CN115478542A - Enclosing method for deep foundation pit supporting of miniature steel pipe pile inscribed in reinforced concrete cast-in-place pile - Google Patents

Enclosing method for deep foundation pit supporting of miniature steel pipe pile inscribed in reinforced concrete cast-in-place pile Download PDF

Info

Publication number
CN115478542A
CN115478542A CN202211169629.XA CN202211169629A CN115478542A CN 115478542 A CN115478542 A CN 115478542A CN 202211169629 A CN202211169629 A CN 202211169629A CN 115478542 A CN115478542 A CN 115478542A
Authority
CN
China
Prior art keywords
steel pipe
pile
reinforced concrete
cast
place pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211169629.XA
Other languages
Chinese (zh)
Inventor
张军舰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202211169629.XA priority Critical patent/CN115478542A/en
Publication of CN115478542A publication Critical patent/CN115478542A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • E02D5/285Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/52Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments
    • E02D5/523Piles composed of separable parts, e.g. telescopic tubes ; Piles composed of segments composed of segments
    • E02D5/526Connection means between pile segments

Abstract

The invention discloses a bracing method for supporting a deep foundation pit of a miniature steel pipe pile inscribed in a reinforced concrete cast-in-place pile, which comprises a reinforced concrete cast-in-place pile, and solves the problems of high construction difficulty, low efficiency, high cost, high pollution and the like of the traditional cast-in-place pile bracing method in a soil-rock combined binary stratum, and also solves the problems of large occupied space, high excavation risk at a reserved platform and the like of the traditional steel pipe pile external foot hanging pile bracing method in the soil-rock combined binary stratum.

Description

Enclosing method for deep foundation pit supporting of miniature steel pipe pile inscribed in reinforced concrete cast-in-place pile
Technical Field
The invention relates to the technical field of deep foundation pits of soil-rock combined binary stratums, in particular to the technical field of deep foundation pits of soil-rock combined binary stratums in densely built-up areas of cities, and specifically relates to a support method for a deep foundation pit of a reinforced concrete cast-in-place pile inscribed micro steel pipe pile.
Background
The area of a domestic hilly area accounts for about 10% of the land area, deep foundation pits excavated in the hilly area often meet 'upper weak lower strong' binary structure strata of an upper soil layer and lower rocks, a binary stratum deep foundation pit supporting and enclosing method is generally characterized in that a reinforced concrete filling pile is adopted according to an experience soil layer, the filling pile is embedded into a rock stratum to a certain depth, a platform with a certain width (1.2-2.0 m) is reserved at a soil-rock junction, a 'foot hanging pile' method of externally connecting miniature steel pipe piles is adopted for rock strata below the platform, the enclosing method occupies a large space (2.5-3.5 m), and particularly, supporting members cannot be arranged in a built-up area of a city with a narrow space and are limited in application; although a conversion waist beam and a locking anchor cable are arranged at an earth-rock joint, a cast-in-place pile and a miniature steel pipe pile are disconnected after all, the integrity is poor, the safety degree is low, the manufacturing cost is higher, a deep foundation pit is dug in a binary stratum in a densely built-up area of a city, and when the space is limited, in order to ensure that the deformation of the existing underground pipelines and building structures at the periphery is within an allowable range, a cast-in-place pile one-pile-to-bottom enclosing method is often adopted.
Disclosure of Invention
Aiming at the existing difficult problems of a support method for supporting a deep foundation pit in a soil-rock combined binary stratum in a densely built-up area of a city, the invention discloses a support method for supporting the deep foundation pit by connecting a miniature steel pipe pile in a reinforced concrete cast-in-place pile, which not only solves the problem that a support member with a narrow space cannot be arranged, but also solves the problems that the cast-in-place pile is too much rock-entering to cause construction difficulty, too high cost, construction influence on the surrounding environment and the like.
In order to realize the purpose, the invention adopts the technical scheme that: the enclosure method for supporting the deep foundation pit of the miniature steel pipe pile internally connected with the reinforced concrete cast-in-place pile comprises the reinforced concrete cast-in-place pile, wherein a crown beam is arranged on the outer surface of one end of the reinforced concrete cast-in-place pile, a supporting system is arranged on the outer wall of the reinforced concrete cast-in-place pile, the miniature steel pipe pile is arranged in the middle of the reinforced concrete cast-in-place pile and comprises a steel pipe, a steel reinforcement cage main rib and a connecting steel bar, the steel reinforcement cage main rib is positioned on the outer wall of the steel pipe, and the connecting steel bar is positioned between the steel pipe and the steel reinforcement cage main rib.
Preferably, the outer surface of one end of the reinforced concrete cast-in-place pile is fixedly connected with the outer surface of one end of the crown beam, and the main reinforcement of the reinforcement cage is fixedly connected with the steel pipe through the connecting reinforcement.
Preferably, the enclosure method for supporting the deep foundation pit with the miniature steel pipe pile inscribed in the reinforced concrete cast-in-place pile comprises the following steps:
A. completing hole forming operation of the reinforced concrete cast-in-place pile in a soil layer, and ensuring that a hole wall is intact and does not collapse;
B. completing the positioning of the miniature steel pipe pile in the original cast-in-place pile hole;
C. adopting a pneumatic rock drilling rig to complete the pore-forming operation of the miniature steel pipe pile in the original cast-in-place pile hole, and then putting the miniature steel pipe pile into the hole
A miniature steel pipe pile;
D. cement slurry or cement mortar is injected into and out of the hole of the miniature steel pipe pile;
E. arranging a cast-in-place pile reinforcement cage below the lower part;
F. binding and positioning a cast-in-place pile reinforcement cage and the miniature steel pipe;
G. pouring cast-in-place pile concrete;
H. constructing a reinforced concrete crown beam on the top of the cast-in-place pile;
I. excavating in layers and installing a supporting system;
J. and repeating the step I until the base elevation is excavated.
Preferably, dry-method hole forming is adopted for hole forming of the cast-in-place pile; the diameter D of the bored concrete pile is 0.8-1.2m; the depth h1 of the bored concrete pile hole into the rock is determined according to the weathering degree of the rock, wherein the medium weathering rock h1 is not less than 1.0m, and the slightly weathering rock h1 is not less than 0.6m.
Preferably, the diameter of the micro steel pipe pile pore-forming is 150-200mm; the depth h2 of a hole formed in the bottom of the foundation pit is determined according to the weathering degree of the rocks, wherein the medium weathering rocks h2 are not less than 1.8m, the slightly weathering rocks h1 are not less than 1.5m, and the distance d between the center of the steel pipe and the center of a main reinforcement of the steel reinforcement cage is not less than 150mm; the length h3 is greater than h1 and is not less than 1m in the steel pipe stretches into bored concrete pile, and is not less than 1m above the displacement of anchor bolt trompil is strutted in this department, and steel pipe and reinforcement cage overlap joint region adopt short reinforcement both ends spot welding fixed connection, and short reinforcement diameter is with reinforcement cage owner muscle diameter, respectively sets up one around the steel pipe, and vertical interval t =0.5m.
Preferably, the width of the reinforced concrete crown beam is 50-100mm wider than the two sides of the diameter of the cast-in-place pile respectively, the height of the reinforced concrete crown beam is 0.7 time of the width, the support system comprises a waist beam, a support, a prestressed anchor rod, a non-prestressed anchor rod and the like, and the waist beam and the support can be made of steel or reinforced concrete materials.
Preferably, the concrete labels of the crown beam and the cast-in-place pile are C25, C30 and C35; the grouting material of the steel pipe pile is cement paste or cement mortar, the compressive strength of the cement paste is not lower than 25MPa, and the strength of the cement mortar is not lower than M25; the water cement ratio of cement paste is 0.5-0.7, and 42.5 grade cement is adopted.
Advantageous effects
Compared with the prior art, the invention has the following beneficial effects:
1. the enclosing method solves the problems of high construction difficulty, low efficiency, high cost, high pollution and the like of the traditional cast-in-place pile enclosing method in the soil-rock combined binary stratum, can save the construction period by more than 50 percent and the supporting cost by more than 30 percent compared with the traditional cast-in-place pile enclosing method in a deep foundation pit of the soil-rock combined stratum in a densely built-up area of a city, and can reduce the pollution of noise, sludge and the like.
2. The enclosure method also solves the problems of large occupied space, poor integrity, high excavation risk at a reserved platform and the like of the traditional enclosure method of the 'hanging foot pile' externally connected with the steel pipe pile in the soil-rock combined binary stratum, and has the advantages of high safety, large integral rigidity, small occupied space, quick construction, low manufacturing cost and the like compared with the traditional enclosure method of the 'hanging foot pile' externally connected with the steel pipe.
3. In a word, the enclosing method has great popularization value and wide application prospect in the deep foundation pit support of the soil-rock combination in the binary stratum, particularly in the deep foundation pit support of the soil-rock combination stratum in the densely built-up area of the city.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a layout view of two steel pipe piles according to the present invention;
FIG. 3 is a layout view of three steel pipe piles according to the present invention;
FIG. 4 is a schematic view of the connection structure of the reinforcement cage and the steel tube according to the present invention;
FIG. 5 is a schematic view of the connection structure of the crown beam and the cast-in-place pile according to the present invention;
fig. 6 is a schematic view showing the connection structure of tendons and steel pipes according to the present invention.
In the figure: 1. pouring reinforced concrete into the pile; 2. a crown beam; 3. a support system; 4. miniature steel pipe piles; 41. a steel pipe; 42. a main reinforcement of a reinforcement cage; 43. and connecting the reinforcing steel bars.
Detailed Description
In order to make the technical means, the creation characteristics, the achievement purposes and the effects of the invention easy to understand, the invention is further described with the specific embodiments.
As shown in fig. 1-6, a method for enclosing a micro steel pipe pile in a reinforced concrete cast-in-place pile for supporting a deep foundation pit includes a reinforced concrete cast-in-place pile 1, a crown beam 2 is arranged on an outer surface of one end of the reinforced concrete cast-in-place pile 1, a supporting system 3 is arranged on an outer wall of the reinforced concrete cast-in-place pile 1, a micro steel pipe pile 4 is arranged in the middle of the reinforced concrete cast-in-place pile 1, the micro steel pipe pile 4 includes a steel pipe 41, a steel reinforcement cage main reinforcement 42 and a connecting reinforcement 43, the steel reinforcement cage main reinforcement 42 is located on the outer wall of the steel pipe 41, and the connecting reinforcement 43 is located between the steel pipe 41 and the steel reinforcement cage main reinforcement 42.
Further, the outer surface of one end of the reinforced concrete cast-in-place pile 1 is fixedly connected with the outer surface of one end of the crown beam 2, the steel reinforcement cage main reinforcement 42 is fixedly connected with the steel pipe 41 through the connecting reinforcement 43, and the connecting reinforcement 43 is mainly used for fixedly connecting the steel reinforcement cage main reinforcement 42 and the steel pipe 41 when in use.
Further, the enclosure method for supporting the deep foundation pit of the reinforced concrete cast-in-place pile inscribed with the miniature steel pipe pile comprises the following steps:
A. completing hole forming operation of the reinforced concrete cast-in-place pile in a soil layer, and ensuring that the hole wall is intact and does not collapse;
B. completing the positioning of the miniature steel pipe pile in the original cast-in-place pile hole;
C. adopting a pneumatic rock drilling rig to complete the pore-forming operation of the miniature steel pipe pile in the original cast-in-place pile hole, and then putting the miniature steel pipe pile into the hole
Miniature steel pipe piles;
D. cement slurry or cement mortar is injected into and out of the hole of the miniature steel pipe pile;
E. arranging a cast-in-place pile reinforcement cage below;
F. binding and positioning a filling pile reinforcement cage and the miniature steel pipe;
G. pouring cast-in-place pile concrete;
H. constructing a reinforced concrete crown beam on the top of the cast-in-place pile;
I. excavating in layers and installing a supporting system;
J. and repeating the step I until the base elevation is excavated.
Further, dry-process hole forming is adopted for hole forming of the cast-in-place pile; the diameter D of the bored concrete pile is 0.8-1.2m; the depth h1 of the bored concrete pile hole into the rock is determined according to the weathering degree of the rock, wherein the medium weathering rock h1 is not less than 1.0m, and the slightly weathering rock h1 is not less than 0.6m.
Further, the diameter of the micro steel pipe pile hole is 150-200mm; the depth h2 of a hole formed in the foundation pit bottom is determined according to the weathering degree of rocks, wherein medium weathering rocks h2 are not less than 1.8m, slightly weathering rocks h1 are not less than 1.5m, and the distance d between the center of the steel pipe and the center of a main reinforcement of the steel reinforcement cage is not less than 150mm; the steel pipe stretches into bored concrete pile internal length h3 and is greater than h1 and is not less than 1m, and does not less than 1m above this anchor bolt trompil displacement of strutting, and steel pipe and reinforcement cage overlap joint region adopt short reinforcement both ends spot welding fixed connection, and the short reinforcement diameter is with reinforcement cage owner muscle diameter, respectively sets up one around the steel pipe, and vertical interval t =0.5m.
Furthermore, the width of the reinforced concrete crown beam is 50-100mm wider than the two sides of the diameter of the cast-in-place pile respectively, the height of the reinforced concrete crown beam is 0.7 times of the width, the support system comprises a waist beam, a support, a prestressed anchor rod, a non-prestressed anchor rod and the like, and the waist beam and the support can be made of steel or reinforced concrete materials.
Furthermore, the concrete labels of the crown beam and the cast-in-place pile are C25, C30 and C35; the grouting material of the steel pipe pile is cement paste or cement mortar, the compressive strength of the cement paste is not lower than 25MPa, and the strength of the cement mortar is not lower than M25; the water cement ratio of cement paste is 0.5-0.7, and 42.5 grade cement is adopted.
The invention discloses a support method for supporting a deep foundation pit of a miniature steel pipe pile internally connected in a reinforced concrete cast-in-place pile.
The foregoing shows and describes the general principles, principal features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only preferred examples of the present invention and are not intended to limit the present invention, and that various changes and modifications may be made without departing from the spirit and scope of the present invention, which fall within the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (7)

1. A support method for supporting a deep foundation pit of a micro steel pipe pile inscribed in a reinforced concrete cast-in-place pile comprises the reinforced concrete cast-in-place pile (1), and is characterized in that: the outer surface of one end of the reinforced concrete cast-in-place pile (1) is provided with a top beam (2), the outer wall of the reinforced concrete cast-in-place pile (1) is provided with a supporting system (3), the middle of the reinforced concrete cast-in-place pile (1) is provided with a miniature steel pipe pile (4), the miniature steel pipe pile (4) comprises a steel pipe (41), a steel reinforcement cage main rib (42) and a connecting steel bar (43), the steel reinforcement cage main rib (42) is located on the outer wall of the steel pipe (41), and the connecting steel bar (43) is located between the steel pipe (41) and the steel reinforcement cage main rib (42).
2. The enclosure method for supporting the deep foundation pit of the micro steel pipe pile inscribed in the reinforced concrete cast-in-place pile according to claim 1, characterized by comprising the following steps: the outer surface of one end of the reinforced concrete cast-in-place pile (1) is fixedly connected with the outer surface of one end of the crown beam (2), and the main reinforcement (42) of the reinforcement cage is fixedly connected with the steel pipe (41) through the connecting reinforcement (43).
3. The enclosure method for supporting the deep foundation pit of the micro steel pipe pile inscribed in the reinforced concrete cast-in-place pile according to claim 1, characterized by comprising the following steps: the enclosure method for supporting the deep foundation pit with the miniature steel pipe pile inscribed in the reinforced concrete cast-in-place pile comprises the following steps:
A. completing hole forming operation of the reinforced concrete cast-in-place pile in a soil layer, and ensuring that the hole wall is intact and does not collapse;
B. completing the positioning of the miniature steel pipe pile in the original cast-in-place pile hole;
C. adopting a pneumatic rock drilling rig to complete the hole forming operation of the miniature steel pipe pile in the original cast-in-place pile hole, and then putting the miniature steel pipe pile into the hole;
D. cement slurry or cement mortar is injected into and out of the hole of the miniature steel pipe pile;
E. arranging a cast-in-place pile reinforcement cage below;
F. binding and positioning a cast-in-place pile reinforcement cage and the miniature steel pipe;
G. pouring cast-in-place pile concrete;
H. constructing a reinforced concrete crown beam on the top of the cast-in-place pile;
I. excavating in layers and installing a supporting system;
J. and repeating the step I until the base elevation is excavated.
4. The enclosure method for supporting the deep foundation pit of the micro steel pipe pile inscribed in the reinforced concrete cast-in-place pile according to claim 3, characterized by comprising the following steps: the hole forming of the cast-in-place pile needs to adopt a dry method for hole forming; the diameter D of the bored concrete pile is 0.8-1.2m; the depth h1 of the bored concrete pile hole into the rock is determined according to the weathering degree of the rock, wherein the medium weathering rock h1 is not less than 1.0m, and the slightly weathering rock h1 is not less than 0.6m.
5. The enclosure method for supporting the deep foundation pit of the micro steel pipe pile inscribed in the reinforced concrete cast-in-place pile according to claim 4, characterized by comprising the following steps: the diameter of the micro steel pipe pile hole is 150-200mm; the depth h2 of a hole formed in the bottom of the foundation pit is determined according to the weathering degree of the rocks, wherein the medium weathering rocks h2 are not less than 1.8m, the slightly weathering rocks h1 are not less than 1.5m, and the distance d between the center of the steel pipe and the center of a main reinforcement of the steel reinforcement cage is not less than 150mm; the length h3 is greater than h1 and is not less than 1m in the steel pipe stretches into bored concrete pile, and is not less than 1m above the displacement of anchor bolt trompil is strutted in this department, and steel pipe and reinforcement cage overlap joint region adopt short reinforcement both ends spot welding fixed connection, and short reinforcement diameter is with reinforcement cage owner muscle diameter, respectively sets up one around the steel pipe, and vertical interval t =0.5m.
6. The enclosure method for supporting the deep foundation pit of the reinforced concrete cast-in-place pile inscribed with the miniature steel pipe pile, according to claim 5, is characterized in that: the width of the reinforced concrete crown beam is 50-100mm wider than the diameter of each side of the cast-in-place pile, the height of the reinforced concrete crown beam is 0.7 times of the width, the support system comprises a waist beam, a support, a prestressed anchor rod, a non-prestressed anchor rod and the like, and the waist beam and the support can be made of steel or reinforced concrete.
7. The enclosure method for supporting the deep foundation pit of the reinforced concrete cast-in-place pile inscribed with the miniature steel pipe pile, according to claim 6, is characterized in that: the concrete labels of the crown beam and the cast-in-place pile are C25, C30 and C35; the grouting material of the steel pipe pile is cement paste or cement mortar, the compressive strength of the cement paste is not lower than 25MPa, and the strength of the cement mortar is not lower than M25; the water cement ratio of cement paste is 0.5-0.7, and 42.5 grade cement is adopted.
CN202211169629.XA 2022-09-21 2022-09-21 Enclosing method for deep foundation pit supporting of miniature steel pipe pile inscribed in reinforced concrete cast-in-place pile Pending CN115478542A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211169629.XA CN115478542A (en) 2022-09-21 2022-09-21 Enclosing method for deep foundation pit supporting of miniature steel pipe pile inscribed in reinforced concrete cast-in-place pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211169629.XA CN115478542A (en) 2022-09-21 2022-09-21 Enclosing method for deep foundation pit supporting of miniature steel pipe pile inscribed in reinforced concrete cast-in-place pile

Publications (1)

Publication Number Publication Date
CN115478542A true CN115478542A (en) 2022-12-16

Family

ID=84393745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211169629.XA Pending CN115478542A (en) 2022-09-21 2022-09-21 Enclosing method for deep foundation pit supporting of miniature steel pipe pile inscribed in reinforced concrete cast-in-place pile

Country Status (1)

Country Link
CN (1) CN115478542A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002004271A (en) * 2000-06-27 2002-01-09 Shimizu Corp Composite pile and execution method therefor
CN101122131A (en) * 2007-08-14 2008-02-13 蓝冰 Foundation pit supporting pile using pipe casting pile embedding in rock
CN205604232U (en) * 2016-05-06 2016-09-28 中铁十局集团第二工程有限公司 Drilled pile pile foundation steel reinforcement cage positioner
CN109930609A (en) * 2019-04-09 2019-06-25 大连交通大学 A kind of campshed composite supporting construction and its construction method for upper-soft lower-hard ground
CN209339156U (en) * 2018-12-04 2019-09-03 中铁十二局集团第二工程有限公司 The embedding rock foot pilework of anchor tube formula in a kind of Extra-Deep Foundation Pit
CN110924433A (en) * 2019-12-09 2020-03-27 中交铁道设计研究总院有限公司 Design method of subway foundation pit foot-hanging pile enclosure structure in upper-soft lower-hard rock stratum
CN114508119A (en) * 2022-03-29 2022-05-17 中铁一局集团有限公司 Mountain slope protection construction structure and construction method based on miniature steel pipe piles

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002004271A (en) * 2000-06-27 2002-01-09 Shimizu Corp Composite pile and execution method therefor
CN101122131A (en) * 2007-08-14 2008-02-13 蓝冰 Foundation pit supporting pile using pipe casting pile embedding in rock
CN205604232U (en) * 2016-05-06 2016-09-28 中铁十局集团第二工程有限公司 Drilled pile pile foundation steel reinforcement cage positioner
CN209339156U (en) * 2018-12-04 2019-09-03 中铁十二局集团第二工程有限公司 The embedding rock foot pilework of anchor tube formula in a kind of Extra-Deep Foundation Pit
CN109930609A (en) * 2019-04-09 2019-06-25 大连交通大学 A kind of campshed composite supporting construction and its construction method for upper-soft lower-hard ground
CN110924433A (en) * 2019-12-09 2020-03-27 中交铁道设计研究总院有限公司 Design method of subway foundation pit foot-hanging pile enclosure structure in upper-soft lower-hard rock stratum
CN114508119A (en) * 2022-03-29 2022-05-17 中铁一局集团有限公司 Mountain slope protection construction structure and construction method based on miniature steel pipe piles

Similar Documents

Publication Publication Date Title
US20140026518A1 (en) Construction method for root-type foundation anchorage and bored, root-type cast in-situ pile with anchor bolts
CN109024651B (en) Steel pipe concrete mixed pile foundation and construction method
CN103669365A (en) External diagonal-pulling and internal diagonal-bracing herringbone foundation pit supporting pile and construction method thereof
CN100510281C (en) Semi-inverse construction method of super large diameter, ultra-burial depth storage pond
CN102162258B (en) Concrete-filled steel tubular high-pile tower footing structure of tower crane and construction method thereof
CN110485430A (en) A kind of interlocking pile combines foundation pit supporting method with ground-connecting-wall
CN104631440A (en) Stiffening core lengthening foundation pit support structure for existing large-diameter bored concrete pile and construction method
CN102359112A (en) Method for bracing foundation pit by using steel box piles
CN214245694U (en) Pile forming system for large-diameter cast-in-situ bored pile in karst area
CN104005414B (en) Large-size rebar cast in place concrete pile supports the constructional method of column
CN204000925U (en) Prefabricated diaphragm wall
CN205917713U (en) Truss -like steel pipe slip casting pile foundation
CN210263075U (en) Arrange bars formula tubular pile post back slip casting internal anchor outer stagnant water support system
CN217870505U (en) Excavation supporting construction of tunnel top foundation ditch excavation
CN213867907U (en) Prefabricated expanded packing key type digging foundation for power transmission line
CN113668554B (en) Construction method of foundation pit supporting structure adjacent to building
CN201883453U (en) Combined pipe jacking working well
CN109989346A (en) Bridge major diameter precast concrete tubular column basis and its construction method
CN113152446A (en) Multi-section type prestressed hollow pile and construction method thereof
CN115478542A (en) Enclosing method for deep foundation pit supporting of miniature steel pipe pile inscribed in reinforced concrete cast-in-place pile
CN209923935U (en) Co-location combined pile wall supporting structure in upper-soft and lower-hard stratum
CN112343074A (en) Spliced prefabricated root key type digging foundation
CN215482904U (en) Multi-section type prestressed hollow pile
CN213836719U (en) Spliced prefabricated root key type digging foundation
CN110485431A (en) A kind of interlocking pile combines foundation pit supporting construction with ground-connecting-wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication