CN115722018A CN202211532875.7A CN202211532875A CN115722018A CN 115722018 A CN115722018 A CN 115722018A CN 202211532875 A CN202211532875 A CN 202211532875A CN 115722018 A CN115722018 A CN 115722018A
Authority
CN
China
Prior art keywords
water
water storage
bearing frame
plate
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211532875.7A
Other languages
Chinese (zh)
Inventor
请求不公布姓名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN202211532875.7A priority Critical patent/CN115722018A/en
Publication of CN115722018A publication Critical patent/CN115722018A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

The invention discloses treatment equipment for green building construction, and particularly relates to the field of dust emission treatment, which comprises a supporting mechanism, wherein a water treatment mechanism for spraying and dust fall treatment is arranged at the top of the supporting mechanism, an auxiliary mechanism is arranged at the bottom of the water treatment mechanism, a bearing mechanism is fixedly arranged at the bottom of the water treatment mechanism, the supporting mechanism comprises a clamping plate, a first bearing frame is fixedly arranged at the top of the clamping plate, a second bearing frame is fixedly arranged on one side of the first bearing frame through a bolt, the water treatment mechanism comprises a plurality of water storage pipes, and a supporting seat used for being connected with the second bearing frame is fixedly arranged on the outer wall of each water storage pipe. According to the invention, the water receiving amount of the water storage tank is controlled, and the piston rod is driven by the self weight to vertically draw the inner cavity of the water storage pipe, so that water in the inner cavity of the water storage pipe is sprayed out from the spraying head, and the water storage device is very convenient to use, convenient to carry at any time and more beneficial to indoor dust reduction.

Description

Treatment equipment for green building construction
Technical Field
The invention relates to the technical field of dust control, in particular to control equipment for green building construction.
Background
The green building is a high-quality building which saves resources, protects the environment, reduces pollution, provides healthy, applicable and efficient use space for people in the life cycle, realizes harmony and symbiosis between people and nature to the maximum extent, has reasonable indoor layout, reduces the use of synthetic materials as much as possible, fully utilizes sunlight, saves energy and creates a feeling close to nature for residents. The method aims at the coordinated development of people, buildings and natural environment, creates a good and healthy living environment by utilizing natural conditions and artificial means, controls and reduces the use and damage of the natural environment as much as possible, and fully reflects the balance between asking for and returning to the nature.
The water is sprayed more on the construction site, trees are planted on the two sides of the road, the dust harm prevention effect is achieved to a certain extent, however, the existing water spraying equipment is large in size and can be used outdoors, and for construction projects carried out indoors, such as wood cutting, wood slag and dust are more, the breathing health of workers is easily affected, so that the invention relates to treatment equipment for green building construction to solve the problems.
Disclosure of Invention
In order to overcome the above defects in the prior art, embodiments of the present invention provide a treatment apparatus for green building construction, which solves the above problems in the background art by controlling the water receiving amount of the water storage tank, and driving the piston rod to vertically pump through its own weight into the inner cavity of the water storage pipe, so as to form a spray from the spray head to spray the water in the inner cavity of the water storage pipe.
In order to achieve the purpose, the invention provides the following technical scheme: the treatment equipment for green building construction comprises a supporting mechanism, wherein a water treatment mechanism for spraying and dust-falling treatment is arranged at the top of the supporting mechanism, an auxiliary mechanism is arranged at the bottom of the water treatment mechanism, a bearing mechanism is fixedly arranged at the bottom of the water treatment mechanism, the supporting mechanism comprises a clamping plate, a first bearing frame is fixedly arranged at the top of the clamping plate, a second bearing frame is fixedly arranged on one side of the first bearing frame through a bolt, the water treatment mechanism comprises a plurality of water storage pipes, a supporting seat used for being connected with the second bearing frame is fixedly arranged on the outer wall of the plurality of water storage pipes, atomizing heads used for spraying water mist are fixedly connected onto the plurality of water storage pipes, the tops of the plurality of water storage pipes are respectively communicated with a first water pipe, a second water pipe used for pumping water is communicated with the outer wall of the first water pipe, and a water storage tank used for storing water is communicated with one end of the second water pipe;
the auxiliary mechanism includes two balancing poles at least, and two balancing pole difference fixed mounting is in the both sides of storage water tank, two one side of balancing pole all has rather than the extension pole that is the vertical state through bolt fixed mounting, the outer wall of extension pole has cup jointed the pull pole that is used for being connected with second bearing frame, the one end fixed mounting of extension pole has rather than the layer board that is the vertical state, the top fixed mounting of layer board has the piston rod that is used for pegging graft at the storage water pipe inner chamber, bearing mechanism includes anti-skidding gasket, anti-skidding gasket fixed mounting is in the inside of first bearing frame, anti-skidding gasket's top articulates there is the first folded sheet that is the slope form and arranges, the top of first folded sheet articulates there is the second folded sheet, one side fixed mounting of second folded sheet has a plurality of third springs that are used for being connected with the storage water tank.
In a preferred embodiment, the first folding plate and the second folding plate are arranged in a one-to-one correspondence manner, and a fourth spring for connecting with the non-slip mat is fixedly installed on one side, away from the third spring, of the second folding plate through a bolt.
In a preferred embodiment, the number of the first folding plates is at least two, the two first folding plates are arranged in mirror symmetry with respect to a vertical center line of the water storage tank, and a plurality of tension springs are fixedly mounted between the two first folding plates through bolts.
In a preferred embodiment, the connecting rod is movably inserted into the inner cavity of the pull rod, and the bottom of the balance rod is fixedly provided with a second spring for connecting with the pull rod.
In a preferred embodiment, a first one-way check valve for controlling water outlet is fixedly installed at the joint of the water storage pipe and the spray head, and a second one-way check valve for controlling water inlet is fixedly installed at the joint of the water storage pipe and the first water pipe.
In a preferred embodiment, a limiting seat for limiting the moving range of the second water pipe is fixedly mounted at the top of the first supporting frame, and a water inlet groove matched with a water inlet of the water storage tank is formed in the top of the first supporting frame.
In a preferred embodiment, the second water pipe is inserted into the inner cavity of the limiting seat, and the bottom of the limiting seat is communicated with a soft water pipe, and the soft water pipe arranged at the bottom of the limiting seat is arranged in the inner cavity of the water storage tank.
In a preferred embodiment, the clamping plate is hollow, a rectangular slot is formed in one side of the clamping plate, a wear pad is inserted into an inner cavity of the rectangular slot formed in one side of the clamping plate, a connecting plate is fixedly mounted on one side of the wear pad, and a first spring used for being connected with the clamping plate is fixedly mounted on one side of the connecting plate.
In a preferred embodiment, the interior of the clamping plate has a brace inserted therein for connection to the connector plate, and a pressure piece is fixedly mounted on an end of the brace remote from the connector plate.
The invention has the technical effects and advantages that:
according to the invention, when the water storage tank receives water, the first folding plate and the third spring are pressed to bend by the self weight, the piston rod is driven to downwards draw in the inner cavity of the water storage pipe by losing the gravity, and water in the inner cavity of the water storage tank is drawn into the inner cavity of the water storage pipe through the second water pipe and the first water pipe.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a partial structural sectional view of the present invention.
FIG. 3 is an enlarged view of the portion A of FIG. 2 according to the present invention.
Fig. 4 is a schematic axial side structure of the present invention.
FIG. 5 is an enlarged view of the portion B of FIG. 4 according to the present invention.
Fig. 6 is a structural sectional view of the support mechanism of the present invention.
FIG. 7 is an enlarged view of the structure of the portion C of FIG. 6 according to the present invention.
The reference signs are: the device comprises a supporting mechanism 1, a clamping plate 101, a first bearing frame 102, a second bearing frame 103, a water inlet tank 104, a wear-resistant pad 105, a connecting plate 106, a first spring 107, a stay rod 108, a pressing block 109, a water treatment mechanism 2, a water storage pipe 21, a support seat 22, a spray head 23, a first water pipe 24, a second water pipe 25, a water storage tank 26, a limit seat 27, an auxiliary mechanism 3, a balancing rod 31, a connecting rod 32, a drawing rod 33, a supporting plate 34, a piston rod 35, a second spring 36, a bearing mechanism 4, an anti-skid gasket 41, a first folding plate 42, a second folding plate 43, a third spring 44, a fourth spring 45 and a tension spring 46.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to the attached drawings 1-7 in the specification, the treatment equipment for green building construction according to an embodiment of the present invention is shown in fig. 1, and includes a supporting mechanism 1, a water treatment mechanism 2 for performing spray dust-fall treatment is disposed on the top of the supporting mechanism 1, an auxiliary mechanism 3 is disposed on the bottom of the water treatment mechanism 2, and a supporting mechanism 4 is fixedly disposed on the bottom of the water treatment mechanism 2, as shown in fig. 4, the supporting mechanism 1 includes a clamping plate 101, a first supporting frame 102 is fixedly disposed on the top of the clamping plate 101, a second supporting frame 103 is fixedly disposed on one side of the first supporting frame 102 through bolts, the clamping plate 101 is fixedly clamped on a construction site, for example, when an operator needs to cut wood indoors, the equipment can be clamped around the construction site through the clamping plate 101, meanwhile, the first supporting frame 102 is used for mounting the supporting mechanism 4, and the second supporting frame 103 is used for fixedly mounting the water treatment mechanism 2, referring to fig. 2, the water treatment mechanism 2 includes a plurality of water storage pipes 21, a support seat 22 for connecting with the second support frame 103 is fixedly installed on the outer wall of the plurality of water storage pipes 21, spray heads 23 for spraying water mist are fixedly connected to the plurality of water storage pipes 21, and first water pipes 24 are communicated with the top of the plurality of water storage pipes 21, at least three water storage pipes 21 are set as one group, and the three water storage pipes 21 are sequentially arranged at equal intervals with respect to the horizontal line of the first water pipes 24, and at least two groups of water storage pipes 21 are arranged symmetrically with respect to the vertical center line of the second support frame 103, so that after the plurality of water storage pipes 21 extract water through the first water pipes 24 and spray water through the spray heads 23, both sides of the second support frame 103 can be always kept balanced, thereby preventing the clamp plate 101 from being clamped and damaged due to deflection in the use process, meanwhile, a second water pipe 25 for pumping water is communicated with the outer wall of the first water pipe 24, and one end of the second water pipe 25 is communicated with a water storage tank 26 for storing water;
referring to fig. 3, in order to facilitate water extraction and water ejection, the auxiliary mechanism 3 at least includes two balance rods 31, the two balance rods 31 are respectively and fixedly installed at two sides of the water storage tank 26, an engagement rod 32 in a perpendicular state to each balance rod 31 is fixedly installed at one side of each balance rod 31 through a bolt, a pull rod 33 for connecting with the second bearing frame 103 is sleeved on an outer wall of the engagement rod 32, a support plate 34 in a perpendicular state to each engagement rod 32 is fixedly installed at one end of each engagement rod 32, a piston rod 35 for being inserted into an inner cavity of the water storage tank 21 is fixedly installed at the top of each support plate 34, the engagement rod 32 is movably inserted into the inner cavity of the pull rod 33, a second spring 36 for connecting with the pull rod 33 is fixedly installed at the bottom of each balance rod 31, when reinforced water is filled into the inner cavity of the water storage tank 26, a downward gravity is generated to drive the water storage tank 26 to move downward inside the first bearing frame 102, and in the process that the water storage tank 26 moves, the engagement rod 32 is pushed to move in the inner cavity of the pull rod 33 through the limit of the engagement rod 31, thereby pushing the support plate 34 to pull the piston rod 35 to pull the inner cavity of the water storage tank 21, so that the water storage tank generates suction force generated by the second balance rod 24 and the inner cavity of the water storage tank 26 to suck the water through the second balance rod 25.
Furthermore, a first one-way check valve for controlling water outlet is fixedly installed at the joint of the water storage pipe 21 and the spray head 23, and a second one-way check valve for controlling water inlet is fixedly installed at the joint of the water storage pipe 21 and the first water pipe 24, so that water can only enter the inner cavity of the water storage pipe 21 from the joint of the first water pipe 24 and can only be sprayed out from the joint of the spray head 23 and the water storage pipe 21.
Referring to fig. 5, in order to make the water form a spray to be sprayed out from the spraying head 23 after a sufficient amount of water is taken in the water storage tank 26, the supporting mechanism 4 includes an anti-slip pad 41, the anti-slip pad 41 is fixedly installed inside the first supporting frame 102, a first folding plate 42 arranged in an inclined manner is hinged on the top of the anti-slip pad 41, wherein the number of the first folding plate 42 is at least two, the two first folding plates 42 are arranged in a mirror symmetry manner with respect to the vertical center line of the water storage tank 26, and a plurality of tension springs 46 are fixedly installed between the two first folding plates 42 through bolts, in a normal state, the two first folding plates 42 are arranged in an inclined manner in a symmetrical manner on the anti-slip pad 41, and the tension spring 46 between the two first folding plates 42 is supported in a straight state, when the water storage tank 26 stores a certain amount of water, the water storage tank 26 presses the two first folding plates 42 downwards, the two first folding plates 42 are pressed downwards, the first folding plates 42 deflect towards the center line of the first bearing frame 102, meanwhile, the tension springs 46 are stressed to bend the center downwards, when the external force extrusion is lost, the tension springs 46 rebound to a straight state through self elastic restoring force to support the two first folding plates 42, meanwhile, the top of the first folding plates 42 are hinged with second folding plates 43, one side of each second folding plate 43 is fixedly provided with a plurality of third springs 44 used for being connected with the water storage tank 26, the first folding plates 42 and the second folding plates 43 are arranged in a one-to-one correspondence manner, one side of each second folding plate 43 far away from the third springs 44 is fixedly provided with a fourth spring 45 used for being connected with an anti-skidding gasket 41 through bolts, and the rotating direction of the second folding plates 43 is opposite to that of the first folding plates 42, thereby when second folded sheet 43 receives pressure extrusion, second folded sheet 43 is buckled downwards and is driven first folded sheet 42 and buckle, thereby make storage water tank 26 lose the support, down move rapidly, thereby receive piston rod 35 to twitch the inner chamber at storage water pipe 21 rapidly through the rapid pulling of balancing pole 31, join pole 32 and layer board 34, make storage water pipe 21 inner chamber take out water, at this moment, the water of storage water tank 26 inner chamber is taken out the back, storage water tank 26 weight reduces, elasticity restoring force through third spring 44 and fourth spring 45 promotes storage water tank 26 and upwards moves, thereby drive piston rod 35 through balancing pole 31, join pole 32 and layer board 34 and promote the inner chamber at storage water pipe 21, make the water of storage water pipe 21 inner chamber spout from atomising head 23, thereby carry out spraying dust fall to the construction environment.
