WO2018121736A1 - Modular same-floor drainage device for building and installing method therefor - Google Patents

Modular same-floor drainage device for building and installing method therefor Download PDF

Info

Publication number
WO2018121736A1
WO2018121736A1 PCT/CN2017/119874 CN2017119874W WO2018121736A1 WO 2018121736 A1 WO2018121736 A1 WO 2018121736A1 CN 2017119874 W CN2017119874 W CN 2017119874W WO 2018121736 A1 WO2018121736 A1 WO 2018121736A1
Authority
WO
WIPO (PCT)
Prior art keywords
pipe
water
modular
drainage device
floor
Prior art date
Application number
PCT/CN2017/119874
Other languages
French (fr)
Chinese (zh)
Inventor
王凤蕊
Original Assignee
濮阳市明锐建筑节能技术有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from CN201611268484.3A external-priority patent/CN107237395B/en
Priority claimed from CN201611268444.9A external-priority patent/CN106812184A/en
Application filed by 濮阳市明锐建筑节能技术有限公司 filed Critical 濮阳市明锐建筑节能技术有限公司
Publication of WO2018121736A1 publication Critical patent/WO2018121736A1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03CDOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER; SINKS
    • E03C1/00Domestic plumbing installations for fresh water or waste water; Sinks
    • E03C1/12Plumbing installations for waste water; Basins or fountains connected thereto; Sinks
    • E03C1/122Pipe-line systems for waste water in building

Definitions

  • the present application relates to the technical field of building water supply and drainage devices, and in particular relates to a modular same layer drainage device for building and a mounting method thereof.
  • the riser pipe In the field of building drainage, the riser pipe is usually embedded in the drainage riser to cross the floor to connect the floor and the lower drainage riser.
  • the following disadvantages occur: 1) In order to avoid leakage, usually The waterproof layer is turned upside down along the pipeline and the water blocking platform is arranged, so that the indoor floor arrangement is messy, unattractive, and not easy to be decorated, and the water of the ground area cannot be directly discharged, so that the sinking area still has leakage leakage; 2) floor drain The water outlets of the bathtubs, wash basins, mop pools, etc. are all separately provided with water seals.
  • the water seal of a drain outlet will cause indoor odor and harm to health; 3) With the promotion and popularization of residential industrialization construction methods, the pipeline section is adopted at the site. Pipe fitting and bonding method to connect the drain pipe installation method, there is a drawback that the joint quality cannot be guaranteed, and the construction period is long; 4) The drain port of the side drain toilet is connected with the drain riser due to the connection between the drain riser and the toilet There is a certain distance, the drainage connection between the toilet drain and the riser will occupy the indoor space, affecting the appearance, and the bathroom floor. The height of the toilet drainage repair the error between the height of the cross tube, resulting in not seal mounting side drain toilet, the water leakage caused returning odor indoor environmental pollution. In order to solve the above problems, people have been seeking an ideal technical solution.
  • the purpose of the application is to provide a deficiencies against the prior art, thereby providing a simple structure, scientific design, convenient use, reliable performance, outstanding leakage prevention effect, concentrated water seal anti-back odor, good ventilation effect, toilet drainage Modular flushing device for building with convenient installation and not easy to block, and installation method thereof.
  • a modular same-layer drainage device for building comprising a water storage tank, a riser connection pipe disposed in the water collection tank, and at least one waste water discharge inlet opened on the water tank top cover; the riser connection pipe is provided The water outlet located in the water tank, the waste water discharge inlet is connected to the water outlet through a water sealing mechanism.
  • the method further includes a lower snorkel passing through the bottom wall of the water tank and not higher than the highest point of the header of the water tank, and an upper snorkel disposed on the top of the water tank and communicating with the inside of the water tank; the upper vent tube and There is a gas flow path between the lower vent pipes, and the top end of the lower vent pipe is not lower than the highest point of the water outlet.
  • the water tank top cover is provided with a water discharge hole, and the water discharge hole is connected with the water outlet of the riser connection pipe.
  • the waste water discharge inlet and the drain hole are connected to the water outlet of the riser connection pipe by a water seal mechanism alone or both, and the water outlet of the water seal mechanism is lower than the water outlet of the riser connection pipe. The lowest point.
  • the water tank top cover is provided with an access hole corresponding to the position of the water sealing mechanism, and the inspection hole is one of at least one waste water discharge port.
  • the manhole is used to clear and clean the water storage part in the water seal mechanism.
  • the setting of the manhole is not necessary, but is an optimized technical solution.
  • the waste water inlet can also be used as a manhole, but the water needs to be guaranteed.
  • the water storage part of the sealing mechanism is arranged corresponding to the waste water discharge port.
  • the manhole can be installed in the non-overhaul state, and can also be used for wastewater discharge.
  • the water sealing mechanism comprises a water sealing box, the water sealing box is provided with a water outlet, and the water sealing component is installed at a position corresponding to the water outlet in the water sealing box.
  • the water seal shares a top cover and/or a bottom wall with the water transfer tank.
  • the riser connection tube is at least one.
  • the riser connecting pipe is provided with a side row connecting member that communicates with the toilet drain.
  • the toilet connector on the side row connector is provided with a rotating insert, and the rotary insert is provided with an eccentric jack.
  • the side row connecting member comprises a flat sewage tank, and a sewage outlet is opened at a communication end of the sewage tank and the riser connecting pipe, and a side wall of the sewage tank is provided with an opening direction perpendicular to the axis of the riser connecting pipe. Toilet connection.
  • the upper edge of the water tank is provided with a flange.
  • the horizontal portion of the flange has a height difference from the header of the water tank, and the horizontal portion of the flange is higher than the top of the header of the water tank.
  • the flange is used to cover the gap between the floor and the waterproof layer of the floor, and the horizontal part of the flange has a certain height difference from the cover of the water tank, and the water can be accumulated on the top cover of the water tank. Block it.
  • At least one of the waste water discharge ports is equipped with a waste water drain pipe.
  • the waste water drain pipe has a rectangular or circular cross section.
  • the side row connector is a rectangular or elliptical structure.
  • the side row connecting piece and the riser connecting pipe are eccentrically connected, and have a slope of the inclined drainage riser connecting pipe.
  • the manhole corresponds to a position of a water seal elbow or a water seal cylinder inside the water seal mechanism.
  • the prefabricated floor slab of the bathroom is reserved for the pipe jack for assembling the riser pipe in the pre-fabrication; when the cast-in-place layer of the toilet is cast on site, the installation hole is reserved according to the design position;
  • the prefabricated floor slab of the bathroom shall be reserved for the pipe jack for assembling the riser pipe and the lower vent pipe according to the design position during prefabrication; when the cast-in-place layer of the toilet is poured on site, the installation hole shall be reserved according to the design position;
  • the modular flush drainage device for the building has the following advantages:
  • the flange design of the top cover of the water tank is formed with the waterproof layer of the bathroom to form a lap joint mechanism that folds downwards, so that the waterproof layer can effectively cover the installation gap between the water tank and the floor installation hole, without using concrete filling
  • the end of the waterproof layer is located on the top cover of the water tank, which forms a height difference with the waterproof layer at the ground, so that the ground water can be guided to the top of the water tank and discharged into the water tank, and The water can not be reversed from the waterproof layer and the joint cover of the water tank top cover, thereby completely solving the problem of water leakage in the pipeline passing through the floor in the prior art;
  • the design of the drain hole of the top cover of the water tank can make the water of the area flow along the waterproof layer to the top cover of the water tank, and then flow into the water tank through the drain hole, which facilitates timely discharge of the ground area water and avoids the floor decoration layer. Leakage caused by the accumulation of water between the waterproof layer and the waterproof layer;
  • Wastewater from floor drains, bathtubs, wash basins, mop pools, etc. can be directly transferred into the waste water drain pipe. Since the waste water drain pipe is directly connected with the water seal box in the water transfer tank, a centralized water seal and deodorization is formed. The structure replaces the multiple water seal designs in the prior art and avoids the problem of indoor back odor caused by failure of a certain water seal;
  • the sewage side row connecting piece is a box type structure, which can reduce the thickness of the box body and reduce the wall drainage under the premise of ensuring the effective flow cross section of the sewage.
  • the horizontal pipe occupies the indoor space, and even the side drainage connector is conveniently installed directly in the partition wall, and the horizontal pipe installed on the ground by the wall drainage toilet is reduced to zero occupancy of the bathroom interior space, thereby saving indoor space. Easy to decorate and use.
  • the toilet drain is directly or indirectly connected to the eccentric jack of the rotary plug of the sewage tank, and when the rotary insert is matched with the sewage inlet of the sewage tank, the eccentric joint can be rotated as needed to adjust the corresponding position of the jack and the sewage inlet, and reserve
  • the variation of the installation space is convenient for installation;
  • Integrating the drainage riser and the vent pipe ie, the riser connection pipe and the upper and lower vent pipe, not only saves the installation space in the toilet, but also realizes the liquid water, solid and gas confluence sewage flow in the drainage riser.
  • the separation of liquid and solids and gas is completed in the integrated drainage device on each floor.
  • the gas in the drainage riser directly enters the vent pipe through the water tank, which realizes separation of water and gas layer by layer, and reduces the drainage riser and the water collection tank.
  • the fluctuation of air pressure inside is beneficial to prevent the water seal mechanism from being damaged by air pressure shock, and to ensure that the indoor air environment is protected from the fouling of the drainage system;
  • the modular same-layer drainage device for building has the advantages of simple structure, scientific design, convenient use, reliable performance, reliable water seal and anti-back odor, and the modular same-layer drainage device for construction is produced according to the design size of the building toilet.
  • the product quality and installation effect are guaranteed to the utmost extent; and in the assembly building, there is no wet work such as grouting of fine stone concrete, and the waterproof layer construction is simple and reliable.
  • FIG. 1 is a schematic plan view showing a water tank of a modular same layer drainage device for a building according to Embodiment 1;
  • FIG. 2 is a cross-sectional structural view showing the modular same-layer drainage device for construction in the first embodiment
  • FIG. 3 is a schematic view showing a connection structure of a riser connecting pipe and a sewage tank of the modular same-layer drainage device for building according to Embodiment 1;
  • Figure 4 is a top plan view showing the water tank of the modular same layer drainage device for building according to Embodiment 2;
  • Figure 5 is a cross-sectional structural view showing the modular same-layer drainage device for building in the second embodiment
  • FIG. 6 is a schematic view showing a connection structure of a riser connecting pipe and a sewage tank of the modular same-layer drainage device for building according to Embodiment 2;
  • Figure 7 is a cross-sectional structural view showing the axial connection line between the riser connecting pipe and the upper vent pipe of the modular same layer drainage device for building according to Embodiment 2;
  • Figure 8 is a cross-sectional structural view showing the axial connection line between the riser connecting pipe and the upper vent pipe of the modular same-layer drainage device for building according to Embodiment 3;
  • Figure 9 is a top plan view showing the water tank of the modular same layer drainage device for building according to Embodiment 4.
  • Figure 10 is a top plan view showing the water tank of the modular same layer drainage device for building according to Embodiment 5;
  • Figure 11 is a top plan view showing the water tank of the modular same layer drainage device for building according to Embodiment 6;
  • Figure 12 is a top plan view showing the water tank of the modular same layer drainage device for building according to Embodiment 7;
  • Figure 13 is a cross-sectional structural view showing the modular same layer drainage device for building in the eighth embodiment.
  • Figure 14 is a schematic view showing the installation structure of the modular same-floor drainage device for building in the cast-in-place reinforced concrete floor structure according to the embodiments 6 and 7;
  • Figure 15 is a schematic view showing the installation structure of the modular same floor drainage device for building according to the embodiments 6 and 7 in the assembled laminated floor structure toilet;
  • Figure 16 is a cross-sectional structural view showing the modular same layer drainage device for building according to Embodiment 9 at the inlet of the waste water;
  • Figure 17 is a cross-sectional structural view showing the modular same-layer drainage device for building according to Embodiment 10 at the inlet of the waste water;
  • Figure 18 is a cross-sectional structural view showing the modular same-layer drainage device for construction in the waste water discharge port of the embodiment 11;
  • Figure 19 is a cross-sectional structural view showing the modular same layer drainage device for building according to Embodiment 12 at the inlet of the waste water;
  • Fig. 20 is a cross-sectional structural view showing the modular same layer drainage device for building according to Embodiment 15 at the inlet of the waste water.
  • a modular same-layer drainage device for a building includes a water collection tank 10, a riser connection pipe 40 that is disposed in the water collection tank 10, and a waste water discharge line that is opened on the water tank top cover 11.
  • the inlet 13 and the riser connecting pipe 40 are provided with a water outlet 41 in the water tank, the waste water discharge port 13 is connected to the water outlet 41 through a water sealing mechanism, and the waste water discharge port 13 is equipped with a waste water drain pipe 14;
  • the cross section is rectangular, and the upper edge of the water tank 10 is outwardly provided with a flange 12;
  • the riser connection pipe 40 is connected with a side row connecting member, and the side row connecting member comprises a flat sewage tank 30, the sewage tank 30
  • the communication end of the riser connection pipe 40 is provided with a sewage outlet 32.
  • the side wall of the sewage tank 30 is provided with a toilet connection port 31 whose opening direction is perpendicular to the axis of the riser connection pipe, and the toilet connection port 31 and the riser connection pipe
  • the shaft spacing is not more than 500 mm
  • the toilet connector 31 is provided with a rotating insert 34
  • the rotating insert 34 is provided with an eccentric jack 33
  • the water sealing mechanism comprises a water sealing box 20, and the water sealing box 20 is connected with the waste water inlet 13 a water outlet 21 is provided on the bottom wall of the water seal box 20, and water is disposed on the drain port 21 Cylinder 22, cylinder 22 and the seal 13 corresponding to discharge waste water inlet is provided.
  • the difference from the first embodiment is that the lower vent pipe 71 passing through the bottom wall of the water tank 10 and higher than the highest point of the water tank top cover 11 is provided, and the water tank top cover 11 is provided.
  • the present embodiment is different from the second embodiment in that the lower vent pipe 71 is lower than the water tank top cover 11, and the upper vent pipe 70 is a straight pipe and is disposed corresponding to the lower vent pipe 71.
  • the present embodiment is different from the first embodiment in that the relative position of the riser connecting pipe 40 and the waste water discharge port 13 is changed, and the waste water drain pipe has a circular cross section, and the water tank top cover A drain hole 16 communicating with the water tank 10 is also provided on the upper portion 11.
  • the water sealing mechanism in this embodiment may be provided with two, the water leakage hole is separately connected to one water sealing mechanism, and the waste water discharge inlet is connected to another water sealing mechanism.
  • the present embodiment is different from the second embodiment in that the relative position of the riser connecting pipe 40 and the waste water discharge port 13 is changed, and the waste water drain pipe has a circular cross section, and the water tank top cover A drain hole 16 communicating with the water tank 10 is also provided on the upper portion 11.
  • the water sealing mechanism in this embodiment may be provided with two, the water leakage hole is separately connected to one water sealing mechanism, and the waste water discharge inlet is connected to another water sealing mechanism.
  • the difference between the present embodiment and the embodiment 4 is that the relative position of the riser connection pipe 40 and the waste water discharge port 13 is changed, and the cover hole 15 is further provided with an inspection hole 15 and an inspection hole. 15 corresponds to the water seal tube setting.
  • the installation method of the modular same-layer drainage device for building in the cast-in-place reinforced concrete floor structure of the present embodiment is as follows:
  • the installation method of the modular same floor drainage device for building in the assembled laminated floor structure toilet according to the embodiment is as follows:
  • the prefabricated floor slab 50 of the bathroom is reserved for the pipe jack for assembling the riser pipe according to the design position during prefabrication; the installation hole is reserved according to the design position when pouring the cast-in-place layer of the toilet on site;
  • the embodiment is different from the embodiment 5 in that a cover hole 15 is further defined in the top cover of the water tank, and the inspection hole 15 is disposed corresponding to the water seal cylinder.
  • the installation method of the modular same-layer drainage device for building in the present embodiment of the cast-in-place reinforced concrete floor structure toilet is as follows:
  • the installation method of the modular same floor drainage device for building in the assembled laminated floor structure toilet according to the embodiment is as follows:
  • the prefabricated floor slab 50 of the bathroom is reserved for the pipe jack for assembling the riser pipe and the lower vent pipe according to the design position during prefabrication; when the cast-in-place layer of the toilet is poured on site, the installation hole is reserved according to the design position;
  • the difference between this embodiment and the first and second embodiments is that the relative position of the riser connection pipe 40 and the waste water discharge port 13 is changed, and the water seal mechanism includes a water seal box 20 and a water seal box. 20 is connected to the waste water discharge port 13 .
  • the bottom wall of the water seal box 20 is provided with a drain port 21 .
  • the drain port 21 is provided with an inverted U-shaped pipe 26 , and the inverted U-shaped pipe 26 is disposed corresponding to the waste water discharge port 13 .
  • the water tank top cover 11 is provided with a drain hole 16 which communicates with the water seal box 20.
  • the waste water drain pipe 14 has a circular cross section.
  • the waste water discharge port 13 can also function as a manhole.
  • the difference between the embodiment and the embodiment 1 is that the waste water drain pipe 14 has a circular cross section; the water seal mechanism includes a water seal box 20 connected to the waste water discharge port 13 and a water seal box.
  • the 20-box wall is provided with a drain port 21, and a water seal partition plate 23 is disposed on the top wall of the water seal box 20, and both ends of the water seal partition plate 23 are connected to the side wall of the water seal box 20, and the water seal is separated.
  • the water seal space on both sides of the plate 23 is connected through the communication passage at the bottom of the water seal partition plate 23, the drain port 21 is located on the side of the water seal partition plate, and the waste water discharge port 13 is located on the other side of the water seal partition plate 23, and
  • the lowest point of the drain port 21 is not lower than the highest point of the communication passage, specifically, as long as the lowest point of the drain port 21 is not lower than the lowest point of the communication passage.
  • the present embodiment is different from the embodiment 9 in that the water tank top cover 11 constitutes a top wall of the water seal box 20, and the water tank top cover 11 is provided with an access hole 15 and a waste water drain pipe.
  • the cross section of the 14 is rectangular, and the waste water drain pipe 14 is provided with a plurality of inlet pipes 17.
  • the present embodiment is different from the embodiment 9 in that the relative position of the riser connecting pipe 40 and the waste water discharge port 13 is changed, and the header tank cover 11 constitutes the top wall of the water seal box 20,
  • the bottom wall of the water tank 10 constitutes a bottom wall of the water seal box 20, and the water tank top cover 11 is provided with a drain hole 16 which communicates with the water seal box 20.
  • the embodiment differs from the first embodiment and the second embodiment in that the water tank top cover 11 is provided with a drain hole 16 and an access hole 15; the water seal mechanism includes a drain discharge port 13 and a drain.
  • the water seal 16 and the manhole 15 are connected to the water seal 20, the water seal box 20 is provided with a drain port 21, and the water seal box 21 is provided with a water seal elbow 24, and the water seal elbow 24 has one end and a drain port. 21 is connected, and the other end is placed in the water seal box 20, and the lowest point of the water seal elbow 24 is lower than the lowest point of the drain port 21.
  • This embodiment differs from the embodiment 12 in that the header of the water tank constitutes the top wall of the water seal box.
  • top cover of the water tank constitutes the top wall of the water seal box and the bottom wall of the water tank constitutes the bottom wall of the water seal box.
  • the difference between this embodiment and the first and second embodiments is that the relative position of the riser connecting pipe 40 and the waste water discharge port 13 is changed, and the water sealing mechanism is a U-shaped water seal elbow 25, U.
  • the inlets of the water seal elbows 25 are respectively connected to the waste water discharge port 13, and the outlet of the U-shaped water seal elbow 25 is not lower than the lowest point of the U-shaped water seal elbow.
  • the water seal elbow 25 may be a U-shaped water seal elbow, an S-type water seal elbow or other shape water seal elbow in the prior art.
  • the waste water drain pipe 14 in this embodiment has a cap-tube structure, and the waste water drain pipe 14 is provided with a plurality of inlet pipes 17 for matching different wastewater discharge sources, such as surface pools, floor drains, etc., need to be U-shaped. When the water seal bend is overhauled, the waste water drain pipe 14 can be taken out from the waste water discharge port 13 .
  • the lowest point of the water outlet of the modular same-layer drainage device hidden water sealing mechanism for building according to the present application is not lower than the technical feature of the lowest point of the water outlet of the riser connecting pipe, otherwise smooth drainage cannot be achieved.
  • the modular same-layer drainage device for building according to Embodiments 1-15 is connected to the toilet drain port and the drain riser through the sewage side row connecting piece during use, and the sewage side row connecting piece is a box-type structure, which can effectively accommodate the sewage. And will be discharged into the riser connecting pipe 40 from the side wall opening (ie, the sewage outlet 32), and then enter the drainage riser without causing clogging, and can also adjust the communication port area of the sewage outlet 32 and the riser connecting pipe 40.
  • the toilet drain port is aligned with the eccentric jack 33, and when the rotary insert 34 is engaged with the toilet connector 31, the corresponding position of the jack 33 and the toilet connector 31 can be adjusted as needed. Reserve the variation margin of the installation space for easy installation;
  • the toilet connection port of the concealed sewage tank is located at the end of the sewage tank, but is not limited to the structure.
  • the shape of the sewage tank has a certain inclination structure or the installation angle between the sewage tank and the riser pipe is more suitable for the sewage to flow into the riser connection pipe.
  • This technical feature is also included in the technical solution of the present application.
  • the waste water of the floor drain, the bathtub, the wash basin, the mop pool and the like in the toilet directly enters the waste water drain pipe 14, passes through the water seal mechanism, and is discharged into the water transfer tank 10, and then flows to the water outlet 41 of the riser connection member 40. And discharged into the drainage riser from the water outlet.
  • the water sealing mechanism can effectively block the odor of the drainage riser and the water tank 1 from tumbling.
  • the waste water drain pipe 14 is directly connected with the water seal box in the water transfer tank 10, so that a centralized water seal and odor-removing structure is formed, which replaces the plurality of water seal designs in the prior art and avoids a certain water seal failure. Causes the problem of indoor odor.
  • the liquid water, solid and gas confluent sewage in the drainage riser completes the separation of liquid and solids from the gas in the water tank 10 of each floor, and the gas in the drainage riser and the water tank 10 is directly connected from the lower vent 71
  • the gas flow passage between the tracheal insertion holes 70 is discharged into the upper vent pipe 70 to realize layer-by-layer water and gas separation, and reduce the pressure fluctuations in the drainage riser and the water collection tank 10, thereby preventing the water sealing mechanism from being impacted by the air pressure. Destruction to ensure that the indoor air environment is protected from the fouling of the drainage system.
  • the flange 12 of the water tank top cover 11 is designed to form a flattening ⁇ downward folding relationship with the bathroom waterproof layer 51, so that the waterproof layer 51 can effectively cover the installation gap between the water tank and the floor installation hole, without using The concrete is caulked; at the same time, the end of the waterproof layer 51 is located on the header cap 11 of the water tank, which forms a height difference with the waterproof layer at the ground, so that the ground water can be guided to the header cap 11 and discharged into the sink.
  • water accumulation cannot be reversed from the joint between the waterproof layer 51 and the water tank top cover 11, thereby completely solving the problem of water leakage in the pipeline passing through the floor in the prior art.
  • the present invention is not limited to the details of the above-described exemplary embodiments, and can be embodied in other specific forms without departing from the spirit or essential characteristics of the application.
  • the application for example, the specific connection position of the water sealing box and the top cover of the water tank, the shape of the water sealing box, the water sealing box adopts a water sealing tube, a water sealing elbow, a partition or other water sealing members in the prior art, sewage
  • the shape of the box, the cross-sectional structure and area of the sewage outlet, the position of the toilet joint on the sewage tank, and the positional distribution of the drain hole on the top cover are deformed by various technical features.

Abstract

Provided is a modular same-floor drainage device for a building, the device comprising a water collection tank (10), a vertical connecting pipe (40) through the water collection tank (10) and at least one waste water inlet (13) provided on a top cover (11) of the water collection tank, wherein the vertical connecting pipe (40) is provided with a water outlet (41) located inside the water collection tank (10), and the waste water inlet (13) is in communication with the water outlet (41) via a water seal mechanism. Further disclosed is an installing construction method for the modular same-floor-drainage device for a building.

Description

一种建筑用模块化同层排水装置及其安装方法Modular same layer drainage device for building and installation method thereof 技术领域Technical field
本申请涉及建筑给排水装置技术领域,具体涉及一种建筑用模块化同层排水装置及其安装方法。The present application relates to the technical field of building water supply and drainage devices, and in particular relates to a modular same layer drainage device for building and a mounting method thereof.
背景技术Background technique
在建筑排水领域,通常将立管连接管预埋在排水立管穿越楼板部位,以便连接本层和下层排水立管,但是在具体应用过程中,出现如下弊端:1)为了避免渗漏,通常将防水层沿管道上翻并设置阻水台,使得室内地面布置显得凌乱、不美观,也不便于装修,而且地面积水无法直接排走,致使下沉区域仍旧存在渗漏隐患;2)地漏、浴盆、洗手盆、拖布池等的排水口均单独设置水封,一个排水口水封干涸就会造成室内返臭,危害健康;3)随着住宅产业化建造方式的推广和普及,现场采用管段管件拼装粘接方式连接排水管的安装方式,存在接头质量无法保证,施工周期长的弊端;4)侧排水坐便器的排水口在与排水立管连接时,由于排水立管与坐便器之间有一定的距离,坐便器排水口至立管之间的排水连接横管会占用室内空间,影响美观,而且受到卫生间地面装修高度与马桶排水横管高度之间的误差,导致侧排水坐便器无法密封安装,导致漏水返臭污染室内环境。为了解决以上存在的问题,人们一直在寻求一种理想的技术解决方案。In the field of building drainage, the riser pipe is usually embedded in the drainage riser to cross the floor to connect the floor and the lower drainage riser. However, in the specific application process, the following disadvantages occur: 1) In order to avoid leakage, usually The waterproof layer is turned upside down along the pipeline and the water blocking platform is arranged, so that the indoor floor arrangement is messy, unattractive, and not easy to be decorated, and the water of the ground area cannot be directly discharged, so that the sinking area still has leakage leakage; 2) floor drain The water outlets of the bathtubs, wash basins, mop pools, etc. are all separately provided with water seals. The water seal of a drain outlet will cause indoor odor and harm to health; 3) With the promotion and popularization of residential industrialization construction methods, the pipeline section is adopted at the site. Pipe fitting and bonding method to connect the drain pipe installation method, there is a drawback that the joint quality cannot be guaranteed, and the construction period is long; 4) The drain port of the side drain toilet is connected with the drain riser due to the connection between the drain riser and the toilet There is a certain distance, the drainage connection between the toilet drain and the riser will occupy the indoor space, affecting the appearance, and the bathroom floor. The height of the toilet drainage repair the error between the height of the cross tube, resulting in not seal mounting side drain toilet, the water leakage caused returning odor indoor environmental pollution. In order to solve the above problems, people have been seeking an ideal technical solution.
为了解决以上存在的问题,人们一直在寻求一种理想的技术解决方案。In order to solve the above problems, people have been seeking an ideal technical solution.
发明内容Summary of the invention
本申请的目的是提供是针对现有技术的不足,从而提供一种结构简单、设计科学、使用方便、性能可靠、防渗漏效果突出、集中水封防返臭、通气效果好、坐便器排水口安装方便且不易堵塞的建筑用模块化同层排水装置及其安装方法。The purpose of the application is to provide a deficiencies against the prior art, thereby providing a simple structure, scientific design, convenient use, reliable performance, outstanding leakage prevention effect, concentrated water seal anti-back odor, good ventilation effect, toilet drainage Modular flushing device for building with convenient installation and not easy to block, and installation method thereof.
为解决上述技术问题,本申请采用的技术方案如下:In order to solve the above technical problems, the technical solutions adopted in the present application are as follows:
一种建筑用模块化同层排水装置,包括汇水箱、穿设在汇水箱内的立管连接管和开设在汇水箱顶盖上的至少一个废水排入口;所述立管连接管上设有位于汇水箱内的出水口,所述废水排入口通过水封机构与所述出水口相连通。A modular same-layer drainage device for building, comprising a water storage tank, a riser connection pipe disposed in the water collection tank, and at least one waste water discharge inlet opened on the water tank top cover; the riser connection pipe is provided The water outlet located in the water tank, the waste water discharge inlet is connected to the water outlet through a water sealing mechanism.
优选的,还包括穿过汇水箱底壁且不高于汇水箱顶盖最高处的下通气管和设于汇水箱顶盖上且与汇水箱内部连通的上通气管;所述上通气管与下通气管之间有气体流道,所述下通气管的顶端不低于出水口的最高处。Preferably, the method further includes a lower snorkel passing through the bottom wall of the water tank and not higher than the highest point of the header of the water tank, and an upper snorkel disposed on the top of the water tank and communicating with the inside of the water tank; the upper vent tube and There is a gas flow path between the lower vent pipes, and the top end of the lower vent pipe is not lower than the highest point of the water outlet.
优选的,所述汇水箱顶盖上开设有泄水孔,泄水孔与立管连接管的出水口相连通。Preferably, the water tank top cover is provided with a water discharge hole, and the water discharge hole is connected with the water outlet of the riser connection pipe.
优选的,所述废水排入口和泄水孔单独或二者共同通过水封机构与立管连接管的出水口连通,所述水封机构的排水口最低处高于立管连接管的出水口最低处。Preferably, the waste water discharge inlet and the drain hole are connected to the water outlet of the riser connection pipe by a water seal mechanism alone or both, and the water outlet of the water seal mechanism is lower than the water outlet of the riser connection pipe. The lowest point.
优选的,所述汇水箱顶盖上开设有检修孔,所述检修孔与所述水封机构的位置相对 应,所述检修孔为至少一个废水排入口中的一个。Preferably, the water tank top cover is provided with an access hole corresponding to the position of the water sealing mechanism, and the inspection hole is one of at least one waste water discharge port.
检修孔用来对水封机构内的存水部位进行疏通、清洁,检修孔的设置不是必须的,而是作为优化的技术方案,同时废水排入口也可以作为检修孔来使用,但是需要保证水封机构的存水部位对应废水排入口设置。而且检修孔在非检修状态下,可以安装地漏,当然也可以用于废水排入。The manhole is used to clear and clean the water storage part in the water seal mechanism. The setting of the manhole is not necessary, but is an optimized technical solution. At the same time, the waste water inlet can also be used as a manhole, but the water needs to be guaranteed. The water storage part of the sealing mechanism is arranged corresponding to the waste water discharge port. Moreover, the manhole can be installed in the non-overhaul state, and can also be used for wastewater discharge.
优选的,所述水封机构包括水封箱,所述水封箱开设有排水口,水封部件安装在所述水封箱内与排水口相对应的位置。Preferably, the water sealing mechanism comprises a water sealing box, the water sealing box is provided with a water outlet, and the water sealing component is installed at a position corresponding to the water outlet in the water sealing box.
优选的,所述水封箱与所述汇水箱共用顶盖和/或底壁。Preferably, the water seal shares a top cover and/or a bottom wall with the water transfer tank.
优选的,所述立管连接管至少为一个。Preferably, the riser connection tube is at least one.
优选的,所述立管连接管上设有连通坐便器排水口的侧排连接件。Preferably, the riser connecting pipe is provided with a side row connecting member that communicates with the toilet drain.
优选的,所述侧排连接件上的坐便器连接口设有旋转插件,旋转插件上设有偏心插孔。Preferably, the toilet connector on the side row connector is provided with a rotating insert, and the rotary insert is provided with an eccentric jack.
优选的,所述侧排连接件包括呈扁平状的污水箱,污水箱与立管连接管的连通端开设有污水出口,污水箱侧壁上设有开口方向垂直于立管连接管轴线的坐便器连接口。Preferably, the side row connecting member comprises a flat sewage tank, and a sewage outlet is opened at a communication end of the sewage tank and the riser connecting pipe, and a side wall of the sewage tank is provided with an opening direction perpendicular to the axis of the riser connecting pipe. Toilet connection.
优选的,所述汇水箱的上边沿向外设有翻边。Preferably, the upper edge of the water tank is provided with a flange.
优选的,所述翻边的水平部与所述汇水箱顶盖存在高度差,并且翻边的所述水平部高于所述汇水箱顶盖的顶部。Preferably, the horizontal portion of the flange has a height difference from the header of the water tank, and the horizontal portion of the flange is higher than the top of the header of the water tank.
所述翻边用于遮盖楼板留洞缝隙及与楼板防水层形成搭接防水,且翻边的水平部与汇水箱的汇水箱顶盖有一定高度差,可以对汇水箱顶盖上的积水进行阻挡。The flange is used to cover the gap between the floor and the waterproof layer of the floor, and the horizontal part of the flange has a certain height difference from the cover of the water tank, and the water can be accumulated on the top cover of the water tank. Block it.
优选的,所述废水排入口的至少一个上装配有废水排水管。Preferably, at least one of the waste water discharge ports is equipped with a waste water drain pipe.
优选的,所述废水排水管横截面为矩形或者圆形。Preferably, the waste water drain pipe has a rectangular or circular cross section.
优选的,所述侧排连接件为矩型或椭圆型结构。Preferably, the side row connector is a rectangular or elliptical structure.
优选的,所述侧排连接件与所述立管连接管为偏心连接,且带有坡向排水立管连接管的坡度。Preferably, the side row connecting piece and the riser connecting pipe are eccentrically connected, and have a slope of the inclined drainage riser connecting pipe.
优选的,所述检修孔与水封机构内部的水封弯管或水封筒位置相对应。Preferably, the manhole corresponds to a position of a water seal elbow or a water seal cylinder inside the water seal mechanism.
上述建筑用模块化同层排水装置在现浇钢筋混凝土楼板结构卫生间的安装方法,其特征在于,步骤如下:The installation method of the above-mentioned modular multi-layer drainage device for building a cast-in-place reinforced concrete floor structure toilet is characterized in that the steps are as follows:
1)卫生间的结构楼板上预留安装洞,并在安装前对楼板的安装洞进行上、下楼层找直,使各楼层的楼板安装洞的中心连线与水平地面垂直;1) Reserve holes for the structural floor of the bathroom, and straighten the upper and lower floors of the installation holes of the floor before installation, so that the center connection of the floor installation holes of each floor is perpendicular to the horizontal floor;
2)在安装洞底部支吊模板,并在吊模板对应排水立管位置开设管道穿孔,之后将各楼层的吊模板管道穿孔中心进行垂直对正,并向安装洞内浇筑细石混凝土后压实铺平;2) Lift the template at the bottom of the installation hole, and open the pipe perforation at the position of the drainage riser corresponding to the hanging template. Then, the perforated center of the hanging formwork pipe of each floor is vertically aligned, and the fine stone concrete is poured into the installation hole and compacted. pave;
3)将与建筑用模块化同层排水装置外形尺寸一致的定位模具装配于安装洞内的设计位置,并将定位模具上的立管连接管与吊模板的管道穿孔配合,同时用细石混凝土灌 缝填实立管连接管与吊模板管道穿孔的连接处间隙;3) The positioning mold conforming to the outer dimensions of the modular same-drainage device for building is assembled in the design position in the installation hole, and the riser connecting pipe on the positioning mold is matched with the pipe perforation of the hanging template, and the fine stone concrete is used at the same time. Filling the gap between the riser connecting pipe and the perforated pipe of the hanging template pipe;
4)取出定位模具并将建筑用模块化同层排水装置安装于安装洞内的设计位置处,且将立管连接管配合吊模板的管道穿孔插入,建筑用模块化同层排水装置的翻边搭设在安装洞边沿处;4) Take out the positioning mold and install the modular same-layer drainage device in the installation position in the installation hole, and insert the riser connection pipe with the pipe perforation of the hanging formwork, and the flange of the modular same-layer drainage device for building Lay at the edge of the installation hole;
5)铺设卫生间的防水层,并将防水层端部越过翻边后向下翻折且伸至汇水箱顶盖上,用胶粘接防水层与建筑用模块化同层排水装置的连接处,之后用水泥砂浆对防水层压边;5) Lay the waterproof layer of the bathroom, and fold the end of the waterproof layer over the flange, then fold down and extend to the top cover of the water tank, and glue the joint between the waterproof layer and the modular same-layer drainage device for the building. Then use cement mortar to waterproof laminated edges;
6)将废水排水管的出水口插入汇水箱顶盖的废水排入口,并用胶粘接密封,之后安装排水立管;6) Insert the water outlet of the waste water drain pipe into the waste water discharge port of the top cover of the water tank, and seal it with glue, then install the drain riser;
7)浇筑水泥砂浆垫层,铺地面装饰层;最后将坐便器排水口与建筑用模块化同层排水装置旋转插件的偏心插孔对正插接即可。7) Pouring the cement mortar cushion and paving the floor decoration layer; finally, the toilet drain outlet can be inserted into the eccentric jack of the modular plug-in rotating device of the building.
上述建筑用模块化同层排水装置在现浇钢筋混凝土楼板结构卫生间的安装方法,其特征在于,步骤如下:The installation method of the above-mentioned modular multi-layer drainage device for building a cast-in-place reinforced concrete floor structure toilet is characterized in that the steps are as follows:
1)卫生间预制楼板在预制时按照设计位置预留用于装配立管连接管的管道插孔;现场浇筑卫生间的现浇层时按照设计位置预留安装洞;1) The prefabricated floor slab of the bathroom is reserved for the pipe jack for assembling the riser pipe in the pre-fabrication; when the cast-in-place layer of the toilet is cast on site, the installation hole is reserved according to the design position;
2)安装前对楼板的安装洞进行上、下楼层找直,使各楼层的楼板安装洞的中心连线与水平地面垂直;2) Before installation, straighten the upper and lower floors of the installation holes of the floor, so that the center connection of the floor installation holes of each floor is perpendicular to the horizontal ground;
3)将建筑用模块化同层排水装置安装于安装洞内,且将立管连接管配合预制楼板的管道穿孔插入,建筑用模块化同层排水装置的翻边搭设在安装洞边沿处;3) Install the modular same-layer drainage device for the building in the installation hole, and insert the riser connection pipe with the pipe perforation of the prefabricated floor slab, and the flange of the building with the same layer drainage device is placed at the edge of the installation hole;
4)铺设卫生间的防水层,并将防水层端部越过翻边后向下翻折且伸至汇水箱顶盖上,用胶粘接防水层与建筑用模块化同层排水装置的连接处,之后用水泥砂浆对防水层压边;4) Lay the waterproof layer of the bathroom, and fold the end of the waterproof layer over the flange, then fold down and extend to the top cover of the water tank, and bond the waterproof layer with the modular same-layer drainage device for the building. Then use cement mortar to waterproof laminated edges;
5)将废水排水管的出水口插入汇水箱顶盖的废水排入口,并用胶粘接密封,之后安装排水立管;5) Insert the water outlet of the waste water drain pipe into the waste water discharge port of the top cover of the water tank, and seal it with glue, then install the drain riser;
6)浇筑水泥砂浆垫层,铺地面装饰层;最后将坐便器排水口与建筑用模块化同层排水装置旋转插件的偏心插孔对正插接即可。6) Pouring the cement mortar cushion and paving the floor decoration layer; finally, the toilet drain outlet can be inserted into the eccentric jack of the modular plug-in rotating device of the building.
上述建筑用模块化同层排水装置在现浇钢筋混凝土楼板结构卫生间的安装方法,其特征在于,步骤如下:The installation method of the above-mentioned modular multi-layer drainage device for building a cast-in-place reinforced concrete floor structure toilet is characterized in that the steps are as follows:
1)卫生间的结构楼板上预留安装洞,并在安装前对楼板的安装洞进行上、下楼层找直,使各楼层的楼板安装洞的中心连线与水平地面垂直;1) Reserve holes for the structural floor of the bathroom, and straighten the upper and lower floors of the installation holes of the floor before installation, so that the center connection of the floor installation holes of each floor is perpendicular to the horizontal floor;
2)在安装洞底部支吊模板,并在吊模板对应排水立管位置和通气管开设管道穿孔,之后将各楼层的吊模板管道穿孔中心进行垂直对正,并向安装洞内浇筑细石混凝土后压实铺平;2) Support the template at the bottom of the installation hole, and open the pipe perforation corresponding to the position of the drainage riser and the vent pipe of the hanging template, then vertically align the perforated center of the hanging template pipe of each floor, and pour the fine stone concrete into the installation hole. Post-compaction flattening;
3)将与高层用模块化同层排水装置外形尺寸一致的定位模具装配于安装洞内的设 计位置,并将定位模具上的立管连接管和下通气管与吊模板的管道穿孔配合,同时用细石混凝土灌缝填实立管连接管和下通气管与吊模板管道穿孔的连接处间隙;3) The positioning mold conforming to the outer dimensions of the modular same-layer drainage device of the high-rise is assembled in the design position in the installation hole, and the riser connection pipe and the lower ventilation pipe on the positioning mold are matched with the pipe perforation of the hanging template, and at the same time Filling the gap between the riser connecting pipe and the lower vent pipe and the perforated pipe through the fine stone concrete filling;
4)取出定位模具并将高层用模块化同层排水装置安装于安装洞内的设计位置处,且将立管连接管和下通气管配合吊模板的管道穿孔插入,高层用模块化同层排水装置的翻边搭设在安装洞边沿处;4) Take out the positioning mold and install the high-rise modular drainage device at the design position in the installation hole, and insert the pipe connection between the riser connection pipe and the lower vent pipe and the stencil. The high-rise modular drainage The flange of the device is placed at the edge of the mounting hole;
5)铺设卫生间的防水层,并将防水层端部越过翻边后向下翻折且伸至汇水箱顶盖上,用胶粘接防水层与高层用模块化同层排水装置的连接处,之后用水泥砂浆对防水层压边;5) Lay the waterproof layer of the bathroom, and fold the end of the waterproof layer over the flange, then fold down and extend to the top cover of the water tank, and glue the joint between the waterproof layer and the modular high-level drainage device. Then use cement mortar to waterproof laminated edges;
6)将废水排水管的出水口插入汇水箱顶盖的废水排入口,并用胶粘接密封,之后安装排水立管和通气管;6) Insert the water outlet of the waste water drain pipe into the waste water discharge port of the top cover of the water tank, and seal it with glue, then install the drain riser and the vent pipe;
7)浇筑水泥砂浆垫层,铺地面装饰层;最后将坐便器排水口与高层用模块化同层排水装置旋转插件的偏心插孔对正插接即可;7) Pouring the cement mortar cushion and paving the floor decoration layer; finally, the toilet drain outlet and the high-rise eccentric jack of the modular same layer drainage device rotating insert are aligned and inserted;
上述建筑用模块化同层排水装置在现浇钢筋混凝土楼板结构卫生间的安装方法,其特征在于,步骤如下:The installation method of the above-mentioned modular multi-layer drainage device for building a cast-in-place reinforced concrete floor structure toilet is characterized in that the steps are as follows:
1)卫生间预制楼板在预制时按照设计位置预留用于装配立管连接管和下通气管的管道插孔;现场浇筑卫生间的现浇层时按照设计位置预留安装洞;1) The prefabricated floor slab of the bathroom shall be reserved for the pipe jack for assembling the riser pipe and the lower vent pipe according to the design position during prefabrication; when the cast-in-place layer of the toilet is poured on site, the installation hole shall be reserved according to the design position;
2)安装前对楼板的安装洞进行上、下楼层找直,使各楼层的楼板安装洞的中心连线与水平地面垂直;2) Before installation, straighten the upper and lower floors of the installation holes of the floor, so that the center connection of the floor installation holes of each floor is perpendicular to the horizontal ground;
3)将高层用模块化同层排水装置安装于安装洞内,且将立管连接管和下通气管配合预制楼板的管道穿孔插入,高层用模块化同层排水装置的翻边搭设在安装洞边沿处;3) Install the high-rise modular flushing device in the installation hole, and insert the riser connecting pipe and the lower vent pipe into the pipe of the prefabricated floor slab. The high-rise is installed in the installation hole with the flange of the modular same-layer drainage device. Edge
4)铺设卫生间的防水层,并将防水层端部越过翻边后向下翻折且伸至汇水箱顶盖上,用胶粘接防水层与高层用模块化同层排水装置的连接处,之后用水泥砂浆对防水层压边;4) Laying the waterproof layer of the bathroom, and turning the end of the waterproof layer over the flange, then folding down and extending to the top cover of the water tank, and bonding the waterproof layer with the modular same-layer drainage device of the high-rise layer, Then use cement mortar to waterproof laminated edges;
5)将废水排水管的出水口插入汇水箱顶盖的废水排入口,并用胶粘接密封,之后安装排水立管和通气管;5) Insert the water outlet of the waste water drain pipe into the waste water discharge port of the top cover of the water tank, and seal it with glue, then install the drain riser and the vent pipe;
6)浇筑水泥砂浆垫层,铺地面装饰层;最后将坐便器排水口与高层用模块化同层排水装置旋转插件的偏心插孔对正插接即可。6) Pouring the cement mortar cushion and paving the floor decoration layer; finally, the toilet drain outlet and the high-rise eccentric jack of the modular same-layer drainage device rotating insert can be inserted and aligned.
本申请相对现有技术具有突出的实质性特点和显著进步,具体的说,该建筑用模块化同层排水装置具有以下优点:The present application has outstanding substantive features and significant advances over the prior art. Specifically, the modular flush drainage device for the building has the following advantages:
1)汇水箱顶盖的翻边设计,与卫生间防水层形成了平接→向下翻折的搭接关系机构,使得防水层可以有效遮盖汇水箱与楼板安装洞的安装间隙,无须采用混凝土填缝;同时防水层端部位于汇水箱顶盖上,这与地面处的防水层形成高度差,使得地面积水可以具有导向性地流至汇水箱顶盖上并排入汇水箱中,而且积水还无法从防水层与汇水箱 顶盖粘接缝处翻越倒流,从而彻底解决了现有技术中管道穿越楼板处积水渗漏的难题;1) The flange design of the top cover of the water tank is formed with the waterproof layer of the bathroom to form a lap joint mechanism that folds downwards, so that the waterproof layer can effectively cover the installation gap between the water tank and the floor installation hole, without using concrete filling At the same time, the end of the waterproof layer is located on the top cover of the water tank, which forms a height difference with the waterproof layer at the ground, so that the ground water can be guided to the top of the water tank and discharged into the water tank, and The water can not be reversed from the waterproof layer and the joint cover of the water tank top cover, thereby completely solving the problem of water leakage in the pipeline passing through the floor in the prior art;
2)汇水箱顶盖的泄水孔设计,可使地面积水沿着防水层流至汇水箱顶盖,然后通过泄水孔流入汇水箱内,利于及时排出地面积水,避免了地面装饰层与防水层之间的积水无法外排从而引发的渗漏隐患;2) The design of the drain hole of the top cover of the water tank can make the water of the area flow along the waterproof layer to the top cover of the water tank, and then flow into the water tank through the drain hole, which facilitates timely discharge of the ground area water and avoids the floor decoration layer. Leakage caused by the accumulation of water between the waterproof layer and the waterproof layer;
3)地漏、浴盆、洗手盆、拖布池等排水口的废水可直接汇入废水排水管中,由于废水排水管与汇水箱内的水封箱直接连接,所以形成了一户一个集中水封防臭的结构,取代了现有技术中的多个水封设计且避免了某个水封失效而造成室内返臭的问题;3) Wastewater from floor drains, bathtubs, wash basins, mop pools, etc. can be directly transferred into the waste water drain pipe. Since the waste water drain pipe is directly connected with the water seal box in the water transfer tank, a centralized water seal and deodorization is formed. The structure replaces the multiple water seal designs in the prior art and avoids the problem of indoor back odor caused by failure of a certain water seal;
4)卫生间内所有废水排放点排放的废水,都经过水封机构排出,这样水封机构内的水就提高了置换频率,使得水封机构内的水蒸发干涸的机率大大降低,对卫生间防止返臭和避免水封蒸发而引发的二次污染,具有显著的技术贡献;4) All waste water discharged from the waste water discharge point in the toilet is discharged through the water seal mechanism, so that the water in the water seal mechanism increases the replacement frequency, so that the probability of water evaporation in the water seal mechanism is greatly reduced, and the bathroom is prevented from returning. The odor and the secondary pollution caused by avoiding the evaporation of the water seal have significant technical contributions;
5)通过污水侧排连接件连通坐便器排水口和排水立管,污水侧排连接件为箱体式结构,可以在保证污水有效流通断面的的前提下,减少箱体的厚度,减少墙排水横管道对室内空间的占用,甚至方便把侧排水连接件直接安装在隔墙内,将墙排水坐便器安装在地面上的横管对卫生间室内空间的占用降低到零占有,从而节约室内空间,方便装修和使用。坐便器排水口直接或间接与污水箱旋转插件的偏心插孔连接,再将旋转插件与污水箱的污水进口配合时,可以根据需要旋转偏心接头实现调整插孔与污水进口的相应位置,预留安装空间的变动余量,方便安装;5) Connect the toilet drain port and the drain riser through the sewage side row connecting piece. The sewage side row connecting piece is a box type structure, which can reduce the thickness of the box body and reduce the wall drainage under the premise of ensuring the effective flow cross section of the sewage. The horizontal pipe occupies the indoor space, and even the side drainage connector is conveniently installed directly in the partition wall, and the horizontal pipe installed on the ground by the wall drainage toilet is reduced to zero occupancy of the bathroom interior space, thereby saving indoor space. Easy to decorate and use. The toilet drain is directly or indirectly connected to the eccentric jack of the rotary plug of the sewage tank, and when the rotary insert is matched with the sewage inlet of the sewage tank, the eccentric joint can be rotated as needed to adjust the corresponding position of the jack and the sewage inlet, and reserve The variation of the installation space is convenient for installation;
6)将排水立管与通气管(即立管连接管和上、下通气管)集成至一体,不仅节约卫生间内的安装空间,而且能实现排水立管内的液水、固体、气体汇合污水流在每层楼层的集成排水装置内完成液体和固体与气体的分离,排水立管内的气体经汇水箱内直接从进入通气管,实现了逐层水、气分离,减小排水立管和汇水箱内的气压波动,有利于防止水封机构被气压冲击破坏,保证室内空气环境免受排水系统返臭污染;6) Integrating the drainage riser and the vent pipe (ie, the riser connection pipe and the upper and lower vent pipe), not only saves the installation space in the toilet, but also realizes the liquid water, solid and gas confluence sewage flow in the drainage riser. The separation of liquid and solids and gas is completed in the integrated drainage device on each floor. The gas in the drainage riser directly enters the vent pipe through the water tank, which realizes separation of water and gas layer by layer, and reduces the drainage riser and the water collection tank. The fluctuation of air pressure inside is beneficial to prevent the water seal mechanism from being damaged by air pressure shock, and to ensure that the indoor air environment is protected from the fouling of the drainage system;
7)建筑用模块化同层排水装置具有结构简单、设计科学、使用方便、性能可靠、水封可靠防返臭的优点,而且建筑用模块化同层排水装置根据建筑卫生间的设计尺寸进行生产,产品质量和安装效果得到最大限度地保证;且在装配式建筑中现场无细石混凝土的灌缝等湿作业,防水层施工简单、可靠。7) The modular same-layer drainage device for building has the advantages of simple structure, scientific design, convenient use, reliable performance, reliable water seal and anti-back odor, and the modular same-layer drainage device for construction is produced according to the design size of the building toilet. The product quality and installation effect are guaranteed to the utmost extent; and in the assembly building, there is no wet work such as grouting of fine stone concrete, and the waterproof layer construction is simple and reliable.
附图说明DRAWINGS
图1为实施例1中所述建筑用模块化同层排水装置的汇水箱俯视结构示意图;1 is a schematic plan view showing a water tank of a modular same layer drainage device for a building according to Embodiment 1;
图2为实施例1中所述建筑用模块化同层排水装置于废水排入口处的剖视结构示意图;2 is a cross-sectional structural view showing the modular same-layer drainage device for construction in the first embodiment;
图3为实施例1中所述建筑用模块化同层排水装置的立管连接管和污水箱的连接结构示意图;3 is a schematic view showing a connection structure of a riser connecting pipe and a sewage tank of the modular same-layer drainage device for building according to Embodiment 1;
图4为实施例2中所述建筑用模块化同层排水装置的汇水箱俯视结构示意图;Figure 4 is a top plan view showing the water tank of the modular same layer drainage device for building according to Embodiment 2;
图5为实施例2中所述建筑用模块化同层排水装置于废水排入口处的剖视结构示意图;Figure 5 is a cross-sectional structural view showing the modular same-layer drainage device for building in the second embodiment;
图6为实施例2中所述建筑用模块化同层排水装置的立管连接管和污水箱的连接结构示意图;6 is a schematic view showing a connection structure of a riser connecting pipe and a sewage tank of the modular same-layer drainage device for building according to Embodiment 2;
图7为实施例2中所述建筑用模块化同层排水装置的立管连接管和上通气管的轴线连接线处的剖视结构示意图;Figure 7 is a cross-sectional structural view showing the axial connection line between the riser connecting pipe and the upper vent pipe of the modular same layer drainage device for building according to Embodiment 2;
图8为实施例3中所述建筑用模块化同层排水装置的立管连接管和上通气管的轴线连接线处的剖视结构示意图;Figure 8 is a cross-sectional structural view showing the axial connection line between the riser connecting pipe and the upper vent pipe of the modular same-layer drainage device for building according to Embodiment 3;
图9为实施例4中所述建筑用模块化同层排水装置的汇水箱俯视结构示意图;Figure 9 is a top plan view showing the water tank of the modular same layer drainage device for building according to Embodiment 4;
图10为实施例5中所述建筑用模块化同层排水装置的汇水箱俯视结构示意图;Figure 10 is a top plan view showing the water tank of the modular same layer drainage device for building according to Embodiment 5;
图11为实施例6中所述建筑用模块化同层排水装置的汇水箱俯视结构示意图;Figure 11 is a top plan view showing the water tank of the modular same layer drainage device for building according to Embodiment 6;
图12为实施例7中所述建筑用模块化同层排水装置的汇水箱俯视结构示意图;Figure 12 is a top plan view showing the water tank of the modular same layer drainage device for building according to Embodiment 7;
图13为实施例8中所述建筑用模块化同层排水装置于废水排入口处的剖视结构示意图;Figure 13 is a cross-sectional structural view showing the modular same layer drainage device for building in the eighth embodiment;
图14为实施例6、7中所述建筑用模块化同层排水装置在现浇钢筋混凝土楼板结构卫生间的安装结构示意图;Figure 14 is a schematic view showing the installation structure of the modular same-floor drainage device for building in the cast-in-place reinforced concrete floor structure according to the embodiments 6 and 7;
图15为实施例6、7中所述建筑用模块化同层排水装置在装配式叠合楼板结构卫生间的安装结构示意图;Figure 15 is a schematic view showing the installation structure of the modular same floor drainage device for building according to the embodiments 6 and 7 in the assembled laminated floor structure toilet;
图16为实施例9中所述建筑用模块化同层排水装置于废水排入口处的剖视结构示意图;Figure 16 is a cross-sectional structural view showing the modular same layer drainage device for building according to Embodiment 9 at the inlet of the waste water;
图17为实施例10中所述建筑用模块化同层排水装置于废水排入口处的剖视结构示意图;Figure 17 is a cross-sectional structural view showing the modular same-layer drainage device for building according to Embodiment 10 at the inlet of the waste water;
图18为实施例11中所述建筑用模块化同层排水装置于废水排入口处的剖视结构示意图;Figure 18 is a cross-sectional structural view showing the modular same-layer drainage device for construction in the waste water discharge port of the embodiment 11;
图19为实施例12中所述建筑用模块化同层排水装置于废水排入口处的剖视结构示意图;Figure 19 is a cross-sectional structural view showing the modular same layer drainage device for building according to Embodiment 12 at the inlet of the waste water;
图20为实施例15中所述建筑用模块化同层排水装置于废水排入口处的剖视结构示意图。Fig. 20 is a cross-sectional structural view showing the modular same layer drainage device for building according to Embodiment 15 at the inlet of the waste water.
具体实施方式detailed description
为了使本申请的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本申请进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本申请,并不用于限定本申请。In order to make the objects, technical solutions, and advantages of the present application more comprehensible, the present application will be further described in detail below with reference to the accompanying drawings and embodiments. It is understood that the specific embodiments described herein are merely illustrative of the application and are not intended to be limiting.
如图1-3所示,一种建筑用模块化同层排水装置,其包括汇水箱10、穿设在汇水 箱10内的立管连接管40和开设在汇水箱顶盖11上的废水排入口13,立管连接管40上设有位于汇水箱内的出水口41,废水排入口13通过水封机构与出水口41相连通,且废水排入口13装配有废水排水管14;废水排水管横截面为矩形,汇水箱10的上边沿向外设有翻边12;所述立管连接管40上连通有侧排连接件,侧排连接件包括呈扁平状的污水箱30,污水箱30与立管连接管40的连通端开设有污水出口32,污水箱30侧壁上设有开口方向垂直于立管连接管轴线的坐便器连接口31,坐便器连接口31与立管连接管的轴间距不大于500mm,坐便器连接口31设有旋转插件34,旋转插件34上设有偏心插孔33;所述水封机构包括水封箱20,水封箱20与废水排入口13相连通,水封箱20底壁上设有排水口21,排水口21上设有水封筒22,水封筒22与废水排入口13对应设置。As shown in FIG. 1-3, a modular same-layer drainage device for a building includes a water collection tank 10, a riser connection pipe 40 that is disposed in the water collection tank 10, and a waste water discharge line that is opened on the water tank top cover 11. The inlet 13 and the riser connecting pipe 40 are provided with a water outlet 41 in the water tank, the waste water discharge port 13 is connected to the water outlet 41 through a water sealing mechanism, and the waste water discharge port 13 is equipped with a waste water drain pipe 14; The cross section is rectangular, and the upper edge of the water tank 10 is outwardly provided with a flange 12; the riser connection pipe 40 is connected with a side row connecting member, and the side row connecting member comprises a flat sewage tank 30, the sewage tank 30 The communication end of the riser connection pipe 40 is provided with a sewage outlet 32. The side wall of the sewage tank 30 is provided with a toilet connection port 31 whose opening direction is perpendicular to the axis of the riser connection pipe, and the toilet connection port 31 and the riser connection pipe The shaft spacing is not more than 500 mm, the toilet connector 31 is provided with a rotating insert 34, and the rotating insert 34 is provided with an eccentric jack 33; the water sealing mechanism comprises a water sealing box 20, and the water sealing box 20 is connected with the waste water inlet 13 a water outlet 21 is provided on the bottom wall of the water seal box 20, and water is disposed on the drain port 21 Cylinder 22, cylinder 22 and the seal 13 corresponding to discharge waste water inlet is provided.
实施例2Example 2
如图4-7所示,与实施例1不同之处在于,还包括穿过汇水箱10底壁且等高于汇水箱顶盖11最高处的下通气管71、设于汇水箱顶盖11上且与汇水箱10内部连通的上通气管70;上通气管70与下通气管71之间有气体流道,下通气管71的顶端不低于出水口41的最低处,优选,下通气管71的顶端不低于出水口41的最高处。As shown in FIG. 4-7, the difference from the first embodiment is that the lower vent pipe 71 passing through the bottom wall of the water tank 10 and higher than the highest point of the water tank top cover 11 is provided, and the water tank top cover 11 is provided. An upper vent pipe 70 communicating with the inside of the water tank 10; a gas flow path between the upper vent pipe 70 and the lower vent pipe 71; the top end of the lower vent pipe 71 is not lower than the lowest point of the water outlet 41, preferably, the lower pass The top end of the air tube 71 is not lower than the highest point of the water outlet 41.
实施例3Example 3
如图8所示,本实施例与实施例2不同之处在于,所述下通气管71最高处低于汇水箱顶盖11,上通气管70为直管且与下通气管71对应设置。As shown in FIG. 8, the present embodiment is different from the second embodiment in that the lower vent pipe 71 is lower than the water tank top cover 11, and the upper vent pipe 70 is a straight pipe and is disposed corresponding to the lower vent pipe 71.
实施例4Example 4
如图9所示,本实施例与实施例1不同之处在于,立管连接管40与废水排入口13的相对位置改变,且所述废水排水管的横截面为圆形,汇水箱顶盖11上还设有与汇水箱10连通的泄水孔16。As shown in FIG. 9, the present embodiment is different from the first embodiment in that the relative position of the riser connecting pipe 40 and the waste water discharge port 13 is changed, and the waste water drain pipe has a circular cross section, and the water tank top cover A drain hole 16 communicating with the water tank 10 is also provided on the upper portion 11.
本实施例中的水封机构可以设置两个,泄水孔单独与一个水封机构连通且废水排入口连通另一个水封机构。The water sealing mechanism in this embodiment may be provided with two, the water leakage hole is separately connected to one water sealing mechanism, and the waste water discharge inlet is connected to another water sealing mechanism.
实施例5Example 5
如图10所示,本实施例与实施例2不同之处在于,立管连接管40与废水排入口13的相对位置改变,且所述废水排水管的横截面为圆形,汇水箱顶盖11上还设有与汇水箱10连通的泄水孔16。As shown in FIG. 10, the present embodiment is different from the second embodiment in that the relative position of the riser connecting pipe 40 and the waste water discharge port 13 is changed, and the waste water drain pipe has a circular cross section, and the water tank top cover A drain hole 16 communicating with the water tank 10 is also provided on the upper portion 11.
本实施例中的水封机构可以设置两个,泄水孔单独与一个水封机构连通且废水排入口连通另一个水封机构。The water sealing mechanism in this embodiment may be provided with two, the water leakage hole is separately connected to one water sealing mechanism, and the waste water discharge inlet is connected to another water sealing mechanism.
实施例6Example 6
如图11所示,本实施例与实施例4的不同之处在于,立管连接管40与废水排入口13的相对位置改变,所述汇水箱顶盖上还开设有检修孔15,检修孔15对应水封筒设置。As shown in FIG. 11 , the difference between the present embodiment and the embodiment 4 is that the relative position of the riser connection pipe 40 and the waste water discharge port 13 is changed, and the cover hole 15 is further provided with an inspection hole 15 and an inspection hole. 15 corresponds to the water seal tube setting.
如图14所示,本实施例所述建筑用模块化同层排水装置在现浇钢筋混凝土楼板结 构卫生间的安装方法,步骤如下:As shown in Fig. 14, the installation method of the modular same-layer drainage device for building in the cast-in-place reinforced concrete floor structure of the present embodiment is as follows:
1)卫生间的结构楼板60上预留安装洞,并在安装前对楼板的安装洞进行上、下楼层找直,使各楼层的楼板安装洞的中心连线与水平地面垂直;1) The installation of the hole is reserved on the structural floor 60 of the bathroom, and the upper and lower floors of the floor installation hole are straightened before installation, so that the center connection of the floor installation hole of each floor is perpendicular to the horizontal ground;
2)在安装洞底部支吊模板,并在吊模板对应排水立管位置开设管道穿孔,之后将各楼层的吊模板管道穿孔中心进行垂直对正,并向安装洞内浇筑细石混凝土后压实铺平;2) Lift the template at the bottom of the installation hole, and open the pipe perforation at the position of the drainage riser corresponding to the hanging template. Then, the perforated center of the hanging formwork pipe of each floor is vertically aligned, and the fine stone concrete is poured into the installation hole and compacted. pave;
3)将与建筑用模块化同层排水装置外形尺寸一致的定位模具装配于安装洞内的设计位置,并将定位模具上的立管连接管与吊模板的管道穿孔配合,同时用细石混凝土灌缝填实立管连接管与吊模板管道穿孔的连接处间隙;3) The positioning mold conforming to the outer dimensions of the modular same-drainage device for building is assembled in the design position in the installation hole, and the riser connecting pipe on the positioning mold is matched with the pipe perforation of the hanging template, and the fine stone concrete is used at the same time. Filling the gap between the riser connecting pipe and the perforated pipe of the hanging template pipe;
4)取出定位模具并将建筑用模块化同层排水装置安装于安装洞内的设计位置处,且将立管连接管40配合吊模板的管道穿孔插入,建筑用模块化同层排水装置的翻边12搭设在安装洞边沿处;4) Take out the positioning mold and install the modular same-layer drainage device in the installation position in the installation hole, and insert the riser connection pipe 40 into the pipe perforation of the hanging formwork, and turn the modular same-layer drainage device for the building. The edge 12 is placed at the edge of the mounting hole;
5)铺设卫生间的防水层51,并将防水层51端部越过翻边12后向下翻折且伸至汇水箱顶盖上,用胶粘接防水层与建筑用模块化同层排水装置的连接处,之后用水泥砂浆对防水层51压边;5) Laying the waterproof layer 51 of the bathroom, and folding the end of the waterproof layer 51 over the flange 12, then folding down and extending to the top cover of the water tank, bonding the waterproof layer with the glue and the modular same layer drainage device for the building. a joint, and then pressurizing the waterproof layer 51 with cement mortar;
6)将废水排水管14的出水口插入汇水箱顶盖的废水排入口,并用胶粘接密封,之后安装排水立管52;6) Insert the water outlet of the waste water drain pipe 14 into the waste water discharge port of the cover of the water tank, and seal it with glue, then install the drain riser 52;
7)浇筑水泥砂浆垫层,铺地面装饰层,并在废水排水管14和检修孔处装设地漏53;最后将坐便器排水口与建筑用模块化同层排水装置旋转插件的偏心插孔对正插接即可。7) Pouring the cement mortar cushion, laying the floor decoration layer, and installing the floor drain 53 at the waste water drain pipe 14 and the manhole; finally, the toilet outlet and the eccentric jack of the rotating plug of the modular same layer drainage device for the building Just plug in.
如图15所示,本实施例所述建筑用模块化同层排水装置在装配式叠合楼板结构卫生间的安装方法,步骤如下:As shown in FIG. 15, the installation method of the modular same floor drainage device for building in the assembled laminated floor structure toilet according to the embodiment is as follows:
1)卫生间预制楼板50在预制时按照设计位置预留用于装配立管连接管的管道插孔;现场浇筑卫生间的现浇层时按照设计位置预留安装洞;1) The prefabricated floor slab 50 of the bathroom is reserved for the pipe jack for assembling the riser pipe according to the design position during prefabrication; the installation hole is reserved according to the design position when pouring the cast-in-place layer of the toilet on site;
2)安装前对楼板的安装洞进行上、下楼层找直,使各楼层的楼板安装洞的中心连线与水平地面垂直;2) Before installation, straighten the upper and lower floors of the installation holes of the floor, so that the center connection of the floor installation holes of each floor is perpendicular to the horizontal ground;
3)将建筑用模块化同层排水装置安装于安装洞内,且将立管连接管40配合预制楼板的管道穿孔插入,建筑用模块化同层排水装置的翻边12搭设在安装洞边沿处;3) Install the modular same-layer drainage device for the building in the installation hole, and insert the riser connection pipe 40 into the perforation of the prefabricated floor slab, and the flange 12 of the modular same-layer drainage device for the building is placed at the edge of the installation hole. ;
4)铺设卫生间的防水层51,并将防水层51端部越过翻边12后向下翻折且伸至汇水箱12汇水箱顶盖上,用胶粘接防水层与建筑用模块化同层排水装置的连接处,之后用水泥砂浆对防水层压边;4) Laying the waterproof layer 51 of the toilet, and the end of the waterproof layer 51 is folded over the flange 12 and then folded down to the top cover of the water tank 12 of the water tank 12, and the waterproof layer is bonded with the modular layer of the building. a joint of the drainage device, followed by a cement mortar to the waterproof laminated edge;
5)将废水排水管14的出水口插入汇水箱顶盖的废水排入口,并用胶粘接密封,之后安装排水立管40;5) insert the water outlet of the waste water drain pipe 14 into the waste water discharge port of the cover of the water tank, and seal it with glue, then install the drain riser 40;
6)浇筑水泥砂浆垫层,铺地面装饰层,并在废水排水管14和检修孔处装设地漏 53;最后将坐便器排水口与建筑用模块化同层排水装置旋转插件的偏心插孔对正插接即可。6) Pouring the cement mortar cushion, laying the floor decoration layer, and installing the floor drain 53 at the waste water drain pipe 14 and the manhole; finally, the toilet outlet and the eccentric jack of the rotating plug of the modular same layer drainage device for the building Just plug in.
实施例7Example 7
如图12所示,本实施例与实施例5的不同之处在于,所述汇水箱顶盖上还开设有检修孔15,检修孔15对应水封筒设置。As shown in FIG. 12, the embodiment is different from the embodiment 5 in that a cover hole 15 is further defined in the top cover of the water tank, and the inspection hole 15 is disposed corresponding to the water seal cylinder.
如图14所示,本实施例所述建筑用模块化同层排水装置在现浇钢筋混凝土楼板结构卫生间的安装方法,步骤如下:As shown in FIG. 14, the installation method of the modular same-layer drainage device for building in the present embodiment of the cast-in-place reinforced concrete floor structure toilet is as follows:
1)卫生间的结构楼板60上预留安装洞,并在安装前对楼板的安装洞进行上、下楼层找直,使各楼层的楼板安装洞的中心连线与水平地面垂直;1) The installation of the hole is reserved on the structural floor 60 of the bathroom, and the upper and lower floors of the floor installation hole are straightened before installation, so that the center connection of the floor installation hole of each floor is perpendicular to the horizontal ground;
2)在安装洞底部支吊模板,并在吊模板对应排水立管和通气管位置开设管道穿孔,之后将各楼层的吊模板管道穿孔中心进行垂直对正,并向安装洞内浇筑细石混凝土后压实铺平;2) Support the template at the bottom of the installation hole, and open the pipe perforation at the position of the drainage riser and the vent pipe of the hanging template, then vertically align the perforated center of the hanging template pipe of each floor, and pour the fine stone concrete into the installation hole. Post-compaction flattening;
3)将与建筑用模块化同层排水装置外形尺寸一致的定位模具装配于安装洞内的设计位置,并将定位模具上的立管连接管和下通气管与吊模板的管道穿孔配合,同时用细石混凝土灌缝填实立管连接管和下通气管与吊模板管道穿孔的连接处间隙;3) The positioning mold conforming to the outer dimensions of the modular same-drainage device for building is assembled in the design position in the installation hole, and the riser connecting pipe and the lower vent pipe on the positioning die are matched with the pipe perforation of the hanging formwork, and at the same time Filling the gap between the riser connecting pipe and the lower vent pipe and the perforated pipe through the fine stone concrete filling;
4)取出定位模具并将建筑用模块化同层排水装置安装于安装洞内的设计位置处,且将立管连接管40和下通气管配合吊模板的管道穿孔插入,建筑用模块化同层排水装置的翻边12搭设在安装洞边沿处;4) Remove the positioning mold and install the modular same-layer drainage device in the installation position in the installation hole, and insert the riser connection pipe 40 and the lower vent pipe into the pipe perforation of the stencil, and the modular layer of the building The flange 12 of the drainage device is disposed at the edge of the installation hole;
5)铺设卫生间的防水层51,并将防水层51端部越过翻边12后向下翻折且伸至汇水箱顶盖上,用胶粘接防水层与建筑用模块化同层排水装置的连接处,之后用水泥砂浆对防水层51压边;5) Laying the waterproof layer 51 of the bathroom, and folding the end of the waterproof layer 51 over the flange 12, then folding down and extending to the top cover of the water tank, bonding the waterproof layer with the glue and the modular same layer drainage device for the building. a joint, and then pressurizing the waterproof layer 51 with cement mortar;
6)将废水排水管14的出水口插入汇水箱顶盖的废水排入口,并用胶粘接密封,之后安装排水立管52和通气管;6) insert the water outlet of the waste water drain pipe 14 into the waste water discharge port of the top cover of the water tank, and seal it with glue, and then install the drain riser 52 and the vent pipe;
7)浇筑水泥砂浆垫层,铺地面装饰层,并在废水排入口和检修孔处装设地漏53;最后将坐便器排水口与建筑用模块化同层排水装置旋转插件的偏心插孔对正插接即可。7) Pouring the cement mortar cushion, laying the floor decoration layer, and installing the floor drain 53 at the waste water inlet and the inspection hole; finally, aligning the toilet drain with the eccentric jack of the rotating plug of the modular same layer drainage device for the building Plug in.
如图15所示,本实施例所述建筑用模块化同层排水装置在装配式叠合楼板结构卫生间的安装方法,步骤如下:As shown in FIG. 15, the installation method of the modular same floor drainage device for building in the assembled laminated floor structure toilet according to the embodiment is as follows:
1)卫生间预制楼板50在预制时按照设计位置预留用于装配立管连接管和下通气管的管道插孔;现场浇筑卫生间的现浇层时按照设计位置预留安装洞;1) The prefabricated floor slab 50 of the bathroom is reserved for the pipe jack for assembling the riser pipe and the lower vent pipe according to the design position during prefabrication; when the cast-in-place layer of the toilet is poured on site, the installation hole is reserved according to the design position;
2)安装前对楼板的安装洞进行上、下楼层找直,使各楼层的楼板安装洞的中心连线与水平地面垂直;2) Before installation, straighten the upper and lower floors of the installation holes of the floor, so that the center connection of the floor installation holes of each floor is perpendicular to the horizontal ground;
3)将建筑用模块化同层排水装置安装于安装洞内,且将立管连接管40和下通气管配合预制楼板的管道穿孔插入,建筑用模块化同层排水装置的翻边12搭设在安装洞边沿处;3) Install the modular same-layer drainage device for the building in the installation hole, and insert the pipe connection between the riser connection pipe 40 and the lower vent pipe with the prefabricated floor slab, and the flange 12 of the modular same-layer drainage device of the building is placed at Install the edge of the hole;
4)铺设卫生间的防水层51,并将防水层51端部越过翻边12后向下翻折且伸至汇水箱12汇水箱顶盖上,用胶粘接防水层与建筑用模块化同层排水装置的连接处,之后用水泥砂浆对防水层压边;4) Laying the waterproof layer 51 of the toilet, and the end of the waterproof layer 51 is folded over the flange 12 and then folded down to the top cover of the water tank 12 of the water tank 12, and the waterproof layer is bonded with the modular layer of the building. a joint of the drainage device, followed by a cement mortar to the waterproof laminated edge;
5)将废水排水管14的出水口插入汇水箱顶盖11的废水排入口,并用胶粘接密封,之后安装排水立管40和通气管;5) inserting the water outlet of the waste water drain pipe 14 into the waste water discharge port of the header tank 11 of the water tank, and sealing and sealing with glue, and then installing the drain riser 40 and the vent pipe;
6)浇筑水泥砂浆垫层,铺地面装饰层,并在废水排入口和检修孔处装设地漏53;最后将坐便器排水口与建筑用模块化同层排水装置旋转插件的偏心插孔对正插接即可。6) Pouring the cement mortar cushion, laying the floor decoration layer, and installing the floor drain 53 at the waste water inlet and the inspection hole; finally, aligning the toilet drain with the eccentric jack of the modular flushing plug of the building with the same layer drainage device Plug in.
实施例8Example 8
如图13所示,本实施例与实施例1、2的不同处在于,立管连接管40与废水排入口13的相对位置改变,且所述水封机构包括水封箱20,水封箱20与废水排入口13相连通,水封箱20底壁上设有排水口21,排水口21上设有倒U型管26,倒U型管26与废水排入口13对应设置。汇水箱顶盖11上设有泄水孔16,泄水孔16与水封箱20相连通。As shown in FIG. 13, the difference between this embodiment and the first and second embodiments is that the relative position of the riser connection pipe 40 and the waste water discharge port 13 is changed, and the water seal mechanism includes a water seal box 20 and a water seal box. 20 is connected to the waste water discharge port 13 . The bottom wall of the water seal box 20 is provided with a drain port 21 . The drain port 21 is provided with an inverted U-shaped pipe 26 , and the inverted U-shaped pipe 26 is disposed corresponding to the waste water discharge port 13 . The water tank top cover 11 is provided with a drain hole 16 which communicates with the water seal box 20.
本实施例中,废水排水管14的截面为圆形。废水排入口13还可兼有检修孔的作用。In the present embodiment, the waste water drain pipe 14 has a circular cross section. The waste water discharge port 13 can also function as a manhole.
实施例9Example 9
如图16所示,本实施例与实施例1的不同处在于,废水排水管14横截面为圆形;所述水封机构包括与废水排入口13相连通的水封箱20,水封箱20箱壁上设有排水口21,水封箱20内顶壁上向下设有水封分隔板23,水封分隔板23两端与水封箱20侧壁相连,水封分隔板23两侧的水封箱空间通过水封分隔板23底部的连通通道相连,排水口21位于水封分隔板一侧,废水排入口13位于水封分隔板23另一侧,且排水口21的最低处不低于连通通道的最高处,具体而言,只要排水口21的最低处不低于连通通道的最低处即可。As shown in FIG. 16, the difference between the embodiment and the embodiment 1 is that the waste water drain pipe 14 has a circular cross section; the water seal mechanism includes a water seal box 20 connected to the waste water discharge port 13 and a water seal box. The 20-box wall is provided with a drain port 21, and a water seal partition plate 23 is disposed on the top wall of the water seal box 20, and both ends of the water seal partition plate 23 are connected to the side wall of the water seal box 20, and the water seal is separated. The water seal space on both sides of the plate 23 is connected through the communication passage at the bottom of the water seal partition plate 23, the drain port 21 is located on the side of the water seal partition plate, and the waste water discharge port 13 is located on the other side of the water seal partition plate 23, and The lowest point of the drain port 21 is not lower than the highest point of the communication passage, specifically, as long as the lowest point of the drain port 21 is not lower than the lowest point of the communication passage.
本实施例所述安装方式同实施例6、7。The installation manners in this embodiment are the same as those in the embodiments 6 and 7.
实施例10Example 10
如图17所示,本实施例与实施例9不同之处在于:所述汇水箱顶盖11构成水封箱20的顶壁,且汇水箱顶盖11上开设有检修孔15,废水排水管14的截面为矩形,废水排水管14上设有数根进水管17。As shown in FIG. 17, the present embodiment is different from the embodiment 9 in that the water tank top cover 11 constitutes a top wall of the water seal box 20, and the water tank top cover 11 is provided with an access hole 15 and a waste water drain pipe. The cross section of the 14 is rectangular, and the waste water drain pipe 14 is provided with a plurality of inlet pipes 17.
实施例11Example 11
如图18所示,本实施例与实施例9不同之处在于:立管连接管40与废水排入口13的相对位置改变,且所述汇水箱顶盖11构成水封箱20的顶壁、汇水箱10底壁构成水封箱20的底壁,汇水箱顶盖11上设有泄水孔16,泄水孔16与水封箱20连通。As shown in FIG. 18, the present embodiment is different from the embodiment 9 in that the relative position of the riser connecting pipe 40 and the waste water discharge port 13 is changed, and the header tank cover 11 constitutes the top wall of the water seal box 20, The bottom wall of the water tank 10 constitutes a bottom wall of the water seal box 20, and the water tank top cover 11 is provided with a drain hole 16 which communicates with the water seal box 20.
实施例12Example 12
如图19所示,本实施例与实施例1、2不同之处在于,汇水箱顶盖11上设有泄水孔16和检修孔15;所述水封机构包括与废水排入口13、泄水孔16和检修孔15相连通 的水封箱20,水封箱20箱壁上设有排水口21,水封箱21内设有水封弯管24,水封弯管24一端与排水口21连接,另一端置于水封箱20内,水封弯管24最低处低于排水口21的最低处。As shown in FIG. 19, the embodiment differs from the first embodiment and the second embodiment in that the water tank top cover 11 is provided with a drain hole 16 and an access hole 15; the water seal mechanism includes a drain discharge port 13 and a drain. The water seal 16 and the manhole 15 are connected to the water seal 20, the water seal box 20 is provided with a drain port 21, and the water seal box 21 is provided with a water seal elbow 24, and the water seal elbow 24 has one end and a drain port. 21 is connected, and the other end is placed in the water seal box 20, and the lowest point of the water seal elbow 24 is lower than the lowest point of the drain port 21.
本实施例所述安装方式同实施例6、7。The installation manners in this embodiment are the same as those in the embodiments 6 and 7.
实施例13Example 13
本实施例与实施例12不同之处在于:所述汇水箱顶盖构成水封箱的顶壁。This embodiment differs from the embodiment 12 in that the header of the water tank constitutes the top wall of the water seal box.
实施例14Example 14
本实施例与实施例12不同之处在于:所述汇水箱顶盖构成水封箱的顶壁、汇水箱底壁构成水封箱的底壁。The difference between this embodiment and the embodiment 12 is that the top cover of the water tank constitutes the top wall of the water seal box and the bottom wall of the water tank constitutes the bottom wall of the water seal box.
实施例15Example 15
如图20所示,本实施例与实施例1、2不同之处在于,立管连接管40与废水排入口13的相对位置改变,所述水封机构为U型水封弯管25,U型水封弯管25的进口分别对应连接废水排入口13,U型水封弯管25的出口不低于U型水封弯管的最低处。As shown in FIG. 20, the difference between this embodiment and the first and second embodiments is that the relative position of the riser connecting pipe 40 and the waste water discharge port 13 is changed, and the water sealing mechanism is a U-shaped water seal elbow 25, U. The inlets of the water seal elbows 25 are respectively connected to the waste water discharge port 13, and the outlet of the U-shaped water seal elbow 25 is not lower than the lowest point of the U-shaped water seal elbow.
所述水封弯管25可以为现有技术中的U型水封弯管、S型水封弯管或其他形状的水封弯管。本实施例中的废水排水管14呈帽筒式结构,废水排水管14上设有数根进水管17,进水管17用于配合不同的废水排放源,如面池、地漏等,需要对U型水封弯管检修时,可以将废水排水管14从废水排入口13处拔出即可。The water seal elbow 25 may be a U-shaped water seal elbow, an S-type water seal elbow or other shape water seal elbow in the prior art. The waste water drain pipe 14 in this embodiment has a cap-tube structure, and the waste water drain pipe 14 is provided with a plurality of inlet pipes 17 for matching different wastewater discharge sources, such as surface pools, floor drains, etc., need to be U-shaped. When the water seal bend is overhauled, the waste water drain pipe 14 can be taken out from the waste water discharge port 13 .
本实施例所述安装方式同实施例6、7。The installation manners in this embodiment are the same as those in the embodiments 6 and 7.
本申请所述建筑用模块化同层排水装置隐含水封机构的排水口最低处不低于立管连接管的出水口最低处的技术特征,否则无法实现顺利排水。The lowest point of the water outlet of the modular same-layer drainage device hidden water sealing mechanism for building according to the present application is not lower than the technical feature of the lowest point of the water outlet of the riser connecting pipe, otherwise smooth drainage cannot be achieved.
实施例1-15所述建筑用模块化同层排水装置在使用时,通过污水侧排连接件连通坐便器排水口和排水立管,污水侧排连接件为箱体式结构,可以有效容纳污水并将从侧壁开口(即污水出口32)处排入立管连接管40,进而进入排水立管,不会造成堵塞,而且还可以通过调整污水出口32与立管连接管40的连通口面积来调整污水排量;坐便器排水口与偏心插孔33对正插接,将旋转插件34与坐便器连接口31配合时,可以根据需要调整插孔33与坐便器连接口31的相应位置,预留安装空间的变动余量,方便安装;The modular same-layer drainage device for building according to Embodiments 1-15 is connected to the toilet drain port and the drain riser through the sewage side row connecting piece during use, and the sewage side row connecting piece is a box-type structure, which can effectively accommodate the sewage. And will be discharged into the riser connecting pipe 40 from the side wall opening (ie, the sewage outlet 32), and then enter the drainage riser without causing clogging, and can also adjust the communication port area of the sewage outlet 32 and the riser connecting pipe 40. To adjust the sewage discharge; the toilet drain port is aligned with the eccentric jack 33, and when the rotary insert 34 is engaged with the toilet connector 31, the corresponding position of the jack 33 and the toilet connector 31 can be adjusted as needed. Reserve the variation margin of the installation space for easy installation;
本实施例中隐含污水箱的坐便器连接口位于污水箱端部的结构特征,但并不限于该结构。In this embodiment, the toilet connection port of the concealed sewage tank is located at the end of the sewage tank, but is not limited to the structure.
当然,污水箱的造型具有一定倾角的结构或者污水箱与立管连接管呈一定安装夹角,更加有利于污水流入立管连接管中,该技术特征也在本申请技术方案的囊括范围。Of course, the shape of the sewage tank has a certain inclination structure or the installation angle between the sewage tank and the riser pipe is more suitable for the sewage to flow into the riser connection pipe. This technical feature is also included in the technical solution of the present application.
同时卫生间内的地漏、浴盆、洗手盆、拖布池等排水口的废水直接汇入废水排水管14中,经过水封机构后排入汇水箱10,继而流至立管连接件40的出水口41,并从所述出水口排入排水立管中。水封机构可以有效对排水立管和汇水箱1内翻涌的臭气进行 封堵。At the same time, the waste water of the floor drain, the bathtub, the wash basin, the mop pool and the like in the toilet directly enters the waste water drain pipe 14, passes through the water seal mechanism, and is discharged into the water transfer tank 10, and then flows to the water outlet 41 of the riser connection member 40. And discharged into the drainage riser from the water outlet. The water sealing mechanism can effectively block the odor of the drainage riser and the water tank 1 from tumbling.
废水排水管14与汇水箱10内的水封箱直接连接,所以形成了一户一个集中水封防臭的结构,取代了现有技术中的多个水封设计且避免了某个水封失效而造成室内返臭的问题。The waste water drain pipe 14 is directly connected with the water seal box in the water transfer tank 10, so that a centralized water seal and odor-removing structure is formed, which replaces the plurality of water seal designs in the prior art and avoids a certain water seal failure. Causes the problem of indoor odor.
排水立管内的液水、固体、气体汇合污水流在每层楼层的汇水箱10内完成液体和固体与气体的分离,排水立管和汇水箱10内的气体直接从下通气管71与上通气管插孔70之间的气体流道排入上通气管70内,实现了逐层水、气分离,减小排水立管和汇水箱10内的气压波动,有利于防止水封机构被气压冲击破坏,保证室内空气环境免受排水系统返臭污染。The liquid water, solid and gas confluent sewage in the drainage riser completes the separation of liquid and solids from the gas in the water tank 10 of each floor, and the gas in the drainage riser and the water tank 10 is directly connected from the lower vent 71 The gas flow passage between the tracheal insertion holes 70 is discharged into the upper vent pipe 70 to realize layer-by-layer water and gas separation, and reduce the pressure fluctuations in the drainage riser and the water collection tank 10, thereby preventing the water sealing mechanism from being impacted by the air pressure. Destruction to ensure that the indoor air environment is protected from the fouling of the drainage system.
汇水箱顶盖11的翻边12设计,与卫生间防水层51形成了平接→向下翻折的搭接关系机构,使得防水层51可以有效遮盖汇水箱与楼板安装洞的安装间隙,无须采用混凝土填缝;同时防水层51端部位于汇水箱顶盖11上,这与地面处的防水层形成高度差,使得地面积水可以具有导向性地流至汇水箱顶盖11上并排入汇水箱10中,而且积水还无法从防水层51与汇水箱顶盖11粘接缝处翻越倒流,从而彻底解决了现有技术中管道穿越楼板处积水渗漏的难题。The flange 12 of the water tank top cover 11 is designed to form a flattening→downward folding relationship with the bathroom waterproof layer 51, so that the waterproof layer 51 can effectively cover the installation gap between the water tank and the floor installation hole, without using The concrete is caulked; at the same time, the end of the waterproof layer 51 is located on the header cap 11 of the water tank, which forms a height difference with the waterproof layer at the ground, so that the ground water can be guided to the header cap 11 and discharged into the sink. In the water tank 10, water accumulation cannot be reversed from the joint between the waterproof layer 51 and the water tank top cover 11, thereby completely solving the problem of water leakage in the pipeline passing through the floor in the prior art.
需要特别注明地是,对于本领域技术人员而言,显然本申请不限于上述示范性实施例的细节,而且在不背离本申请的精神或基本特征的情况下,能够以其他的具体形式实现本申请,例如:水封箱与汇水箱顶盖的具体连接位置、水封箱的形状,水封箱采用水封筒、水封弯管、隔板或其他现有技术中的水封构件,污水箱的形状、污水出口的截面结构和面积、坐便器连接口在污水箱上的设置位置,泄水孔在顶盖上的位置分布等各种技术特征的变形。因此,无论从哪一点来看,均应将实施例看作是示范性的,而且是非限制性的,本申请的范围由所附权利要求而不是上述说明限定,因此旨在将落在权利要求的等同要件的含义和范围内的所有变化囊括在本申请内。不应将附图中的任何附图标记视为限制所涉及的权利要求。It is to be understood that the present invention is not limited to the details of the above-described exemplary embodiments, and can be embodied in other specific forms without departing from the spirit or essential characteristics of the application. The application, for example, the specific connection position of the water sealing box and the top cover of the water tank, the shape of the water sealing box, the water sealing box adopts a water sealing tube, a water sealing elbow, a partition or other water sealing members in the prior art, sewage The shape of the box, the cross-sectional structure and area of the sewage outlet, the position of the toilet joint on the sewage tank, and the positional distribution of the drain hole on the top cover are deformed by various technical features. Therefore, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the invention is defined by the appended claims instead All changes in the meaning and scope of equivalent elements are included in this application. Any reference signs in the drawings should not be construed as limiting the claims.

Claims (22)

  1. 一种建筑用模块化同层排水装置,其特征在于,包括汇水箱、穿设在汇水箱内的立管连接管和开设在汇水箱顶盖上的至少一个废水排入口;所述立管连接管上设有位于汇水箱内的出水口,所述废水排入口通过水封机构与所述出水口相连通。A modular same layer drainage device for building, comprising: a water receiving tank, a riser connecting pipe disposed in the water receiving tank, and at least one waste water discharge inlet opened on the water tank top cover; the riser connection The water pipe is provided in the water tank, and the waste water discharge port is connected to the water outlet through a water sealing mechanism.
  2. 如权利要求1所述的建筑用模块化同层排水装置,其特征在于,还包括穿过汇水箱底壁且不高于汇水箱顶盖最高处的下通气管和设于汇水箱顶盖上且与汇水箱内部连通的上通气管;所述上通气管与下通气管之间有气体流道,所述下通气管的顶端不低于出水口的最高处。A modular flush drainage device for a building according to claim 1, further comprising a lower vent pipe passing through the bottom wall of the water tank and not higher than the highest point of the header of the water tank, and being disposed on the top cover of the water tank And an upper vent pipe communicating with the inside of the water tank; a gas flow path is disposed between the upper vent pipe and the lower vent pipe, and a top end of the lower vent pipe is not lower than a highest point of the water outlet.
  3. 如权利要求1或2所述的建筑用模块化同层排水装置,其特征在于,所述汇水箱顶盖上开设有泄水孔,泄水孔与立管连接管的出水口相连通。The modular same-layer drainage device for building according to claim 1 or 2, wherein the water tank top cover is provided with a water discharge hole, and the water discharge hole communicates with the water outlet of the riser connection pipe.
  4. 如权利要求3所述的建筑用模块化同层排水装置,其特征在于,所述废水排入口和泄水孔单独或二者共同通过水封机构与立管连接管的出水口连通,所述水封机构的排水口最低处高于立管连接管的出水口最低处。The modular same layer drainage device for a building according to claim 3, wherein the waste water discharge port and the drain hole are connected to the water outlet of the riser pipe through a water seal mechanism alone or both. The lowest point of the water sealing mechanism is higher than the lowest point of the water outlet of the riser connecting pipe.
  5. 如权利要求1或2所述的建筑用模块化同层排水装置,其特征在于,所述汇水箱顶盖上开设有检修孔,所述检修孔与所述水封机构的位置相对应,所述检修孔为至少一个废水排入口中的一个。The modular same layer drainage device for a building according to claim 1 or 2, wherein the cover of the water tank is provided with an inspection hole, and the inspection hole corresponds to the position of the water sealing mechanism. The inspection hole is one of at least one waste water discharge port.
  6. 如权利要求1或2所述的建筑用模块化同层排水装置,其特征在于,所述水封机构包括水封箱,所述水封箱开设有排水口,水封部件安装在所述水封箱内与排水口相对应的位置。A modular flush drainage device for a building according to claim 1 or 2, wherein said water seal mechanism comprises a water seal box, said water seal box is provided with a drain port, and a water seal member is mounted on said water The position in the enclosure corresponding to the drain.
  7. 如权利要求6任一所述的建筑用模块化同层排水装置,其特征在于,所述水封箱与所述汇水箱共用顶盖和/或底壁。A modular flush drainage apparatus for a building according to any of claims 6 to 4, wherein said water seal tank shares a top cover and/or a bottom wall with said water transfer tank.
  8. 如权利要求1-7任一所述的建筑用模块化同层排水装置,其特征在于,所述立管连接管至少为一个。A modular flush drainage device for a building according to any of claims 1-7, wherein said riser connection pipe is at least one.
  9. 如权利要求1-8任一所述的建筑用模块化同层排水装置,其特征在于,所述立管连接管上设有连通坐便器排水口的侧排连接件。A modular flush drainage device for a building according to any of claims 1-8, wherein the riser connection pipe is provided with a side row connection member that communicates with the toilet drain.
  10. 如权利要求9所述的建筑用模块化同层排水装置,其特征在于,所述侧排连接件上的坐便器连接口设有旋转插件,旋转插件上设有偏心插孔。The modular same layer drainage device for a building according to claim 9, wherein the toilet connector connection port on the side row connecting member is provided with a rotating insert, and the rotating insert is provided with an eccentric jack.
  11. 如权利要求9或10所述的建筑用模块化同层排水装置,其特征在于,所述侧排连接件包括呈扁平状的污水箱,污水箱与立管连接管的连通端开设有污水出口,污水箱侧壁上设有开口方向垂直于立管连接管轴线的坐便器连接口。The modular same layer drainage device for building according to claim 9 or 10, wherein the side row connecting member comprises a flat sewage tank, and a communication outlet is opened at a communication end of the sewage tank and the riser connecting pipe. The side wall of the sewage tank is provided with a toilet connector opening with an opening direction perpendicular to the axis of the riser connecting pipe.
  12. 如权利要求1-11任一所述的建筑用模块化同层排水装置,其特征在于,所述汇水箱的上边沿向外设有翻边。A modular flush drainage device for a building according to any of claims 1-11, wherein the upper edge of the water conduit is provided with a flange.
  13. 如权利要求1-12任一所述的建筑用模块化同层排水装置,其特征在于,所述翻 边的水平部与所述汇水箱顶盖存在高度差,并且翻边的所述水平部高于所述汇水箱顶盖的顶部。A modular flush drainage device for a building according to any one of claims 1 to 12, wherein a horizontal portion of the flange has a height difference from the header of the water tank, and the horizontal portion of the flange Higher than the top of the header of the water tank.
  14. 如权利要求1-13任一所述的建筑用模块化同层排水装置,其特征在于,所述废水排入口的至少一个上装配有废水排水管。A modular flush drainage device for a building according to any one of claims 1 to 13, wherein at least one of said waste water discharge ports is equipped with a waste water drain pipe.
  15. 如权利要求14任一所述的建筑用模块化同层排水装置,其特征在于,所述废水排水管横截面为矩形或者圆形。A modular flush drainage apparatus for a building according to any of claims 14 to 4, wherein the waste water drain pipe has a rectangular or circular cross section.
  16. 如权利要求9-15任一所述的建筑用模块化同层排水装置,其特征在于,所述侧排连接件为矩型或椭圆型结构。A modular flush drainage device for a building according to any of claims 9-15, wherein said side row connection members are of a rectangular or elliptical configuration.
  17. 如权利要求9-16任一所述的建筑用模块化同层排水装置,其特征在于,所述侧排连接件与所述立管连接管为偏心连接,且带有坡向排水立管连接管的坡度。The modular same layer drainage device for building according to any one of claims 9-16, wherein the side row connecting piece and the riser connecting pipe are eccentrically connected and have a sloped drainage riser connection. The slope of the tube.
  18. 如权利要求5-17任一所述的建筑用模块化同层排水装置,其特征在于,所述检修孔与水封机构内部的水封弯管或水封筒位置相对应。A modular flush drainage device for a building according to any of claims 5-17, wherein the manhole is corresponding to the position of the water seal elbow or water seal cylinder inside the water seal mechanism.
  19. 如权利要求1,3-18任一所述建筑用模块化同层排水装置在现浇钢筋混凝土楼板结构卫生间的安装方法,其特征在于,步骤如下:A method for installing a modular cast-in-situ drainage device for a cast-in-place reinforced concrete floor structure according to any one of claims 1,3-18, wherein the steps are as follows:
    1)卫生间的结构楼板上预留安装洞,并在安装前对楼板的安装洞进行上、下楼层找直,使各楼层的楼板安装洞的中心连线与水平地面垂直;1) Reserve holes for the structural floor of the bathroom, and straighten the upper and lower floors of the installation holes of the floor before installation, so that the center connection of the floor installation holes of each floor is perpendicular to the horizontal floor;
    2)在安装洞底部支吊模板,并在吊模板对应排水立管位置开设管道穿孔,之后将各楼层的吊模板管道穿孔中心进行垂直对正,并向安装洞内浇筑细石混凝土后压实铺平;2) Lift the template at the bottom of the installation hole, and open the pipe perforation at the position of the drainage riser corresponding to the hanging template. Then, the perforated center of the hanging formwork pipe of each floor is vertically aligned, and the fine stone concrete is poured into the installation hole and compacted. pave;
    3)将与建筑用模块化同层排水装置外形尺寸一致的定位模具装配于安装洞内的设计位置,并将定位模具上的立管连接管与吊模板的管道穿孔配合,同时用细石混凝土灌缝填实立管连接管与吊模板管道穿孔的连接处间隙;3) The positioning mold conforming to the outer dimensions of the modular same-drainage device for building is assembled in the design position in the installation hole, and the riser connecting pipe on the positioning mold is matched with the pipe perforation of the hanging template, and the fine stone concrete is used at the same time. Filling the gap between the riser connecting pipe and the perforated pipe of the hanging template pipe;
    4)取出定位模具并将建筑用模块化同层排水装置安装于安装洞内的设计位置处,且将立管连接管配合吊模板的管道穿孔插入,建筑用模块化同层排水装置的翻边搭设在安装洞边沿处;4) Take out the positioning mold and install the modular same-layer drainage device in the installation position in the installation hole, and insert the riser connection pipe with the pipe perforation of the hanging formwork, and the flange of the modular same-layer drainage device for building Lay at the edge of the installation hole;
    5)铺设卫生间的防水层,并将防水层端部越过翻边后向下翻折且伸至汇水箱顶盖上,用胶粘接防水层与建筑用模块化同层排水装置的连接处,之后用水泥砂浆对防水层压边;5) Lay the waterproof layer of the bathroom, and fold the end of the waterproof layer over the flange, then fold down and extend to the top cover of the water tank, and glue the joint between the waterproof layer and the modular same-layer drainage device for the building. Then use cement mortar to waterproof laminated edges;
    6)将废水排水管的出水口插入汇水箱顶盖的废水排入口,并用胶粘接密封,之后安装排水立管;6) Insert the water outlet of the waste water drain pipe into the waste water discharge port of the top cover of the water tank, and seal it with glue, then install the drain riser;
    7)浇筑水泥砂浆垫层,铺地面装饰层;最后将坐便器排水口与建筑用模块化同层排水装置旋转插件的偏心插孔对正插接即可。7) Pouring the cement mortar cushion and paving the floor decoration layer; finally, the toilet drain outlet can be inserted into the eccentric jack of the modular plug-in rotating device of the building.
  20. 如权利要求1,3-18任一所述建筑用模块化同层排水装置在现浇钢筋混凝土楼 板结构卫生间的安装方法,其特征在于,步骤如下:A method of installing a modular same-layer drainage device for a building in a cast-in-place reinforced concrete floor structure according to any one of claims 1,3-18, wherein the steps are as follows:
    1)卫生间预制楼板在预制时按照设计位置预留用于装配立管连接管的管道插孔;现场浇筑卫生间的现浇层时按照设计位置预留安装洞;1) The prefabricated floor slab of the bathroom is reserved for the pipe jack for assembling the riser pipe in the pre-fabrication; when the cast-in-place layer of the toilet is cast on site, the installation hole is reserved according to the design position;
    2)安装前对楼板的安装洞进行上、下楼层找直,使各楼层的楼板安装洞的中心连线与水平地面垂直;2) Before installation, straighten the upper and lower floors of the installation holes of the floor, so that the center connection of the floor installation holes of each floor is perpendicular to the horizontal ground;
    3)将建筑用模块化同层排水装置安装于安装洞内,且将立管连接管配合预制楼板的管道穿孔插入,建筑用模块化同层排水装置的翻边搭设在安装洞边沿处;3) Install the modular same-layer drainage device for the building in the installation hole, and insert the riser connection pipe with the pipe perforation of the prefabricated floor slab, and the flange of the building with the same layer drainage device is placed at the edge of the installation hole;
    4)铺设卫生间的防水层,并将防水层端部越过翻边后向下翻折且伸至汇水箱顶盖上,用胶粘接防水层与建筑用模块化同层排水装置的连接处,之后用水泥砂浆对防水层压边;4) Lay the waterproof layer of the bathroom, and fold the end of the waterproof layer over the flange, then fold down and extend to the top cover of the water tank, and bond the waterproof layer with the modular same-layer drainage device for the building. Then use cement mortar to waterproof laminated edges;
    5)将废水排水管的出水口插入汇水箱顶盖的废水排入口,并用胶粘接密封,之后安装排水立管;5) Insert the water outlet of the waste water drain pipe into the waste water discharge port of the top cover of the water tank, and seal it with glue, then install the drain riser;
    6)浇筑水泥砂浆垫层,铺地面装饰层;最后将坐便器排水口与建筑用模块化同层排水装置旋转插件的偏心插孔对正插接即可。6) Pouring the cement mortar cushion and paving the floor decoration layer; finally, the toilet drain outlet can be inserted into the eccentric jack of the modular plug-in rotating device of the building.
  21. 如权利要求2-18任一所述建筑用模块化同层排水装置在现浇钢筋混凝土楼板结构卫生间的安装方法,其特征在于,步骤如下:A method for installing a modular reinforced concrete floor structure toilet according to any one of claims 2 to 18, wherein the steps are as follows:
    1)卫生间的结构楼板上预留安装洞,并在安装前对楼板的安装洞进行上、下楼层找直,使各楼层的楼板安装洞的中心连线与水平地面垂直;1) Reserve holes for the structural floor of the bathroom, and straighten the upper and lower floors of the installation holes of the floor before installation, so that the center connection of the floor installation holes of each floor is perpendicular to the horizontal floor;
    2)在安装洞底部支吊模板,并在吊模板对应排水立管位置和通气管开设管道穿孔,之后将各楼层的吊模板管道穿孔中心进行垂直对正,并向安装洞内浇筑细石混凝土后压实铺平;2) Support the template at the bottom of the installation hole, and open the pipe perforation corresponding to the position of the drainage riser and the vent pipe of the hanging template, then vertically align the perforated center of the hanging template pipe of each floor, and pour the fine stone concrete into the installation hole. Post-compaction flattening;
    3)将与高层用模块化同层排水装置外形尺寸一致的定位模具装配于安装洞内的设计位置,并将定位模具上的立管连接管和下通气管与吊模板的管道穿孔配合,同时用细石混凝土灌缝填实立管连接管和下通气管与吊模板管道穿孔的连接处间隙;3) The positioning mold conforming to the outer dimensions of the modular same-layer drainage device of the high-rise is assembled in the design position in the installation hole, and the riser connection pipe and the lower ventilation pipe on the positioning mold are matched with the pipe perforation of the hanging template, and at the same time Filling the gap between the riser connecting pipe and the lower vent pipe and the perforated pipe through the fine stone concrete filling;
    4)取出定位模具并将高层用模块化同层排水装置安装于安装洞内的设计位置处,且将立管连接管和下通气管配合吊模板的管道穿孔插入,高层用模块化同层排水装置的翻边搭设在安装洞边沿处;4) Take out the positioning mold and install the high-rise modular drainage device at the design position in the installation hole, and insert the pipe connection between the riser connection pipe and the lower vent pipe and the stencil. The high-rise modular drainage The flange of the device is placed at the edge of the mounting hole;
    5)铺设卫生间的防水层,并将防水层端部越过翻边后向下翻折且伸至汇水箱顶盖上,用胶粘接防水层与高层用模块化同层排水装置的连接处,之后用水泥砂浆对防水层压边;5) Lay the waterproof layer of the bathroom, and fold the end of the waterproof layer over the flange, then fold down and extend to the top cover of the water tank, and glue the joint between the waterproof layer and the modular high-level drainage device. Then use cement mortar to waterproof laminated edges;
    6)将废水排水管的出水口插入汇水箱顶盖的废水排入口,并用胶粘接密封,之后安装排水立管和通气管;6) Insert the water outlet of the waste water drain pipe into the waste water discharge port of the top cover of the water tank, and seal it with glue, then install the drain riser and the vent pipe;
    7)浇筑水泥砂浆垫层,铺地面装饰层;最后将坐便器排水口与高层用模块化同层 排水装置旋转插件的偏心插孔对正插接即可;7) Pouring the cement mortar cushion and paving the floor decoration layer; finally, the toilet drain outlet and the high-rise eccentric jack of the modular same-layer drainage device rotating plug-in can be plugged in;
  22. 如权利要求2-18任一所述建筑用模块化同层排水装置在现浇钢筋混凝土楼板结构卫生间的安装方法,其特征在于,步骤如下:A method for installing a modular reinforced concrete floor structure toilet according to any one of claims 2 to 18, wherein the steps are as follows:
    1)卫生间预制楼板在预制时按照设计位置预留用于装配立管连接管和下通气管的管道插孔;现场浇筑卫生间的现浇层时按照设计位置预留安装洞;1) The prefabricated floor slab of the bathroom shall be reserved for the pipe jack for assembling the riser pipe and the lower vent pipe according to the design position during prefabrication; when the cast-in-place layer of the toilet is poured on site, the installation hole shall be reserved according to the design position;
    2)安装前对楼板的安装洞进行上、下楼层找直,使各楼层的楼板安装洞的中心连线与水平地面垂直;2) Before installation, straighten the upper and lower floors of the installation holes of the floor, so that the center connection of the floor installation holes of each floor is perpendicular to the horizontal ground;
    3)将高层用模块化同层排水装置安装于安装洞内,且将立管连接管和下通气管配合预制楼板的管道穿孔插入,高层用模块化同层排水装置的翻边搭设在安装洞边沿处;3) Install the high-rise modular flushing device in the installation hole, and insert the riser connecting pipe and the lower vent pipe into the pipe of the prefabricated floor slab. The high-rise is installed in the installation hole with the flange of the modular same-layer drainage device. Edge
    4)铺设卫生间的防水层,并将防水层端部越过翻边后向下翻折且伸至汇水箱顶盖上,用胶粘接防水层与高层用模块化同层排水装置的连接处,之后用水泥砂浆对防水层压边;4) Laying the waterproof layer of the bathroom, and turning the end of the waterproof layer over the flange, then folding down and extending to the top cover of the water tank, and bonding the waterproof layer with the modular same-layer drainage device of the high-rise layer, Then use cement mortar to waterproof laminated edges;
    5)将废水排水管的出水口插入汇水箱顶盖的废水排入口,并用胶粘接密封,之后安装排水立管和通气管;5) Insert the water outlet of the waste water drain pipe into the waste water discharge port of the top cover of the water tank, and seal it with glue, then install the drain riser and the vent pipe;
    6)浇筑水泥砂浆垫层,铺地面装饰层;最后将坐便器排水口与高层用模块化同层排水装置旋转插件的偏心插孔对正插接即可。6) Pouring the cement mortar cushion and paving the floor decoration layer; finally, the toilet drain outlet and the high-rise eccentric jack of the modular same-layer drainage device rotating insert can be inserted and aligned.
PCT/CN2017/119874 2016-12-31 2017-12-29 Modular same-floor drainage device for building and installing method therefor WO2018121736A1 (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
CN201611268484.3A CN107237395B (en) 2016-12-31 2016-12-31 Modularized same-floor drainage device for high-rise building and installation method thereof
CN201611268444.9A CN106812184A (en) 2016-12-31 2016-12-31 A kind of modular same-layer drainage arrangement for building and its installation method
CN201611268444.9 2016-12-31
CN201611268484.3 2016-12-31

Publications (1)

Publication Number Publication Date
WO2018121736A1 true WO2018121736A1 (en) 2018-07-05

Family

ID=62707909

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/CN2017/119874 WO2018121736A1 (en) 2016-12-31 2017-12-29 Modular same-floor drainage device for building and installing method therefor

Country Status (1)

Country Link
WO (1) WO2018121736A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109898611A (en) * 2019-03-26 2019-06-18 上海深海宏添建材有限公司 A kind of co-layer draining cyclone sub-assembly
CN110409830A (en) * 2019-05-30 2019-11-05 广西建工集团第五建筑工程有限责任公司 A kind of construction method that high layer main body subregion intercepts water and U-shaped shuting used
CN112962752A (en) * 2021-02-07 2021-06-15 康泰塑胶科技集团有限公司 Local board drainage system that falls
CN112962751A (en) * 2021-02-05 2021-06-15 康泰塑胶科技集团有限公司 Pipe declining board is with layer drainage system
CN115387617A (en) * 2022-08-25 2022-11-25 中建八局建筑科技(山东)有限公司 Assembly type integral bathroom installation method based on accurate positioning of drain pipe

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100211522B1 (en) * 1997-05-10 1999-08-02 이해명 Double pipe construction method for drainage separating from drain water and rain of a building
JP2001104689A (en) * 1999-10-13 2001-04-17 Takenaka Komuten Co Ltd Washing waste water sorting device and method thereof
CN101078229A (en) * 2007-06-22 2007-11-28 王凤蕊 Architecture indoor single-stack drain system and mounting method thereof
CN102330456A (en) * 2011-06-01 2012-01-25 王凤蕊 Riser connecting member for draining at same layer
CN202990036U (en) * 2012-12-18 2013-06-12 王凤蕊 Connecting piece special for ventilation of high-rise buildings
CN203066182U (en) * 2013-02-01 2013-07-17 王凤蕊 Modular water saving device for drainage on same floor for high-rise building
CN204298933U (en) * 2014-12-09 2015-04-29 黄学春 A kind of integrated modular co-layer draining linkage
CN106812184A (en) * 2016-12-31 2017-06-09 濮阳市明锐建筑节能技术有限公司 A kind of modular same-layer drainage arrangement for building and its installation method
CN107237395A (en) * 2016-12-31 2017-10-10 濮阳市明锐建筑节能技术有限公司 It is a kind of high-rise with modular same-layer drainage arrangement and its installation method
CN206800530U (en) * 2016-12-31 2017-12-26 濮阳市明锐建筑节能技术有限公司 A kind of modular same-layer drainage arrangement for building
CN206800601U (en) * 2016-12-31 2017-12-26 濮阳市明锐建筑节能技术有限公司 A kind of high level uses modular same-layer drainage arrangement

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100211522B1 (en) * 1997-05-10 1999-08-02 이해명 Double pipe construction method for drainage separating from drain water and rain of a building
JP2001104689A (en) * 1999-10-13 2001-04-17 Takenaka Komuten Co Ltd Washing waste water sorting device and method thereof
CN101078229A (en) * 2007-06-22 2007-11-28 王凤蕊 Architecture indoor single-stack drain system and mounting method thereof
CN102330456A (en) * 2011-06-01 2012-01-25 王凤蕊 Riser connecting member for draining at same layer
CN202990036U (en) * 2012-12-18 2013-06-12 王凤蕊 Connecting piece special for ventilation of high-rise buildings
CN203066182U (en) * 2013-02-01 2013-07-17 王凤蕊 Modular water saving device for drainage on same floor for high-rise building
CN204298933U (en) * 2014-12-09 2015-04-29 黄学春 A kind of integrated modular co-layer draining linkage
CN106812184A (en) * 2016-12-31 2017-06-09 濮阳市明锐建筑节能技术有限公司 A kind of modular same-layer drainage arrangement for building and its installation method
CN107237395A (en) * 2016-12-31 2017-10-10 濮阳市明锐建筑节能技术有限公司 It is a kind of high-rise with modular same-layer drainage arrangement and its installation method
CN206800530U (en) * 2016-12-31 2017-12-26 濮阳市明锐建筑节能技术有限公司 A kind of modular same-layer drainage arrangement for building
CN206800601U (en) * 2016-12-31 2017-12-26 濮阳市明锐建筑节能技术有限公司 A kind of high level uses modular same-layer drainage arrangement

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109898611A (en) * 2019-03-26 2019-06-18 上海深海宏添建材有限公司 A kind of co-layer draining cyclone sub-assembly
CN110409830A (en) * 2019-05-30 2019-11-05 广西建工集团第五建筑工程有限责任公司 A kind of construction method that high layer main body subregion intercepts water and U-shaped shuting used
CN112962751A (en) * 2021-02-05 2021-06-15 康泰塑胶科技集团有限公司 Pipe declining board is with layer drainage system
CN112962752A (en) * 2021-02-07 2021-06-15 康泰塑胶科技集团有限公司 Local board drainage system that falls
CN115387617A (en) * 2022-08-25 2022-11-25 中建八局建筑科技(山东)有限公司 Assembly type integral bathroom installation method based on accurate positioning of drain pipe

Similar Documents

Publication Publication Date Title
WO2018121736A1 (en) Modular same-floor drainage device for building and installing method therefor
CN108193740B (en) Modular same-floor drainage device for building and installation method thereof
WO2017016125A1 (en) Integrated bathroom floor
CN102330453A (en) Access apparatus of pipeline for anti-back overflow
WO2018157846A1 (en) Vertical reclaimed water storage, treatment and reuse system for water closet
CN107237395B (en) Modularized same-floor drainage device for high-rise building and installation method thereof
CN102330452B (en) Overflow-proof same-layer water drainage riser connecting piece
CN206800600U (en) A kind of high level uses modular same-layer drainage arrangement
CN206800529U (en) A kind of modular same-layer drainage arrangement for building
CN216380401U (en) Integrated bathroom waterproof construction
CN107237374B (en) Modular same-floor drainage device for building and installation method thereof
CN206800530U (en) A kind of modular same-layer drainage arrangement for building
CN206800601U (en) A kind of high level uses modular same-layer drainage arrangement
CN204510742U (en) A kind of plumbing integration module, supply and drain water system and bathing room
CN204645162U (en) A kind of installation node of plumbing integration module
CN107237394B (en) Modularized same-floor drainage device for high-rise building and installation method thereof
CN104727529A (en) Water supply and drainage integration module, water supply and drainage system and bathroom
CN204626539U (en) The supply and drain water system of a kind of plumbing integration module and building
CN204626537U (en) The supply and drain water system of a kind of plumbing integration module and building
CN204645171U (en) The supply and drain water system of a kind of plumbing integration module and building
CN204626541U (en) The supply and drain water system of a kind of plumbing integration module and building
CN204552161U (en) A kind of bathing room
CN214738496U (en) Pre-buried formula drainage concentrator of ventilating
CN218814109U (en) Water drainage device
CN212053032U (en) Drainage system capable of preventing water accumulation

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 17888883

Country of ref document: EP

Kind code of ref document: A1

NENP Non-entry into the national phase

Ref country code: DE

122 Ep: pct application non-entry in european phase

Ref document number: 17888883

Country of ref document: EP

Kind code of ref document: A1