CN213268940U CN202022061322.0U CN202022061322U CN213268940U CN 213268940 U CN213268940 U CN 213268940U CN 202022061322 U CN202022061322 U CN 202022061322U CN 213268940 U CN213268940 U CN 213268940U
Authority
CN
China
Prior art keywords
connecting seat
rod
fixedly connected
building construction
green building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022061322.0U
Other languages
Chinese (zh)
Inventor
吴海龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022061322.0U priority Critical patent/CN213268940U/en
Application granted granted Critical
Publication of CN213268940U publication Critical patent/CN213268940U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)
  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

The utility model discloses a green building construction operation face sprays dust fall heat sink belongs to building engineering technical field. A green building construction working face spraying dust-reducing and cooling device comprises a mounting box and a mounting column, wherein a spraying mechanism is arranged on the mounting box, the mounting box is in threaded connection with the mounting column, a threaded rod is connected in the mounting column in a rotating mode, a third connecting seat is connected on the threaded rod in a threaded mode, a second connecting rod is connected on the third connecting seat in a rotating mode, a fifth connecting seat is fixedly connected to the outer wall of the mounting column, a mounting rod is connected on the fifth connecting seat in a rotating mode, a fourth connecting seat is fixedly connected on the mounting rod, and one end, far away from the third connecting seat, of the second connecting rod is connected; the utility model discloses can dismantle, the transportation is convenient, can fix it on the overhead through the fixing base, avoids occuping the position on the construction face to can not lead to the fact the hindrance to workman's work.

Description

Green building construction working face sprays dust fall heat sink
Technical Field
The utility model relates to a building engineering technical field especially relates to a green building construction operation face sprays dust fall heat sink.
Background
The building construction refers to production activities in the engineering construction implementation stage, is the construction process of various buildings, and also can be a process of changing various lines on a design drawing into a real object at a specified place. It includes foundation engineering construction, major structure construction, roofing engineering construction, decorates engineering construction etc. and in the construction operation in-process of summer, in order to guarantee construction environment's health and temperature, need carry out effectual dust fall cooling to the construction site and handle.
The construction working face has big or small, and some construction working faces set up on the overhead, therefore this type working face is less, and current spraying dust fall heat sink is not fit for using on this kind of less working face, so need design a green building construction working face and spray dust fall heat sink.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem that the dust fall heat sink is not suitable for the defect of using at less construction operation face among the prior art, and the green construction operation face that proposes sprays the dust fall heat sink.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a spraying dust-reducing and cooling device for green building construction working faces comprises an installation box and an installation column, wherein a spraying mechanism is arranged on the installation box, the mounting box is in threaded connection with the mounting column, a threaded rod is connected in the mounting column in a rotating manner, a third connecting seat is in threaded connection with the threaded rod, the third connecting seat is rotatably connected with a second connecting rod, the outer wall of the mounting column is fixedly connected with a fifth connecting seat, the fifth connecting seat is rotatably connected with a mounting rod, the mounting rod is fixedly connected with a fourth connecting seat, one end of the second connecting rod, which is far away from the third connecting seat, is rotatably connected to the fourth connecting seat, one end of the mounting rod, which is far away from the mounting column, is fixedly connected with a fixed seat, threaded connection has the bolt on the fixing base, the bottom of bolt is rotated and is connected with the fixed block, the fixed block slides in the fixing base, sliding connection has the slider with fixed block matched with on the fixing base.
Preferably, the spraying mechanism comprises an installation box and a shunt pipe, the shunt pipe is rotatably connected to the installation box through a first connecting seat, a spray head is fixedly connected to the shunt pipe, and a driving shunt pipe rotating driving part is arranged in the installation box.
Preferably, the drive division includes motor and reciprocal lead screw, motor fixed connection is at the bottom inner wall of install bin, the one end fixed connection of reciprocal lead screw is at the output of motor, the other end of reciprocal lead screw rotates the top inner wall of connection at the install bin, threaded connection has the second connecting seat on the reciprocal lead screw, it is connected with the head rod to rotate on the second connecting seat, the one end that the second connecting seat was kept away from to the head rod is passed through the sixth connecting seat and is rotated the connection on the shunt tubes, be equipped with in the install bin and spray the mechanism and cooperate and send water mechanism.
Preferably, the water feeding mechanism comprises a piston cylinder and a connecting plate, a piston rod is fixedly connected to the bottom of the connecting plate, a piston head is fixedly connected to the bottom of the piston rod, the piston head is connected to the inside of the piston cylinder in a sliding mode, an inlet pipe is fixedly connected to the input end of the piston cylinder, and the output end of the piston cylinder is communicated with the flow dividing pipe through an outlet pipe.
Preferably, the water inlet pipe and the water outlet pipe are both provided with one-way valves.
Preferably, the shunt tubes are provided with a plurality of groups, and the plurality of groups of shunt tubes are arranged on the side wall of the installation box in a circumferential distribution manner.
Compared with the prior art, the utility model provides a green building construction operation face sprays dust fall heat sink possesses following beneficial effect:
1. this green building construction operation face sprays dust fall heat sink includes install bin and shunt tubes through spraying the mechanism, and the shunt tubes rotates through first connecting seat to be connected on the install bin, fixedly connected with shower nozzle on the shunt tubes, is equipped with drive shunt tubes pivoted drive division in the install bin, through making shunt tubes reciprocating rotation, makes the water smoke that erupts more intensive aloft to this reaches better cooling dust fall effect.
2. This green building construction working face sprays dust fall heat sink is equipped with the multiunit through the shunt tubes, and the multiunit shunt tubes is the lateral wall of circumference distribution install bin, and the increase is sprayed the face, makes cooling dust fall scope wider.
Drawings
Fig. 1 is a schematic structural view of a green building construction working face spray dust-reducing cooling device provided by the utility model;
fig. 2 is the utility model provides a green building construction working face sprays dust fall heat sink in fig. 1 part a's schematic structure.
In the figure: 1. installing a box; 101. a first connecting seat; 2. a motor; 201. a reciprocating screw rod; 203. a second connecting seat; 2031. a first connecting rod; 204. a connecting plate; 2041. a piston rod; 3. mounting a column; 301. a threaded rod; 302. a third connecting seat; 303. a second connecting rod; 304. a fourth connecting seat; 305. a fifth connecting seat; 4. a shunt tube; 401. a spray head; 402. a water outlet pipe; 403. a sixth connecting seat; 5. a piston cylinder; 501. a piston head; 502. a water inlet pipe; 503. a one-way valve; 6. mounting a rod; 601. a bolt; 602. a slider; 603. a fixed seat; 604. and (5) fixing blocks.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
Example (b):
referring to fig. 1-2, a green building construction working face spraying dust-settling and cooling device comprises a mounting box 1 and a mounting column 3, a spraying mechanism is arranged on the mounting box 1, the mounting box 1 is in threaded connection with the mounting column 3, a threaded rod 301 is rotationally connected with the mounting column 3, the threaded rod 301 is in threaded connection with a third connecting seat 302, the third connecting seat 302 is rotationally connected with a second connecting rod 303, the outer wall of the mounting column 3 is fixedly connected with a fifth connecting seat 305, the fifth connecting seat 305 is rotationally connected with a mounting rod 6, the mounting rod 6 is fixedly connected with a fourth connecting seat 304, one end of the second connecting rod 303 far away from the third connecting seat 302 is rotationally connected with the fourth connecting seat 304, one end of the mounting rod 6 far away from the mounting column 3 is fixedly connected with a fixing seat 603, a bolt 601 is in threaded connection with the fixing seat 603, the bottom of the bolt 601 is rotationally, the fixed seat 603 is slidably connected with a sliding block 602 which is matched with the fixed block 604.
