CN115878872A - Construction progress visualization method and system - Google Patents

Construction progress visualization method and system Download PDF

Info

Publication number
CN115878872A
CN115878872A CN202310080936.9A CN202310080936A CN115878872A CN 115878872 A CN115878872 A CN 115878872A CN 202310080936 A CN202310080936 A CN 202310080936A CN 115878872 A CN115878872 A CN 115878872A
Authority
CN
China
Prior art keywords
construction
information
progress
initial model
task
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202310080936.9A
Other languages
Chinese (zh)
Other versions
CN115878872B (en
Inventor
刘沅
阎智力
谭阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yizhi Technology Chengdu Co ltd
Original Assignee
Yizhi Technology Chengdu Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yizhi Technology Chengdu Co ltd filed Critical Yizhi Technology Chengdu Co ltd
Priority to CN202310819906.5A priority Critical patent/CN116775966A/en
Priority to CN202310080936.9A priority patent/CN115878872B/en
Publication of CN115878872A publication Critical patent/CN115878872A/en
Application granted granted Critical
Publication of CN115878872B publication Critical patent/CN115878872B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/904Browsing; Visualisation therefor
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • General Engineering & Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a construction progress visualization method and a construction progress visualization system. The method comprises the following steps: acquiring part information of a construction project, wherein the part information comprises a plurality of construction parts, and each of the plurality of construction parts is configured with at least one construction task; establishing an initial model, wherein the initial model comprises partial or all initial graphic representations of a plurality of construction sites; acquiring construction task information of a construction project, and determining progress information of at least one construction part based on the construction task information; and determining a construction progress visualization result of the construction project based on the progress information and the initial model. The system comprises: the device comprises a first acquisition module, a model building module, a second acquisition module and a visual result determination module.

Description

Construction progress visualization method and system
Technical Field
The invention relates to the field of construction project management, in particular to a construction progress visualization method and a construction progress visualization system.
Background
During construction of a construction project, a number of interested parties (e.g., owners, construction contractors, etc.) may be involved. Multiple interested parties may wish to view the progress of the construction in real time, etc. At present, most of construction progress is manually updated, labor cost is high, and the reality and credibility of data of the construction progress cannot be guaranteed.
Therefore, it is desirable to provide a construction progress visualization method and system, which can automatically update the construction progress, reduce labor cost, ensure that the data of the construction progress is real and credible, and further enable a relevant party to check the construction progress in real time, thereby improving the use experience of the relevant party.
Disclosure of Invention
The invention comprises a construction progress visualization method. The construction progress visualization method comprises the following steps: acquiring part information of a construction project, wherein the part information comprises information of a plurality of construction parts, and each of the plurality of construction parts is configured with at least one construction task; establishing an initial model comprising an initial pictorial representation of some or all of the plurality of construction sites; acquiring construction task information of the construction project, and determining progress information of at least one construction part based on the construction task information; and determining a construction progress visualization result of the construction project based on the progress information and the initial model.
The invention comprises a construction progress visualization system. The construction progress visualization system includes: the device comprises a first acquisition module, a model establishment module, a second acquisition module and a visualization result determination module; the first acquisition module is used for acquiring position information of a construction project, wherein the position information comprises information of a plurality of construction positions, and each of the plurality of construction positions is configured with at least one construction task; the model building module is used for building an initial model, and the initial model comprises an initial graphic expression of part or all of the plurality of construction sites; the second acquisition module is used for acquiring the construction task information of the construction project and determining the progress information of at least one construction part based on the construction task information; and the visualization result determining module is used for determining the construction progress visualization result of the construction project based on the progress information and the initial model.
Drawings
The present description will be further explained by way of exemplary embodiments, which will be described in detail by way of the accompanying drawings. These embodiments are not intended to be limiting, and in these embodiments like numerals are used to indicate like structures, wherein:
FIG. 1 is a schematic illustration of an application scenario of a construction progress visualization system in accordance with some embodiments of the present description;
FIG. 2 is an exemplary block diagram of a construction progress visualization system according to some embodiments of the present description;
FIG. 3 is an exemplary flow diagram of a method of visualizing construction progress, according to some embodiments of the present description;
FIG. 4 is an exemplary flow diagram for generating an initial model of a first class of technology files, according to some embodiments of the present description;
FIG. 5 is an exemplary flow diagram for generating a visualization of construction progress for a first category of technical documents shown in some embodiments of the present description;
FIG. 6 is an exemplary flow diagram of a construction progress visualization of a second class of technical files, shown in some embodiments of the present description.
Detailed Description
In order to more clearly illustrate the technical solutions of the embodiments of the present specification, the drawings used in the description of the embodiments will be briefly described below. It is obvious that the drawings in the following description are only examples or embodiments of the present description, and that for a person skilled in the art, the present description can also be applied to other similar scenarios on the basis of these drawings without inventive effort. Unless otherwise apparent from the context, or otherwise indicated, like reference numbers in the figures refer to the same structure or operation.
It should be understood that "system", "apparatus", "unit" and/or "module" as used herein is a method for distinguishing different components, elements, parts, portions or assemblies at different levels. However, other words may be substituted by other expressions if they accomplish the same purpose.
The terms "a," "an," "the," and/or "the" are not intended to be inclusive in the singular, but rather are inclusive in the plural, unless the context clearly dictates otherwise. In general, the terms "comprises" and "comprising" merely indicate that steps and elements are included which are explicitly identified, that the steps and elements do not form an exclusive list, and that a method or apparatus may include other steps or elements.
Flow charts are used in this description to illustrate operations performed by a system according to embodiments of the present description. It should be understood that the preceding or following operations are not necessarily performed in the exact order in which they are performed. Rather, the various steps may be processed in reverse order or simultaneously. Meanwhile, other operations may be added to the processes, or a certain step or several steps of operations may be removed from the processes.
Fig. 1 is a schematic view of an application scenario of a construction progress visualization system according to some embodiments of the present description.
As shown in fig. 1, an application scenario 100 of the construction progress visualization system may include a processor 110, a network 120, a storage device 130, a user terminal 140, and a construction management platform 150.
The processor 110 may be configured to perform one or more of the functions disclosed in one or more embodiments of the present description. For example, the processor 110 may obtain location information for a construction project. For another example, the processor 110 may determine a construction progress visualization of the construction project based on the progress information and the initial model.
In some embodiments, processor 110 may include one or more processing engines (e.g., a single chip processing engine or a multi-chip processing engine). Merely by way of example, the processor 110 may include a Central Processing Unit (CPU), an Application Specific Integrated Circuit (ASIC), an Application Specific Instruction Processor (ASIP), a Graphics Processor (GPU), a Physical Processor (PPU), a Digital Signal Processor (DSP), a Field Programmable Gate Array (FPGA), a programmable logic circuit (PLD), a controller, a micro-controller unit, a Reduced Instruction Set Computer (RISC), a microprocessor, or the like or any combination thereof.
The network 120 may connect the various components of the system and/or connect the system with external resource components. The network 120 enables communication between the various components, as well as with other components outside the system, facilitating the exchange of data and/or information. For example, processor 110 may retrieve location information for a construction project from storage device 130 via network 120.
In some embodiments, the network 120 may be any one or more of a wired network or a wireless network. For example, network 120 may include a cable network, a fiber optic network, a telecommunications network, the internet, a Local Area Network (LAN), a Wide Area Network (WAN), a Wireless Local Area Network (WLAN), a Metropolitan Area Network (MAN), a Public Switched Telephone Network (PSTN), a bluetooth network, a ZigBee network (ZigBee), near Field Communication (NFC), an in-device bus, an in-device line, a cable connection, and the like, or any combination thereof. The network connection between the parts can be in one way or in multiple ways. In some embodiments, the network may be point-to-point, shared, centralized, etc. or a combination of topologies.
The storage device 130 may be used to store data and/or instructions related to the application scenario 100 of the construction progress visualization system. In some embodiments, storage device 130 may store data and/or information obtained from processor 110, user terminal 140, or the like. For example, the storage device 130 may store construction projects, construction task information, construction progress visualizations, and the like.
Storage device 130 may include one or more storage components, each of which may be a separate device or part of another device. In some embodiments, the storage device 130 may include Random Access Memory (RAM), read Only Memory (ROM), mass storage, removable storage, volatile read and write memory, and the like, or any combination thereof. Illustratively, mass storage may include magnetic disks, optical disks, solid state disks, and the like. In some embodiments, the storage device 130 may be implemented on a cloud platform.
User terminal 140 may refer to one or more terminal devices or software used by a user. The user may refer to an individual or a group related to the progress of the construction. For example, a plurality of related parties (e.g., an owner, a construction general contractor, a construction subcontractor, a constructor, a construction manager, a construction acceptance person, etc.) related to the progress of construction. In some embodiments, the user terminal 140 may include a mobile device 140-1, a tablet 140-2, a laptop 140-3, a desktop 140-4, and the like, or any combination thereof. In some embodiments, the processor 110 may interact with a user through a user terminal 140. The above examples are intended only to illustrate the broad scope of the user terminal and not to limit its scope.
The construction management platform 150 may include a platform that manages construction projects. In some embodiments, construction management platform 150 may include an Application Program (APP). In some embodiments, the APP may be provided in a user terminal of a user such as a constructor, a construction manager, or a construction acceptance staff. Wherein, APP in constructor's user terminal, construction management personnel and construction acceptance personnel's user terminal's APP's function can be different. In some embodiments, various information and operational data related to a construction project may be managed by construction management platform 150. In some embodiments, the construction management platform 150 may split the construction project into construction sites including multiple levels and construction tasks included in each of the construction sites, and represent the affiliations of the various levels of the construction project in the form of a task tree structure. In some embodiments, a construction manager may dispatch a construction task to a constructor (i.e., worker) via the construction management platform 150, and when the constructor accepts the construction task, the construction management platform 150 may generate dispatch information for the construction project. In some embodiments, construction management platform 150 may also receive acceptance information for each construction task (e.g., which may be input by construction acceptance personnel) to determine whether the construction task is complete and payrolls may be issued for the constructors. In some embodiments, a construction organization (e.g., an enterprise, a team, etc.) may issue payouts to constructors through the construction management platform 150 and generate worker payouts. In some embodiments, the construction management platform 150 may also upload and store worker salary information to the blockchain to ensure authenticity of the worker salary information. In some embodiments, the construction management platform 150 may also generate construction task information for each construction task in real-time based on the progress of the construction project.
In some embodiments, the construction progress visualization system may be one of the construction management platforms 150, and may communicate data with other portions of the construction management platform 150 via internal data connections. In other embodiments, the construction progress visualization system may be a system separate from the construction management platform 150 and may communicate data with the construction management platform 150 via the network 120. For example, the construction progress visualization system may obtain a task tree for a construction project and construction site information from construction management platform 150. For another example, the construction progress visualization system may obtain construction task information from the construction management platform 150, including worksheet information and worker salary information.
It should be noted that the application scenario 100 of the construction progress visualization system is provided for illustrative purposes only and is not intended to limit the scope of the present application. It will be apparent to those skilled in the art that various modifications and variations can be made in light of the description of the present specification. For example, the application scenario 100 of the construction progress visualization system may implement similar or different functionality on other devices. However, such changes and modifications do not depart from the scope of the present application.
FIG. 2 is an exemplary block diagram of a construction progress visualization system according to some embodiments of the present description.
In some embodiments, the construction progress visualization system 200 may include a first obtaining module 210, a model building module 220, a second obtaining module 230, and a visualization determination module 240.
In some embodiments, the first obtaining module 210 may be configured to obtain location information of a construction project, the location information including information of a plurality of construction locations, each of the plurality of construction locations configured with at least one construction task.
In some embodiments, model building module 220 may be used to build an initial model that includes an initial pictorial representation of some or all of the plurality of construction sites.
In some embodiments, the second obtaining module 230 may be configured to obtain construction task information for the construction project, and determine progress information for at least one construction site based on the construction task information.
In some embodiments, the visualization determination module 240 may be used to determine a construction progress visualization of the construction project based on the progress information and the initial model.
In some embodiments, the construction task information includes dispatching information and worker salary information, and the second obtaining module 230 may be further configured to determine a completed construction task based on the dispatching information and the worker salary information; based on the completed construction task, progress information for at least one construction site is determined.
In some embodiments, the second obtaining module 230 may be further configured to obtain acceptance information of at least one construction task; based on the acceptance information, progress information is determined.
In some embodiments, the model building module 220 may be further configured to obtain a technical file of the construction project; analyzing the technical file to obtain the structural information of the technical file; and associating the structural information with part or all of the plurality of construction parts to generate an initial model.
In some embodiments, the technology files include a first class of technology files, the first class of technology files not including structured elements; model building module 220 may be further configured to determine a first target element based on the first class of technology files, wherein the first target element comprises a building element; and extracting a preset position outline of the first target element, and taking the preset position outline as structural information.
In some embodiments, the model building module 220 may be further configured to identify the first target element and the non-first target element by the tag based on the first class of technology files, and mask the non-first target element.
In some embodiments, the model building module 220 may be further configured to determine a construction site of the plurality of construction sites that is located at a preset location; and based on the position information of the first target element, associating a preset position outline with a construction part located at a preset position in the plurality of construction parts, and generating an initial model, wherein the preset position outline is used as an initial graphic expression of part or all of the plurality of construction parts.
In some embodiments, the visualization result determining module 240 may be further configured to determine a construction site to be displayed based on the progress information; determining visual parameters of the construction part to be displayed based on the relevant information of the construction part to be displayed; and generating a graphic representation of the construction part to be displayed in the initial model according to the visualization parameters, and determining a visualization result of the construction progress.
In some embodiments, the visualization determination module 240 may be further configured to show the completion progress of the corresponding construction site in the pictorial representation of the construction site to be shown.
In some embodiments, the technology file comprises a second class of technology files, the second class of technology files comprising structured elements; the model building module 220 may be further configured to extract a second target element from the structured elements based on the second class of technical documents, and use the second target element as the structured information.
In some embodiments, model building module 220 may be further configured to associate a second target element with some or all of the plurality of construction sites, generating an initial model, wherein the second target element is expressed as an initial illustration of some or all of the plurality of construction sites.
In some embodiments, the visualization determination module 240 may be further configured to identify a completion progress of at least one construction site in the initial model based on the progress information; and determining the identified initial model as a construction progress visualization result.
It should be understood that the system and its modules shown in FIG. 2 may be implemented in a variety of ways. For example, in some embodiments the system and its modules may be implemented in hardware, software, or a combination of software and hardware.
It should be noted that the above description of the system and its modules is for convenience only and should not limit the present disclosure to the illustrated embodiments. It will be appreciated by those skilled in the art that, given the teachings of the present system, any combination of modules or sub-system configurations may be used to connect to other modules without departing from such teachings. In some embodiments, the first obtaining module 210, the model building module 220, the second obtaining module 230, and the visualization result determining module 240 disclosed in fig. 2 may be different modules in a system, or may be a module that implements the functions of two or more modules described above. For example, the first acquisition module 210 and the second acquisition module 230 may be integrated in one module. For example, each module may share one memory module, and each module may have its own memory module. Such variations are within the scope of the present disclosure.
FIG. 3 is an exemplary flow diagram of a method of visualizing construction progress, shown in some embodiments according to the present description. As shown in fig. 3, the process 300 includes the following steps. In some embodiments, the process 300 may be performed by the processor 110.
Step 310, obtaining position information of a construction project, wherein the position information comprises information of a plurality of construction positions, and each of the plurality of construction positions is configured with at least one construction task. In some embodiments, step 310 may be performed by the first acquisition module 210.
A construction project may refer to a project under construction or to be constructed. For example, the construction project is a construction project of a certain cell, a certain mall, or the like being constructed.
The site information may indicate information related to a construction site of the construction project. For example, the site information may include a name, a hierarchy, location information, and the like of the construction site. The construction site may refer to a portion to be constructed, which is divided by a building range, of a building in a construction project. For example, the construction section may include a building, a unit, or a floor of a building of the construction project. In some embodiments, a construction project may include a plurality of construction sites. In some embodiments, the site information may include information for each of a plurality of construction sites, and the like. In some embodiments, the construction sites may be divided into a plurality of different levels according to the coverage, for example, a first-level construction site having the highest level, a second-level construction site having a level lower than the first-level construction site, a third-level construction site having a level lower than the second-level construction site, and so on. In some embodiments, the primary construction site may comprise a building of a building. In some embodiments, the secondary construction site may comprise a unit of a building. In some embodiments, the tertiary construction site may include a floor of a building. In some embodiments, the high-level construction site may include a plurality of low-level construction sites. For example, a primary construction site may include one or more secondary construction sites. As another example, a secondary construction site may include one or more tertiary construction sites. It should be noted that the construction site may further include more levels, which is not limited in this specification, for example, each floor may include construction sites of multiple work types, and a construction site of each work type may be regarded as a four-level construction site.
In some embodiments, each of the plurality of construction sites is configured with at least one construction task, and the site information may indicate the construction task for which the construction site is configured. In some embodiments, a construction task may refer to a specific job task that needs to be completed by a constructor to complete a certain construction project. The construction tasks can be divided into different construction positions according to different work types. For example, the construction site may include a construction site of 3 units of 1 unit and 2 layers of steel bar workers (i.e., a work type), and the construction task may include straightening steel bars, welding steel bars, and the like of the construction site. Further details regarding construction task information can be found in relation to the description in step 330.
In some embodiments, the first obtaining module 210 may obtain the location information of the construction project in various ways. In some embodiments, the first obtaining module 210 may obtain the relevant data of the construction project through a network or the like. The first obtaining module 210 may automatically split the related data of the construction project into a task tree including a plurality of levels. For example, the first obtaining module 210 may divide the construction items by building, and obtain level 1 of a task tree representing different buildings. The first obtaining module 210 may divide different buildings according to units, and obtain level 2 of the task tree representing different units of different buildings. The first obtaining module 210 may divide different units according to floors, and obtain a level 3 of a task tree representing different floors. The first obtaining module 210 may divide the construction tasks of different floors according to work categories, to obtain a 4 th level of a task tree indicating a plurality of work categories, where the construction task corresponding to each work category is a 5 th level of the task tree. The first obtaining module 210 may obtain at least one construction task configured for each of the plurality of construction sites based on the task tree. For example, if the construction site is a floor (three-level construction site) and the floor corresponds to the 3 rd level of the task tree, the first obtaining module 210 may obtain the construction tasks of all types of the floor based on the task tree. In some embodiments, the first obtaining module 210 may also obtain a task tree for the construction project from the construction management platform 150.
At step 320, an initial model is established, the initial model including an initial pictorial representation of some or all of the plurality of construction sites. In some embodiments, step 320 may be performed by model building module 220.
The initial model may refer to an initial visualized model of the construction project. The initial model may be a two-dimensional model or a three-dimensional model. The user may view the initial model through the user terminal. In some embodiments, the initial model may include an initial pictorial representation of some or all of the plurality of construction sites. In some embodiments, the initial pictorial representation may include a visual presentation of some or all of the construction project. For example, the initial model may include an initial pictorial representation of a construction site of a first floor of different buildings, different units, etc. As another example, the initial model may include all buildings of the construction project, an initial pictorial representation of the floors of all units, and so forth.
In some embodiments, model building module 220 may obtain a technical file of the construction project; analyzing the technical file to obtain the structural information of the technical file; and associating the structural information with part or all of the plurality of construction positions to generate an initial model.
The technical document may refer to technical data related to a construction project, for example, a construction drawing, a design standard, and the like of the construction project. The type of technical file may include a variety of types. In some embodiments, the technology files may include a first type of technology file, which may be a file that does not include structured elements. For example, the first type of technical document may include a drawing of a design software (e.g., sketchup, etc.), etc. In some embodiments, the technology files may also include a second class of technology files, which may be files that include structured elements. For example, the second technical files may include drawings of Building Information Model (BIM) type.
In some embodiments, model building module 220 may obtain a technical file of the construction project in a storage device over a network.
Structured information may refer to information in a technical document that may represent the structure of a construction project. The structured information may include the relevant structure of the construction project and data of the relevant structure. For example, the structured information may include information such as buildings, the number of buildings, and location information between buildings in the construction project represented in the technical document, the number of units and units in different buildings, the number of floors and the floor height of different units, the internal structure of different floors, and data of related structures. The data of the relevant structure may include data of the axis of the relevant structure, floor elevation data, size of the relevant structure, etc.
In some embodiments, model building module 220 may determine structured information based on structured elements contained in the technical file. In some embodiments, the model building module 220 may also parse different types of technical documents by parsing methods, such as structured matching, neural networks, statistical classification, etc., to determine the structured information of the technical documents. The structural information of the analyzed technical file can embody the information of a plurality of interrelated components of the construction project. There is a clear hierarchical structure between the components of the construction project in the structured information.
In some embodiments, the model building module 220 may determine the first target element based on the first class of technical documents that does not include the structural element, extract a preset position contour of the first target element, and use the preset position contour as the structural information, which may be referred to in the related description of fig. 4.
In some embodiments, the model building module 220 may extract a second target element from the structured elements based on a second type of technical document including the structured elements, and use the second target element as the structured information, and further on the above description may refer to fig. 6.
In some embodiments, model building module 220 may associate the structured information with a plurality of construction sites. For example, the model building module 220 may correspond the structured information to a plurality of levels in the task tree one to one. For example only, model building module 220 may associate and bind building information of the relevant structure in the structured information with level 1 representing a building in the task tree. Such as associating and binding building information representing building No. 1 with level 1 representing building No. 1 in the task tree. By analogy, the model building module 220 may associate and bind building information of a related structure in the structured information with the level 1 representing the building in the task tree in a one-to-one correspondence. The model building module 220 may associate and bind the unit information of the related structure in the structured information with the level 2 representing the different units in the task tree. The model building module 220 may associate and bind the floor information of the related structure in the structured information with the 3 rd level representing the different floors in the task tree. The model building module 220 may associate and bind the floor internal structure information of the related structure in the structured information with the 4 th level representing different job types in the task tree. In this manner, model building module 220 may associate the structured information with some or all of the plurality of construction sites to generate an initial model. The model building module 220 may select part or all of the plurality of construction locations to be associated with the structured information according to actual requirements, thereby generating an initial model.
In some embodiments, the model building module 220 may determine a construction site located at a preset position in the plurality of construction sites, and generate an initial model by associating the preset position profile with the construction site located at the preset position in the plurality of construction sites based on the position information of the first target element, which may be referred to in relation to fig. 4.
In some embodiments, model building module 220 may associate the second target element with some or all of the plurality of construction sites to generate an initial model, further of which reference may be made to the associated description of FIG. 6.
In some embodiments of the present description, the structured information of the technical file is obtained by analyzing the technical file, and then the structured information is associated with part or all of the plurality of construction locations to generate an initial model, which is beneficial to determining a construction progress visualization result of a construction project based on the initial model, so that a user can view the result in real time.
Step 330, obtaining the construction task information of the construction project, and determining the progress information of at least one construction part based on the construction task information. In some embodiments, step 330 may be performed by the second acquisition module 230.
The construction task information may refer to information related to a construction task. For example, the construction task information may include a name of the construction task, a corresponding construction site, a start and stop date, worksheet information of the construction task, worker information of receiving the construction task, a construction amount of the construction task, worker salary information corresponding to the construction task, and the like.
The progress information refers to related information that can indicate the completion of the construction site. For example, progress information may be represented by incomplete, completed. For another example, the progress information may be represented by a completion progress. The completion progress may indicate a degree of completion of the construction site. The progress of completion may be represented by a numerical value (e.g., a percentage between 0-100%), or the like. The higher the value is, the more at least one construction task indicating the arrangement of the construction site is completed, and the greater the completion progress is. Illustratively, 100% means that at least one construction task of the construction site configuration is completely completed, and the completion progress is 100%.
In some embodiments, the progress information may further include information related to a planned time and a planned completion amount of the construction site. For example, the current time is 5 months and 1 day, and the schedule information may include planning the construction site a completion for 5 months and 10 days. For another example, when the current time is 5 months and 1 days, the progress information may include 5 months and 1 days, the completion progress of the construction site B is 95%, and the completion progress of the construction site B is 100% in the planned 5 months and 15 days.
In some embodiments, the second obtaining module 230 may obtain the construction task information of the construction project in a variety of ways. For example, the second obtaining module 230 may obtain the construction task information of the construction project stored by the storage device through the network. For another example, the second obtaining module 230 may obtain the construction task information generated by the user terminal or the server in real time through the network. In some embodiments, the second retrieval module 230 may retrieve the construction task information by accessing the construction management platform 150 (or some module thereof).
In some embodiments, the second acquisition module 230 may determine progress information for at least one construction site based on the construction task information. For example, the second obtaining module may obtain construction task information of one or more construction tasks corresponding to a certain construction location. And further determining whether one or more construction tasks are finished or not based on the starting and ending dates in the construction task information. The larger the number of the construction tasks finished, the higher the numerical value corresponding to the progress information (such as the completion progress) of the construction part. For another example, the second obtaining module 230 may determine the completion time limit of one or more construction tasks based on the start/stop date in the construction task information of one or more construction tasks corresponding to a certain construction location, and further determine the progress information of the future time of the construction location.
In some embodiments, the progress information for the construction site may be updated in real-time. The second obtaining module 230 may update, in real time, progress information determining at least one construction site based on the construction task information.
The start and stop dates in the construction task information may not be consistent with the actual completion condition of the construction task. For example, the construction task completion period in the construction task information may be 5 months and 10 days, and the actual completion period of the construction task may be 5 months and 15 days. In order to more accurately determine the progress information of the construction site, the progress information may be determined by dispatch information and worker payroll information. In some embodiments, the construction task information may include dispatch information and worker salary information. The second obtaining module 230 may determine a completed construction task based on the dispatch information and the worker salary information, and determine progress information of at least one construction site based on the completed construction task.
Dispatch information may refer to relevant information for distributing a construction task. The dispatching information may include a name of the construction task, a construction site corresponding to the construction task, a dispatching start date, a dispatching end date, money amount information corresponding to the construction task, worker information corresponding to the construction task, and the like.
Worker salary information may refer to relevant information about salary given to a worker. The worker salary information may include relevant information such as a salary date, a salary amount, an enterprise for sending salary to a worker, a worker for receiving salary, a name of a construction task corresponding to the salary, and a construction site corresponding to the construction task. The dispatching information and the worker salary information have a one-to-one correspondence relationship. And the dispatching information corresponding to the same construction task is the same as the name of the construction task corresponding to the worker salary information and the construction part corresponding to the construction task.
The completed construction task may indicate that the construction corresponding to the construction task is finished. In some embodiments, an enterprise may manage a construction project through construction management platform 150. In some embodiments, the construction management platform 150 may only issue salaries to workers when the construction tasks accepted by the workers are completed and accepted. That is, when the worker receives the salary issued by the construction task, it can indicate that the construction task is finished. In some embodiments, the construction management platform 150 issues salaries to workers without manual intervention, and the salaries are issued to the workers only when the construction management platform 150 determines that the construction task accepted by the workers is checked and accepted, so that the timeliness of salary can be effectively guaranteed, and the accuracy of generated salary information can be guaranteed.
In some embodiments, after the worker pays, the construction management platform 150 may upload the worker paying information to the corresponding blockchain, so as to prevent the worker paying information from being modified, thereby ensuring the authenticity of the worker paying information. The second obtaining module 230 may obtain the worker salary information through the corresponding blockchain. In some embodiments, the second obtaining module 230 may determine a corresponding construction task having a dispatch end date and a worker payroll date that are earlier than or equal to the current date as a completed construction task.
In some embodiments, the second obtaining module 230 may determine progress information for the construction site based on the number of completed construction tasks and the total number of construction tasks for the construction site configuration. For example, the second obtaining module 230 may determine a ratio (e.g., a percentage) of the number of completed construction tasks to the total number of construction tasks for the configuration of the construction site as the completion progress of the construction site. In some embodiments, one or more construction tasks of a construction site configuration may each correspond to a different weight value. The weight value may be preset in advance. For example, the larger the work load of a construction task, the larger the corresponding weight value. The smaller the engineering quantity of the construction task is, the smaller the corresponding weight value is. The second obtaining module 230 may perform weighted summation based on the completed construction tasks configured for the construction site and the corresponding weights to determine the completion progress of the construction site. Illustratively, construction site a corresponds to 3 construction tasks (corresponding weights of 0.5, 0.3, and 0.2, respectively), wherein 2 construction tasks have been completed (corresponding weights of 0.3 and 0.2, respectively). The progress information of the construction site a is 50% of the completion progress.
In some embodiments of the present description, a completed construction task is determined based on dispatch information and worker salary information, and progress information of at least one construction site is automatically determined based on the completed construction task, so that authenticity of data of the determined progress information can be ensured, falsification is avoided, and accuracy of a subsequently determined construction progress visualization result is ensured.
In some embodiments, the second obtaining module 230 may obtain acceptance information of at least one construction task, and determine progress information based on the acceptance information.
The acceptance information may refer to information related to acceptance of the completion quality of the construction task. When a construction task is completed, the completion quality of the construction task needs to be correspondingly checked and accepted. The acceptance information can comprise the name of the construction task to be accepted, the acceptance date and the acceptance result (such as qualified construction task, unqualified construction task and rework requirement).
In some embodiments, the second obtaining module 230 may obtain acceptance information of the construction task input by the user through the user terminal through the network. In some embodiments, the second obtaining module 230 may obtain acceptance information for the construction task by accessing other portions of the construction management platform.
In some embodiments, the second obtaining module 230 may determine progress information based on the acceptance information. For example, when the acceptance information of one or more construction tasks corresponding to the construction site C is all qualified, the second obtaining module 230 may determine that the progress information of the construction site C is completed. For another example, when the acceptance information of one or more construction tasks corresponding to the construction site D includes pass and fail, the second obtaining module 230 may determine that the progress information of the construction site D is incomplete. The second obtaining module 230 may also determine the completion progress of the construction site D according to a ratio (e.g., percentage) of the construction tasks that are qualified according to the acceptance information of the construction site D to the total number of the construction tasks of the construction site D. The second obtaining module 230 may also perform weighted summation according to the construction tasks that are qualified according to the acceptance information of the construction location D and the corresponding weights to determine the completion progress of the construction location D.
In some embodiments of the present description, the progress information is determined based on the acceptance information, so that accuracy of the determined progress information can be improved, and accuracy of a subsequently determined construction progress visualization result can be ensured.
And 340, determining a construction progress visualization result of the construction project based on the progress information and the initial model. In some embodiments, step 340 may be performed by the visualization determination module 240.
The construction progress visualization result may refer to a result of the construction progress presented in a form that can be viewed. The construction progress visualization result can be represented through a visualization progress model. For example, the construction progress visualization result may be a three-dimensional visualization progress model that can be rotated 360 degrees. The user can check the construction progress visualization result through the user terminal. The construction progress visualization result can display an actual construction progress visualization result at the current time, a predicted construction progress visualization result at the future time, a construction progress visualization result at the historical time, and the like. The user can select the construction progress visualization results at different times according to actual requirements.
In some embodiments, the visualization result determining module 240 may obtain the construction location (i.e., the floor) corresponding to the progress information in the level 3 of the task tree and the one-to-one correspondence relationship between the task tree and the initial model, and then present the construction location corresponding to the progress information in the initial model, determine the visualization progress model, and the visualization result of the construction progress may be embodied through the visualization progress model. When the visualization result of the construction progress is determined for the first time, the visualization result determining module 240 may determine the visualization progress model by presenting the construction part corresponding to the progress information through the initial model based on the progress information and the initial model. In determining the visualization result of the construction progress for the second time, the visualization result determining module 240 may determine a visualization progress model corresponding for the second time based on the progress information and the visualization progress model corresponding for the first time. By analogy, the visualization result determining module 240 determines the visualization result of the construction progress based on the previous visualization progress model. The visualization result determination module 240 may update the visualization progress model based on the real-time updated progress information, and update the construction progress visualization result of the construction project in real time. In some embodiments, the construction progress visualization may also be determined each time based on the current progress information and the initial model.
In some embodiments of the description, the construction progress visualization result of the construction project is determined through the progress information of the construction part and the initial model, so that a user can check the construction progress at different time points in real time, and the use experience of the user is improved. In some embodiments of the present description, the progress information of the construction location is automatically obtained, and the construction progress is automatically updated, so that the labor cost can be reduced.
FIG. 4 is an exemplary flow diagram for generating an initial model of a first class of technology files, according to some embodiments of the present description. As shown in fig. 4, the process 400 includes the following steps. In some embodiments, flow 400 may be performed by processor 110.
Step 410, determining a first target element based on the first type of technical file, wherein the first target element comprises a building element.
A first category of technical documents may refer to technical material associated with a construction project that does not include structured elements. For example, the first type of technical document may be a non-BIM type of drawing (e.g., a sketch, an effect drawing, etc.). For example only, the first type of technical document may include Sketchup-type drawings, and the like. Sketchup-type drawings are drawings that do not include data on structured sites. Structured elements refer to elements of data that can characterize the relevant structured part of a construction project. For example, the structured elements may include elements of relevant data for buildings of different buildings, underground garages, cell squares, etc. in a construction project. The relevant data may include axes of the structured portions, elevation data, size data, position information, positional relationships between different structured portions, and the like.
The first target element may be an element having the same attribute as the structured site. In some embodiments, the first target element may comprise a building element. The building elements may be elements representing buildings such as unit buildings, ocean houses, villas, underground garages, and residential squares involved in the construction project. The information related to the first target element may include various kinds, for example, position information of the first target element, shape information of the first target element, size information of the first target element, and the like. The position information of the first target element refers to relevant information that can characterize the geographical position of the building represented by the first target element in the construction project. For example, the location information of the first target element may include latitude and longitude information, coordinate information, and the like, in which a building is located. The shape information of the first target element may be related information characterizing the outer shape of the building represented by the first target element. Such as the shape of the bottom of a building, the shape of a projection, etc. The size information of the first target element may be related information characterizing various sizes of the building represented by the first target element. Such as the height of the building, the dimensions of the outline, etc. For example, the axis data and floor height data corresponding to the construction site.
In some embodiments, model building module 220 may determine the first target element, information related to the first target element, and the like in a variety of ways (e.g., using drawing processing software, through drawing secondary development techniques, and the like).
In some embodiments, the model building module 220 may identify the first target element and the non-first target element by the tag based on the first class of technology files and mask the non-first target element.
The label may refer to a classification label preset in advance. The identified first target element and non-first target elements may be included in the tag. Non-first target elements may refer to elements that differ from the construction project structured site attributes. For example, the non-first target elements in Sketchup-type drawings may include models of people, greens (trees, flowers, etc.), vehicles, and the like. The model building module 220 may mask the non-first target elements in the Sketchup-type drawing, and then determine the processed Sketchup-type drawing that only includes the first target elements.
In some embodiments of the present description, the accuracy of the structured information of the determined technical document may be further improved by the tag identifying the first target element and the non-first target element.
Step 420, extracting a preset position contour of the first target element, and using the preset position contour as the structural information.
The preset position profile may refer to a bottom profile of the first target element located at a preset area, for example, a profile of a different building located at the ground, a preset height, a bottom of a building, etc. The preset height may be a height (e.g., 1 meter, 2 meters, etc.) preset in advance from the ground.
In some embodiments, the model building module 220 may extract the preset location profile of the first target element (e.g., buildings, etc.) through a drawing secondary development technique (e.g., cross-plane capability in the secondary development interface of Sketchup), etc., and use the preset location profile as the structured information.
In some embodiments of the present description, for a first type of technical file that does not include a structural element, a preset position profile is extracted through a drawing secondary development technology and the like, and is used as structural information, which is beneficial to expanding a use coverage of a construction progress visualization system, so that the first type of technical file that does not include a structural element can also meet the requirement of visualization of the construction progress.
And 430, determining a construction position located at a preset position in the plurality of construction positions.
The construction site at the preset position may refer to a component part on the ground, a preset height, a bottom, etc. that needs to be constructed in a construction project. For example, the construction project is a certain cell being constructed. The construction site at the preset position may be the construction of a ground, a preset height, a bottom, etc. portion in the first floor of each unit of the building of the community, for example, the foundation of the building, the first floor, the bottom of the first floor, etc.
In some embodiments, the model building module 220 may determine a construction site located at a preset position among the plurality of construction sites based on the site information of the construction site. For example, the model building module 220 may determine that the construction site located at the preset position is a construction site of the first floor as the position information in the site information of the construction site.
And step 440, associating a preset position outline with a construction part located at a preset position in the plurality of construction parts based on the position information of the first target element, and generating an initial model, wherein the preset position outline is expressed as an initial diagram of part or all of the plurality of construction parts.
The position information of the first target element can be seen in the related description of step 410.
In some embodiments, the model building module 220 may associate and bind the preset position contour with the construction site at the preset position in the task tree based on the position information of the first target element. For example only, the location information of the first target element is building 1 unit d, and the model building module 220 may associate and bind the preset location outline of building 1 unit d with the construction site in the task tree representing building 1 unit d at the preset location. By analogy, the model building module 220 may associate and bind the preset position profiles with the same positions with the construction positions located at the preset positions in the task tree based on the position information of the first target element, so as to generate the initial model. And the processed Sketchup drawings generate an initial model by associating the preset position outline with the construction position located at the preset position in the plurality of construction positions. In some embodiments, the initial model is a three-dimensional initial model that can be identified by a computer.
In some embodiments of the present description, the initial model is generated by associating the preset position profile with a construction position located at a preset position in the plurality of construction positions, which is beneficial to automatically building based on the generated initial model, and further determining a construction progress visualization result of the construction project, so that a user can conveniently check the construction progress of the construction project in real time.
In some embodiments, the method for generating the initial model based on the first-class technical document may also include other deformation processes. For example only, after the model building module 220 determines the first target elements, each first target element may be associated and bound with a structural part of the second level (e.g., a building) according to the position information of the first target element, and then a preset position profile of the first target element is extracted, and the obtained preset position profile is used as a preset position profile of the structural part of the second level (e.g., a building) bound thereto, and the initialization model is generated based on the preset position profile. Since the second level structured portion includes a plurality of third level structured portions (e.g., cells), the preset location profile of the second level structured portion also includes a plurality of third level structured portions.
In some embodiments, based on the generated initial model, the visualization result determining module 240 may determine the construction site to be displayed based on the progress information, and determine the visualization parameter of the construction site to be displayed based on the related information of the construction site to be displayed. The visualization result determining module 240 may generate a graphical representation of the construction site to be displayed in the initial model according to the visualization parameters, and further determine a visualization result of the construction progress, which may be referred to in the related description of fig. 5 for more contents above.
FIG. 5 is an exemplary flow diagram for generating a visualization of construction progress for a first category of technical documents shown in some embodiments of the present description. As shown in fig. 5, the process 500 includes the following steps. In some embodiments, flow 500 may be performed by processor 110.
And 510, determining a construction part to be displayed based on the progress information.
The construction site to be displayed may refer to a construction site that is not embodied in the initial model.
In some embodiments, the visualization determination module 240 may determine the construction site to be presented based on the progress information. For example, the visualization result determination module 240 may determine the construction site completed in the progress information as the construction site to be displayed. For another example, the visualization result determining module 240 may determine the construction site of which the completion progress is greater than 0 in the progress information as the construction site to be displayed.
In some embodiments, the construction sites to be displayed include at least adjacent construction sites to the corresponding construction sites in the initial model. For example, the position of a part of the construction site in the initial model is floor 1 of the cell a. The construction positions to be exhibited related to the unit A in the construction positions to be exhibited at least comprise a floor 2 adjacent to the floor 1 or a minus one floor. In some embodiments, when the position of the construction site to be displayed determined by the visualization result determining module 240 is discontinuous from the position of the corresponding construction site in the initial model (i.e., does not include the adjacent construction site with the construction site in the initial model), the visualization result determining module 240 may perform a warning or alert about an abnormality, etc. For example, part of the construction sites in the initial model is floor 1 of the unit B. When the to-be-displayed construction part of the to-be-displayed construction part related to the unit B includes the floor 3 spaced from the floor 1 and does not include the floor 2, the visual result determining module 240 may prompt the progress information and/or the to-be-displayed construction part to be abnormal, so that the construction progress visualization system automatically reconfirms or prompts a manager of the construction progress visualization system to perform manual confirmation and the like, and further, the accuracy of a subsequent construction progress visualization result can be ensured.
Step 520, determining the visualization parameters of the construction part to be displayed based on the relevant information of the construction part to be displayed.
The related information of the construction site to be exhibited may refer to information related to the construction site to be exhibited. For example, the information related to the construction site to be displayed may include a name, a position, a size, a story height, progress information of at least one construction task configured by the construction site, and the like of the construction site. In some embodiments, the information related to the construction site to be presented may be determined based on site information of the construction project. For more information about the location of the construction project and the construction location, reference may be made to the description of fig. 3.
The visualization parameters may refer to parameters of how the construction site to be presented is automatically generated in the model based on the initial model. For example, the visualization parameters may include axis data, floor elevation data, etc. corresponding to the construction site.
In some embodiments, the visualization result determining module 240 may determine the visualization parameter of the construction site to be displayed through the first target element and the information related to the first target element, and the like, based on the association relationship between the hierarchy of the construction site to be displayed in the task tree and the first target element.
And 530, generating a graphic representation of the construction part to be displayed in the initial model according to the visualization parameters, and determining a visualization result of the construction progress.
In some embodiments, the visualization result determining module 240 may automatically generate a pictorial representation of the construction site to be displayed in the initial model according to the visualization parameters, and determine the visualization result of the construction progress. For example, the visualization result determining module 240 may stretch the preset position profile in the initial model according to the axis data and the floor elevation data by using a push-pull function provided in a secondary development interface of construction drawing design software such as Sketchup, so as to automatically generate a model of the construction site to be displayed. The visualization result determining module 240 may automatically generate a graphical representation of the construction site to be displayed in the initial model according to the visualization parameters, and determine a visualization result of the construction progress.
In some embodiments, the visualization result determining module 240 may determine, in real time or periodically, the visualization parameter of the construction location to be displayed according to the continuously updated progress information, and generate, in real time or periodically, a graphical representation of the construction location to be displayed on the basis of the initial model (such as the visualization progress model) updated last time according to the visualization parameter, so as to determine the visualization result of the construction progress.
In some embodiments, the visualization determination module 240 may show the completion progress of the corresponding construction site in a pictorial representation of the construction site to be shown. For more explanation of the completion progress of the construction site, reference may be made to the description of fig. 3.
In some embodiments of the present description, by displaying the completion progress of the corresponding construction site in the pictorial representation of the construction site to be displayed, the display can be performed in the initial model even if the construction site is not completed, which may allow the owner, construction contractor, construction management department, and the like to have a more detailed understanding of the construction progress.
In some embodiments of the present description, the non-BIM technical file is analyzed, and the initial visualization model is generated on the basis of the graph of the non-BIM technical file, so that the construction progress visualization method and system can be effectively prevented from being limited by the original file of the construction project. Moreover, since the BIM-type technical files generally require high cost, most construction projects do not have such technical files, and the construction progress visualization method and system provided by some embodiments of the present disclosure do not require construction projects to have BIM-type files, which can save visualization cost and effectively improve the application range of the construction progress visualization method and system.
FIG. 6 is an exemplary flow diagram of a construction progress visualization of a second class of technical files, shown in some embodiments herein. As shown in fig. 6, the process 600 includes the following steps. In some embodiments, flow 600 may be performed by processor 110.
And step 610, extracting a second target element in the structural elements based on the second-class technical file, and taking the second target element as structural information.
The second category of technical documents may refer to technical material associated with a construction project that includes structured elements. For example, the second type of technical document may be a BIM type of drawing. Illustratively, drawings of BIM-type construction drawing design software, drawings of lightweight technology platforms and the like. The related description about the structural element can refer to the related description of fig. 4.
The second target element refers to a related element that may characterize the structuring of the construction project. For example, the second target element may include a structured building model, such as a structured building model, a structured unit model, a structured floor model, and the like.
In some embodiments, since the second type of technical document includes the structured elements, the model building module 220 may directly extract a second target element from the structured elements based on the second type of technical document, and use the second target element as the structured information.
In some embodiments of the present description, for a second type of technical file including a structural element, a second target element in the structural element may be directly extracted, and the second target element is used as structural information, and for different technical files, the structural information is determined in different ways, which is beneficial to improving the efficiency of the determined structural information, further expanding the coverage area of the construction progress visualization system, and facilitating subsequent generation of an initial model and determination of a construction progress visualization result.
And step 620, associating a second target element with part or all of the plurality of construction positions to generate an initial model, wherein the second target element is used as an initial graphic expression of part or all of the plurality of construction positions.
In some embodiments, model building module 220 may associate the second target element with some or all of the plurality of construction sites, generating an initial model. For example, the model building module 220 may associate and bind the second target element with a plurality of levels in the task tree in a one-to-one correspondence. For example only, the model building module 220 may associate and bind the different buildings of the second target element with levels 1 in the task tree representing the different buildings in a one-to-one correspondence. By analogy, the model building module 220 may associate and bind different units of the second target element with levels 2 in the task tree representing the different units in a one-to-one correspondence. The model building module 220 may associate and bind the different floors of the second target element with levels 3 in the task tree representing the different floors in a one-to-one correspondence. In this manner, model building module 220 may associate the second target element with some or all of the plurality of construction sites to generate an initial model.
Step 630, based on the progress information, a completion progress of at least one construction site in the initial model is identified.
The completion progress may indicate a degree of completion of the construction site. The relevant description of the completion progress can be referred to the relevant description of fig. 3.
In some embodiments, the initial model may directly include all buildings, units, floors, etc. of the construction project. The visualization determination module 240 may identify the completion progress of at least one construction site in the initial model in a variety of ways. For example, the visualization determination module 240 may identify the completion progress of the corresponding construction site in the initial model by a numerical value representing the completion progress based on the completion progress of the construction site in the progress information. For another example, the visualization determination module 240 may identify the completion progress of the corresponding construction site in the initial model by different colors and/or different marks and/or numerical values, etc. representing the completion progress based on the completion progress of the construction site in the progress information. In example 1, the color green indicates a completed construction site, the color orange indicates a construction site where construction is not started, the color yellow indicates a construction site where construction is started but not completed, and the like, wherein the construction site colored in yellow may also be marked with a numerical value indicating the progress of completion. Example 2, a circle mark indicates a completed construction site, a square mark indicates a construction site where construction is not started, a triangle mark indicates a construction site where construction is started but not completed, and the like, wherein the construction site of the triangle mark may also mark a numerical value indicating a completion progress.
In other embodiments, the initial model may include only portions of the construction project. For example, the initial model includes only construction sites in a construction project at a predetermined position (e.g., ground, etc.). The visualization result determination module 240 may present the construction part corresponding to the progress information through the initial model based on the progress information (such as the completed construction part, the uncompleted construction part, and the completion progress), and identify the completion progress of the corresponding construction part.
And step 640, determining the identified initial model as a construction progress visualization result.
The identified initial model can indicate the initial model identifying the completion progress of the construction part.
In some embodiments, the visualization determination module 240 may directly determine the identified initial model as a construction progress visualization for the interested party to view in real time.
In some embodiments of the present specification, an initial model is generated by associating the second target element with the construction site, and a completion progress of at least one construction site in the initial model is identified based on the progress information, so that a user can view a construction progress visualization result of a construction project in real time, and the use experience of the user is further improved.
It should be noted that the above description of the flow is for illustration and description only and does not limit the scope of the application of the present specification. Various modifications and alterations to the flow may occur to those skilled in the art, given the benefit of this description. However, such modifications and variations are intended to be within the scope of the present description.
Having thus described the basic concept, it will be apparent to those skilled in the art that the foregoing detailed disclosure is to be regarded as illustrative only and not as limiting the present specification. Various modifications, improvements and adaptations to the present description may occur to those skilled in the art, though not explicitly described herein. Such modifications, improvements and adaptations are proposed in the present specification and thus fall within the spirit and scope of the exemplary embodiments of the present specification.
Also, the description uses specific words to describe embodiments of the description. Reference throughout this specification to "one embodiment," "an embodiment," and/or "some embodiments" means that a particular feature, structure, or characteristic described in connection with at least one embodiment of the specification is included. Therefore, it is emphasized and should be appreciated that two or more references to "an embodiment" or "one embodiment" or "an alternative embodiment" in various places throughout this specification are not necessarily all referring to the same embodiment. Furthermore, some features, structures, or characteristics of one or more embodiments of the specification may be combined as appropriate.
Additionally, the order in which elements and sequences are described in this specification, the use of numerical letters, or other designations are not intended to limit the order of the processes and methods described in this specification, unless explicitly stated in the claims. While certain presently contemplated useful embodiments of the invention have been discussed in the foregoing disclosure by way of various examples, it is to be understood that such detail is solely for that purpose and that the appended claims are not limited to the disclosed embodiments, but, on the contrary, are intended to cover all modifications and equivalent arrangements that are within the spirit and scope of the embodiments herein described. For example, although the system components described above may be implemented by hardware devices, they may also be implemented by software-only solutions, such as installing the described system on an existing server or mobile device.
Similarly, it should be noted that in the preceding description of embodiments of the present specification, various features are sometimes grouped together in a single embodiment, figure, or description thereof for the purpose of streamlining the disclosure aiding in the understanding of one or more of the embodiments. This method of disclosure, however, is not intended to imply that more features than are expressly recited in a claim. Indeed, the embodiments may be characterized as having less than all of the features of a single embodiment disclosed above.
Numerals describing the number of components, attributes, etc. are used in some embodiments, it being understood that such numerals used in the description of the embodiments are modified in some instances by the use of the modifier "about", "approximately" or "substantially". Unless otherwise indicated, "about", "approximately" or "substantially" indicates that the number allows a variation of ± 20%. Accordingly, in some embodiments, the numerical parameters used in the specification and claims are approximations that may vary depending upon the desired properties of the individual embodiments. In some embodiments, the numerical parameter should take into account the specified significant digits and employ a general digit-preserving approach. Notwithstanding that the numerical ranges and parameters setting forth the broad scope of the range are approximations, in the specific examples, such numerical values are set forth as precisely as possible within the scope of the application.
For each patent, patent application publication, and other material, such as articles, books, specifications, publications, documents, etc., cited in this specification, the entire contents of each are hereby incorporated by reference into this specification. Except where the application history document does not conform to or conflict with the contents of the present specification, it is to be understood that the application history document, as used herein in the present specification or appended claims, is intended to define the broadest scope of the present specification (whether presently or later in the specification) rather than the broadest scope of the present specification. It is to be understood that the descriptions, definitions and/or uses of terms in the accompanying materials of the present specification shall control if they are inconsistent or inconsistent with the statements and/or uses of the present specification.
Finally, it should be understood that the embodiments described herein are merely illustrative of the principles of the embodiments described herein. Other variations are also possible within the scope of this description. Thus, by way of example, and not limitation, alternative configurations of the embodiments of the present specification can be seen as consistent with the teachings of the present specification. Accordingly, the embodiments of the present description are not limited to only those embodiments explicitly described and depicted herein.

Claims (10)

1. A construction progress visualization method is characterized by comprising the following steps:
acquiring part information of a construction project, wherein the part information comprises information of a plurality of construction parts, and each of the plurality of construction parts is configured with at least one construction task;
establishing an initial model comprising an initial pictorial representation of some or all of the plurality of construction sites;
acquiring construction task information of the construction project, and determining progress information of at least one construction part based on the construction task information; and
and determining a construction progress visualization result of the construction project based on the progress information and the initial model.
2. The method of claim 1, wherein the construction task information includes dispatch information and worker salary information, and wherein determining progress information for at least one construction site based on the construction task information includes:
determining a completed construction task based on the dispatching information and the worker salary information;
determining progress information for the at least one construction site based on the completed construction task.
3. The method of claim 1, wherein the establishing an initial model comprises:
acquiring a technical file of the construction project;
analyzing the technical file to acquire structural information of the technical file;
and associating the structural information with part or all of the plurality of construction positions to generate the initial model.
4. The method of claim 3, wherein the technology files comprise a first class of technology files, wherein the first class of technology files does not comprise structured elements; the analyzing the technical file and the obtaining the structural information of the technical file comprise:
determining a first target element based on the first class of technology files, wherein the first target element comprises a building element;
and extracting a preset position outline of the first target element, and taking the preset position outline as the structural information.
5. The method of claim 4, wherein the correlating the structured information and some or all of the plurality of construction sites, generating the initial model comprises:
determining a construction position located at a preset position in the plurality of construction positions;
and generating the initial model by associating the preset position outline with a construction part located at a preset position in the plurality of construction parts based on the position information of the first target element, wherein the preset position outline is used as the initial graphic expression of part or all of the plurality of construction parts.
6. The method of claim 4, wherein the determining a construction progress visualization of the construction project based on the progress information and the initial model comprises:
determining a construction part to be displayed based on the progress information;
determining the visualization parameters of the construction part to be displayed based on the relevant information of the construction part to be displayed;
generating a graphic representation of the construction part to be displayed in the initial model according to the visualization parameters, and determining the visualization result of the construction progress.
7. The method of claim 6, wherein determining a construction progress visualization of the construction project based on the progress information and the initial model further comprises:
and displaying the completion progress of the corresponding construction part in the graphic expression of the construction part to be displayed.
8. The method of claim 3, wherein the technology file comprises a second class of technology file, wherein the second class of technology file comprises structured elements; the analyzing the technical file and the obtaining the structural information of the technical file comprise:
and extracting a second target element in the structural elements based on the second technical file, and taking the second target element as the structural information.
9. The method of claim 8, wherein the correlating the structured information and some or all of the plurality of construction sites, generating the initial model comprises:
associating the second target element with some or all of the plurality of construction sites to generate the initial model, wherein the second target element is expressed as the initial graph of some or all of the plurality of construction sites;
the determining a construction progress visualization result of the construction project based on the progress information and the initial model comprises:
identifying a completion progress of the at least one construction site in the initial model based on the progress information;
and determining the identified initial model as the construction progress visualization result.
10. A construction progress visualization system, comprising: the device comprises a first acquisition module, a model establishment module, a second acquisition module and a visualization result determination module;
the first acquisition module is used for acquiring position information of a construction project, wherein the position information comprises information of a plurality of construction positions, and each of the plurality of construction positions is configured with at least one construction task;
the model building module is used for building an initial model, and the initial model comprises an initial graphic expression of part or all of the plurality of construction positions;
the second acquisition module is used for acquiring the construction task information of the construction project and determining the progress information of at least one construction part based on the construction task information; and
and the visualization result determining module is used for determining the construction progress visualization result of the construction project based on the progress information and the initial model.
CN202310080936.9A 2023-02-08 2023-02-08 Construction progress visualization method and system Active CN115878872B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202310819906.5A CN116775966A (en) 2023-02-08 2023-02-08 Construction progress visualization method and system
CN202310080936.9A CN115878872B (en) 2023-02-08 2023-02-08 Construction progress visualization method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310080936.9A CN115878872B (en) 2023-02-08 2023-02-08 Construction progress visualization method and system

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN202310819906.5A Division CN116775966A (en) 2023-02-08 2023-02-08 Construction progress visualization method and system

Publications (2)

Publication Number Publication Date
CN115878872A true CN115878872A (en) 2023-03-31
CN115878872B CN115878872B (en) 2023-07-25

Family

ID=85760898

Family Applications (2)

Application Number Title Priority Date Filing Date
CN202310819906.5A Pending CN116775966A (en) 2023-02-08 2023-02-08 Construction progress visualization method and system
CN202310080936.9A Active CN115878872B (en) 2023-02-08 2023-02-08 Construction progress visualization method and system

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN202310819906.5A Pending CN116775966A (en) 2023-02-08 2023-02-08 Construction progress visualization method and system

Country Status (1)

Country Link
CN (2) CN116775966A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116777387A (en) * 2023-06-29 2023-09-19 华腾建信科技有限公司 Engineering data processing method and system for visual progress display
CN117592949A (en) * 2024-01-18 2024-02-23 一智科技(成都)有限公司 Construction task management method, system and storage medium
CN117592948A (en) * 2024-01-18 2024-02-23 一智科技(成都)有限公司 Construction project early warning method, system, device and storage medium

Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007328434A (en) * 2006-06-06 2007-12-20 Hitachi Ltd Piecework management system
CN105335559A (en) * 2015-10-28 2016-02-17 上海同筑信息科技有限公司 Engineering standardized construction process control method and system on basis of BIM (building information modeling)
CN106777823A (en) * 2017-01-25 2017-05-31 天津大学 Construction schemes of underground structure group progress simulation optimization method based on ventilation numerical simulation
CN106803150A (en) * 2017-01-20 2017-06-06 上海市地下空间设计研究总院有限公司 Municipal Engineering Construction progress msg management method and system based on BIM
CN108446889A (en) * 2018-02-11 2018-08-24 北京市轨道交通建设管理有限公司 A kind of exchange method of construction site and construction speed platform
CN109146120A (en) * 2018-06-25 2019-01-04 国网经济技术研究院有限公司 A kind of threedimensional model identification method of project of transmitting and converting electricity construction task progress status
CN109145366A (en) * 2018-07-10 2019-01-04 湖北工业大学 Building Information Model lightweight method for visualizing based on Web3D
CN109377065A (en) * 2018-10-31 2019-02-22 广西路桥工程集团有限公司 One kind being based on three-dimensional visualization engineering construction progress control and cost control system
CN109446664A (en) * 2018-10-31 2019-03-08 广西路桥工程集团有限公司 A kind of scene progress control display device system
CN109598085A (en) * 2018-12-18 2019-04-09 上海荷福人工智能科技(集团)有限公司 One kind being based on artificial intelligence construction project time management method
CN110084527A (en) * 2019-05-05 2019-08-02 广西路桥工程集团有限公司 A kind of digitlization construction management system based on BIM model
CN110084526A (en) * 2019-05-05 2019-08-02 广西路桥工程集团有限公司 A kind of visualization project management monitoring system based on BIM+WBS
CN110990927A (en) * 2019-12-04 2020-04-10 武汉墨斗建筑咨询有限公司 BIM-based whole process consultation method
CN111598379A (en) * 2020-03-31 2020-08-28 中铁建华南建设有限公司 Project management method, platform, device, computer equipment and storage medium
CN113642088A (en) * 2021-10-13 2021-11-12 北京天辰信科技有限公司 Method for feeding back construction progress information and displaying deviation of BIM (building information modeling) model in real time
CN113722797A (en) * 2021-08-30 2021-11-30 中国国家铁路集团有限公司 Lightweight BIM prefabricated part full life cycle comprehensive information management system
CN115238359A (en) * 2022-08-03 2022-10-25 中国长江三峡集团有限公司 Construction progress simulation method and device, electronic equipment and storage medium
CN115481884A (en) * 2022-09-13 2022-12-16 中铁第四勘察设计院集团有限公司 Engineering progress information visual management method based on engineering structure tree
CN115587399A (en) * 2022-05-31 2023-01-10 江西科晨洪兴信息技术有限公司 Project progress management system and application based on BIM

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103247004B (en) * 2013-04-28 2015-09-16 中建安装工程有限公司 A kind of approaches to IM based on the integrated BIM model of electromechanics and system
US20150234377A1 (en) * 2014-02-18 2015-08-20 ResiWeb Limited Construction management system
CN112052506A (en) * 2020-09-08 2020-12-08 江苏燕宁工程科技集团有限公司 Project construction progress and safety management method and system based on BIM
WO2022094934A1 (en) * 2020-11-06 2022-05-12 深圳市深能环保东部有限公司 Site location-based system and method for management of engineering quality acceptance
CN113282792A (en) * 2021-06-09 2021-08-20 青岛理工大学 Intelligent management data storage method for prefabricated building based on BIM
CN113360583B (en) * 2021-06-15 2024-05-14 东南大学 Construction progress visualization method based on BIM model and monitoring image comparison
CN115330180A (en) * 2022-08-10 2022-11-11 中国长江三峡集团有限公司 Engineering management and control method and device based on BIM (building information modeling)

Patent Citations (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007328434A (en) * 2006-06-06 2007-12-20 Hitachi Ltd Piecework management system
CN105335559A (en) * 2015-10-28 2016-02-17 上海同筑信息科技有限公司 Engineering standardized construction process control method and system on basis of BIM (building information modeling)
CN106803150A (en) * 2017-01-20 2017-06-06 上海市地下空间设计研究总院有限公司 Municipal Engineering Construction progress msg management method and system based on BIM
CN106777823A (en) * 2017-01-25 2017-05-31 天津大学 Construction schemes of underground structure group progress simulation optimization method based on ventilation numerical simulation
CN108446889A (en) * 2018-02-11 2018-08-24 北京市轨道交通建设管理有限公司 A kind of exchange method of construction site and construction speed platform
CN109146120A (en) * 2018-06-25 2019-01-04 国网经济技术研究院有限公司 A kind of threedimensional model identification method of project of transmitting and converting electricity construction task progress status
CN109145366A (en) * 2018-07-10 2019-01-04 湖北工业大学 Building Information Model lightweight method for visualizing based on Web3D
CN109446664A (en) * 2018-10-31 2019-03-08 广西路桥工程集团有限公司 A kind of scene progress control display device system
CN109377065A (en) * 2018-10-31 2019-02-22 广西路桥工程集团有限公司 One kind being based on three-dimensional visualization engineering construction progress control and cost control system
CN109598085A (en) * 2018-12-18 2019-04-09 上海荷福人工智能科技(集团)有限公司 One kind being based on artificial intelligence construction project time management method
CN110084527A (en) * 2019-05-05 2019-08-02 广西路桥工程集团有限公司 A kind of digitlization construction management system based on BIM model
CN110084526A (en) * 2019-05-05 2019-08-02 广西路桥工程集团有限公司 A kind of visualization project management monitoring system based on BIM+WBS
CN110990927A (en) * 2019-12-04 2020-04-10 武汉墨斗建筑咨询有限公司 BIM-based whole process consultation method
CN111598379A (en) * 2020-03-31 2020-08-28 中铁建华南建设有限公司 Project management method, platform, device, computer equipment and storage medium
CN113722797A (en) * 2021-08-30 2021-11-30 中国国家铁路集团有限公司 Lightweight BIM prefabricated part full life cycle comprehensive information management system
CN113642088A (en) * 2021-10-13 2021-11-12 北京天辰信科技有限公司 Method for feeding back construction progress information and displaying deviation of BIM (building information modeling) model in real time
CN115587399A (en) * 2022-05-31 2023-01-10 江西科晨洪兴信息技术有限公司 Project progress management system and application based on BIM
CN115238359A (en) * 2022-08-03 2022-10-25 中国长江三峡集团有限公司 Construction progress simulation method and device, electronic equipment and storage medium
CN115481884A (en) * 2022-09-13 2022-12-16 中铁第四勘察设计院集团有限公司 Engineering progress information visual management method based on engineering structure tree

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘配宁;邓森文;王振奎;段磊;: "桥梁工程设计BIM技术应用的研究", 科学技术创新 *
孙金晖;孙兴昌;: "BIM在建筑工程管理中的应用", 商丘师范学院学报 *
邹元品;王栋;佟大威;余佳;王晓玲;宋文帅;: "基于Web增强现实的高拱坝仓面施工可视化仿真研究", 水利水电技术 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116777387A (en) * 2023-06-29 2023-09-19 华腾建信科技有限公司 Engineering data processing method and system for visual progress display
CN117592949A (en) * 2024-01-18 2024-02-23 一智科技(成都)有限公司 Construction task management method, system and storage medium
CN117592948A (en) * 2024-01-18 2024-02-23 一智科技(成都)有限公司 Construction project early warning method, system, device and storage medium
CN117592948B (en) * 2024-01-18 2024-04-26 一智科技(成都)有限公司 Construction project early warning method, system, device and storage medium

Also Published As

Publication number Publication date
CN116775966A (en) 2023-09-19
CN115878872B (en) 2023-07-25

Similar Documents

Publication Publication Date Title
CN115878872B (en) Construction progress visualization method and system
Jackson Project cost overruns and risk management
US20050171790A1 (en) Construction project management system and method
US20060044307A1 (en) System and method for visually representing project metrics on 3-dimensional building models
US20140279573A1 (en) System and method for automatic and intelligent form generation
EP0165291A1 (en) Structural graphics representation
CN105046456B (en) GIS-based intelligent monitoring method for land full life circle
CN110880097B (en) Project progress simulation display method and device
US20210342761A1 (en) System for mapping model, cost, and schedule of large-scale capital project
Fernandes Advantages and disadvantages of BIM platforms on construction site
Haidar Construction program management–decision making and optimization techniques
RU2686006C1 (en) Method and system for information modeling of business processes of a life cycle of a production facility
CN106991534A (en) Engineering Project Construction process appraisal procedure
US20020128889A1 (en) System, method and article of manufacture for a pro-active manager in an integrated scheduling and document management framework
Enegbuma et al. A preliminary study on building information modeling (BIM) implementation in Malaysia
CN110599041A (en) Enterprise target management method, cloud and system based on artificial intelligence technology
Kelsey et al. Understanding the project planning process: requirements capture for the virtual construction site
Mohandes et al. Exploiting the effectiveness of building information modeling during the stage of post construction
Al-Ageeli et al. The most influential factor on the stumble and failure of the governmental projects
KR102384931B1 (en) Apparatus for user-customized building plan design utilizing the latest building related laws
Mielke Applications for enterprise simulation
Paul et al. A handbook for construction project planning and scheduling
Kazaryan et al. Assessment of the efficiency of quality management systems of agricultural planning and economic elements
Aksyonov et al. Hybrid agents implementation for the control of the construction company
Wang et al. Constructing a building information modelling (BIM) execution plan for quantity surveying practice

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant