CN212897583U - One-time pre-embedding device for steel sleeve - Google Patents

One-time pre-embedding device for steel sleeve Download PDF

Info

Publication number
CN212897583U
CN212897583U CN202021105981.3U CN202021105981U CN212897583U CN 212897583 U CN212897583 U CN 212897583U CN 202021105981 U CN202021105981 U CN 202021105981U CN 212897583 U CN212897583 U CN 212897583U
Authority
CN
China
Prior art keywords
sleeve
steel
round steel
embedding device
round
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021105981.3U
Other languages
Chinese (zh)
Inventor
张路路
纪庆
白英锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CNNC Huachen Construction Engineering Co Ltd
Original Assignee
CNNC Huachen Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNNC Huachen Construction Engineering Co Ltd filed Critical CNNC Huachen Construction Engineering Co Ltd
Priority to CN202021105981.3U priority Critical patent/CN212897583U/en
Application granted granted Critical
Publication of CN212897583U publication Critical patent/CN212897583U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a pre-buried device of steel casing pipe once, includes the circular steel sheet of installation on the civil engineering template, circular steel sheet center department pass the round steel, round steel on open porosely, the round steel other end is the mantle fiber, the mantle fiber on be provided with sleeve pipe shutoff mould. The utility model has the characteristics of save the manual work, prevent the seepage purpose, reduce cost expenditure.

Description

One-time pre-embedding device for steel sleeve
Technical Field
The utility model relates to an installation water supply and drainage specialty steel casing pipe pre-buried technical field, in particular to steel casing pipe is pre-buried device in advance.
Background
Building construction installation trade, it is pre-buried to reserve for the drainage specialty, passes the face in earlier stage, and the later stage adds the sleeve pipe and hangs the hole and handle, and the process is comparatively complicated, and the workman uses the steel rule, and actual measurement has the deviation, and the reservation position is inaccurate, and later period is repaiied the hole and is hung the hole and easily produce the seepage risk, reduces the seepage risk through certain technological means, saves the manual work, reduces construction enterprise's economic expenditure.
Disclosure of Invention
In order to overcome the defects of the prior art, the utility model aims to provide a steel sleeve once pre-embedding device, which has the characteristics of labor saving, leakage prevention and cost reduction.
In order to realize the purpose, the utility model discloses a technical scheme is:
the utility model provides a pre-buried device of steel casing pipe once, includes circular steel sheet 2 of installation on the civil engineering template, 2 center departments of circular steel sheet wear round steel 1, evenly open around round steel 1 on circular steel sheet 2 has a plurality of holes 3, the one end of round steel 1 is mantle fiber 4, mantle fiber 4 on be provided with sleeve pipe shutoff mould 5.
The sleeve blocking mold 5 and the mantle fiber 4 are fastened through a nut 8.
And a sleeve 6 is arranged between the circular steel plate 2 at the outer side of the round steel 1 and the sleeve plugging die 5.
The sleeve plugging mould 5 is of a stepped structure.
The sleeve 6 and the civil engineering template are fixed through 4 self-tapping screws 7.
The utility model has the advantages that:
the device simple manufacture, cost material is cheap, and one shot forming saves the manual work, reduces the process, and it is reliable to prevent the seepage, passes through the simulation experiment qualification rate and reaches 98%, can drop into in the job site installation in a large number.
Drawings
Fig. 1 is a schematic structural view of the circular steel plate 2 of the present invention.
Fig. 2 is a schematic view of a round steel plate 2 combined with a round steel 1.
Fig. 3 is a structural schematic diagram of the casing plugging mold 5.
Fig. 4 is a schematic view of the overall structure of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
As shown in fig. 1, fig. 2, fig. 4: the utility model provides a steel casing once pre-buried device, includes circular steel sheet 2 of installation on the civil engineering template, 2 central departments of circular steel sheet pass round steel 1, round steel 1 round steel 2 around open and to have the hole 3, the round steel 1 other end is mantle fiber 4, mantle fiber 4 on be provided with sleeve pipe shutoff mould 5.
The sleeve blocking mold 5 and the mantle fiber 4 are fastened through a nut 8.
And a sleeve 6 is arranged between the circular steel plate 2 at the outer side of the round steel 1 and the sleeve plugging die 5.
The sleeve 6 and the civil engineering template are fixed through 4 self-tapping screws 7.
As shown in fig. 3: the sleeve plugging mould 5 is of a stepped structure.
The preparation process comprises the following steps:
1. according to the model of the pipeline marked by the drawing, selecting a proper steel sleeve model, as shown in the following table:
selecting a meter for the type of the steel sleeve: unit: mm is
Serial number 1 2 3 4 5 6 7 8 9 10
Pipe diameter 15 20 25 32 40 50 65 80 100 125
Pipe diameter of casing 25 32 40 50 65 80 100 125 125 150
2. A round steel plate 2 (the outer diameter of which is equal to that of the corresponding steel sleeve) and round steel 1 (phi 12).
3. Straight shank twist drill, welding electrode, iron red antirust paint, blue color and paint, round die and die holder, galvanized nut, self-tapping, and talc pen. Tool: the electric drill, the set square, the steel plate ruler, the steel tape, the compasses and the infrared level meter are held by hand.
4. The process comprises the following steps: manufacturing a mold (a sleeve fixing mold, a plugging mold and a positioning mold), coordinating civil engineering formwork matching, positioning a first-layer line drawing, fixing a sleeve, positioning and installing a second-layer sleeve, and protecting a finished product.
5. The process method comprises the following steps:
manufacturing a mould: and manufacturing a set of matched dies according to the steel sleeve of each type.
6. The mold is fixed to the sleeve: the steel sleeve is formed by welding a circular steel plate 2 with the inner diameter smaller than that of a steel sleeve by 2mm and round steel 1 (phi 12) with one end sheathed with threads, wherein the length L of the round steel 1 is 50mm longer than that of the steel sleeve with the corresponding model, and four round holes 3 (phi 5) are uniformly punched on the circular steel plate 2 to be used for fixing with a wood template;
7. the sleeve plugging die 5: a step equal to the wall thickness of the steel sleeve is cut at the edge of the circular steel plate 2 with the center of a phi 13 hole by using mechanical equipment, a circular steel plate 5 with a platform is manufactured and matched with a sleeve fixing mold for use, the upper opening of the sleeve is sealed and the sleeve is reliably fixed, and the outer diameter d1 of the circular steel plate 2 is equal to that of the steel sleeve 6 to be embedded.
8. A sleeve positioning die: similar to the plugging die, a step equal to the wall thickness of the steel sleeve is cut at the edge of the circular steel plate with a phi 3 hole at the center by using mechanical equipment, and a circular steel plate with a platform is manufactured and placed on the steel sleeve 6 for lower-layer positioning.
9. Firstly, before the template is erected, a pipeline well casing arrangement diagram is provided for a civil engineering, the position coordinates of the casing central line are marked, and the civil engineering is coordinated not to erect a batten within 100mm of the central line position, so that the positioning drilling is free of obstacles. And after the first-layer top plate template is erected, an inner wall line of the civil engineering discharge pipe shaft is required to be used as an accurate reference for sleeve pre-embedding. According to the pipeline well inner wall line provided by pipeline well arrangement technology intersection and civil engineering, tools such as a steel tape, a steel plate ruler, a set square, compasses and the like are used for measuring and releasing the central cross line of the sleeve, and the steel sleeve is positioned.
10. The fixed sleeve 6 is drilled on the top plate template by a phi 13 straight shank twist drill, phi 12 round steel at the lower part of the fixed die of the sleeve 6 is inserted into the drilled hole, and the die is firmly fixed by 4 self-tapping screws 7. The steel sleeve 6 is sleeved on the fixed mould, and then the sleeve plugging mould is covered on the sleeve 6 and fixed by the galvanized nut. And after the top plate concrete is solidified, the sleeve plugging die and the sleeve fixing die are disassembled for recycling.
11. And positioning and installing the two layers of sleeves, and placing a sleeve positioning die on the sleeve reserved on the first layer after the lower layer of template is erected by civil engineering. And taking the hole phi 3 of the mold as a datum point, guiding the hole to the lower part of the second-layer top plate by utilizing a vertical positioning line of an infrared level meter, determining the central point of the steel sleeve, drilling a hole from the lower part of the top plate, directly inserting the fixed mold into the positioning hole on the second-layer top plate, and executing a program of embedding the sleeve in the first layer to circulate until the last layer. The screw head of the extended nut 8 is coated with butter and sleeved with a PVC pipe for protection. And the upper part of the pre-embedded sleeve is blocked by a wood board, so that impurities are prevented from polluting the inner wall of the sleeve.
12. The positioning of the first layer of sleeve pipe is accurate;
the fixing piece is fastened to ensure that no gap is left between the bottom of the steel sleeve 6 and the template, the fixing piece is firmly attached to the steel sleeve, and concrete is prevented from entering the sleeve to cause blockage during pouring.
13. Quality requirement
Checking and accepting the parts to be classified in pipeline concealment projects before concealment; all indexes are in accordance with the design requirements, and the positions, the sizes and the elevations of the reserved holes are recorded and are in accordance with the design requirements. The top of the sleeve pipe arranged in the floor slab is 20mm higher than the decorative ground; the top of the sleeve pipe arranged in the toilet and the kitchen is 50mm higher than the decorative ground; the bottom of the floor slab is equal to the bottom surface of the floor slab.

Claims (5)

1. The utility model provides a steel casing once pre-buried device, its characterized in that includes circular steel sheet (2) of installation on the civil engineering template, circular steel sheet (2) center department wear round steel (1), evenly open around round steel (1) on circular steel sheet (2) has a plurality of holes (3), the one end of round steel (1) is mantle fiber (4), mantle fiber (4) on be provided with sleeve pipe shutoff mould (5).
2. The steel sleeve one-time embedding device as claimed in claim 1, wherein the sleeve plugging die (5) and the threading (4) are fastened through a nut (8).
3. The steel sleeve one-time embedding device as claimed in claim 1, wherein a sleeve (6) is arranged between the circular steel plate (2) on the outer side of the round steel (1) and the sleeve plugging die (5).
4. The steel sleeve one-time embedding device as recited in claim 1, wherein the sleeve plugging mold (5) is of a stepped structure.
5. The steel sleeve one-time embedding device as claimed in claim 1, wherein the sleeve (6) and the civil engineering template are fixed through 4 self-tapping screws (7).
CN202021105981.3U 2020-06-16 2020-06-16 One-time pre-embedding device for steel sleeve Active CN212897583U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021105981.3U CN212897583U (en) 2020-06-16 2020-06-16 One-time pre-embedding device for steel sleeve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021105981.3U CN212897583U (en) 2020-06-16 2020-06-16 One-time pre-embedding device for steel sleeve

Publications (1)

Publication Number Publication Date
CN212897583U true CN212897583U (en) 2021-04-06

Family

ID=75277281

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021105981.3U Active CN212897583U (en) 2020-06-16 2020-06-16 One-time pre-embedding device for steel sleeve

Country Status (1)

Country Link
CN (1) CN212897583U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113309369A (en) * 2021-06-29 2021-08-27 方泽华 Accurate positioning and mounting method for building structure embedded sleeve and sleeve assembly component

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113309369A (en) * 2021-06-29 2021-08-27 方泽华 Accurate positioning and mounting method for building structure embedded sleeve and sleeve assembly component

Similar Documents

Publication Publication Date Title
CN103061504B (en) Concrete slab Pipe installing hole to be provided construction mould and construction method
CN108952165B (en) Construction method for prefabricating and embedding row of sleeve pipe assemblies
CN212897583U (en) One-time pre-embedding device for steel sleeve
CN103291072A (en) Method for reserving holes in floors by aid of PVC (polyvinyl chloride) sleeves
CN106049862A (en) Inflatable adjustable type construction mold for reserved hole in concrete structure plate, and construction method
CN109296138B (en) Positioning device for post-planting steel bars of constructional column and construction method
CN205088965U (en) Can dismantle floor gauge control instrument
CN210950229U (en) Embedded device for gas inlet pipe sleeve in indoor shear wall
CN101787798A (en) Construction process for reinforced concrete beam bottom bracing and reinforcing template
CN203050108U (en) Concrete slab pipe installation reserved hole construction mold
CN102926535A (en) Energy-saving waterproof tension screw and construction method using tension screw to locate basement concrete outer wall formwork
CN210947779U (en) Prefabricated shear wall reserved joint bar positioning device and positioning structure thereof
CN107288341A (en) A kind of reserving hole building mortion and construction method
CN111236641A (en) Aluminum alloy template top plate water supply and drainage reserved hole die and construction method thereof
CN104747798B (en) The construction method of installation of kitchen and bath's drainpipe
CN212836174U (en) Laminated slab band plugging device
CN113090025B (en) Aluminum mold matching overhanging outer frame construction method of full concrete outer wall structure
CN205743005U (en) Inflatable adjustable concrete structural slab hole to be provided construction mould
CN109899600A (en) A kind of building pipe mounting process
CN103556825A (en) Construction method for reserved pipe sleeve in concrete of structural layers of high-rise building
CN211143739U (en) Automatic centering device for circle center of embedded sleeve
CN205742606U (en) A kind of building structure being easy to decoration renovation
CN202882425U (en) Energy-saving and waterproof opposite-pulling screw rod
CN111851997A (en) Construction method for post-cast section template of laminated slab
CN109750723A (en) A kind of construction method of installation of kitchen and bath's drainpipe