The spraying mechanism comprises an installation box 1 and a shunt tube 4, the shunt tube 4 is rotatably connected to the installation box 1 through a first connecting seat 101, a spray head 401 is fixedly connected to the shunt tube 4, and a driving part for driving the shunt tube 4 to rotate is arranged in the installation box 1.
The drive division includes motor 2 and reciprocal lead screw 201, 2 fixed connection of motor are at the bottom inner wall of install bin 1, the one end fixed connection of reciprocal lead screw 201 is at the output of motor 2, the other end of reciprocal lead screw 201 rotates the top inner wall of connection at install bin 1, threaded connection has second connecting seat 203 on the reciprocal lead screw 201, it is connected with head rod 2031 to rotate on the second connecting seat 203, the one end that second connecting seat 203 was kept away from to head rod 2031 rotates through sixth connecting seat 403 and connects on shunt tubes 4, be equipped with in the install bin 1 and spray the mechanism and cooperate and send water mechanism.
The water feeding mechanism comprises a piston cylinder 5 and a connecting plate 204, the bottom of the connecting plate 204 is fixedly connected with a piston rod 2041, the bottom of the piston rod 2041 is fixedly connected with a piston head 501, the piston head 501 is connected in the piston cylinder 5 in a sliding manner, the input end of the piston cylinder 5 is fixedly connected with a water inlet pipe 502, and the output end of the piston cylinder 5 is communicated with the flow dividing pipe 4 through a water outlet pipe 402.
The water inlet pipe 502 and the water outlet pipe 402 are both provided with one-way valves 503.
The shunt tubes 4 are provided with a plurality of groups, and the multi-component flow tubes 4 are distributed on the side wall of the installation box 1 in a circumferential manner.
The working principle is as follows: in the utility model, the handle on the top of the threaded rod 301 is rotated to open the fixing seat 603, specifically, the threaded rod 301 is rotated to slide the third connecting seat 302, when the third connecting seat 302 slides downwards, the mounting rod 6 is driven by the second connecting rod 303 to rotate with the fixing seat 603 by taking the fifth connecting seat 305 as an axis, then the bolt 601 and the slider 602 are loosened, the fixing seat 603 is connected on the overhead frame, the fixing block 604 is pressed against the overhead frame rod by rotating the bolt 601, the fixing block 604 can be folded when not used normally, thereby saving space, then the mounting box 1 is in threaded connection with the mounting post 3, the two can be disassembled during transportation to lighten weight, the transportation is convenient, finally, the external water pipe is connected with the water inlet pipe 502, the water source is connected, the starting motor 2 starts to spray, dust fall and temperature reduction, specifically, the motor 2 drives the reciprocating screw rod 201 to rotate, the reciprocating screw rod 201 drives the second connecting seat 203 and the connecting plate 204 to, connecting plate 204 drives piston head 501 through piston rod 2041 and slides in piston cylinder 5 and carry the water source, and water gets into shunt tubes 4 through outlet pipe 402 in, through the reposition of redundant personnel after from shower nozzle 401 blowout cooling and dust fall, second connecting seat 203 makes shunt tubes 4 use sixth connecting seat 403 as axle center reciprocating rotation through first connecting rod 2031, makes the water smoke that erupts denser in the air to this reaches better cooling dust fall effect.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a green building construction working face sprays dust fall heat sink, includes install bin (1) and erection column (3), be equipped with on install bin (1) and spray the mechanism, its characterized in that, install bin (1) threaded connection is on erection column (3), the internal rotation of erection column (3) is connected with threaded rod (301), threaded connection has third connecting seat (302) on threaded rod (301), rotate on third connecting seat (302) and be connected with second connecting rod (303), the outer wall fixedly connected with fifth connecting seat (305) of erection column (3), rotate on fifth connecting seat (305) and be connected with installation pole (6), fixedly connected with fourth connecting seat (304) on installation pole (6), the one end rotation that third connecting seat (302) was kept away from to second connecting rod (303) is connected on fourth connecting seat (304), one end fixedly connected with fixing base (603) of erection column (3) is kept away from in erection column (6), threaded connection has bolt (601) on fixing base (603), the bottom of bolt (601) is rotated and is connected with fixed block (604), fixed block (604) slide in fixing base (603), sliding connection has slider (602) with fixed block (604) matched with on fixing base (603).
2. The green building construction working face spraying dust-reducing and temperature-reducing device is characterized in that the spraying mechanism comprises an installation box (1) and a shunt pipe (4), the shunt pipe (4) is rotatably connected to the installation box (1) through a first connecting seat (101), a spray head (401) is fixedly connected to the shunt pipe (4), and a driving portion for driving the shunt pipe (4) to rotate is arranged in the installation box (1).
3. The green building construction working face spraying dust-reducing and temperature-reducing device according to claim 2, it is characterized in that the driving part comprises a motor (2) and a reciprocating screw rod (201), the motor (2) is fixedly connected with the inner wall of the bottom of the mounting box (1), one end of the reciprocating screw rod (201) is fixedly connected with the output end of the motor (2), the other end of the reciprocating screw rod (201) is rotatably connected with the inner wall of the top of the mounting box (1), a second connecting seat (203) is connected to the reciprocating screw rod (201) in a threaded manner, a first connecting rod (2031) is rotatably connected to the second connecting seat (203), one end, far away from the second connecting seat (203), of the first connecting rod (2031) is rotatably connected to the flow dividing pipe (4) through a sixth connecting seat (403), and a water feeding mechanism matched with the spraying mechanism is arranged in the installation box (1).
4. The green building construction working face spraying dust-reducing and temperature-reducing device according to claim 3, wherein the water feeding mechanism comprises a piston cylinder (5) and a connecting plate (204), a piston rod (2041) is fixedly connected to the bottom of the connecting plate (204), a piston head (501) is fixedly connected to the bottom of the piston rod (2041), the piston head (501) is slidably connected in the piston cylinder (5), an inlet pipe (502) is fixedly connected to an input end of the piston cylinder (5), and an output end of the piston cylinder (5) is communicated with the flow dividing pipe (4) through an outlet pipe (402).
5. The green building construction working face spraying dust-reducing and temperature-reducing device as claimed in claim 4, wherein the water inlet pipe (502) and the water outlet pipe (402) are both provided with one-way valves (503).
6. The spraying dust-reducing and temperature-reducing device for the green building construction working face is characterized in that a plurality of groups of the shunt pipes (4) are arranged, and the shunt pipes (4) are distributed on the side wall of the installation box (1) in the circumferential direction.
CN202022061322.0U 2020-09-19 2020-09-19 Green building construction working face sprays dust fall heat sink Active CN213268940U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022061322.0U CN213268940U (en) 2020-09-19 2020-09-19 Green building construction working face sprays dust fall heat sink

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022061322.0U CN213268940U (en) 2020-09-19 2020-09-19 Green building construction working face sprays dust fall heat sink

Publications (1)

Publication Number Publication Date
CN213268940U true CN213268940U (en) 2021-05-25

Family

ID=75942585

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022061322.0U Active CN213268940U (en) 2020-09-19 2020-09-19 Green building construction working face sprays dust fall heat sink

Country Status (1)

Country Link
CN (1) CN213268940U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114272707A (en) * 2021-12-30 2022-04-05 中国建筑第五工程局有限公司 A raise dust treatment equipment for in green building work progress

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114272707A (en) * 2021-12-30 2022-04-05 中国建筑第五工程局有限公司 A raise dust treatment equipment for in green building work progress
CN114272707B (en) * 2021-12-30 2023-01-10 中国建筑第五工程局有限公司 A raise dust treatment equipment for in green building work progress

Similar Documents

Publication Publication Date Title
CN213268940U (en) Green building construction working face sprays dust fall heat sink
CN214089661U (en) Building construction working face sprays dust fall heat sink
CN208214629U (en) Cooling device is used in a kind of construction welding
CN216452393U (en) Greening roof in sponge city
CN218281118U (en) Dust device is used in house construction
CN208130747U (en) A kind of movable deduster of constructing metro tunnel
CN214471915U (en) Traffic highway detection sampling device with heat dissipation function and drill bit convenient to replace
CN112344464A (en) High-efficient heat sink that sprays of construction working face
CN211936189U (en) Dust collector is used in special fertilizer production in flower nursery
CN218323716U (en) Paint spraying apparatus for energy-conserving building
CN219061215U (en) Assembled construction enclosure
CN220428843U (en) Water adding device for sprayed concrete rubber tube
CN217044659U (en) Drilling equipment for building engineering
CN214809434U (en) Dust-removing humidifying sprayer for high-rise building
CN220558851U (en) Dust fall device for environmental protection engineering
CN216474432U (en) Make things convenient for efficient municipal works road repair device
CN215027219U (en) Civil engineering building construction working face sprays dust fall heat sink
CN217439367U (en) Architectural design roofing heat insulation structure
CN218406628U (en) A concrete column device of moisturizing for building engineering
CN219992324U (en) Highway construction is with watering dust device
CN212523479U (en) Portable dry fog dust remover for cement encaustic tile production
CN217680108U (en) Wisdom building roof waterproof engineering construction equipment
CN209189843U (en) A kind of aluminum honeycomb panel processing tool
CN216553078U (en) Bolt assembly for improving quality of concrete joint of constructional engineering
CN218834002U (en) Dust device with measurement function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant