CN115532381A - Construction waste portable transfer equipment - Google Patents

Construction waste portable transfer equipment Download PDF

Info

Publication number
CN115532381A
CN115532381A CN202211120600.2A CN202211120600A CN115532381A CN 115532381 A CN115532381 A CN 115532381A CN 202211120600 A CN202211120600 A CN 202211120600A CN 115532381 A CN115532381 A CN 115532381A
Authority
CN
China
Prior art keywords
fixedly installed
frame
pipe
construction waste
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211120600.2A
Other languages
Chinese (zh)
Inventor
李翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202211120600.2A priority Critical patent/CN115532381A/en
Publication of CN115532381A publication Critical patent/CN115532381A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C13/00Disintegrating by mills having rotary beater elements ; Hammer mills
    • B02C13/02Disintegrating by mills having rotary beater elements ; Hammer mills with horizontal rotor shaft
    • B02C13/06Disintegrating by mills having rotary beater elements ; Hammer mills with horizontal rotor shaft with beaters rigidly connected to the rotor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D47/00Separating dispersed particles from gases, air or vapours by liquid as separating agent
    • B01D47/06Spray cleaning
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C13/00Disintegrating by mills having rotary beater elements ; Hammer mills
    • B02C13/26Details
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C13/00Disintegrating by mills having rotary beater elements ; Hammer mills
    • B02C13/26Details
    • B02C13/28Shape or construction of beater elements
    • B02C13/2804Shape or construction of beater elements the beater elements being rigidly connected to the rotor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C13/00Disintegrating by mills having rotary beater elements ; Hammer mills
    • B02C13/26Details
    • B02C13/286Feeding or discharge
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C13/00Disintegrating by mills having rotary beater elements ; Hammer mills
    • B02C13/26Details
    • B02C13/30Driving mechanisms
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C21/00Disintegrating plant with or without drying of the material
    • B02C21/02Transportable disintegrating plant
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B13/00Accessories or details of general applicability for machines or apparatus for cleaning
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B3/00Cleaning by methods involving the use or presence of liquid or steam
    • B08B3/02Cleaning by the force of jets or sprays
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C13/00Disintegrating by mills having rotary beater elements ; Hammer mills
    • B02C13/26Details
    • B02C13/286Feeding or discharge
    • B02C2013/28618Feeding means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C2201/00Codes relating to disintegrating devices adapted for specific materials
    • B02C2201/06Codes relating to disintegrating devices adapted for specific materials for garbage, waste or sewage
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/58Construction or demolition [C&D] waste

Landscapes

  • Engineering & Computer Science (AREA)
  • Food Science & Technology (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Disintegrating Or Milling (AREA)

Abstract

本发明公开了一种建筑垃圾便捷式转运设备,涉及建筑垃圾转运技术领域,具体为一种建筑垃圾便捷式转运设备,包括粉碎机构、清洗调节机构、降尘机构、传动控制机构和卸料机构,所述粉碎机构包括移动架、破碎箱、进料通道和旋转轴,所述破碎箱的底部固定安装在移动架的顶部一侧,所述进料通道的底部固定安装在破碎箱的顶部。该建筑垃圾便捷式转运设备,通过粉碎机构和卸料机构的设置,使该建筑垃圾便捷式转运设备具备了对建筑垃圾进行粉碎处理,使得建筑垃圾的规格统一,从而便于后期进行运输的效果,从而起到了减小工人的工作强度的作用,达到了圾运输处理的效率高的目的。

Figure 202211120600

The invention discloses a convenient construction waste transfer device, which relates to the technical field of construction waste transfer, in particular to a construction waste transfer device, which includes a crushing mechanism, a cleaning adjustment mechanism, a dust reduction mechanism, a transmission control mechanism and a discharge mechanism. The crushing mechanism includes a moving frame, a crushing box, a feeding channel and a rotating shaft. The bottom of the crushing box is fixedly installed on the top side of the moving frame, and the bottom of the feeding channel is fixedly installed on the top of the crushing box. The construction waste portable transfer equipment, through the setting of the crushing mechanism and the unloading mechanism, enables the construction waste portable transfer equipment to have the effect of crushing the construction waste, making the specifications of the construction waste uniform, and thus facilitating the later transportation. Thereby, the effect of reducing the work intensity of workers is achieved, and the purpose of high efficiency of garbage transportation and treatment is achieved.

Figure 202211120600

Description

一种建筑垃圾便捷式转运设备A portable transfer device for construction waste

技术领域technical field

本发明涉及建筑垃圾转运技术领域,具体为一种建筑垃圾便捷式转运设备。The invention relates to the technical field of construction waste transfer, in particular to a portable construction waste transfer device.

背景技术Background technique

建筑垃圾指人们在从事拆迁、建设、装修和修缮等建筑业的生产活动中产生的渣土、废旧混凝土、废旧砖石及其他废弃物的统称;按产生源分类:建筑垃圾可分为工程渣土、装修垃圾、拆迁垃圾和工程泥浆等;按组成成分分类:建筑垃圾中可分为渣土、混凝土块、碎石块、砖瓦碎块、废砂浆、泥浆、沥青块、废塑料、废金属和废竹木等,这些材料对于建筑本身而言是没有任何帮助的,但却是在建筑的过程中产生的物质,需要进行相应的处理,这样才能够达到理想的工程项目建设。Construction waste refers to the general designation of muck, waste concrete, waste masonry and other wastes generated in the production activities of the construction industry such as demolition, construction, decoration and repair; classified according to the source of generation: construction waste can be divided into engineering slag Soil, decoration waste, demolition waste and engineering mud, etc.; classified by composition: construction waste can be divided into muck, concrete blocks, crushed stones, brick and tile fragments, waste mortar, mud, asphalt blocks, waste plastics, waste Metal, waste bamboo and wood, etc. These materials are of no help to the building itself, but they are substances produced during the construction process, which need to be treated accordingly, so as to achieve the ideal project construction.

然而,在建筑垃圾处理的过程中,由于垃圾的形状或体积大小不一,进而难以进行统一运输处理,不仅增加了工人的工作强度,而且处理速度缓慢,从而使得垃圾运输处理的效率低,在对建筑垃圾进行粉碎时容易产生大量灰尘,进而对环境造成污染。However, in the process of construction waste treatment, due to the different shapes or sizes of waste, it is difficult to carry out unified transportation and treatment, which not only increases the work intensity of workers, but also slows down the processing speed, which makes the efficiency of waste transportation and treatment low. When crushing construction waste, it is easy to generate a large amount of dust, which will pollute the environment.

发明内容Contents of the invention

(一)解决的技术问题(1) Solved technical problems

针对现有技术的不足,本发明提供了一种建筑垃圾便捷式转运设备,解决了上述背景技术中提出的问题。Aiming at the deficiencies of the prior art, the present invention provides a portable transfer device for construction waste, which solves the problems raised in the background art above.

(二)技术方案(2) Technical solutions

为实现以上目的,本发明通过以下技术方案予以实现:一种建筑垃圾便捷式转运设备,包括粉碎机构、清洗调节机构、降尘机构、传动控制机构和卸料机构,所述粉碎机构包括移动架、破碎箱、进料通道和旋转轴,所述破碎箱的底部固定安装在移动架的顶部一侧,所述进料通道的底部固定安装在破碎箱的顶部;In order to achieve the above objectives, the present invention is achieved through the following technical solutions: a portable construction waste transfer equipment, including a crushing mechanism, a cleaning adjustment mechanism, a dust reduction mechanism, a transmission control mechanism and a discharge mechanism, and the crushing mechanism includes a moving frame, A crushing box, a feeding channel and a rotating shaft, the bottom of the crushing box is fixedly installed on the top side of the mobile frame, and the bottom of the feeding channel is fixedly installed on the top of the crushing box;

所述清洗调节机构包括固定柱、第一丝杆、推送架和推送杆,所述固定柱的底部固定安装在移动架的顶部一侧,所述固定柱的顶部开设有位移槽,所述第一丝杆的一端转动连接在位移槽的内部;The cleaning adjustment mechanism includes a fixed column, a first screw rod, a push frame and a push rod, the bottom of the fixed column is fixedly installed on the top side of the mobile frame, and a displacement groove is opened on the top of the fixed column. One end of the wire rod is rotatably connected to the inside of the displacement groove;

所述降尘机构包括转动轴、转动架、连接架和连接座,所述转动轴的一端转动连接在粉碎箱的内侧壁,所述转动架的顶部固定安装在转动轴的另一端,所述连接架的一侧固定安装在转动架的一侧下方;The dust reduction mechanism includes a rotating shaft, a turret, a connecting frame and a connecting seat. One end of the rotating shaft is rotatably connected to the inner wall of the crushing box, and the top of the turret is fixedly installed on the other end of the rotating shaft. The connecting One side of the frame is fixedly installed under one side of the turret;

所述移动架的内部开设有下料槽,所述下料槽位于粉碎箱的正下方,所述下料槽的内侧壁固定安装有过滤板,所述移动架的底部固定安装有废水箱,所述过滤板位于废水箱的内部,所述废水箱的底部固定安装有排水管,所述排水管的外侧固定安装有控制阀,所述废水箱的一侧固定安装有储物箱;The inside of the moving frame is provided with a feeding chute, the feeding chute is located directly below the crushing box, a filter plate is fixedly installed on the inner wall of the lowering chute, and a waste water tank is fixedly installed at the bottom of the moving frame. The filter plate is located inside the waste water tank, the bottom of the waste water tank is fixedly installed with a drain pipe, the outer side of the drain pipe is fixedly installed with a control valve, and one side of the waste water tank is fixedly installed with a storage box;

所述传动控制机构包括第二主动带轮、第二皮带、固定座和主动转轴,所述第二主动带轮的一端固定安装在驱动电机的输出端,所述第二皮带设置在第二主动带轮的外侧;The transmission control mechanism includes a second driving pulley, a second belt, a fixed seat and a driving shaft, one end of the second driving pulley is fixedly installed on the output end of the driving motor, and the second belt is arranged on the second driving the outer side of the pulley;

所述卸料机构包括滑动槽、第二丝杆、滑动块和第三从动带轮,所述滑动槽开设在移动架的底部,所述第二丝杆的一端转动连接在滑动槽的内部,所述滑动块的内部传动连接在第二丝杆的外侧。The unloading mechanism includes a sliding groove, a second screw rod, a sliding block and a third driven pulley, the sliding groove is provided at the bottom of the moving frame, and one end of the second screw rod is rotatably connected to the inside of the sliding groove , the inner drive connection of the sliding block is connected to the outer side of the second screw rod.

可选的,所述旋转轴的外侧转动连接在破碎箱的内部,所述旋转轴的一端固定安装有第一从动带轮,所述移动架的顶部一侧固定安装有驱动电机,所述驱动电机的输出端固定安装有第一主动带轮,所述第一主动带轮的外侧设置有第一皮带,所述第一从动带轮的外侧和第一主动带轮的外侧通过第一皮带传动连接,所述旋转轴的外侧固定安装有破碎齿,所述破碎齿位于破碎箱的内部。Optionally, the outer side of the rotating shaft is rotatably connected to the inside of the crushing box, one end of the rotating shaft is fixedly installed with a first driven pulley, and one side of the top of the moving frame is fixedly installed with a driving motor. The output end of the driving motor is fixedly installed with a first driving pulley, the outside of the first driving pulley is provided with a first belt, and the outside of the first driven pulley and the outside of the first driving pulley pass through the first Belt drive connection, crushing teeth are fixedly installed on the outside of the rotating shaft, and the crushing teeth are located inside the crushing box.

可选的,所述推送架的底部传动连接在第一丝杆的外侧,且推送架的底部滑动连接在位移槽的内部,所述推送杆的一端固定安装在推送架的顶部一侧,所述破碎箱的一侧固定安装有安装架,所述推送杆的外侧滑动连接在安装架的内部,所述安装架的一侧固定安装有缓冲弹簧,所述缓冲弹簧的一端固定安装在推送杆的外侧,所述第一丝杆的一端固定安装有直齿轮,所述移动架的顶部一侧固定安装有第一电动伸缩杆,所述第一电动伸缩杆位于驱动电机的一侧,所述移动架的顶部固定安装有支撑座,所述支撑座的内部滑动连接有直齿条,所述直齿条的一端固定安装在第一电动伸缩杆的伸出端,所述直齿条的一侧啮合在直齿轮的外侧。Optionally, the bottom of the push frame is connected to the outside of the first screw rod, and the bottom of the push frame is slidably connected to the inside of the displacement groove, and one end of the push rod is fixedly installed on the top side of the push frame. A mounting frame is fixedly installed on one side of the crushing box, the outside of the push rod is slidably connected to the inside of the mounting frame, a buffer spring is fixedly mounted on one side of the mounting frame, and one end of the buffer spring is fixedly mounted on the push rod One end of the first screw rod is fixedly installed with a spur gear, and one side of the top of the mobile frame is fixedly installed with a first electric telescopic rod, and the first electric telescopic rod is located on one side of the driving motor. The top of the mobile frame is fixedly installed with a support seat, and the inside of the support seat is slidably connected with a spur rack. One end of the spur rack is fixedly installed on the extended end of the first electric telescopic rod. The side meshes on the outside of the spur gear.

可选的,所述连接座的一端转动连接在连接架的一端,所述连接座的另一端固定安装在推送杆的一端,所述转动架的一侧固定安装有第一喷淋管,所述第一喷淋管的一侧固定安装有第一水喷头,所述第一水喷头的外侧固定安装在转动架的一侧,所述第一喷淋管的外侧固定安装有第一上水管,所述粉碎箱的内侧壁上方固定安装有储水管,所述第一上水管的一端固定安装在储水管的外侧。Optionally, one end of the connecting seat is rotatably connected to one end of the connecting frame, the other end of the connecting seat is fixedly installed on one end of the push rod, and a first spray pipe is fixedly installed on one side of the rotating frame, so One side of the first spray pipe is fixedly installed with a first water nozzle, the outer side of the first water nozzle is fixedly installed on one side of the turret, and the outer side of the first spray pipe is fixedly installed with a first upper water pipe A water storage pipe is fixedly installed above the inner side wall of the crushing box, and one end of the first upper water pipe is fixedly installed on the outside of the water storage pipe.

可选的,所述粉碎箱的内顶壁固定安装有支撑架,所述支撑架的顶部固定安装有安装座,所述安装座的内部固定安装有第二喷淋管,所述第二喷淋管的底部固定安装有第二水喷头,所述第二水喷头的外侧固定安装在支撑架的底部,所述第二喷淋管的外侧固定安装有第二上水管,所述第二上水管的一端固定安装在储水管的一端,所述移动架的顶部固定安装有储水箱,所述储水箱的内底壁固定安装有水泵,所述水泵的顶部一侧固定安装有吸水管,所述水泵的顶部另一侧固定安装有送水管,所述送水管的另一端固定安装在储水管的一端。Optionally, a support frame is fixedly installed on the inner top wall of the crushing box, and a mounting seat is fixedly mounted on the top of the support frame, and a second spray pipe is fixedly installed inside the mounting seat, and the second spray pipe The bottom of the shower pipe is fixedly installed with a second water nozzle, the outer side of the second water nozzle is fixedly installed at the bottom of the support frame, the outer side of the second shower pipe is fixedly installed with a second upper water pipe, and the second upper water pipe is fixedly installed on the outer side of the second upper water pipe. One end of the water pipe is fixedly installed on one end of the water storage pipe, a water storage tank is fixedly installed on the top of the mobile frame, a water pump is fixedly installed on the inner bottom wall of the water storage tank, and a water suction pipe is fixedly installed on one side of the top of the water pump. A water delivery pipe is fixedly installed on the other side of the top of the water pump, and the other end of the water delivery pipe is fixedly installed at one end of the water storage pipe.

可选的,所述固定座的顶部固定安装在移动架的底部一侧,所述主动转轴的外侧转动连接在固定座的内部下方,所述主动转轴的一端固定安装有第二从动带轮,所述第二主动带轮和第二从动带轮之间通过第二皮带传动连接,所述固定座的顶部一侧固定安装有第二电动伸缩杆,所述第二电动伸缩杆的伸出端固定安装有位移架,所述移动架的底部一侧开设有移动槽,所述位移架的顶部滑动连接在移动槽的内部,所述位移架的一侧转动连接有从动转轴,所述从动转轴的外侧固定安装有主动锥齿轮,所述移动架的一侧固定安装有支架,所述支架的内部转动连接有连接转轴,所述连接转轴的一端固定安装有从动锥齿轮,所述连接转轴的另一端固定安装有第三主动带轮,所述第三主动带轮的外侧设置有第三皮带。Optionally, the top of the fixed base is fixedly installed on the bottom side of the moving frame, the outer side of the driving shaft is rotatably connected to the inside of the fixing base, and one end of the driving shaft is fixedly installed with a second driven pulley , the second driving pulley and the second driven pulley are connected through a second belt transmission, and a second electric telescopic rod is fixedly installed on the top side of the fixed seat, and the extension of the second electric telescopic rod A displacement frame is fixedly installed at the outlet, and a moving groove is provided on one side of the bottom of the moving frame. The top of the displacement frame is slidably connected to the inside of the moving groove. A driving bevel gear is fixedly installed on the outside of the driven shaft, a bracket is fixedly installed on one side of the moving frame, a connecting shaft is connected to the inside of the bracket, and a driven bevel gear is fixedly installed on one end of the connecting shaft. The other end of the connecting shaft is fixedly installed with a third driving pulley, and a third belt is arranged outside the third driving pulley.

可选的,且滑动块的外侧滑动连接在滑动槽的内部,所述第三从动带轮的一端固定安装在第二丝杆的一端,所述第三从动带轮和第三主动带轮之间通过第三皮带传动连接,所述储物箱的内侧壁滑动连接有推送卸料板,所述推送卸料板的顶部一侧固定安装在滑动块的底部,所述推送卸料板顶部开设有伸缩槽。Optionally, the outer side of the sliding block is slidably connected to the inside of the sliding groove, one end of the third driven pulley is fixedly installed on one end of the second screw rod, and the third driven pulley and the third driving belt The wheels are connected by a third belt drive, and the inner side wall of the storage box is slidingly connected with a push unloading plate, and the top side of the push unloading plate is fixedly installed on the bottom of the sliding block, and the push unloading plate The top is provided with telescopic slots.