Furthermore, a limiting seat 27 for limiting the moving range of the second water pipe 25 is fixedly mounted at the top of the first supporting frame 102, a water inlet groove 104 used for being matched with a water inlet of the water storage tank 26 is formed in the top of the first supporting frame 102, the water pipe is connected from the water inlet groove 104, water is injected into an inner cavity of the water storage tank 26, when the water storage tank 26 generates weight to move downwards, the water storage tank 26 slides on the outer wall of the second water pipe 25, and in order to avoid the situation that a water source cannot be extracted, a soft water pipe is arranged in the inner cavity of the water storage tank 26 and connected with the second water pipe 25.
As shown in fig. 7, in order to enhance the convenience of assembling and disassembling the clamping plate 101, the clamping plate 101 is arranged in a hollow shape, one side of the clamping plate 101 is provided with a rectangular slot, an inner cavity of the rectangular slot formed in one side of the clamping plate 101 is inserted with a wear pad 105, one side of the wear pad 105 is fixedly provided with a connecting plate 106, one side of the connecting plate 106 is fixedly provided with a first spring 107 for being connected with the clamping plate 101, the inside of the clamping plate 101 is inserted with a stay bar 108 for being connected with the connecting plate 106, one end of the stay bar 108 far away from the connecting plate 106 is fixedly provided with a pressing block 109, when in use, the stay bar 108 is pushed by pressing the pressing block 109 to drive the connecting plate 106 to extrude towards the side wall of the clamping plate 101, so that the wear pad 105 is contracted into the inner cavity of the clamping plate 101, then the clamping plate 101 is clamped on a plate passing through the rail, the pressing block 109 is loosened, so that the first spring 107 pushes the wear pad 105 out of the inner cavity of the rectangular slot formed in the clamping plate 101, thereby forming clamping and fixing the rail or the plate.
It should be noted that: when the water storage tank 26 is connected with a certain amount of water in the inner cavity of the water storage tank 26, the water storage tank 26 extrudes the second folding plate 43 and the first folding plate 42, so that the first folding plate 42 and the second folding plate 43 are simultaneously bent in opposite directions, the water storage tank 26 loses the supporting force of lifting and rapidly sinks, the balance rod 31, the connecting rod 32 and the supporting plate 34 are driven to enable the piston rod 35 to simultaneously pump downwards in the inner cavity of the water storage tank 21, water entering the inner cavity of the water storage tank 26 enters the inner cavity of the water storage tank 21 through the second water pipe 25 and the first water pipe 24, the quality of the water storage tank 26 is reduced after the water is sucked by the water storage tank 21, the second folding plate 43 and the first folding plate 42 are pushed to restore to the original position by combining the elastic restoring force of the third spring 44 and the fourth spring 45, the water storage tank 26 is pushed upwards, and meanwhile, the balance rod 31, the connecting rod 32 and the connecting rod 34 drive the piston rod 35 to simultaneously push the inner cavity of the connecting plate 21 to push the inner cavity of the water storage tank 21 downwards to spray dust and form a spraying head for spraying and spraying work on the construction site.
The points to be finally explained are: first, in the description of the present application, it should be noted that, unless otherwise specified and limited, the terms "mounted," "connected," and "connected" should be understood broadly, and may be a mechanical connection or an electrical connection, or a communication between two elements, and may be a direct connection, and "upper," "lower," "left," and "right" are only used to indicate a relative positional relationship, and when the absolute position of the object to be described is changed, the relative positional relationship may be changed;
secondly, the method comprises the following steps: in the drawings of the disclosed embodiments of the invention, only the structures related to the disclosed embodiments are referred to, other structures can refer to common designs, and the same embodiment and different embodiments of the invention can be combined with each other without conflict;
and finally: the above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents, improvements and the like that are within the spirit and principle of the present invention are intended to be included in the scope of the present invention.

Claims (3)

1. Treatment equipment of green building construction, including supporting mechanism (1), the top of supporting mechanism (1) is equipped with water treatment mechanism (2) that are used for carrying out the spraying dust fall and handle, the bottom of water treatment mechanism (2) is equipped with complementary unit (3), the bottom fixed mounting of water treatment mechanism (2) has bearing mechanism (4), its characterized in that: the supporting mechanism (1) comprises a clamping plate (101), a first bearing frame (102) is fixedly mounted at the top of the clamping plate (101), a second bearing frame (103) is fixedly mounted on one side of the first bearing frame (102) through a bolt, the water treatment mechanism (2) comprises a plurality of water storage pipes (21), a supporting seat (22) used for being connected with the second bearing frame (103) is fixedly mounted on the outer wall of each water storage pipe (21), atomizing heads (23) used for spraying water mist are fixedly connected onto the plurality of water storage pipes (21), first water pipes (24) are communicated with the tops of the plurality of water storage pipes (21), second water pipes (25) used for drawing water are communicated with the outer wall of the first water pipes (24), and water storage tanks (26) used for storing water are communicated with one ends of the second water pipes (25);
the auxiliary mechanism (3) at least comprises two balancing rods (31), the two balancing rods (31) are respectively and fixedly installed on two sides of the water storage tank (26), one sides of the two balancing rods (31) are respectively and fixedly provided with a connecting rod (32) which is vertical to the two balancing rods through bolts, the outer wall of the connecting rod (32) is sleeved with a drawing rod (33) which is used for being connected with a second bearing frame (103), one end of the connecting rod (32) is fixedly provided with a supporting plate (34) which is vertical to the connecting rod, the top of the supporting plate (34) is fixedly provided with a piston rod (35) which is used for being inserted into an inner cavity of the water storage pipe (21), the bearing mechanism (4) comprises an anti-slip gasket (41), the anti-slip gasket (41) is fixedly installed inside the first bearing frame (102), the top of the anti-slip gasket (41) is hinged with a first folding plate (42) which is obliquely arranged, the top of the first folding plate (42) is hinged with a second folding plate (43), and one side of the second folding plate (43) is fixedly provided with a plurality of springs (44) which are used for being connected with the water storage tank (26);
a first one-way check valve for controlling water outlet is fixedly arranged at the joint of the water storage pipe (21) and the atomizing spray head (23), and a second one-way check valve for controlling water inlet is fixedly arranged at the joint of the water storage pipe (21) and the first water pipe (24);
the connecting rod (32) is movably inserted into an inner cavity of the drawing rod (33), and a second spring (36) used for being connected with the drawing rod (33) is fixedly installed at the bottom of the balance rod (31);
the top of the first bearing frame (102) is fixedly provided with a limiting seat (27) for limiting the moving range of the second water pipe (25), and the top of the first bearing frame (102) is provided with a water inlet groove (104) matched with the water inlet of the water storage tank (26);
the second water pipe (25) is inserted into the inner cavity of the limiting seat (27), the bottom of the limiting seat (27) is communicated with a soft water pipe, and the soft water pipe arranged at the bottom of the limiting seat (27) is arranged in the inner cavity of the water storage tank (26).
2. The green building construction treatment equipment of claim 1, wherein: splint (101) are the cavity form setting, the rectangle slot has been seted up to one side of splint (101), the rectangle slot inner chamber that splint (101) one side was seted up is pegged graft and is had wear pad (105), one side fixed mounting of wear pad (105) has linkage plate (106), just one side fixed mounting of linkage plate (106) has first spring (107) that are used for being connected with splint (101).
3. The green building construction treatment equipment of claim 1, wherein: and a support rod (108) used for being connected with the connecting plate (106) is inserted into the clamping plate (101), and a pressing block (109) is fixedly installed at one end, far away from the connecting plate (106), of the support rod (108).
CN202211532875.7A 2021-12-30 2021-12-30 Treatment equipment for green building construction Pending CN115722018A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211532875.7A CN115722018A (en) 2021-12-30 2021-12-30 Treatment equipment for green building construction

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN202111654930.5A CN114272707B (en) 2021-12-30 2021-12-30 A raise dust treatment equipment for in green building work progress
CN202211532875.7A CN115722018A (en) 2021-12-30 2021-12-30 Treatment equipment for green building construction

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN202111654930.5A Division CN114272707B (en) 2021-12-30 2021-12-30 A raise dust treatment equipment for in green building work progress

Publications (1)

Publication Number Publication Date
CN115722018A true CN115722018A (en) 2023-03-03

Family

ID=80878669

Family Applications (3)

Application Number Title Priority Date Filing Date
CN202111654930.5A Active CN114272707B (en) 2021-12-30 2021-12-30 A raise dust treatment equipment for in green building work progress
CN202211532873.8A Pending CN115845530A (en) 2021-12-30 2021-12-30 Green building raise dust treatment equipment
CN202211532875.7A Pending CN115722018A (en) 2021-12-30 2021-12-30 Treatment equipment for green building construction

Family Applications Before (2)

Application Number Title Priority Date Filing Date
CN202111654930.5A Active CN114272707B (en) 2021-12-30 2021-12-30 A raise dust treatment equipment for in green building work progress
CN202211532873.8A Pending CN115845530A (en) 2021-12-30 2021-12-30 Green building raise dust treatment equipment

Country Status (1)

Country Link
CN (3) CN114272707B (en)

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000140545A (en) * 1998-11-02 2000-05-23 Toru Igarashi Water tank for dust collector
US20060261181A1 (en) * 2005-03-24 2006-11-23 Pedro Wirz Backpack sprayer
WO2008004278A1 (en) * 2006-07-04 2008-01-10 Toshiba Mitsubishi-Electric Industrial Systems Corporation Apparatus for concentrating/diluting specific gas and method of concentrating/diluting specific gas
US9415250B2 (en) * 2012-12-20 2016-08-16 Victaulic Company Dry sprinkler
JP5895071B1 (en) * 2015-01-29 2016-03-30 慶源 ▲黄▼ Air dust cleaner
CN208161282U (en) * 2018-02-08 2018-11-30 中铁八局集团第四工程有限公司 A kind of environment-friendly type building fugitive dust processing unit
CN109173513B (en) * 2018-09-30 2020-08-25 重庆工程职业技术学院 Building construction dust fall equipment
CN212575916U (en) * 2020-06-10 2021-02-23 谢艳姣 Energy-concerving and environment-protective flue gas purification discharging equipment
CN213592511U (en) * 2020-08-03 2021-07-02 深圳市华科泰塑胶制品有限公司 A equipment of polishing for plastic mould
CN213268940U (en) * 2020-09-19 2021-05-25 吴海龙 Green building construction working face sprays dust fall heat sink
CN112413612A (en) * 2020-11-23 2021-02-26 南京伊都锦环保科技有限公司 Exhaust gas combustion device with soot treatment function
CN112827302A (en) * 2021-01-08 2021-05-25 中国建筑第五工程局有限公司 Engineering environmental protection dust collector
CN113368637B (en) * 2021-06-23 2022-05-24 江苏惠海建设工程有限公司 Simple automatic water-saving spraying dust-settling system for temporary construction road

Also Published As

Publication number Publication date
CN115845530A (en) 2023-03-28
CN114272707B (en) 2023-01-10
CN114272707A (en) 2022-04-05

Similar Documents

Publication Publication Date Title
CN211121813U (en) On-site water spraying detection equipment for building external window and curtain wall
CN110987308A (en) On-site water spraying detection equipment for building external window and curtain wall
CN110952755A (en) Indoor side installation method for building glass
CN107055393A (en) A kind of sheet material positioning finishing car
CN212970861U (en) Greening curtain wall structure for building
CN110939259A (en) Indoor building decoration scaffold
CN114272707B (en) A raise dust treatment equipment for in green building work progress
CN205431730U (en) Pesticide spraying device
CN203985281U (en) Removable reinforced cement greenhouse booth
CN109353159A (en) A kind of painting glue-type wallpaper device for adhibiting
CN210987243U (en) Vegetable planting frame
CN219100657U (en) Scaffold convenient to move
CN210846939U (en) Lifting fountain device
CN114679937B (en) Spray seeding table for spray seeding machine
CN109779143A (en) Green assembled architecture wall panel assembly
CN110179295A (en) A kind of folding exhibition position device convenient for adjusting installation
CN106192847B (en) A kind of asphalt concrete road surface area water processing equipment
CN211133400U (en) Environment-friendly fog gun machine with raising and lowering functions
CN212261252U (en) High altitude glass cleaning special device
CN108744483B (en) Gardens are with taste type competition device
CN215671269U (en) Building surface treatment device
CN216101278U (en) Interactive traditional culture spreads view device
CN2695596Y (en) Lifesaving rope ladder for building
CN218493213U (en) Protection canopy for building engineering
CN219643551U (en) Cable protection device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination