaporation system E1 and the second evaporation system E2, so as to ensure that the surface resistances of the newly added coating tests of F1 and F2 are the same or similar (namely, meet the allowable range) within a certain speed regulation and control range. The surface resistances of the coatings added by the first non-contact eddy current resistance testing instrument F1 and the second non-contact eddy current resistance testing instrument F2 are the same, and the following can be understood: if the surface resistance of the first non-contact vortex resistance testing instrument F1 is 800mΩ during double-sided film coating, a certain thickness d1 corresponding to the surface resistance can be calculated under the condition of setting a certain conductivity, and the surface resistance control of the second non-contact vortex resistance testing instrument F2 is calculated after the thickness is further thickened to be 2d 1.
The actual control process requires the first evaporation system E1 and the second evaporation system E2 to perform control of temperature rise or temperature drop, and control of coating speed. When the first evaporation system E1 and the second evaporation system E2 reach a certain temperature which can open the baffle, the baffle is opened, and then film coating is carried out, in this case, the film coating speed of V1 is set, speed increment control is carried out according to the results of the tested non-contact vortex resistance test instrument F1 and the non-contact vortex resistance test instrument F2, and the temperature of the first evaporation system E1 and the second evaporation system E2 is gradually increased again.
Aiming at the condition of a plurality of evaporation sources, the prior art always uses a baffle plate to block the plating material before the plating film reaches a steady state, and the problem of waste of the plating material exists. The MD direction refers to the film-running direction, and the larger the surface resistance is, the thinner the plating layer is. Since the characteristics of the second evaporation system E2 and the first evaporation system E1 are different, for example, the first evaporation system E1 can make the surface resistance reach 800 milliohms at 1300 ℃ and 55 m/min; the second evaporation system E2 can achieve 800 mOhm in surface resistance at 1400 ℃ and 55 m/min.
The embodiment of the invention hopefully can embody a control mode, and the practical empirical formulas of fitting of different equipment, different sheet resistance control of the same equipment and the like can be different. According to the embodiment, the thickness of the film layers of the final two-sided film coating can be the same through multiple times of adjustment by the PID algorithm, namely, the single-sided sheet resistance test is carried out by adopting the contact Fang Zuyi, and the displayed sheet resistances are very close. I.e. the thickness of the single sided film calculated based on the characteristic resistivity is very close or the difference is within acceptable limits for quality control.
The following illustrates that more accurate data is obtained in connection with actual plant operation and that previous data is corrected in this way, for example:
First side data: for example, a sheet resistance of 600mΩ is set; 900-35 m/min; 950-41 m/min; 1000-50 m/min; 1050-62 m/min; 1100-75 m/min; 1150-92 m/min; 1200-113 m/min; 1250-129 m/min; 1300-132 m/min, and in order to obtain a relatively stable evaporation state, the practical temperature is not suitable to be continuously increased in consideration of factors such as effective operation and maintenance protection of equipment.
The embodiment can simulate the empirical formula according to the similar values, and can obtain the similar empirical formula when the second surface is independently coated, the related difference is not very large, and the adjustment can be performed on the range of the difference of a few meters in the coated meter.
In addition, the lower the surface resistance, the thicker the film thickness, and if the evaporation efficiency (which can be regarded as evaporation temperature) or the like is not changed, the film coating speed needs to be reduced to obtain a thicker film; conversely, if the coating speed is not changed as the evaporation temperature is higher, the sheet resistance value is smaller, but the coating thickness is larger.
Illustrating: 600mΩ is tested by a first sheet resistance test, the thickness of about 65nm is calculated by specific electrical parameters (if the plating film is an Al film), and if the plating film is a copper film, the specific resistance parameter of the copper film is substituted; if the Al film is plated, the value of the sheet resistance testing instrument at the second position is the result of the eddy current induction measurement of the film layers of the two-sided film plating, and the target value is about 300mΩ, so that the thickness of the coating on one side of the second side is about 65nm, and the situation that 300mΩ is the sheet resistance corresponding to the sum of the thicknesses of the two-sided coating can be understood.
FIG. 2 is a flowchart showing a method for monitoring and controlling uniformity of a plating film according to an embodiment of the present invention. As shown in fig. 2, the method comprises the steps of:
s110: acquiring a temperature value of an evaporation mechanism;
s120: acquiring the surface resistance of the base film;
s130: and controlling the base film transmission speed of the unreeling mechanism and/or the heating power of the evaporating mechanism according to the temperature value of the evaporating mechanism and the surface resistance value of the base film, so that the thickness of the coating layer along the moving direction of the base film is uniform.
In some embodiments, in S130, the base film transmission speed of the unreeling mechanism is controlled according to the temperature value of the evaporating mechanism and the surface resistance value of the base film, and specifically includes: and determining the real-time base film transmission speed of the unreeling mechanism according to the functional relation between the base film transmission speed below the preset surface resistance threshold value and the temperature value of the evaporating mechanism and the real-time temperature value of the evaporating mechanism.
In some embodiments, the method further comprises: when the temperature value of the evaporating mechanism reaches a preset coating temperature threshold value, the unreeling mechanism is controlled to start base film transmission, and a coating baffle plate on the evaporating mechanism is controlled to be started.
In some embodiments, the evaporation mechanism includes a first evaporation system and a second evaporation system, the first evaporation system disposed upstream of the second evaporation system along the base film transport path.
FIG. 3 is a second flowchart of a method for monitoring and controlling uniformity of a plating film according to an embodiment of the present invention. As shown in fig. 3, the method specifically includes the following steps:
s110': acquiring a first temperature value of a first evaporation system and acquiring a second temperature value of a second evaporation system;
s120': acquiring a first surface resistance value of a current coating surface of the base film, acquiring a total surface resistance value of a coating formed on two surfaces of the base film, and acquiring a second surface resistance value of another coating surface according to a difference value between the total surface resistance value and the first surface resistance value;
s131: when the first surface resistance value reaches a preset surface resistance threshold value, determining a real-time base film transmission speed according to a first functional relation between the base film transmission speed under the preset surface resistance threshold value and a temperature value of a first evaporation system and a real-time temperature value of the first evaporation system;
s132: obtaining an ideal temperature value of the second evaporation system according to a second functional relation between the base film transmission speed and the temperature value of the second evaporation system under a preset surface resistance threshold value and the real-time base film transmission speed;
s133: and adjusting the heating power of the second evaporation system according to the comparison result between the ideal temperature value of the second evaporation system and the actual temperature value of the second evaporation system.
In some embodiments, adjusting the heating power of the second evaporation system in S133 according to a comparison between the ideal temperature value of the second evaporation system and the actual temperature value of the second evaporation system specifically includes:
if the ideal temperature value of the second evaporation system is larger than the actual temperature value of the second evaporation system, controlling to increase the heating power of the second evaporation system, and controlling the heating power of the second evaporation system to be larger than the heating power of the first evaporation system or controlling the temperature acceleration rate of the second evaporation system to be larger than the temperature acceleration rate of the first evaporation system; if the ideal temperature value of the second evaporation system is smaller than the actual temperature value of the second evaporation system, controlling to reduce the heating power of the second evaporation system, and controlling the heating power of the second evaporation system to be smaller than the heating power of the first evaporation system or controlling the temperature acceleration of the second evaporation system to be smaller than the temperature acceleration of the first evaporation system.
In some embodiments, the method further comprises the steps of:
acquiring a first temperature value of a first evaporation system and acquiring a second temperature value of a second evaporation system;
acquiring a first surface resistance value of a current coating surface of the base film, acquiring a total surface resistance value of a coating formed on two surfaces of the base film, and acquiring a second surface resistance value of another coating surface according to a difference value between the total surface resistance value and the first surface resistance value;
When the first surface resistance value reaches a preset surface resistance threshold value before the second surface resistance value, determining a real-time basic film transmission speed according to a first functional relation between a basic film transmission speed under the preset surface resistance threshold value and a temperature value of a first evaporation system and a real-time temperature value of the first evaporation system; obtaining an ideal temperature value of the second evaporation system according to a second functional relation between the base film transmission speed and the temperature value of the second evaporation system under a preset surface resistance threshold value and the real-time base film transmission speed; adjusting the heating power of the second evaporation system according to the comparison result between the ideal temperature value of the second evaporation system and the actual temperature value of the second evaporation system;
or when the second surface resistance value reaches a preset surface resistance threshold value before the first surface resistance value, determining the real-time base film transmission speed according to a second functional relation between the base film transmission speed under the preset surface resistance threshold value and the temperature value of the second evaporation system and the real-time temperature value of the second evaporation system; obtaining an ideal temperature value of the first evaporation system according to a first functional relation between a base film transmission speed and a temperature value of the first evaporation system under a preset surface resistance threshold value and a real-time base film transmission speed; and adjusting the heating power of the first evaporation system according to the comparison result between the ideal temperature value of the first evaporation system and the actual temperature value of the first evaporation system.
The following is a detailed description of the above method:
according to the method for monitoring and controlling uniformity of a coating film of the present embodiment, during a coating process, a value measured by the first surface resistance tester F1 needs to be fixed (to reach a target surface resistance value), an actual temperature of the first evaporation system E1 can be obtained first, an unwinding speed can be obtained according to a formula one, and the unwinding speed is adjusted to be the real-time unwinding speed. Because the temperatures of the first evaporation system E1 and the second evaporation system E2 are increased until the steady state of the film coating is reached, the real-time unreeling speed can be obtained in real time according to the first formula, and the unreeling speed is adjusted to be the real-time unreeling speed. At this time, according to the second formula, the real-time unreeling speed is used as an input, and the ideal temperature value of the second evaporation system E2 can be obtained. And when the ideal temperature value of the second evaporation system E2 is reached, the square resistance value measured by the second surface resistance tester F2 is converted into the thickness value which is 2 times of the thickness value measured by the first surface resistance tester F1, so that the thicknesses of the double-sided films are the same.
According to the method for monitoring and controlling uniformity of a film coating in the embodiment, the first evaporation system E1 and the second evaporation system E2 are heated during the whole film coating process. If the ideal temperature value of the second evaporation system E2 is larger than the actual temperature value of the second evaporation system E2, increasing the heating power of the second evaporation system E2, increasing the heating rate of the second evaporation system E2, controlling the heating power of the second evaporation system E2 to be larger than the heating power of the first evaporation system E1, and controlling the heating rate of the second evaporation system E2 to be larger than the heating rate of the first evaporation system E1; if the ideal temperature value of the second evaporation system E2 is smaller than the actual temperature value of the second evaporation system E2, the heating power of the second evaporation system E2 is reduced, the heating rate of the second evaporation system E2 is reduced, the heating power of the second evaporation system E2 is controlled to be smaller than the heating power of the first evaporation system E1, and the heating rate of the second evaporation system E2 is controlled to be smaller than the heating rate of the first evaporation system E1. If the ideal temperature value of the second evaporation system E2 is equal to the actual value of the second evaporation system E2, no adjustment is made.
The method for monitoring and controlling uniformity of a film coating in this embodiment is executed by a control device, wherein the first evaporation system E1 corresponds to a formula one, the second evaporation system E2 corresponds to a formula two, and the first resistance tester F1 is defined as 800 milliohms, and the method includes the following steps of adjusting the temperature value of the second evaporation system E2 in real time:
acquiring a real-time temperature value of the first evaporation system E1 in real time, and adjusting the unreeling speed in real time according to the formula I and the real-time temperature value of the first evaporation system E1, so that an ideal temperature value of the second evaporation system E2 can be obtained according to the formula II and the real-time unreeling speed;
comparing the ideal temperature value of the second evaporation system E2 with the actual temperature value of the second evaporation system E2;
if the ideal temperature value of the second evaporation system E2 is larger, controlling the temperature acceleration rate of the second evaporation system E2 to be larger than the temperature acceleration rate of the first evaporation system E1;
if the ideal value of the second evaporation system E2 is small, the temperature increase rate of the second evaporation system E2 is controlled to be smaller than the temperature increase rate of the first evaporation system E1.
As is clear from the above, if the ideal temperature value of the second evaporation system E2 is greater than the actual temperature value thereof, the heating power of the second evaporation system E2 is controlled to be increased, and the heating power of the second evaporation system E2 is controlled to be greater than the heating power of the first evaporation system E1, that is, the temperature increase rate of the second evaporation system E2 is controlled to be greater than the temperature increase rate of the first evaporation system E1.
The measured value of the first surface resistance tester F1 is always 800 milliohms, and along with the real-time adjustment of the unreeling speed, the measured value of the second surface resistance tester F2 is always about 800 milliohms, so that the thickness of the coating meets the quality requirement.
The method for monitoring and regulating the uniformity of the coating film is executed by a control device, and in order to solve the problem that the adjustment is not proper at any time or the temperature adjustment has hysteresis, the following method is adopted:
judging which measured value of the first surface resistance tester F1 and the second surface resistance tester F2 reaches the surface resistance threshold value first;
if the first surface resistance tester F1 reaches the surface resistance threshold value, adjusting the real-time unreeling speed according to the temperature value of the first evaporation system E1; obtaining an ideal temperature value of the second evaporation system E2 according to a formula II and the real-time unreeling speed, and adjusting an actual temperature value of the second evaporation system E2 according to the ideal temperature value of the second evaporation system E2;
if the second surface resistance tester F2 reaches the surface resistance threshold value, adjusting the real-time unreeling speed according to the temperature value of the second evaporation system E2; and according to the formula I and the real-time unreeling speed, obtaining a theoretical temperature value of the first evaporation system E1, and controlling the heating power to adjust the actual temperature value of the first evaporation system E1 through the theoretical temperature value of the first evaporation system E1.
Further, the method for monitoring and regulating the uniformity of the coating film further comprises the following steps:
if the thickness measured by the first surface resistance tester F1 exceeds the surface resistance threshold, controlling to increase the unreeling speed so as to avoid that the thickness of the first surface resistance tester F1 exceeds the surface resistance threshold; and the two surface resistance values (the surface resistance values measured by the F1 and the F2 respectively) are detected in real time, and if the thickness value or the surface resistance value measured by the second surface resistance tester F2 is reduced at the moment, the heating power of the second evaporation system E2 is increased.
Further, if the temperature increases too fast, it is not possible to decrease the heating power until now, so it is preferable to increase the temperature slowly so that the ideal temperature value of the second evaporation system E2 is always larger than the actual temperature value thereof. Therefore, the method for monitoring and regulating the uniformity of the coating film further comprises the following steps: and when the measured value of the second surface resistance tester F2 reaches the lower surface resistance threshold value, the temperature of the second surface resistance tester F2 is regulated to be increased by a certain proportion.
The embodiment of the invention has the beneficial technical effects that:
1. the waste of evaporated materials in an evaporation boat system in the film deposition process is reduced;
2. the consistency of the overall thickness of the coating film layer on the surface of the substrate along the MD direction is better achieved through the dual regulation and control of the temperature and the coating belt speed of the evaporation system;
3. The phenomenon that the deposited coating on the surface of the baffle plate is influenced by the waste heat of the evaporation system after the coating is finished can be reduced because the invalid deposited coating on the surface of the baffle plate is avoided, and the performance of equipment is influenced.
In the description of the present invention, it should be noted that the orientation or positional relationship indicated by "upper, lower, inner and outer", etc. in terms are based on the orientation or positional relationship shown in the drawings, are merely for convenience of describing the present invention and simplifying the description, and do not indicate or imply that the apparatus or element in question must have a specific orientation, be constructed and operated in a specific orientation, and thus should not be construed as limiting the present invention. Furthermore, the terms "first, second, or third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
The terms "mounted, connected, and coupled" should be construed broadly in this disclosure unless otherwise specifically indicated and defined, such as: can be fixed connection, detachable connection or integral connection; it may also be a mechanical connection, an electrical connection, or a direct connection, or may be indirectly connected through an intermediate medium, or may be a communication between two elements. The specific meaning of the above terms in the present invention will be understood in specific cases by those of ordinary skill in the art.
While the invention has been described with reference to a preferred embodiment, various modifications may be made and equivalents may be substituted for elements thereof without departing from the scope of the invention. In particular, the technical features mentioned in the respective embodiments may be combined in any manner as long as there is no structural conflict. The present invention is not limited to the specific embodiments disclosed herein, but encompasses all technical solutions falling within the scope of the claims.
Claims (10)
1. A plating film uniformity monitoring and control system, the system comprising:
the vacuum winding film plating device comprises an unreeling mechanism, an evaporating mechanism and a reeling mechanism, wherein the evaporating mechanism and the reeling mechanism are used for evaporating a base film;
a temperature measuring device for measuring a temperature value of the evaporation mechanism;
the surface resistance testing device is used for measuring the surface resistance value of the base film;
and the control device is used for controlling the base film transmission speed of the unreeling mechanism and/or the heating power of the evaporating mechanism according to the temperature value of the evaporating mechanism and the surface resistance value of the base film so as to ensure that the thickness of the coating along the moving direction of the base film is uniform.
2. The system according to claim 1, wherein the control means is specifically configured to determine the real-time base film transfer speed of the unreeling mechanism based on a functional relationship between the base film transfer speed below a preset surface resistance threshold and the temperature value of the evaporating mechanism, and the real-time temperature value of the evaporating mechanism.
3. The system of claim 1, wherein the system further comprises a controller configured to control the controller,
the evaporation mechanism comprises a first evaporation system and a second evaporation system, wherein the first evaporation system is arranged at the upstream of the second evaporation system along the base film conveying path;
the temperature measurement device includes: the first temperature detector is arranged on the first evaporation system and is used for measuring a first temperature value of the first evaporation system; the second temperature detector is arranged on the second evaporation system and is used for measuring a second temperature value of the second evaporation system;
the surface resistance testing device comprises: the first surface resistance tester is arranged on a base film conveying path between the first evaporation system and the second evaporation system and is used for measuring a first surface resistance value of a current film coating surface of the base film; and the second surface resistance tester is arranged on the base film conveying path between the second evaporation system and the winding mechanism and is used for measuring the total surface resistance value of a coating formed on the two surfaces of the base film and obtaining the second surface resistance value of the other coating surface according to the difference value of the total surface resistance value and the first surface resistance value.
4. A system according to claim 3, characterized in that the control means are specifically adapted to: when the first surface resistance value reaches a preset surface resistance threshold value, determining a real-time base film transmission speed according to a first functional relation between the base film transmission speed under the preset surface resistance threshold value and the temperature value of the first evaporation system and a real-time temperature value of the first evaporation system; obtaining an ideal temperature value of the second evaporation system according to a second functional relation between the base film transmission speed under the preset surface resistance threshold and the temperature value of the second evaporation system and the real-time base film transmission speed; and adjusting the heating power of the second evaporation system according to the comparison result between the ideal temperature value of the second evaporation system and the actual temperature value of the second evaporation system.
5. The system according to claim 4, characterized in that said control means are specifically adapted to: if the ideal temperature value of the second evaporation system is larger than the actual temperature value of the second evaporation system, controlling to increase the heating power of the second evaporation system, and controlling the heating power of the second evaporation system to be larger than the heating power of the first evaporation system or controlling the temperature acceleration rate of the second evaporation system to be larger than the temperature acceleration rate of the first evaporation system; if the ideal temperature value of the second evaporation system is smaller than the actual temperature value of the second evaporation system, controlling to reduce the heating power of the second evaporation system, and controlling the heating power of the second evaporation system to be smaller than the heating power of the first evaporation system or controlling the temperature acceleration rate of the second evaporation system to be smaller than the temperature acceleration rate of the first evaporation system.
6. A system according to claim 3, characterized in that the control means are specifically adapted to:
when the first surface resistance value reaches a preset surface resistance threshold value before the second surface resistance value, determining a real-time base film transmission speed according to a first functional relation between the base film transmission speed under the preset surface resistance threshold value and the temperature value of the first evaporation system and a real-time temperature value of the first evaporation system; obtaining an ideal temperature value of the second evaporation system according to a second functional relation between the base film transmission speed under the preset surface resistance threshold and the temperature value of the second evaporation system and the real-time base film transmission speed; adjusting the heating power of the second evaporation system according to the comparison result between the ideal temperature value of the second evaporation system and the actual temperature value of the second evaporation system; or,
When the second surface resistance value reaches a preset surface resistance threshold value before the first surface resistance value, determining a real-time base film transmission speed according to a second functional relation between the base film transmission speed under the preset surface resistance threshold value and the temperature value of the second evaporation system and a real-time temperature value of the second evaporation system; obtaining an ideal temperature value of the first evaporation system according to a first functional relation between the base film transmission speed under the preset surface resistance threshold and the temperature value of the first evaporation system and the real-time base film transmission speed; and adjusting the heating power of the first evaporation system according to the comparison result between the ideal temperature value of the first evaporation system and the actual temperature value of the first evaporation system.
7. A method for monitoring and controlling uniformity of a coating film, the method comprising:
acquiring a temperature value of an evaporation mechanism;
acquiring the surface resistance of the base film;
and controlling the base film transmission speed of the unreeling mechanism and/or the heating power of the evaporating mechanism according to the temperature value of the evaporating mechanism and the surface resistance value of the base film, so that the thickness of the coating along the moving direction of the base film is uniform.
8. The method according to claim 7, wherein the controlling the base film transmission speed of the unreeling mechanism according to the temperature value of the evaporating mechanism and the surface resistance value of the base film specifically comprises:
and determining the real-time base film transmission speed of the unreeling mechanism according to the functional relation between the base film transmission speed below the preset surface resistance threshold value and the temperature value of the evaporating mechanism and the real-time temperature value of the evaporating mechanism.
9. The method of claim 7, wherein the evaporation mechanism comprises a first evaporation system and a second evaporation system, the first evaporation system being disposed upstream of the second evaporation system along a base film transport path; the method specifically comprises the following steps:
acquiring a first temperature value of the first evaporation system and a second temperature value of the second evaporation system;
acquiring a first surface resistance value of a current coating surface of the base film, acquiring a total surface resistance value of a coating formed on two surfaces of the base film, and acquiring a second surface resistance value of another coating surface according to a difference value between the total surface resistance value and the first surface resistance value;
when the first surface resistance value reaches a preset surface resistance threshold value, determining a real-time base film transmission speed according to a first functional relation between the base film transmission speed under the preset surface resistance threshold value and the temperature value of the first evaporation system and a real-time temperature value of the first evaporation system;
Obtaining an ideal temperature value of the second evaporation system according to a second functional relation between the base film transmission speed under the preset surface resistance threshold and the temperature value of the second evaporation system and the real-time base film transmission speed;
and adjusting the heating power of the second evaporation system according to the comparison result between the ideal temperature value of the second evaporation system and the actual temperature value of the second evaporation system.
10. The method according to claim 9, wherein said adjusting the heating power of the second evaporation system based on the comparison between the ideal temperature value of the second evaporation system and the actual temperature value of the second evaporation system, comprises:
if the ideal temperature value of the second evaporation system is larger than the actual temperature value of the second evaporation system, controlling to increase the heating power of the second evaporation system, and controlling the heating power of the second evaporation system to be larger than the heating power of the first evaporation system or controlling the temperature acceleration rate of the second evaporation system to be larger than the temperature acceleration rate of the first evaporation system; if the ideal temperature value of the second evaporation system is smaller than the actual temperature value of the second evaporation system, controlling to reduce the heating power of the second evaporation system, and controlling the heating power of the second evaporation system to be smaller than the heating power of the first evaporation system or controlling the temperature acceleration rate of the second evaporation system to be smaller than the temperature acceleration rate of the first evaporation system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310498962.3A CN116445864A (en) | 2023-05-05 | 2023-05-05 | System and method for monitoring and regulating uniformity of coating |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310498962.3A CN116445864A (en) | 2023-05-05 | 2023-05-05 | System and method for monitoring and regulating uniformity of coating |
Publications (1)
Publication Number | Publication Date |
---|---|
CN116445864A true CN116445864A (en) | 2023-07-18 |
Family
ID=87132113
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202310498962.3A Pending CN116445864A (en) | 2023-05-05 | 2023-05-05 | System and method for monitoring and regulating uniformity of coating |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN116445864A (en) |
-
2023
- 2023-05-05 CN CN202310498962.3A patent/CN116445864A/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20130276706A1 (en) | Deposition apparatus | |
TW200536424A (en) | Feedback control system and method for maintaining constant resistance operation of electrically heated elements | |
GB2129018A (en) | Vacuum evaporation apparatus | |
KR20130111337A (en) | Vacuum evaporation apparatus | |
CN104233195A (en) | Evaporation equipment and evaporation method | |
CN108385077A (en) | A kind of coating apparatus and film plating process for capableing of real-time indirect monitoring thicknesses of layers | |
CN116445864A (en) | System and method for monitoring and regulating uniformity of coating | |
CN113235053B (en) | Evaporation coating method with intelligently adjustable evaporation rate | |
US4396640A (en) | Apparatus and method for substrate temperature control | |
US20030029382A1 (en) | Thin film forming method and apparatus | |
US4051270A (en) | Method of measuring vapor deposited coating thickness | |
KR20160024680A (en) | Strip coating apparatus | |
EP3494243B1 (en) | Homogeneous linear evaporation source with heater | |
JP5233248B2 (en) | Electrode manufacturing equipment | |
CN112944692A (en) | Water temperature control method and system of intelligent closestool | |
JPH08117663A (en) | Device for supplying coating material to roll coater | |
JP7128358B2 (en) | Plating layer control device and method in PVD plating process | |
TWI836404B (en) | Material deposition apparatus, method of depositing material on a substrate, and material deposition system | |
JP5320934B2 (en) | Vacuum deposition system | |
JP2663090B2 (en) | Metal strip frame processing apparatus and processing method | |
CN104032264A (en) | Film Coating System Capable Of Performing Thin Film Deposition In Rigorous Evaporation Environment | |
JP3787320B2 (en) | Method and apparatus for controlling alloying in hot dip galvanizing line | |
US20240027100A1 (en) | Control method of heating device | |
JPH1143758A (en) | Cooling method in alloying treatment process | |
CN113136549A (en) | Evaporation material control system and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |