CN205617787U - Positioning device free from opening reserved bolt hole of climbing frame on aluminum alloy template - Google Patents

Positioning device free from opening reserved bolt hole of climbing frame on aluminum alloy template Download PDF

Info

Publication number
CN205617787U
CN205617787U CN201620447556.XU CN201620447556U CN205617787U CN 205617787 U CN205617787 U CN 205617787U CN 201620447556 U CN201620447556 U CN 201620447556U CN 205617787 U CN205617787 U CN 205617787U
Authority
CN
China
Prior art keywords
aluminum alloy
hole
bolt
bolt hole
alloy mould
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620447556.XU
Other languages
Chinese (zh)
Inventor
徐辉
刘洪刚
邹文龙
石继承
焦景毅
李运闯
王满江
毕志刚
丁惠杰
李洋
常兴
杨康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201620447556.XU priority Critical patent/CN205617787U/en
Application granted granted Critical
Publication of CN205617787U publication Critical patent/CN205617787U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides an exempt from to open positioner who climbs frame reservation bolt hole on aluminum alloy template, two aluminum alloy templates that use when concrete placement, a bolt hole is seted up in the design position who reserves the bolt hole to every aluminum alloy template, fixes a locating piece in aluminum alloy template on every bolt hole separately through bolt and nut, through a PVC sleeve pipe of fixed position's locating piece connection between two aluminum alloy templates. The PVC sleeve forms a reserved bolt mounting hole. Use the utility model discloses the location is accurate, easy and simple to handle, do benefit to the site operation, has overcome and has seted up the major diameter hole on the aluminum alloy template and damage the template and influence the shortcoming of later stage maintenance. According to the structure and the design concept of the utility model, the size of the positioning block and the PVC sleeve is changed to carry out electromechanical reserved hole construction, so that the electromechanical reserved sleeve can be prevented from forming large holes on the aluminum alloy template; the large steel mould and other templates can also avoid the problem of forming large holes on the templates.

Description

Avoid opening the positioner in climbing frame prepared screw-bolt hole hole on aluminum alloy mould plate
Technical field
This utility model relates to a kind of frock for building, particularly relates to a kind of positioner avoiding opening climbing frame prepared screw-bolt hole hole on aluminum alloy mould plate.
Background technology
In building cast engineering, building body is designed with the climbing frame prepared screw-bolt hole for installing climbing frame attached wall built-in fitting.Climbing frame prepared screw-bolt hole is at watering between two pieces of aluminum alloy mould plates of building body.In order to ensure the accuracy of later stage climbing frame attached wall installation of embedded parts, execute man-hour requirement on the aluminum alloy mould plate corresponding with climbing frame prepared screw-bolt hole position, output the hole of climbing frame prepared screw-bolt hole.Owing to climbing frame attached wall built-in fitting is all successively to arrange on main building, therefore climbing frame prepared screw-bolt hole hole can be offered on a lot of block aluminum alloy mould plates of rich main building one circle.Again due to the diameter of climbing frame prepared screw-bolt hole bigger (bolt of 38mm should reserve 50mm hole), damage so the macroscopic void of the reserved bolt outputed on aluminum alloy mould plate not only directly becomes to make overall structure to aluminum alloy mould plate, and these macroscopic voids are returned later stage hole repair and caused difficulty.
Utility model content
The purpose of this utility model is intended to overcome wide-bore hole on aluminum alloy mould plate, damages template and affects the shortcoming of template quality, providing a kind of positioner avoiding opening climbing frame prepared screw-bolt hole hole on aluminum alloy mould plate.
The purpose of this utility model is that by.This utility model avoids opening two pieces of aluminum alloy mould plates that the positioner in climbing frame prepared screw-bolt hole hole includes in pouring construction on aluminum alloy mould plate, it is characterized in that: on described two pieces of aluminum alloy mould plates, correspondence offers a positioning bolt hole respectively, one bolt of each connection on each positioning bolt hole, relative being between two aluminum alloy mould plates of threaded portion of two bolts, one circular locating piece is installed on each bolt, bolt and locating piece are fixed on aluminum alloy mould plate by nut, two locating pieces are plugged on the two ends of a PVC sleeve pipe respectively, PVC sleeve pipe is fixed on aluminum alloy mould plate by two locating pieces, PVC casing cavity constitutes the installing hole of reserved bolt.
This utility model avoids opening the positioner in climbing frame prepared screw-bolt hole hole on aluminum alloy mould plate, and the positioning bolt hole on wherein said aluminum alloy mould plate is opened in the climbing frame prepared screw-bolt hole position of structure design.
This utility model avoids opening the positioner in climbing frame prepared screw-bolt hole hole on aluminum alloy mould plate, and wherein said locating piece is made up of the cast iron of diameter 46mm, thickness 20mm, is provided with chamfering and top cuts into tongue and groove outside locating piece.
This utility model avoids opening the positioner in climbing frame prepared screw-bolt hole hole, wherein said PVC sleeve outer 50mm, thickness 1.2mm on aluminum alloy mould plate.
This utility model avoids opening the positioner in climbing frame prepared screw-bolt hole hole on aluminum alloy mould plate, and wherein said bolt is the bolt of hexagonal M8 × 35;Nut is the nut of M8.
This utility model avoids opening the positioner difference from prior art in climbing frame prepared screw-bolt hole hole on aluminum alloy mould plate and is this utility model to avoid on aluminum alloy mould plate to open that the positioner in climbing frame prepared screw-bolt hole hole includes the two pieces of aluminum alloy mould plates used during concreting, and every piece of aluminum alloy mould plate offers a bolt hole in the design attitude of prepared screw-bolt hole.Each a locating piece is fixed on aluminum alloy mould plate by screw bolt and nut on each bolt hole, between two aluminum alloy mould plates, connects a PVC sleeve pipe by the locating piece that position is fixing.PVC sleeve pipe constitutes reserved bolt mounting hole.This utility model overcomes to be offered major diameter hole on aluminum alloy mould plate and damages template and the shortcoming affecting later period maintenance.Use this utility model accurate positioning, easy and simple to handle, be beneficial to site operation meet civilized construction, green construction theory.With reference to this utility model structure and design concept, the size changing locating piece and PVC sleeve pipe carries out dynamo-electric preformed hole construction, and dynamo-electric reserved sleeve pipe can be avoided to offer macroscopic void on aluminum alloy mould plate;The problem that big punching block and other template can also be avoided producing wide-bore hole in template equally.
Below in conjunction with the accompanying drawings the positioner avoiding opening climbing frame prepared screw-bolt hole hole on aluminum alloy mould plate of the present utility model is described further.
Accompanying drawing explanation
Fig. 1 is aluminum alloy mould plate positioner schematic front view.
Fig. 2 is the profile of Fig. 1.
Fig. 3 is aluminum alloy mould plate positioner 3-D view.
In figure, 1. aluminum alloy mould plate, 2. bolt, 3. locating piece, 4. nut, 5.PVC sleeve pipe.
Detailed description of the invention
As shown in Figure 1 and Figure 2, this utility model avoids opening two pieces of aluminum alloy mould plates 1 that the positioner in climbing frame prepared screw-bolt hole hole includes in pouring construction on aluminum alloy mould plate.On two pieces of aluminum alloy mould plates 1, correspondence offers a positioning bolt hole respectively.One bolt 2 of each connection on each positioning bolt hole.Relative being between two aluminum alloy mould plates 1 of threaded portion of two bolts 2.One circular locating piece 3 is installed on each bolt 2.Bolt 2 and locating piece 3 are fixed on aluminum alloy mould plate 1 by nut 4.Two locating pieces 3 are plugged on the two ends of a PVC sleeve pipe 5 respectively.PVC sleeve pipe 5 is fixed on aluminum alloy mould plate 1 by two locating pieces 3.PVC sleeve pipe 5 tube chamber constitutes the installing hole of reserved bolt.
This utility model avoids opening on aluminum alloy mould plate in the positioner in climbing frame prepared screw-bolt hole hole, and the positioning bolt hole on aluminum alloy mould plate 1 is opened in the climbing frame prepared screw-bolt hole position of structure design.
This utility model avoids opening on aluminum alloy mould plate in the positioner in climbing frame prepared screw-bolt hole hole, and locating piece 3 is by diameter 46mm, and thickness is that the cast iron of 20mm is constituted.It is provided with chamfering outside locating piece 3 and top cuts into tongue and groove.
This utility model avoids opening on aluminum alloy mould plate in the positioner in climbing frame prepared screw-bolt hole hole, PVC sleeve pipe 5 external diameter 50mm, thickness 1.2mm.
This utility model avoids opening on aluminum alloy mould plate in the positioner in climbing frame prepared screw-bolt hole hole, and bolt 2 is the bolt of hexagonal M8 × 35;Nut 4 is the nut of M8.
Design this utility model, first has to constructing structure pattern is carried out degree of depth digestion, determines the exact position of climbing frame prepared screw-bolt hole, and determine bolt hole relevant position on aluminum alloy mould plate 1 with this.
Use this utility model, first assembled bolt 2 and locating piece 3 on side aluminum alloy mould plate 1;Locating piece 3 overlaps one end of PVC sleeve pipe 5, then to other side aluminum alloy mould plate 1 assembly bolt 2 and locating piece 3;PVC sleeve pipe 5 is fixed on aluminum alloy mould plate 1 be fixed on two bolts 2 and locating piece 3, is allowed to be maintained at climbing frame prepared screw-bolt hole position, then casting concrete;Reserved bolt is installed after form removal.Afterwards, turn last layer and repeat above step.
Embodiment described above is only to be described preferred implementation of the present utility model; not scope of the present utility model is defined; on the premise of without departing from this utility model design spirit; various deformation that the technical solution of the utility model is made by those of ordinary skill in the art and improvement, all should fall in the protection domain that this utility model claims determine.

Claims (5)

  1. null1. the positioner avoiding opening climbing frame prepared screw-bolt hole hole on aluminum alloy mould plate,Including two pieces of aluminum alloy mould plates (1) in pouring construction,It is characterized in that: on described two pieces of aluminum alloy mould plates (1), correspondence offers a positioning bolt hole respectively,One bolt (2) of each connection on each positioning bolt hole,Relative being between two aluminum alloy mould plates (1) of threaded portion of two bolts (2),Each bolt (2) is upper installs a circular locating piece (3),Bolt (2) and locating piece (3) are fixed on aluminum alloy mould plate (1) by nut (4),Two locating pieces (3) are plugged on the two ends of a PVC sleeve pipe (5) respectively,Described PVC sleeve pipe (5) is fixed on aluminum alloy mould plate (1) by two locating pieces (3),PVC sleeve pipe (5) chamber constitutes the installing hole of reserved bolt.
  2. The positioner avoiding opening climbing frame prepared screw-bolt hole hole on aluminum alloy mould plate the most according to claim 1, it is characterised in that: the positioning bolt hole on described aluminum alloy mould plate (1) is opened in the climbing frame prepared screw-bolt hole position of structure design.
  3. The positioner avoiding opening climbing frame prepared screw-bolt hole hole on aluminum alloy mould plate the most according to claim 1, it is characterized in that: described locating piece (3) is by diameter 46mm, the cast iron of thickness 20mm is constituted, and locating piece (3) outside is provided with chamfering and top cuts into tongue and groove.
  4. The positioner avoiding opening climbing frame prepared screw-bolt hole hole on aluminum alloy mould plate the most according to claim 1, it is characterised in that: described PVC sleeve pipe (5) external diameter 50mm, thickness 1.2mm.
  5. The positioner avoiding opening climbing frame prepared screw-bolt hole hole on aluminum alloy mould plate the most according to claim 1, it is characterised in that: described bolt (2) is the bolt of hexagonal M8 × 35;Nut (4) is the nut of M8.
CN201620447556.XU 2016-05-17 2016-05-17 Positioning device free from opening reserved bolt hole of climbing frame on aluminum alloy template Active CN205617787U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620447556.XU CN205617787U (en) 2016-05-17 2016-05-17 Positioning device free from opening reserved bolt hole of climbing frame on aluminum alloy template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620447556.XU CN205617787U (en) 2016-05-17 2016-05-17 Positioning device free from opening reserved bolt hole of climbing frame on aluminum alloy template

Publications (1)

Publication Number Publication Date
CN205617787U true CN205617787U (en) 2016-10-05

Family

ID=57023579

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620447556.XU Active CN205617787U (en) 2016-05-17 2016-05-17 Positioning device free from opening reserved bolt hole of climbing frame on aluminum alloy template

Country Status (1)

Country Link
CN (1) CN205617787U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109989581A (en) * 2019-05-08 2019-07-09 广东众科建筑技术发展有限公司 Aluminum alloy mould plate system reserves climbing frame hole pre-embedded device
CN111852008A (en) * 2020-07-06 2020-10-30 北京住总第三开发建设有限公司 Cast-in-place wall reserved hole control structure and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109989581A (en) * 2019-05-08 2019-07-09 广东众科建筑技术发展有限公司 Aluminum alloy mould plate system reserves climbing frame hole pre-embedded device
CN111852008A (en) * 2020-07-06 2020-10-30 北京住总第三开发建设有限公司 Cast-in-place wall reserved hole control structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN201443203U (en) Mold of preformed hole of cast-in-place reinforced concrete slab
CN206090861U (en) Portable built -in fitting is used in curtain installation
CN205617787U (en) Positioning device free from opening reserved bolt hole of climbing frame on aluminum alloy template
CN103233479B (en) Method for pouring concrete cup foundation
CN113073840A (en) Concrete reversed ridge accurate positioning die and reversed ridge construction method
CN204098489U (en) A kind of mould making concrete floorslab preformed hole
CN207260574U (en) Template fixing system of building waterproof structure
CN209868938U (en) Prefabricated piping lane forming die
CN204174946U (en) A kind of prefabricated post and post connection positioner
CN203334433U (en) Concrete vertical face embedded part mounting fixing device
CN110629787A (en) Core mold for pipe gallery pouring and construction method
CN203066101U (en) Combined prefabricated column foundation core die
CN216075217U (en) Accurate pre-buried device of complicated basic column base bolt of steel construction
CN205791363U (en) A kind of electrical engineering positioning installation apparatus
CN215888951U (en) Prefabricated double-rib external wall panel
CN205742988U (en) The explosion-proof membrane module of template one word piece
CN107152161B (en) The drawknot construction method of external scaffolding and wall interconnecting piece
KR101438099B1 (en) Construction method of pipe sleeve that is used in the construction of nuclear power plant
CN204983653U (en) Wall body pipe groove reservation mould
CN210758333U (en) Concrete annular interlocking formula stand combination basis prefabricated component pouring mould
CN204163251U (en) The floor plate structure of steel concrete integrated building
CN211286666U (en) Die adjusting embedded part and aluminum alloy template diagonal bracing device
CN103802209A (en) Prefabricated concrete hollow component pore-forming method
CN206220500U (en) Shear wall feedwater tube seat pre-embedded device
CN205604721U (en) Pre -buried mould of window frame