可选的,所述伸缩槽的内底壁固定安装有第三电动伸缩杆,所述第三电动伸缩杆的伸出端固定安装有伸缩挡板,所述伸缩挡板的外侧滑动连接在伸缩槽的内部,所述储物箱的一侧下方开设有排料槽,所述排料槽的内顶壁固定安装有复位弹簧,所述复位弹簧的底部固定安装有阻挡板,所述阻挡板的外侧滑动连接在排料槽的内部,所述储物箱的一侧开设有升降槽,所述升降槽的内部滑动连接有升降块,所述升降块的一侧固定安装在阻挡板的一侧,所述储物箱的一侧上方固定安装有支块,所述支块的内部滑动连接有支杆。Optionally, a third electric telescopic rod is fixedly installed on the inner bottom wall of the telescopic groove, and a telescopic baffle is fixedly mounted on the protruding end of the third electric telescopic rod, and the outer side of the telescopic baffle is slidably connected to the telescopic Inside the groove, a discharge groove is provided under one side of the storage box, a return spring is fixedly installed on the inner top wall of the discharge groove, and a blocking plate is fixedly installed on the bottom of the return spring, and the blocking plate The outer side of the storage box is slidably connected to the inside of the discharge trough, and one side of the storage box is provided with a lifting trough, and the inside of the lifting trough is slidably connected with a lifting block, and one side of the lifting block is fixedly installed on one side of the blocking plate. On one side of the storage box, a support block is fixedly installed on one side of the storage box, and a support rod is slidably connected to the inside of the support block.

(三)有益效果(3) Beneficial effects

本发明提供了一种建筑垃圾便捷式转运设备,具备以下有益效果:The invention provides a portable transfer device for construction waste, which has the following beneficial effects:

1、该建筑垃圾便捷式转运设备,通过粉碎机构和卸料机构的设置,使该建筑垃圾便捷式转运设备具备了对建筑垃圾进行粉碎处理,使得建筑垃圾的规格统一,从而便于后期进行运输的效果,通过移动架、破碎箱、进料通道、旋转轴、第一从动带轮、驱动电机、第一主动带轮、第一皮带和破碎齿的配合设置,在使用的过程中可以通过进料通道把建筑垃圾倒入到粉碎箱的内部,这时打开驱动电机,驱动电机的输出端会第一主动带轮旋转,第一主动带轮会通过第一皮带带动第一从动带轮旋转,第一从动带轮会通过旋转轴带动破碎齿进行旋转,进而使建筑垃圾进行粉碎,而粉碎后的垃圾会经过过滤板流入到储物箱的内部,从而起到了减小工人的工作强度的作用,达到了圾运输处理的效率高的目的。1. The construction waste portable transfer equipment, through the setting of the crushing mechanism and the unloading mechanism, enables the construction waste portable transfer equipment to crush the construction waste, so that the specifications of the construction waste are unified, so that it is convenient for later transportation Effect, through the cooperative setting of the moving frame, the crushing box, the feeding channel, the rotating shaft, the first driven pulley, the driving motor, the first driving pulley, the first belt and the crushing teeth, in the process of use, it can pass through The material channel pours the construction waste into the crushing box, then turn on the drive motor, the output end of the drive motor will rotate the first driving pulley, and the first driving pulley will drive the first driven pulley to rotate through the first belt , the first driven pulley will drive the crushing teeth to rotate through the rotating shaft, and then crush the construction waste, and the crushed waste will flow into the storage box through the filter plate, thereby reducing the work intensity of the workers The role of the garbage transportation and treatment has achieved the purpose of high efficiency.

2、该建筑垃圾便捷式转运设备,通过清洗调节机构和降尘机构的设置,使该建筑垃圾便捷式转运设备具备了有效防止了建筑垃圾在粉碎时灰尘扩散出去同时还可以对粉碎齿进行清洗的效果,通过固定柱、第一丝杆、推送架、推送杆、缓冲弹簧、安装架、直齿轮、第一电动伸缩杆、支撑座和直齿条的配合设置,在使用的过程中可以打开水泵,水泵会通过吸水管把储水箱内部加压后经过送水管送入到储水管的内部,储水管的内部水会分别通过第一上水管和第二上水管进入到第一喷淋管和第二喷淋管的内部,最终加压后的水通过第一水喷头和第二水喷头喷出,对粉碎箱内部粉尘进行降尘,当需要对粉碎齿进行清洗时,打开第一电动伸缩杆,第一电动伸缩杆的伸出端会带动直齿条在支撑座的内部滑动,同时直齿条会带动直齿轮,直齿轮会带动第一丝杆旋转,第一丝杆会带动推送架在位移槽的内部滑动,同时推送架会带动推送杆在安装架的内部滑动,推送杆的一端会带动连接座运动,连接座会带动连接架运动,连接架会带动转动架的底部,进而使转动架带动转动轴在粉碎箱的内侧壁转动,使第一水喷头靠近粉碎齿,进而使粉碎齿进行清洗,从而起到了降尘效果好的作用,达到了不影响作业环境的目的。2. The construction waste portable transfer equipment, through the setting of the cleaning adjustment mechanism and the dust reduction mechanism, enables the construction waste portable transfer equipment to effectively prevent the dust from spreading out when the construction waste is crushed, and at the same time clean the crushing teeth As a result, the water pump can be turned on during use through the cooperation of the fixed column, the first screw rod, the push frame, the push rod, the buffer spring, the mounting frame, the spur gear, the first electric telescopic rod, the support seat and the spur rack. , the water pump will pressurize the inside of the water storage tank through the water suction pipe and send it to the inside of the water storage pipe through the water delivery pipe. Inside the second spray pipe, the finally pressurized water is sprayed through the first water nozzle and the second water nozzle to reduce the dust inside the crushing box. When it is necessary to clean the crushing teeth, open the first electric telescopic rod, The protruding end of the first electric telescopic rod will drive the spur rack to slide inside the support seat, and at the same time the spur rack will drive the spur gear, the spur gear will drive the first screw to rotate, and the first screw will drive the push frame to move The inside of the groove slides, and at the same time, the push frame will drive the push rod to slide inside the installation frame. One end of the push rod will drive the connecting seat to move, the connecting seat will drive the connecting frame to move, and the connecting frame will drive the bottom of the turret, thereby making the turret Drive the rotating shaft to rotate on the inner side wall of the crushing box, make the first water nozzle close to the crushing teeth, and then make the crushing teeth clean, thereby playing a good effect of dust reduction and achieving the purpose of not affecting the working environment.

附图说明Description of drawings

图1为本发明立体的结构示意图;Fig. 1 is the three-dimensional structural representation of the present invention;

图2为本发明正等侧的结构示意图;Fig. 2 is the structural representation of the positive side of the present invention;

图3为本发明剖视的结构示意图;Fig. 3 is the structural representation of cross section of the present invention;

图4为本发明全剖的结构示意图;Fig. 4 is the structural representation of the present invention's full section;

图5为本发明图2中A处放大的结构示意图;Fig. 5 is the schematic structural diagram enlarged at place A in Fig. 2 of the present invention;

图6为本发明图3中B处放大的结构示意图;Fig. 6 is the schematic structural diagram enlarged at B place in Fig. 3 of the present invention;

图7为本发明图3中C处放大的结构示意图;Fig. 7 is the schematic structural diagram enlarged at C place in Fig. 3 of the present invention;

图8为本发明正三侧的结构示意图;Fig. 8 is a structural schematic diagram of the three sides of the present invention;

图9为本发明储物箱内部剖视的结构示意图;Fig. 9 is a schematic structural view of the internal section of the storage box of the present invention;

图10为本发明右视的结构示意图;Fig. 10 is a structural schematic diagram of a right view of the present invention;

图11为本发明图8中D处放大的结构示意图;Fig. 11 is a schematic structural diagram enlarged at D in Fig. 8 of the present invention;

图12为本发明图8中E处放大的结构示意图;Fig. 12 is a schematic structural diagram enlarged at E in Fig. 8 of the present invention;

图13为本发明图9中F处放大的结构示意图;Fig. 13 is a schematic structural view enlarged at F in Fig. 9 of the present invention;

图14为本发明图10中G处放大的结构示意图;Fig. 14 is a schematic structural diagram enlarged at G in Fig. 10 of the present invention;

图15为本发明图10中H处放大的结构示意图;Fig. 15 is a schematic structural view enlarged at H in Fig. 10 of the present invention;

图16为本发明图3中J处放大的结构示意图;Fig. 16 is a schematic structural diagram enlarged at J in Fig. 3 of the present invention;

图17为本发明图3中K处放大的结构示意图。FIG. 17 is an enlarged structural schematic diagram at K in FIG. 3 of the present invention.

图中:11、移动架;12、破碎箱;13、进料通道;14、旋转轴;15、第一从动带轮;16、驱动电机;17、第一主动带轮;18、第一皮带;19、破碎齿;21、固定柱;22、第一丝杆;23、推送架;24、推送杆;25、缓冲弹簧;26、安装架;27、直齿轮;28、第一电动伸缩杆;29、支撑座;210、直齿条;31、转动轴;32、转动架;33、连接架;34、连接座;35、第一喷淋管;36、第一水喷头;37、第一上水管;38、储水管;39、支撑架;310、安装座;311、第二喷淋管;312、第二水喷头;313、第二上水管;314、储水箱;315、水泵;316、吸水管;317、送水管;41、下料槽;42、过滤板;43、废水箱;44、排水管;45、控制阀;46、储物箱;51、第二主动带轮;52、第二皮带;53、固定座;54、主动转轴;55、第二从动带轮;56、第二电动伸缩杆;57、位移架;58、移动槽;59、从动转轴;510、主动锥齿轮;511、支架;512、连接转轴;513、从动锥齿轮;514、第三主动带轮;515、第三皮带;61、滑动槽;62、第二丝杆;63、滑动块;64、第三从动带轮;65、推送卸料板;66、伸缩槽;67、第三电动伸缩杆;68、伸缩挡板;69、排料槽;610、复位弹簧;611、阻挡板;612、升降槽;613、升降块;614、支块;615、支杆。In the figure: 11, moving frame; 12, crushing box; 13, feeding channel; 14, rotating shaft; 15, first driven pulley; 16, driving motor; 17, first driving pulley; 18, first Belt; 19, broken teeth; 21, fixed column; 22, the first screw rod; 23, push frame; 24, push rod; 25, buffer spring; 26, mounting frame; 27, spur gear; 28, the first electric telescopic Rod; 29, support seat; 210, straight rack; 31, rotating shaft; 32, turret; 33, connecting frame; 34, connecting seat; 35, the first spray pipe; 36, the first water nozzle; 37, 38, water storage pipe; 39, support frame; 310, mounting seat; 311, second spray pipe; 312, second water nozzle; 313, second upper water pipe; 314, water storage tank; 315, water pump ; 316, suction pipe; 317, water delivery pipe; 41, feeding trough; 42, filter plate; 43, waste water tank; 44, drainage pipe; 45, control valve; 46, storage box; 51, the second driving pulley ; 52, the second belt; 53, the fixed seat; 54, the driving shaft; 55, the second driven pulley; 56, the second electric telescopic rod; 57, the displacement frame; 58, the moving slot; 59, the driven shaft; 510, driving bevel gear; 511, bracket; 512, connecting shaft; 513, driven bevel gear; 514, the third driving pulley; 515, the third belt; 61, sliding groove; 62, the second screw rod; 63, Sliding block; 64, the third driven pulley; 65, push unloading plate; 66, telescopic groove; 67, the third electric telescopic rod; 68, telescopic baffle; 69, discharge chute; 610, return spring; 611 , blocking plate; 612, lifting groove; 613, lifting block; 614, supporting block; 615, pole.

具体实施方式detailed description

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention.

实施例1Example 1

请参阅图8至图17,本发明提供技术方案:一种建筑垃圾便捷式转运设备,一种建筑垃圾便捷式转运设备,包括粉碎机构、清洗调节机构、降尘机构、传动控制机构和卸料机构,粉碎机构包括移动架11、破碎箱12、进料通道13和旋转轴14,破碎箱12的底部固定安装在移动架11的顶部一侧,进料通道13的底部固定安装在破碎箱12的顶部,旋转轴14的外侧转动连接在破碎箱12的内部,旋转轴14的一端固定安装有第一从动带轮15,移动架11的顶部一侧固定安装有驱动电机16,驱动电机16的输出端固定安装有第一主动带轮17,第一主动带轮17的外侧设置有第一皮带18,第一从动带轮15的外侧和第一主动带轮17的外侧通过第一皮带18传动连接,旋转轴14的外侧固定安装有破碎齿19,破碎齿19位于破碎箱12的内部;Please refer to Figures 8 to 17, the present invention provides a technical solution: a convenient construction waste transfer device, a construction waste transfer device, including a crushing mechanism, a cleaning adjustment mechanism, a dust reduction mechanism, a transmission control mechanism and a discharge mechanism , the crushing mechanism includes a moving frame 11, a crushing box 12, a feeding channel 13 and a rotating shaft 14, the bottom of the crushing box 12 is fixedly installed on the top side of the moving frame 11, and the bottom of the feeding channel 13 is fixedly installed on the bottom of the crushing box 12. At the top, the outer side of the rotating shaft 14 is rotatably connected to the inside of the crushing box 12. One end of the rotating shaft 14 is fixedly equipped with a first driven pulley 15, and the top side of the moving frame 11 is fixedly installed with a drive motor 16. The output end is fixedly installed with the first driving pulley 17, the outside of the first driving pulley 17 is provided with the first belt 18, the outside of the first driven pulley 15 and the outside of the first driving pulley 17 pass through the first belt 18 Transmission connection, the outer side of the rotating shaft 14 is fixedly equipped with crushing teeth 19, and the crushing teeth 19 are located inside the crushing box 12;

移动架11的内部开设有下料槽41,下料槽41位于粉碎箱12的正下方,下料槽41的内侧壁固定安装有过滤板42,移动架11的底部固定安装有废水箱43,过滤板42位于废水箱43的内部,废水箱43的底部固定安装有排水管44,排水管44的外侧固定安装有控制阀45,废水箱43的一侧固定安装有储物箱46;The inside of the mobile frame 11 is provided with a hopper 41, the hopper 41 is located directly below the crushing box 12, the inner wall of the hopper 41 is fixedly equipped with a filter plate 42, and the bottom of the mobile frame 11 is fixedly equipped with a waste water tank 43, The filter plate 42 is located inside the waste water tank 43, the bottom of the waste water tank 43 is fixedly installed with a drainage pipe 44, the outer side of the drain pipe 44 is fixedly installed with a control valve 45, and one side of the waste water tank 43 is fixedly installed with a storage box 46;

传动控制机构包括第二主动带轮51、第二皮带52、固定座53和主动转轴54,第二主动带轮51的一端固定安装在驱动电机16的输出端,第二皮带52设置在第二主动带轮51的外侧,固定座53的顶部固定安装在移动架11的底部一侧,主动转轴54的外侧转动连接在固定座53的内部下方,主动转轴54的一端固定安装有第二从动带轮55,第二主动带轮51和第二从动带轮55之间通过第二皮带52传动连接,固定座53的顶部一侧固定安装有第二电动伸缩杆56,第二电动伸缩杆56的伸出端固定安装有位移架57,移动架11的底部一侧开设有移动槽58,位移架57的顶部滑动连接在移动槽58的内部,位移架57的一侧转动连接有从动转轴59,从动转轴59的外侧固定安装有主动锥齿轮510,移动架11的一侧固定安装有支架511,支架511的内部转动连接有连接转轴512,连接转轴512的一端固定安装有从动锥齿轮513,连接转轴512的另一端固定安装有第三主动带轮514,第三主动带轮514的外侧设置有第三皮带515;The transmission control mechanism comprises a second driving pulley 51, a second belt 52, a fixed seat 53 and a driving shaft 54, and one end of the second driving pulley 51 is fixedly installed on the output end of the drive motor 16, and the second belt 52 is arranged on the second The outer side of the driving pulley 51, the top of the fixed seat 53 is fixedly installed on the bottom side of the mobile frame 11, the outer side of the driving shaft 54 is connected to the inner bottom of the fixed seat 53, and one end of the driving shaft 54 is fixedly installed with the second driven shaft. Pulley 55, between the second driving pulley 51 and the second driven pulley 55 is connected by the transmission of the second belt 52, the top side of the holder 53 is fixedly equipped with the second electric telescopic rod 56, the second electric telescopic rod The extended end of 56 is fixedly equipped with displacement frame 57, and one side of the bottom of the displacement frame 11 is provided with a moving groove 58, and the top of the displacement frame 57 is slidingly connected in the inside of the moving groove 58, and one side of the displacement frame 57 is rotatably connected with a driven Rotating shaft 59, the outer side of driven rotating shaft 59 is fixedly installed with active bevel gear 510, and one side of moving frame 11 is fixedly installed with support 511, and the inner rotation of support 511 is connected with connecting rotating shaft 512, and one end of connecting rotating shaft 512 is fixedly installed with driven gear. Bevel gear 513, the other end of connecting shaft 512 is fixedly installed with the 3rd driving pulley 514, and the outside of the 3rd driving pulley 514 is provided with the 3rd belt 515;

卸料机构包括滑动槽61、第二丝杆62、滑动块63和第三从动带轮64,滑动槽61开设在移动架11的底部,第二丝杆62的一端转动连接在滑动槽61的内部,滑动块63的内部传动连接在第二丝杆62的外侧,且滑动块63的外侧滑动连接在滑动槽61的内部,第三从动带轮64的一端固定安装在第二丝杆62的一端,第三从动带轮64和第三主动带轮514之间通过第三皮带515传动连接,储物箱46的内侧壁滑动连接有推送卸料板65,推送卸料板65的顶部一侧固定安装在滑动块63的底部,推送卸料板65顶部开设有伸缩槽66,伸缩槽66的内底壁固定安装有第三电动伸缩杆67,第三电动伸缩杆67的伸出端固定安装有伸缩挡板68,伸缩挡板68的外侧滑动连接在伸缩槽66的内部,储物箱46的一侧下方开设有排料槽69,排料槽69的内顶壁固定安装有复位弹簧610,复位弹簧610的底部固定安装有阻挡板611,阻挡板611的外侧滑动连接在排料槽69的内部,储物箱46的一侧开设有升降槽612,升降槽612的内部滑动连接有升降块613,升降块613的一侧固定安装在阻挡板611的一侧,储物箱46的一侧上方固定安装有支块614,支块614的内部滑动连接有支杆615,通过粉碎机构和卸料机构的设置,使该建筑垃圾便捷式转运设备具备了对建筑垃圾进行粉碎处理,使得建筑垃圾的规格统一,从而便于后期进行运输的效果,从而起到了减小工人的工作强度的作用,达到了圾运输处理的效率高的目的。The unloading mechanism comprises a sliding groove 61, a second screw mandrel 62, a sliding block 63 and a third driven pulley 64. The sliding groove 61 is provided at the bottom of the mobile frame 11, and one end of the second screw rod 62 is rotatably connected to the sliding groove 61. The inside of the sliding block 63 is connected to the outside of the second screw mandrel 62 by transmission, and the outside of the sliding block 63 is slidingly connected to the inside of the sliding groove 61, and one end of the third driven pulley 64 is fixedly installed on the second screw mandrel. One end of 62, between the 3rd driven pulley 64 and the 3rd drive pulley 514, pass through the 3rd belt 515 transmission connection, the inner sidewall of storage box 46 is connected with push unloading plate 65 slidingly, pushes unloading plate 65 One side of the top is fixedly installed on the bottom of the sliding block 63, and the top of the push unloading plate 65 is provided with a telescopic groove 66, and the inner bottom wall of the telescopic groove 66 is fixedly installed with a third electric telescopic rod 67, and the extension of the third electric telescopic rod 67 The end is fixedly equipped with telescopic baffle 68, and the outer side of telescopic baffle 68 is slidably connected in the inside of telescopic groove 66, and one side below storage box 46 is provided with discharge groove 69, and the inner top wall of discharge groove 69 is fixedly installed with Back-moving spring 610, the bottom of back-moving spring 610 is fixedly equipped with blocking plate 611, and the outside of blocking plate 611 is slidably connected in the inside of discharging groove 69, and one side of storage box 46 is provided with lifting groove 612, and the inside of lifting groove 612 slides Connected with a lift block 613, one side of the lift block 613 is fixedly installed on one side of the blocking plate 611, and a support block 614 is fixedly installed on one side of the storage box 46, and the inside of the support block 614 is slidably connected with a pole 615. The setting of the crushing mechanism and the unloading mechanism makes the construction waste portable transfer equipment capable of crushing the construction waste, making the specifications of the construction waste uniform and convenient for later transportation, thereby reducing the work intensity of the workers The role of the garbage transportation and treatment has achieved the purpose of high efficiency.

使用时,通过进料通道13把建筑垃圾倒入到粉碎箱12的内部,这时打开驱动电机16,驱动电机16的输出端会第一主动带轮17旋转,第一主动带轮17会通过第一皮带18带动第一从动带轮15旋转,第一从动带轮15会通过旋转轴14带动破碎齿19进行旋转,进而使建筑垃圾进行粉碎,而粉碎后的垃圾会经过过滤板42流入到储物箱46的内部,当需要对储物箱46内部进行卸料时,使用者需要用手向上拉动升降块613,升降块613会在升降槽612的内部上升,在升降块613上升到升降槽612顶部时,推动支杆615在支块614的内部滑动,这时升降块613会被支杆615所阻挡,防止阻挡板611因重力下降,进而影响排料效率,升降块613会带动阻挡板611在排料槽69的内部上升,同时会挤压复位弹簧610,这时粉碎后的垃圾会因重力一部分会通过排料槽69排出,为了方便快速并全部排出粉碎后的垃圾,这时同时打开第二电动伸缩杆56和第三电动伸缩杆67,第二电动伸缩杆56的伸出端会带动位移架57在移动槽58的内部滑动,位移架57会带动从动转轴59的一端插入到主动转轴54的内部,同时主动锥齿轮510会靠近从动锥齿轮513,这时驱动电机16的输出端会带动第二主动带轮51,第二主动带轮51会通过第二皮带52带动第二从动带轮55旋转,第二从动带轮55会带动主动转轴54,这时主动锥齿轮510会发生旋转,主动锥齿轮510会带动从动锥齿轮513旋转,从动锥齿轮513会带动连接转轴512在支架511的内部发生旋转,连接转轴512会带动从动锥齿轮513发生旋转,第三主动带轮514会通过第三皮带515带动第三从动带轮64旋转,第三从动带轮64会带动第二丝杆62旋转,第二丝杆62会带动滑动块63在滑动槽61的内部滑动,第三电动伸缩杆67的伸出端会带动伸缩挡板68在伸缩槽66的内部上升,这时滑动块63会带动伸缩挡板68在储物箱46的内部滑动,进而使放置在储物箱46内部的垃圾快速通过排料槽69排出。During use, construction waste is poured into the inside of crushing box 12 by feeding passage 13, at this moment open drive motor 16, the output end of drive motor 16 can rotate first driving pulley 17, and first driving pulley 17 can pass through The first belt 18 drives the first driven pulley 15 to rotate, and the first driven pulley 15 will drive the crushing teeth 19 to rotate through the rotating shaft 14, thereby crushing the construction waste, and the crushed waste will pass through the filter plate 42 It flows into the inside of the storage box 46. When the inside of the storage box 46 needs to be unloaded, the user needs to pull the lifting block 613 upwards by hand, and the lifting block 613 will rise in the inside of the lifting groove 612 and rise in the lifting block 613. When reaching the top of the lift groove 612, push the support rod 615 to slide inside the support block 614. At this time, the lift block 613 will be blocked by the support rod 615 to prevent the blocking plate 611 from falling due to gravity, which will affect the discharge efficiency. The lift block 613 will Drive the blocking plate 611 to rise inside the discharge trough 69, and at the same time squeeze the return spring 610. At this time, part of the crushed garbage will be discharged through the discharge chute 69 due to gravity. In order to facilitate the rapid and complete discharge of the crushed garbage, At this time, the second electric telescopic rod 56 and the third electric telescopic rod 67 are opened at the same time, and the extended end of the second electric telescopic rod 56 will drive the displacement frame 57 to slide inside the moving groove 58, and the displacement frame 57 will drive the driven rotating shaft 59 One end of the drive shaft 54 is inserted into the inside of the driving shaft 54, and the driving bevel gear 510 will be close to the driven bevel gear 513. At this time, the output end of the driving motor 16 will drive the second driving pulley 51, and the second driving pulley 51 will pass through the second driving pulley 51. The belt 52 drives the second driven pulley 55 to rotate, and the second driven pulley 55 can drive the driving shaft 54. At this time, the driving bevel gear 510 can rotate, and the driving bevel gear 510 can drive the driven bevel gear 513 to rotate. The bevel gear 513 will drive the connecting shaft 512 to rotate inside the bracket 511, the connecting shaft 512 will drive the driven bevel gear 513 to rotate, and the third driving pulley 514 will drive the third driven pulley 64 to rotate through the third belt 515 , the third driven pulley 64 will drive the second screw rod 62 to rotate, the second screw rod 62 will drive the sliding block 63 to slide inside the sliding groove 61, and the extended end of the third electric telescopic rod 67 will drive the telescopic baffle 68 rises in the inside of telescopic slot 66, at this moment sliding block 63 can drive telescopic baffle 68 to slide in the inside of storage box 46, and then the rubbish that is placed in storage box 46 inside is quickly discharged through discharge slot 69.

实施例2Example 2

请参阅图1至图7,本发明提供技术方案:一种建筑垃圾便捷式转运设备,包括粉碎机构、清洗调节机构、降尘机构、传动控制机构和卸料机构,清洗调节机构包括固定柱21、第一丝杆22、推送架23和推送杆24,固定柱21的底部固定安装在移动架11的顶部一侧,固定柱21的顶部开设有位移槽,第一丝杆22的一端转动连接在位移槽的内部,推送架23的底部传动连接在第一丝杆22的外侧,且推送架23的底部滑动连接在位移槽的内部,推送杆24的一端固定安装在推送架23的顶部一侧,破碎箱12的一侧固定安装有安装架26,推送杆24的外侧滑动连接在安装架26的内部,安装架26的一侧固定安装有缓冲弹簧25,缓冲弹簧25的一端固定安装在推送杆24的外侧,第一丝杆22的一端固定安装有直齿轮27,移动架11的顶部一侧固定安装有第一电动伸缩杆28,第一电动伸缩杆28位于驱动电机16的一侧,移动架11的顶部固定安装有支撑座29,支撑座29的内部滑动连接有直齿条210,直齿条210的一端固定安装在第一电动伸缩杆28的伸出端,直齿条210的一侧啮合在直齿轮27的外侧;Please refer to Figures 1 to 7, the present invention provides a technical solution: a portable construction waste transfer equipment, including a crushing mechanism, a cleaning adjustment mechanism, a dust reduction mechanism, a transmission control mechanism, and a discharge mechanism. The cleaning adjustment mechanism includes a fixed column 21, First screw mandrel 22, push frame 23 and push rod 24, the bottom of fixed column 21 is fixedly installed on the top side of mobile frame 11, and the top of fixed column 21 offers displacement groove, and one end of first screw mandrel 22 is connected in rotation Inside the displacement groove, the bottom of the push frame 23 is connected to the outside of the first screw mandrel 22 by transmission, and the bottom of the push frame 23 is slidingly connected to the inside of the displacement groove, and one end of the push rod 24 is fixedly mounted on the top side of the push frame 23 One side of the crushing box 12 is fixedly installed with a mounting frame 26, and the outside of the push rod 24 is slidably connected to the inside of the mounting frame 26, and one side of the mounting frame 26 is fixedly mounted with a buffer spring 25, and one end of the buffer spring 25 is fixedly mounted on the push On the outside of the rod 24, a spur gear 27 is fixedly installed on one end of the first screw mandrel 22, and a first electric telescopic link 28 is fixedly installed on one side of the top of the mobile frame 11, and the first electric telescopic link 28 is positioned at one side of the drive motor 16, The top of the mobile frame 11 is fixedly equipped with a support base 29, and the inside of the support base 29 is slidably connected with a spur rack 210, and one end of the spur rack 210 is fixedly installed on the extended end of the first electric telescopic rod 28, and the end of the spur rack 210 One side meshes with the outside of the spur gear 27;

降尘机构包括转动轴31、转动架32、连接架33和连接座34,转动轴31的一端转动连接在粉碎箱12的内侧壁,转动架32的顶部固定安装在转动轴31的另一端,连接架33的一侧固定安装在转动架32的一侧下方,连接座34的一端转动连接在连接架33的一端,连接座34的另一端固定安装在推送杆24的一端,转动架32的一侧固定安装有第一喷淋管35,第一喷淋管35的一侧固定安装有第一水喷头36,第一水喷头36的外侧固定安装在转动架32的一侧,第一喷淋管35的外侧固定安装有第一上水管37,粉碎箱12的内侧壁上方固定安装有储水管38,第一上水管37的一端固定安装在储水管38的外侧,粉碎箱12的内顶壁固定安装有支撑架39,支撑架39的顶部固定安装有安装座310,安装座310的内部固定安装有第二喷淋管311,第二喷淋管311的底部固定安装有第二水喷头312,第二水喷头312的外侧固定安装在支撑架39的底部,第二喷淋管311的外侧固定安装有第二上水管313,第二上水管313的一端固定安装在储水管38的一端,移动架11的顶部固定安装有储水箱314,储水箱314的内底壁固定安装有水泵315,水泵315的顶部一侧固定安装有吸水管316,水泵315的顶部另一侧固定安装有送水管317,送水管317的另一端固定安装在储水管38的一端;The dust-reducing mechanism comprises a rotating shaft 31, a rotating frame 32, a connecting frame 33 and a connecting seat 34. One end of the rotating shaft 31 is rotatably connected to the inner sidewall of the crushing box 12, and the top of the rotating frame 32 is fixedly installed on the other end of the rotating shaft 31. One side of frame 33 is fixedly installed on the one side below of turret 32, and one end of connecting seat 34 is connected to one end of connecting frame 33 in rotation, and the other end of connecting seat 34 is fixedly installed on an end of push rod 24, and one end of turret 32 The side is fixedly installed with the first spray pipe 35, and one side of the first spray pipe 35 is fixedly installed with the first water nozzle 36, and the outer side of the first water nozzle 36 is fixedly installed on one side of the turret 32, and the first spray The outside of pipe 35 is fixedly installed with the first upper water pipe 37, and the top of the inner wall of crushing box 12 is fixedly installed with water storage pipe 38, and one end of the first upper water pipe 37 is fixedly installed on the outside of water storage pipe 38, and the inner top wall of crushing box 12 A support frame 39 is fixedly installed, and a mounting base 310 is fixedly mounted on the top of the support frame 39. A second spray pipe 311 is fixedly mounted inside the mounting base 310, and a second water nozzle 312 is fixedly mounted on the bottom of the second spray pipe 311. , the outer side of the second water nozzle 312 is fixedly installed on the bottom of the support frame 39, the outer side of the second spray pipe 311 is fixedly installed with a second upper water pipe 313, and one end of the second upper water pipe 313 is fixedly installed on one end of the water storage pipe 38, A water storage tank 314 is fixedly installed on the top of the mobile frame 11, a water pump 315 is fixedly installed on the inner bottom wall of the water storage tank 314, a water suction pipe 316 is fixedly installed on one side of the top of the water pump 315, and a water delivery pipe is fixedly installed on the other side of the top of the water pump 315 317, the other end of the water delivery pipe 317 is fixedly installed on one end of the water storage pipe 38;

移动架11的内部开设有下料槽41,下料槽41位于粉碎箱12的正下方,下料槽41的内侧壁固定安装有过滤板42,移动架11的底部固定安装有废水箱43,过滤板42位于废水箱43的内部,废水箱43的底部固定安装有排水管44,排水管44的外侧固定安装有控制阀45,废水箱43的一侧固定安装有储物箱46,通过清洗调节机构和降尘机构的设置,使该建筑垃圾便捷式转运设备具备了有效防止了建筑垃圾在粉碎时灰尘扩散出去同时还可以对粉碎齿19进行清洗的效果,从而起到了降尘效果好的作用,达到了不影响作业环境的目的。The inside of the mobile frame 11 is provided with a hopper 41, the hopper 41 is located directly below the crushing box 12, the inner wall of the hopper 41 is fixedly equipped with a filter plate 42, and the bottom of the mobile frame 11 is fixedly equipped with a waste water tank 43, Filter plate 42 is positioned at the inside of waste water tank 43, and the bottom of waste water tank 43 is fixedly installed with drainpipe 44, and the outside of drainpipe 44 is fixedly installed with control valve 45, and one side of waste water tank 43 is fixedly installed with storage box 46, through cleaning The setting of the adjustment mechanism and the dust reduction mechanism makes the portable construction waste transfer equipment effectively prevent the dust from spreading out when the construction waste is crushed, and at the same time clean the crushing teeth 19, thereby achieving a good effect of dust reduction. The purpose of not affecting the working environment is achieved.

使用时,打开水泵315,水泵315会通过吸水管316把储水箱314内部加压后经过送水管317送入到储水管38的内部,储水管38的内部水会分别通过第一上水管37和第二上水管313进入到第一喷淋管35和第二喷淋管311的内部,最终加压后的水通过第一水喷头36和第二水喷头312喷出,对粉碎箱12内部粉尘进行降尘,当需要对粉碎齿19进行清洗时,打开第一电动伸缩杆28,第一电动伸缩杆28的伸出端会带动直齿条210在支撑座29的内部滑动,同时直齿条210会带动直齿轮27,直齿轮27会带动第一丝杆22旋转,第一丝杆22会带动推送架23在位移槽的内部滑动,同时推送架23会带动推送杆24在安装架26的内部滑动,推送杆24的一端会带动连接座34运动,连接座34会带动连接架33运动,连接架33会带动转动架32的底部,进而使转动架32带动转动轴31在粉碎箱12的内侧壁转动,使第一水喷头36靠近粉碎齿19,进而使粉碎齿19进行清洗。When in use, turn on the water pump 315, and the water pump 315 will pressurize the inside of the water storage tank 314 through the water suction pipe 316 and send it to the inside of the water storage pipe 38 through the water delivery pipe 317, and the internal water of the water storage pipe 38 will pass through the first upper water pipe 37 and the water storage pipe 38 respectively. The second upper water pipe 313 enters the inside of the first spray pipe 35 and the second spray pipe 311, and the finally pressurized water is sprayed out by the first water nozzle 36 and the second water nozzle 312, and the dust in the crushing box 12 To reduce dust, when the crushing teeth 19 need to be cleaned, the first electric telescopic rod 28 is opened, and the extended end of the first electric telescopic rod 28 will drive the spur rack 210 to slide inside the support seat 29, while the spur rack 210 Will drive the spur gear 27, the spur gear 27 will drive the first screw rod 22 to rotate, the first screw rod 22 will drive the push frame 23 to slide inside the displacement groove, and the push frame 23 will drive the push rod 24 inside the installation frame 26 Sliding, one end of the push rod 24 will drive the connecting seat 34 to move, the connecting seat 34 will drive the connecting frame 33 to move, the connecting frame 33 will drive the bottom of the turret 32, and then the turret 32 will drive the rotating shaft 31 on the inside of the crushing box 12 The wall rotates, so that the first water spray head 36 is close to the crushing teeth 19, and then the crushing teeth 19 are cleaned.

以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,根据本发明的技术方案及其发明构思加以等同替换或改变,都应涵盖在本发明的保护范围之内。The above is only a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto, any person familiar with the technical field within the technical scope disclosed in the present invention, according to the technical solution of the present invention Any equivalent replacement or change of the inventive concepts thereof shall fall within the protection scope of the present invention.

Claims (8)

1.一种建筑垃圾便捷式转运设备,包括粉碎机构、清洗调节机构、降尘机构、传动控制机构和卸料机构,其特征在于:所述粉碎机构包括移动架(11)、破碎箱(12)、进料通道(13)和旋转轴(14),所述破碎箱(12)的底部固定安装在移动架(11)的顶部一侧,所述进料通道(13)的底部固定安装在破碎箱(12)的顶部;1. A portable transfer device for construction waste, including a crushing mechanism, a cleaning adjustment mechanism, a dust reduction mechanism, a transmission control mechanism and a discharge mechanism, characterized in that: the crushing mechanism includes a moving frame (11), a crushing box (12) , feeding channel (13) and rotating shaft (14), the bottom of the crushing box (12) is fixedly installed on the top side of the mobile frame (11), and the bottom of the feeding channel (13) is fixedly installed on the crushing the top of the box (12); 所述清洗调节机构包括固定柱(21)、第一丝杆(22)、推送架(23)和推送杆(24),所述固定柱(21)的底部固定安装在移动架(11)的顶部一侧,所述固定柱(21)的顶部开设有位移槽,所述第一丝杆(22)的一端转动连接在位移槽的内部;The cleaning adjustment mechanism includes a fixed column (21), a first screw rod (22), a push frame (23) and a push rod (24), and the bottom of the fixed column (21) is fixedly installed on the movable frame (11). On the top side, a displacement groove is opened on the top of the fixed column (21), and one end of the first screw rod (22) is rotatably connected to the inside of the displacement groove; 所述降尘机构包括转动轴(31)、转动架(32)、连接架(33)和连接座(34),所述转动轴(31)的一端转动连接在粉碎箱(12)的内侧壁,所述转动架(32)的顶部固定安装在转动轴(31)的另一端,所述连接架(33)的一侧固定安装在转动架(32)的一侧下方;The dust reduction mechanism includes a rotating shaft (31), a rotating frame (32), a connecting frame (33) and a connecting seat (34). One end of the rotating shaft (31) is connected to the inner side wall of the crushing box (12), The top of the turret (32) is fixedly installed on the other end of the rotating shaft (31), and one side of the connecting frame (33) is fixedly installed under one side of the turret (32); 所述移动架(11)的内部开设有下料槽(41),所述下料槽(41)位于粉碎箱(12)的正下方,所述下料槽(41)的内侧壁固定安装有过滤板(42),所述移动架(11)的底部固定安装有废水箱(43),所述过滤板(42)位于废水箱(43)的内部,所述废水箱(43)的底部固定安装有排水管(44),所述排水管(44)的外侧固定安装有控制阀(45),所述废水箱(43)的一侧固定安装有储物箱(46);The inside of the moving frame (11) is provided with a chute (41), the chute (41) is located directly below the crushing box (12), and the inner wall of the chute (41) is fixedly installed with The filter plate (42), the waste water tank (43) is fixedly installed on the bottom of the mobile frame (11), the filter plate (42) is located inside the waste water tank (43), and the bottom of the waste water tank (43) is fixed A drain pipe (44) is installed, a control valve (45) is fixedly installed on the outside of the drain pipe (44), and a storage box (46) is fixedly installed on one side of the waste water tank (43); 所述传动控制机构包括第二主动带轮(51)、第二皮带(52)、固定座(53)和主动转轴(54),所述第二主动带轮(51)的一端固定安装在驱动电机(16)的输出端,所述第二皮带(52)设置在第二主动带轮(51)的外侧;The transmission control mechanism includes a second driving pulley (51), a second belt (52), a fixing seat (53) and a driving shaft (54), and one end of the second driving pulley (51) is fixedly installed on the drive The output end of the motor (16), the second belt (52) is arranged outside the second driving pulley (51); 所述卸料机构包括滑动槽(61)、第二丝杆(62)、滑动块(63)和第三从动带轮(64),所述滑动槽(61)开设在移动架(11)的底部,所述第二丝杆(62)的一端转动连接在滑动槽(61)的内部,所述滑动块(63)的内部传动连接在第二丝杆(62)的外侧。The unloading mechanism includes a sliding groove (61), a second screw rod (62), a sliding block (63) and a third driven pulley (64), and the sliding groove (61) is opened on the moving frame (11) One end of the second screw rod (62) is rotatably connected to the inside of the sliding groove (61), and the inner drive connection of the sliding block (63) is connected to the outside of the second screw rod (62). 2.根据权利要求1所述的一种建筑垃圾便捷式转运设备,其特征在于:所述旋转轴(14)的外侧转动连接在破碎箱(12)的内部,所述旋转轴(14)的一端固定安装有第一从动带轮(15),所述移动架(11)的顶部一侧固定安装有驱动电机(16),所述驱动电机(16)的输出端固定安装有第一主动带轮(17),所述第一主动带轮(17)的外侧设置有第一皮带(18),所述第一从动带轮(15)的外侧和第一主动带轮(17)的外侧通过第一皮带(18)传动连接,所述旋转轴(14)的外侧固定安装有破碎齿(19),所述破碎齿(19)位于破碎箱(12)的内部。2. A portable construction waste transfer device according to claim 1, characterized in that: the outer side of the rotating shaft (14) is rotatably connected to the inside of the crushing box (12), and the outer side of the rotating shaft (14) A first driven pulley (15) is fixedly installed at one end, a drive motor (16) is fixedly installed on the top side of the moving frame (11), and a first driving pulley is fixedly installed at the output end of the drive motor (16). Pulley (17), the first belt (18) is provided on the outside of the first driving pulley (17), the outside of the first driven pulley (15) and the first driving pulley (17) The outer side is driven and connected by a first belt (18), and crushing teeth (19) are fixedly installed on the outer side of the rotating shaft (14), and the crushing teeth (19) are located inside the crushing box (12). 3.根据权利要求1所述的一种建筑垃圾便捷式转运设备,其特征在于:所述推送架(23)的底部传动连接在第一丝杆(22)的外侧,且推送架(23)的底部滑动连接在位移槽的内部,所述推送杆(24)的一端固定安装在推送架(23)的顶部一侧,所述破碎箱(12)的一侧固定安装有安装架(26),所述推送杆(24)的外侧滑动连接在安装架(26)的内部,所述安装架(26)的一侧固定安装有缓冲弹簧(25),所述缓冲弹簧(25)的一端固定安装在推送杆(24)的外侧,所述第一丝杆(22)的一端固定安装有直齿轮(27),所述移动架(11)的顶部一侧固定安装有第一电动伸缩杆(28),所述第一电动伸缩杆(28)位于驱动电机(16)的一侧,所述移动架(11)的顶部固定安装有支撑座(29),所述支撑座(29)的内部滑动连接有直齿条(210),所述直齿条(210)的一端固定安装在第一电动伸缩杆(28)的伸出端,所述直齿条(210)的一侧啮合在直齿轮(27)的外侧。3. A portable construction waste transfer device according to claim 1, characterized in that: the bottom of the push frame (23) is connected to the outside of the first screw (22) by transmission, and the push frame (23) The bottom of the push rod (24) is fixedly mounted on the top side of the push frame (23), and one side of the crushing box (12) is fixedly mounted with a mounting frame (26) , the outer side of the push rod (24) is slidably connected to the inside of the installation frame (26), and a buffer spring (25) is fixedly installed on one side of the installation frame (26), and one end of the buffer spring (25) is fixed Installed on the outside of the push rod (24), a spur gear (27) is fixedly installed on one end of the first screw rod (22), and a first electric telescopic rod ( 28), the first electric telescopic rod (28) is located on one side of the drive motor (16), the top of the moving frame (11) is fixedly installed with a support base (29), and the inside of the support base (29) A straight toothed rack (210) is slidingly connected, and one end of the straight toothed rack (210) is fixedly installed on the extended end of the first electric telescopic rod (28), and one side of the straight toothed rack (210) is engaged with the straight the outside of the gear (27). 4.根据权利要求1所述的一种建筑垃圾便捷式转运设备,其特征在于:所述连接座(34)的一端转动连接在连接架(33)的一端,所述连接座(34)的另一端固定安装在推送杆(24)的一端,所述转动架(32)的一侧固定安装有第一喷淋管(35),所述第一喷淋管(35)的一侧固定安装有第一水喷头(36),所述第一水喷头(36)的外侧固定安装在转动架(32)的一侧,所述第一喷淋管(35)的外侧固定安装有第一上水管(37),所述粉碎箱(12)的内侧壁上方固定安装有储水管(38),所述第一上水管(37)的一端固定安装在储水管(38)的外侧。4. A portable construction waste transfer device according to claim 1, characterized in that: one end of the connecting seat (34) is rotatably connected to one end of the connecting frame (33), and the connecting seat (34) The other end is fixedly installed on one end of the push rod (24), the first spray pipe (35) is fixedly installed on one side of the turret (32), and the first spray pipe (35) is fixedly installed on one side There is a first water nozzle (36), the outer side of the first water nozzle (36) is fixedly installed on one side of the turret (32), and the outer side of the first spray pipe (35) is fixedly installed with a first upper A water pipe (37), a water storage pipe (38) is fixedly installed above the inner wall of the crushing box (12), and one end of the first upper water pipe (37) is fixedly installed on the outside of the water storage pipe (38). 5.根据权利要求4所述的一种建筑垃圾便捷式转运设备,其特征在于:所述粉碎箱(12)的内顶壁固定安装有支撑架(39),所述支撑架(39)的顶部固定安装有安装座(310),所述安装座(310)的内部固定安装有第二喷淋管(311),所述第二喷淋管(311)的底部固定安装有第二水喷头(312),所述第二水喷头(312)的外侧固定安装在支撑架(39)的底部,所述第二喷淋管(311)的外侧固定安装有第二上水管(313),所述第二上水管(313)的一端固定安装在储水管(38)的一端,所述移动架(11)的顶部固定安装有储水箱(314),所述储水箱(314)的内底壁固定安装有水泵(315),所述水泵(315)的顶部一侧固定安装有吸水管(316),所述水泵(315)的顶部另一侧固定安装有送水管(317),所述送水管(317)的另一端固定安装在储水管(38)的一端。5. A portable construction waste transfer device according to claim 4, characterized in that: a support frame (39) is fixedly installed on the inner top wall of the crushing box (12), and the support frame (39) An installation seat (310) is fixedly installed on the top, a second spray pipe (311) is fixedly installed inside the installation seat (310), and a second water nozzle is fixedly installed at the bottom of the second spray pipe (311) (312), the outer side of the second water nozzle (312) is fixedly installed on the bottom of the support frame (39), and the outer side of the second spray pipe (311) is fixedly installed with a second upper water pipe (313), so One end of the second upper water pipe (313) is fixedly installed on one end of the water storage pipe (38), and a water storage tank (314) is fixedly installed on the top of the mobile frame (11), and the inner bottom wall of the water storage tank (314) A water pump (315) is fixedly installed, a water suction pipe (316) is fixedly installed on one side of the top of the water pump (315), and a water delivery pipe (317) is fixedly installed on the other side of the top of the water pump (315). The other end of water pipe (317) is fixedly installed on one end of water storage pipe (38). 6.根据权利要求1所述的一种建筑垃圾便捷式转运设备,其特征在于:所述固定座(53)的顶部固定安装在移动架(11)的底部一侧,所述主动转轴(54)的外侧转动连接在固定座(53)的内部下方,所述主动转轴(54)的一端固定安装有第二从动带轮(55),所述第二主动带轮(51)和第二从动带轮(55)之间通过第二皮带(52)传动连接,所述固定座(53)的顶部一侧固定安装有第二电动伸缩杆(56),所述第二电动伸缩杆(56)的伸出端固定安装有位移架(57),所述移动架(11)的底部一侧开设有移动槽(58),所述位移架(57)的顶部滑动连接在移动槽(58)的内部,所述位移架(57)的一侧转动连接有从动转轴(59),所述从动转轴(59)的外侧固定安装有主动锥齿轮(510),所述移动架(11)的一侧固定安装有支架(511),所述支架(511)的内部转动连接有连接转轴(512),所述连接转轴(512)的一端固定安装有从动锥齿轮(513),所述连接转轴(512)的另一端固定安装有第三主动带轮(514),所述第三主动带轮(514)的外侧设置有第三皮带(515)。6. A portable construction waste transfer device according to claim 1, characterized in that: the top of the fixed seat (53) is fixedly installed on the bottom side of the moving frame (11), and the active shaft (54 ) is rotationally connected to the inside of the fixed base (53), and one end of the driving shaft (54) is fixedly mounted with a second driven pulley (55), the second driving pulley (51) and the second The driven pulleys (55) are connected by a second belt (52), and a second electric telescopic rod (56) is fixedly installed on the top side of the fixed seat (53), and the second electric telescopic rod ( The extended end of 56) is fixedly equipped with a displacement frame (57), the bottom side of the mobile frame (11) is provided with a moving groove (58), and the top of the displacement frame (57) is slidably connected to the moving groove (58) ), one side of the displacement frame (57) is rotatably connected with a driven shaft (59), and the outer side of the driven shaft (59) is fixedly equipped with a driving bevel gear (510), and the moving frame (11 ) is fixedly installed with a bracket (511), the inside of the bracket (511) is rotatably connected with a connecting shaft (512), and one end of the connecting shaft (512) is fixedly installed with a driven bevel gear (513), so A third driving pulley (514) is fixedly installed on the other end of the connecting shaft (512), and a third belt (515) is arranged outside the third driving pulley (514). 7.根据权利要求1所述的一种建筑垃圾便捷式转运设备,其特征在于:且滑动块(63)的外侧滑动连接在滑动槽(61)的内部,所述第三从动带轮(64)的一端固定安装在第二丝杆(62)的一端,所述第三从动带轮(64)和第三主动带轮(514)之间通过第三皮带(515)传动连接,所述储物箱(46)的内侧壁滑动连接有推送卸料板(65),所述推送卸料板(65)的顶部一侧固定安装在滑动块(63)的底部,所述推送卸料板(65)顶部开设有伸缩槽(66)。7. A portable construction waste transfer device according to claim 1, characterized in that: the outer side of the sliding block (63) is slidably connected to the inside of the sliding groove (61), and the third driven pulley ( One end of 64) is fixedly installed on one end of the second screw rod (62), and the third driven pulley (64) and the third driving pulley (514) are connected through the third belt (515) for transmission, so The inner wall of the storage box (46) is slidably connected with a push unloading plate (65), and the top side of the push unloading plate (65) is fixedly installed on the bottom of the sliding block (63), and the push unloading plate (65) is fixed on the bottom of the sliding block (63). A telescopic slot (66) is opened on the top of the plate (65). 8.根据权利要求7所述的一种建筑垃圾便捷式转运设备,其特征在于:所述伸缩槽(66)的内底壁固定安装有第三电动伸缩杆(67),所述第三电动伸缩杆(67)的伸出端固定安装有伸缩挡板(68),所述伸缩挡板(68)的外侧滑动连接在伸缩槽(66)的内部,所述储物箱(46)的一侧下方开设有排料槽(69),所述排料槽(69)的内顶壁固定安装有复位弹簧(610),所述复位弹簧(610)的底部固定安装有阻挡板(611),所述阻挡板(611)的外侧滑动连接在排料槽(69)的内部,所述储物箱(46)的一侧开设有升降槽(612),所述升降槽(612)的内部滑动连接有升降块(613),所述升降块(613)的一侧固定安装在阻挡板(611)的一侧,所述储物箱(46)的一侧上方固定安装有支块(614),所述支块(614)的内部滑动连接有支杆(615)。8. A portable construction waste transfer device according to claim 7, characterized in that: a third electric telescopic rod (67) is fixedly installed on the inner bottom wall of the telescopic slot (66), and the third electric telescopic rod (67) The extended end of the telescopic rod (67) is fixedly equipped with a telescopic baffle (68), the outer side of the telescopic baffle (68) is slidably connected to the inside of the telescopic slot (66), and one of the storage boxes (46) There is a discharge trough (69) on the lower side, a return spring (610) is fixedly installed on the inner top wall of the discharge chute (69), and a blocking plate (611) is fixedly installed on the bottom of the return spring (610), The outside of the blocking plate (611) is slidably connected to the inside of the discharge trough (69), and a lifting trough (612) is opened on one side of the storage box (46), and the inside of the lifting trough (612) slides A lifting block (613) is connected, one side of the lifting block (613) is fixedly installed on one side of the blocking plate (611), and a supporting block (614) is fixedly installed on one side of the storage box (46) , the inside of the support block (614) is slidingly connected with a support rod (615).
CN202211120600.2A 2022-09-15 2022-09-15 Construction waste portable transfer equipment Pending CN115532381A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211120600.2A CN115532381A (en) 2022-09-15 2022-09-15 Construction waste portable transfer equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211120600.2A CN115532381A (en) 2022-09-15 2022-09-15 Construction waste portable transfer equipment

Publications (1)

Publication Number Publication Date
CN115532381A true CN115532381A (en) 2022-12-30

Family

ID=84727574

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211120600.2A Pending CN115532381A (en) 2022-09-15 2022-09-15 Construction waste portable transfer equipment

Country Status (1)

Country Link
CN (1) CN115532381A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116273410A (en) * 2023-05-11 2023-06-23 安徽建筑大学 Construction waste discharge device and use method in building construction

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN212524304U (en) * 2020-06-22 2021-02-12 施能权 A construction waste treatment device
JP2021041391A (en) * 2019-09-06 2021-03-18 練韓奇 Movable environment consideration type building waste disposal apparatus
CN215363602U (en) * 2021-05-08 2021-12-31 霍州煤电集团河津杜家沟煤业有限责任公司 Colliery dust protected colliery conveyor
CN114986639A (en) * 2022-05-30 2022-09-02 中建八局西南建设工程有限公司 Wood structure waste treatment device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2021041391A (en) * 2019-09-06 2021-03-18 練韓奇 Movable environment consideration type building waste disposal apparatus
CN212524304U (en) * 2020-06-22 2021-02-12 施能权 A construction waste treatment device
CN215363602U (en) * 2021-05-08 2021-12-31 霍州煤电集团河津杜家沟煤业有限责任公司 Colliery dust protected colliery conveyor
CN114986639A (en) * 2022-05-30 2022-09-02 中建八局西南建设工程有限公司 Wood structure waste treatment device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116273410A (en) * 2023-05-11 2023-06-23 安徽建筑大学 Construction waste discharge device and use method in building construction
CN116273410B (en) * 2023-05-11 2023-08-04 安徽建筑大学 Construction waste discharging device in construction and using method

Similar Documents

Publication Publication Date Title
CN110330249A (en) It is a kind of to build useless brick recyclable device
CN110918614A (en) Building rubbish breaker for building engineering
CN211099224U (en) Building rubbish crushing treatment equipment
CN113976282B (en) Construction waste treatment device and treatment method thereof
CN115532381A (en) Construction waste portable transfer equipment
CN212237483U (en) Fitment construction is with masonry reducing mechanism
CN217342543U (en) An automatic sand and gravel washing machine suitable for concrete processing
CN118384742A (en) Environmentally friendly stirring device and method for producing fly ash geopolymer
CN220216200U (en) Building waste recycling device
CN116493638A (en) A drilling device with a cooler
CN114985048B (en) Device and process for preparing concrete added aggregate by using construction waste
CN216612772U (en) Concrete conveying equipment with adjustable height for building
CN113863676B (en) Concrete horizontal transportation device for roof construction
CN212236179U (en) An energy-saving mixer
CN214346742U (en) Environment-friendly concrete recovery unit
CN213059351U (en) Road bridge construction charging equipment
CN211329510U (en) Stone crushing device for building engineering
CN110743649B (en) Device for smashing and recycling masonry waste
CN211440565U (en) Stirring vane connects protector
CN115253570A (en) Dust removal device for engineering
CN220803638U (en) Solid waste treatment device
CN221789435U (en) Construction waste crushing device
CN219560692U (en) Sand washing device
CN212053801U (en) Concrete raw materials transportation equipment with adjustable
CN219923900U (en) Raw material cleaning device for producing solid waste briquetting bricks

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20221230