CN115387617A - Assembly type integral bathroom installation method based on accurate positioning of drain pipe - Google Patents

Assembly type integral bathroom installation method based on accurate positioning of drain pipe Download PDF

Info

Publication number
CN115387617A
CN115387617A CN202211026758.3A CN202211026758A CN115387617A CN 115387617 A CN115387617 A CN 115387617A CN 202211026758 A CN202211026758 A CN 202211026758A CN 115387617 A CN115387617 A CN 115387617A
Authority
CN
China
Prior art keywords
positioning
drain
assembly type
hole
bathroom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211026758.3A
Other languages
Chinese (zh)
Inventor
孔昕
聂荣浩
郭春华
殷俊凯
宋晓瑜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Bureau Construction Technology Shandong Co ltd
Original Assignee
China Construction Eighth Bureau Construction Technology Shandong Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Bureau Construction Technology Shandong Co ltd filed Critical China Construction Eighth Bureau Construction Technology Shandong Co ltd
Priority to CN202211026758.3A priority Critical patent/CN115387617A/en
Publication of CN115387617A publication Critical patent/CN115387617A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes

Abstract

The invention relates to the technical field of assembly type integral bathrooms, in particular to an assembly type integral bathroom installation method based on accurate positioning of a drain pipe, which comprises the following steps: s1: drawing a processing drawing of the assembled integral bathroom; s2: manufacturing an assembled integral bathroom solid component and a positioning template; s3: positioning and drilling the drain hole on the positioning template; s4: placing the positioning template with the hole at a preset position in a toilet; s5: drawing the edge of the positioning template outside, drawing a chassis positioning line, spraying colored paint on the hole of the drain hole, and manufacturing a drain hole positioning point; s6: according to the positioning points of ground spraying, the drain holes are accurately drilled; s7: installing a drainage pipeline and drilling a concrete hanging hole on the floor slab; s8: after the concrete of the hanging hole reaches the specified strength, mounting the assembled chassis; s9: and installing the assembled wallboard. The invention solves the problem of the installation and positioning precision of the assembled integral bathroom drain pipe and improves the installation efficiency of the assembled integral bathroom.

Description

Assembly type integral bathroom installation method based on accurate positioning of drain pipe
Technical Field
The invention relates to the technical field of assembly type integrated bathrooms, in particular to an assembly type integrated bathroom installation method based on accurate positioning of a drain pipe.
Background
The existing assembled integral bathroom drain pipe is provided with the following two types;
(1) Before the civil engineering unit reassembling type integral bathroom construction unit enters the field, the drain pipe is installed; the disadvantages are that: after the assembly type integral bathroom construction unit enters the field, the data of all bathroom drain pipes are required to be comprehensively retested, and the deviation of the distance between the drain pipes reserved in civil engineering construction is too large, so that the assembly type integral bathroom chassis cannot be produced in batches, and the production and installation period is severely restricted;
(2) After an assembled integral bathroom manufacturer enters a field, according to negotiation with a decoration construction unit and an installation construction unit on the field, determining standard bathroom drainage data, carrying out manual paying-off and point marking positioning on the bathroom ground one by one, and carrying out water drilling and tapping and installing a drainage pipe by the installation unit according to ground marking; the disadvantages are that: the method needs more manpower, places the line and the points on the ground, is easy to damage artificially, causes overlarge accuracy error of floor plate water drilling and hole forming in an installation unit, causes the conflict of installation size of the assembly type integral bathroom base and the drainage pipeline in the later period, and seriously influences the construction of the assembly type integral bathroom.
Disclosure of Invention
The invention aims to overcome the defects of the prior art and provide an assembly type integral bathroom mounting method based on accurate positioning of a drain pipe.
In order to achieve the purpose, the invention adopts the following technical scheme:
an assembly type integral bathroom installation method based on accurate positioning of a drain pipe comprises the following steps:
s1: drawing a processing drawing of the assembled integral bathroom according to the size of the bathroom;
s2: manufacturing an assembled integral bathroom solid component and a positioning template according to the drawn assembled integral bathroom processing drawing; the solid component comprises an assembly type chassis and an assembly type wallboard;
s3: positioning and punching holes of the drain holes on the positioning template;
s4: placing the positioning template with the hole at a preset position in a toilet;
s5: drawing the edge of the positioning template outside, drawing a chassis positioning line, spraying colored paint on the hole of the drain hole, and manufacturing a drain hole positioning point;
s6: according to a drain hole positioning point made of colored paint sprayed on the ground, precisely drilling a hole on the drain hole;
s7: installing a drainage pipeline at the opening of the drainage hole on the ground of the toilet, and opening a concrete hanging hole on the floor slab;
s8: after the concrete of the hanging hole reaches the specified strength, mounting the assembled chassis;
s9: mounting an assembly type wallboard on the assembly type chassis, and compounding a strong and weak current pipe on the assembly type wallboard;
s10: installing ground door passing stones and a bathroom door;
s11: ceiling and installing sanitary accessories.
Preferably, in step S3, the positioning template is provided with a cross positioning slot when the drainage hole is formed.
Preferably, in step S7, the installation height of the drainage pipeline is greater than the floor of the toilet, and the floor-installed drainage pipeline is subjected to deviation rectification and positioning based on the floor opening cross positioning line and the chassis floor positioning line.
Preferably, in step S7, the excess drain pipe is cut, a water closing test is performed after the drain pipe sealing kit and the floor drain are installed, and the floor protective film is installed after the test is passed.
Preferably, in step S11, a strong and weak circuit is connected to the ceiling, and a cold and hot water pipeline is connected to the ceiling.
Preferably, the bathroom accessories comprise a shower, a lamp, an air port, a wash basin, a silver mirror, a towel bar, a closestool, a shower, a switch, a socket and a sanitary appliance, and the installation position is sealed and glued.
Has the advantages that: the invention solves the problem of the installation and positioning precision of the assembled integral bathroom drain pipe; the hole opening and mounting precision of the drain pipe of the assembled bathroom chassis can be reduced from the original +/-30 mm to +/-5 mm; in addition, the invention can greatly shorten the positioning and mounting time of the assembly type chassis and the drainage pipeline, improve the mounting efficiency of the assembly type integral bathroom and save the labor cost.
Drawings
FIG. 1 is a schematic view of a positioning template placed in a toilet for measurement and positioning;
FIG. 2 is a schematic view of the positioning for painting;
FIG. 3 is a schematic view of drawing out a positioning line and forming a drainage hole according to the location of the paint spraying;
FIG. 4 is a schematic view of the installation of a drain pipe in a drain hole;
FIG. 5 is a schematic view of a fabricated chassis installation;
FIG. 6 is a schematic view of an assembled wallboard installation;
FIG. 7 is a schematic view of a sanitary fixture installation;
in the figure, a toilet 1, a positioning template 2, a positioning line 21, a positioning hole 3, a positioning point 31, a cross positioning groove 32, a drain hole 4, a drain pipe 5, an assembly type chassis 6, a sealing sleeve 7, a floor drain 8, an assembly type wall plate 9, a threaded fixing piece 91, a door passing stone 10, a wash basin 1001, a towel bar 1002, a bathroom door 1003, a closestool 1004 and a shower 1005.
Detailed Description
The invention is further illustrated by the following examples and figures.
Fig. 1 and 7 show an assembly type integrated bathroom installation method based on precise positioning of a drain pipe, comprising the following steps:
s1: drawing a processing drawing of the assembled integral bathroom according to the size of the bathroom 1;
s2: manufacturing a chassis positioning template 2 according to the drawn assembly type integral bathroom processing drawing, and manufacturing an assembly type integral bathroom solid component according to the assembly type integral bathroom processing drawing; the solid components comprise an assembly type chassis 6 and an assembly type wallboard 9;
s3: positioning and drilling a drain hole 4 on the positioning template 2, and forming a positioning hole 3;
s4: placing the positioning template 2 with the hole at a preset position in the toilet 1 as shown in figure 1;
s5: drawing the chassis positioning line 21 on the outer side of the edge of the positioning template 2, spraying colored paint on the hole of the drain hole 4, and manufacturing a positioning point 31 of the drain hole 4 as shown in fig. 2;
s6: according to a positioning point 31 of a drain hole 4 made of colored paint sprayed on the ground, precisely drilling a hole on the drain hole 4, as shown in FIG. 3;
s7: installing a drainage pipeline 5 at the opening of a drainage hole 4 on the ground of the toilet 1, as shown in figure 4, and performing floor slab opening concrete hanging hole;
s8: after the concrete of the hanging hole reaches the specified strength, the assembled chassis 6 is installed, as shown in figure 5;
s9: mounting the assembly type wallboard 9 on the assembly type chassis 6 through a thread fixing piece 91, and compounding a strong current pipe and a weak current pipe on the assembly type wallboard 9 as shown in fig. 6;
s10: installing a ground door stone 10 and a bathroom door 1003;
s11: suspended ceiling and installed bathroom accessories.
In another preferred embodiment, in step S3, the positioning plate 2 is provided with a cross positioning slot 32 when the drainage hole 4 is formed.
In a preferred embodiment, in step S7, the installation height of the drainage pipe 5 is greater than the floor of the toilet 1, and the floor-mounted drainage pipe is located in a deviation-correcting manner based on the floor-opening cross positioning line 21 and the chassis floor positioning line 21.
In a preferred embodiment, in step S7, the excess drain pipe is cut, a water closing test is performed after the drain pipe sealing kit 7 and the floor drain 8 are installed, and the ground protection film is installed after the test is passed.
In another preferred embodiment, in step S11, a strong and weak circuit is connected to the ceiling, and a cold and hot water pipeline is connected to the ceiling.
In another preferred embodiment, as shown in fig. 7, the sanitary accessories include shower, light, air outlet, wash basin 1001, mirror, towel bar 1002, toilet 1004, shower 1005, switch, socket, sanitary ware, and sealing glue at the installation site.
According to the invention, according to the dimension re-measured of an on-site toilet 1, a decoration construction unit and an installation construction unit drawing can be combined, an assembly type integral bathroom standard construction drawing is determined, a bathroom 1 standard positioning template 2 is manufactured according to the drawing, positioning and punching of a water drainage hole 4 of the toilet 1 are carried out on the standard positioning template 2, then the positioning template 2 is placed in the toilet 1, after the positioning of the positioning template 2 is completed, colored paint is sprayed on the water drainage hole 4, the positioning and punching installation can be carried out by two steps, the positioning unit firstly positions all the toilets 1 in a unified manner, then the punching installation unit carries out accurate water drilling and punching according to a water drainage hole 4 positioning point 31 sprayed on the floor surface, after the hole is drilled, a drainage pipeline 5 is installed and a concrete hanging hole is plugged, and secondary manual deviation rectification is carried out on the drainage pipeline 5 before concrete is solidified, so as to ensure the installation accuracy of the drainage pipeline 5 and the assembly type integral bathroom chassis; of course, the punching installation can also be performed in two steps, that is, the punching unit firstly punches according to the positioning point 31 of the positioning unit, the installation unit installs according to the hole punched by the punching unit, and performs the secondary deviation correction. Therefore, the assembly type integral bathroom is installed in a plurality of batches step by step, each batch corresponds to a specific worker, the specific worker is dedicated to a certain processing step, the work is skillful, and the work efficiency is improved.
The invention solves the problem of installation and positioning precision of the assembled integral bathroom drain pipe; the hole opening and mounting precision of the drain pipe of the assembled bathroom chassis can be reduced from the original +/-30 mm to +/-5 mm; in addition, the invention can greatly shorten the positioning and installation time of the assembly type chassis 6 and the drainage pipeline 5, improve the installation efficiency of the assembly type integral bathroom and save the labor cost.
Finally, it should be noted that: the above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and these modifications or substitutions do not depart from the spirit of the corresponding technical solutions of the embodiments of the present invention.

Claims (5)

1. An assembly type integral bathroom installation method based on accurate positioning of a drain pipe is characterized by comprising the following steps:
s1: drawing a processing drawing of the assembled integral bathroom according to the size of the bathroom;
s2: manufacturing an assembled integral bathroom solid component and a positioning template according to the drawn assembled integral bathroom processing drawing; the solid component comprises an assembly type chassis and an assembly type wallboard;
s3: positioning and punching holes of the drain holes on the positioning template;
s4: placing the positioning template with the hole at a preset position in a toilet;
s5: drawing the edge of the positioning template outside, drawing a chassis positioning line, spraying colored paint on the hole of the drain hole, and manufacturing a drain hole positioning point;
s6: accurately forming holes on the drain holes according to the positioning points of the drain holes made of the colored paint sprayed on the ground;
s7: installing a drainage pipeline at the opening of the drainage hole on the ground of the toilet, and performing concrete hanging hole on the floor;
s8: after the concrete of the hanging hole reaches the specified strength, mounting the assembled chassis;
s9: mounting an assembly type wallboard on the assembly type chassis, and compounding a strong and weak current pipe on the assembly type wallboard;
s10: installing ground door passing stones and a bathroom door;
s11: ceiling and installing sanitary accessories.
2. The drain pipe accurate positioning-based assembly type bathroom unit installation method according to claim 1, wherein in step S3, the positioning template is provided with a cross positioning groove when a drain hole is formed.
3. The method for installing the assembled bathroom unit based on the precise positioning of the water drainage pipe of claim 1, wherein in step S7, the installation height of the water drainage pipe is greater than the installation height of the bathroom floor, and the floor-installed water drainage pipe is located in a deviation-correcting manner based on the floor opening cross positioning line and the chassis floor positioning line.
4. The assembly type integral bathroom installation method based on drain pipe accurate positioning as claimed in claim 1, wherein in step S7, redundant drain pipes are cut, a water closing test is performed after the drain pipe sealing kit and the floor drain are installed, and a ground protection film is installed after the test is qualified.
5. The method for installing the assembled bathroom unit based on the precise positioning of the water discharging pipe of claim 1, wherein in step S11, a strong and weak circuit is connected to the ceiling, and a cold and hot water pipeline is connected.
CN202211026758.3A 2022-08-25 2022-08-25 Assembly type integral bathroom installation method based on accurate positioning of drain pipe Pending CN115387617A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211026758.3A CN115387617A (en) 2022-08-25 2022-08-25 Assembly type integral bathroom installation method based on accurate positioning of drain pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211026758.3A CN115387617A (en) 2022-08-25 2022-08-25 Assembly type integral bathroom installation method based on accurate positioning of drain pipe

Publications (1)

Publication Number Publication Date
CN115387617A true CN115387617A (en) 2022-11-25

Family

ID=84123600

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211026758.3A Pending CN115387617A (en) 2022-08-25 2022-08-25 Assembly type integral bathroom installation method based on accurate positioning of drain pipe

Country Status (1)

Country Link
CN (1) CN115387617A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE7315670L (en) * 1973-11-20 1975-05-21 Bjaere Element Ab
US20060041448A1 (en) * 2004-08-20 2006-02-23 Patterson Robbie L Number of new and unique manufacturing and assembley methods and processes to cost effectively refit and market legacy implements like "The Gilhoolie" presently names "The Wili Grip" TM
WO2018121736A1 (en) * 2016-12-31 2018-07-05 濮阳市明锐建筑节能技术有限公司 Modular same-floor drainage device for building and installing method therefor
CN109441151A (en) * 2018-12-19 2019-03-08 有利华建材(惠州)有限公司 Prefabricated toilet and its construction and installation method
CN109797988A (en) * 2019-02-21 2019-05-24 北京工业大学 A kind of co-layer draining hard-cover precast block toilet of outer wall provided pipe line groove hole
CN110670906A (en) * 2019-09-16 2020-01-10 佛山建装建筑科技有限公司 Installation method of precast concrete integral bathroom
CN114382295A (en) * 2022-01-21 2022-04-22 陕西建工第五建设集团有限公司 Indoor assembled drainage pipeline modular construction method
CN114800901A (en) * 2022-05-07 2022-07-29 中建八局第二建设有限公司 Assembled toilet positioning and hole-opening device and construction method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE7315670L (en) * 1973-11-20 1975-05-21 Bjaere Element Ab
US20060041448A1 (en) * 2004-08-20 2006-02-23 Patterson Robbie L Number of new and unique manufacturing and assembley methods and processes to cost effectively refit and market legacy implements like "The Gilhoolie" presently names "The Wili Grip" TM
WO2018121736A1 (en) * 2016-12-31 2018-07-05 濮阳市明锐建筑节能技术有限公司 Modular same-floor drainage device for building and installing method therefor
CN109441151A (en) * 2018-12-19 2019-03-08 有利华建材(惠州)有限公司 Prefabricated toilet and its construction and installation method
CN109797988A (en) * 2019-02-21 2019-05-24 北京工业大学 A kind of co-layer draining hard-cover precast block toilet of outer wall provided pipe line groove hole
CN110670906A (en) * 2019-09-16 2020-01-10 佛山建装建筑科技有限公司 Installation method of precast concrete integral bathroom
CN114382295A (en) * 2022-01-21 2022-04-22 陕西建工第五建设集团有限公司 Indoor assembled drainage pipeline modular construction method
CN114800901A (en) * 2022-05-07 2022-07-29 中建八局第二建设有限公司 Assembled toilet positioning and hole-opening device and construction method

Similar Documents

Publication Publication Date Title
US20110162137A1 (en) Trench shower drain
US6886190B2 (en) Device and method for alignment of drains with finished covering
CN115387617A (en) Assembly type integral bathroom installation method based on accurate positioning of drain pipe
CN204627039U (en) A kind of integral vacuum toilet
CN210034649U (en) Socket-type waterproof PVC embedded functional part
CN108798031B (en) Construction method of PVC waterproof embedded sleeve of main stand pipe close to wall in kitchen and toilet
JP2009215846A (en) Method of installing sanitary ware
CN216690508U (en) Leveling mechanism suitable for integral bathroom chassis
CN205617787U (en) Avoid in aluminum alloy template opening and climb a positioner who reserves bolt hole
US11391023B2 (en) Concrete form for freestanding bath filler installation and method of use
CN212897583U (en) One-time pre-embedding device for steel sleeve
CN114382295A (en) Indoor assembled drainage pipeline modular construction method
KR200418916Y1 (en) Pipe laying device for attacing valve to house wall
CN210857599U (en) Pipeline separation waterproof heat preservation integration wall body and building that constitutes thereof
US10221555B2 (en) Method and apparatus for installing a floor drain
US7174580B1 (en) Tub/shower installation block
CN203684332U (en) Water pipe mounting auxiliary tool
CN102587654A (en) Construction method for PVC (poly vinyl chloride) drainage direct-buried pipe fitting
CN112344091A (en) Hanging-hole-free drainage pipeline installation method
CN216031709U (en) Opening positioning tool for bottom box and facing of assembled bathroom
CN110670880A (en) House integrated construction system
CN110593560A (en) Concrete wall column inner wire box installation method
JP2000230272A (en) Pre-assembling method for kitchen and sanitary room for building
CN103982042A (en) Split mounting technique of quick home-decoration split mounting engineering
CN112806878B (en) Concrete form for installation of stand-alone bathtub injector and method of use

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20221125