CN204163251U - The floor plate structure of steel concrete integrated building - Google Patents
The floor plate structure of steel concrete integrated building Download PDFInfo
- Publication number
- CN204163251U CN204163251U CN201420498399.6U CN201420498399U CN204163251U CN 204163251 U CN204163251 U CN 204163251U CN 201420498399 U CN201420498399 U CN 201420498399U CN 204163251 U CN204163251 U CN 204163251U
- Authority
- CN
- China
- Prior art keywords
- floor
- steel bar
- flooring frame
- english truss
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Floor Finish (AREA)
Abstract
The utility model discloses a kind of floor plate structure of steel concrete integrated building, it comprises flooring frame, English truss, floor steel bar, concrete.Described English truss and floor steel bar intersect along both direction in length and breadth respectively and are fixed in flooring frame, the two ends of English truss respectively a protruding hook and this hook through flooring frame, a protruding hook and this hook are through flooring frame respectively for the two ends of floor steel bar, and concrete casting is filled in flooring frame inside casing and is wrapped on English truss and floor steel bar.Owing to being manufactured by the utility model in advance in professional factory, install more quick, the duration is shorter.
Description
Technical field
The utility model relates to integrated building, steel building and mobile house and manufactures and designs field, particularly relates to a kind of floor plate structure of steel concrete integrated building.
Background technology
Current existing traditional civilian construction house mainly contains brick-and-concrete buildings and reinforced concrete structure building two large classes, this two large class building cumbersome when constructing, the manpower of all kinds of technician drop into larger, required auxiliary material and supporting facility of a great variety, it is long to build the construction period, and the many noises of engineering rubbish are large, impact and destruction surrounding enviroment, many disadvantages such as the waste of whole engineering material is very large, and phase of going along with sb. to guard him of safety in production is long, are unfavorable for effective management of construction unit.And this two large class building body of founding a capital is fixing not transportable substantially, midway or build up rear examination if you have questions time be difficult to reform or improve, if run into reorganization and expansion just more difficult transformation.And the floor plate of existing integrated building is too barely satisfactory, the technical indicator such as heat preservation and soundproof, intensity all cannot compared with traditional civilian construction, cannot be formed a complete set of complete, various functions technical indicator can close to civilian construction demand, the civilian construction body that can possess the integrated system of industrialization.
Utility model content
The purpose of this utility model is to provide a kind of floor plate structure of, heat preservation and soundproof better, construction cost lower, shock resistance stronger steel concrete integrated building identical with the function of traditional architecture.
For achieving the above object, technical solution of the present utility model is:
The utility model is a kind of floor plate structure of steel concrete integrated building, and it comprises flooring frame, English truss, floor steel bar, concrete; Described English truss and floor steel bar intersect along both direction in length and breadth respectively and are fixed in flooring frame, the two ends of English truss respectively a protruding hook and this hook through flooring frame, a protruding hook and this hook are through flooring frame respectively for the two ends of floor steel bar, and concrete casting is filled in flooring frame inside casing and is wrapped on English truss and floor steel bar.
The side of the flooring frame between described adjacent two floor plates is provided with inserting slot construction, to be fixedly connected with between adjacent two floor plates.
The utility model is formed primarily of flooring frame, English truss, floor steel bar, concrete, English truss and floor steel bar intersect along both direction in length and breadth respectively and are fixed in flooring frame, concrete casting is filled in flooring frame inside casing and is wrapped on English truss and floor steel bar, has the advantages such as heat preservation and soundproof is better, construction cost is lower, shock resistance is stronger.Owing to being manufactured by the utility model in advance in professional factory, install more quick, the duration is shorter.
Below in conjunction with the drawings and specific embodiments, the utility model is further described.
Accompanying drawing explanation
Fig. 1 is three-dimensional exploded view of the present utility model;
Fig. 2 is the utility model floor plate plan view;
Fig. 3 is floor plate section of structure described in the utility model;
Fig. 4 is the partial enlarged drawing of Fig. 3 at A place;
Fig. 5 is the sectional drawing of the utility model floor plate;
Fig. 6 is the partial enlarged drawing of Fig. 5 at A place.
Detailed description of the invention
As shown in Figure 1 and Figure 2, the utility model is a kind of floor plate structure of steel concrete integrated building, and it comprises flooring frame 41, English truss 42, floor steel bar 43, concrete 44.Described English truss 42 and floor steel bar 43 intersect along both direction in length and breadth respectively and are fixed in flooring frame 41, the two ends difference protruding one of English truss 42 links up with 421 and this hook 421 passes flooring frame 41, the two ends difference protruding one of floor steel bar 43 links up with 431 and this hook 431 passes flooring frame 41, and concrete 44 waters and is filled in flooring frame 41 inside casing and is wrapped on English truss 42 and floor steel bar 43.During installation, the two ends of floor plate 4 are inserted in the H profile steel groove of the crossbeam 22 in beam-column main body 2, the hook 421,431 at the two ends of floor plate 4 is hooked in the end face of crossbeam 22, is provided with and supports spar 45(as shown in Figure 5, Figure 6 between floor plate 4 bottom surface and crossbeam 22H shaped steel groove inner bottom surface).
As shown in Figure 3, Figure 4, the side of the flooring frame 41 between described adjacent two floor plates 4 is provided with inserting slot construction 46, to be fixedly connected with between adjacent two floor plates 4.
Manufacture of the present utility model and mounting method:
First steel plate stamping flanging frame material is carried out Combination Welding and become flooring frame 41, then the English truss 42 that cloth weldering indented bars combines in flooring frame 41 frame and floor steel bar 43 rack, flooring frame 41 is lain in fixture template, bottom surface is underfloor bottom surface, first pour into a mould one deck super strong gypsum, again composite water-proof high-strength concrete is cast in flooring frame 41 framework, and whole reality floating steam-cured after install again and insert in beam-column agent structure crossbeam 22 frame groove; Each position that floor plate is connected with the post beam of beam-column main body all adopts bolts assemblies to carry out quick-assembling combination with the mode of filling clay, and reserved the position, hole of general water supply and sewerage pipeline, strong and weak electricity pipe network embedded system, progressively the section bar of various sizes is combined by that analogy, receive limit adjustment with the system architecture described in other more afterwards, form the floor plate structure of whole building.
Emphasis of the present utility model is just: in professional factory, complete flooring frame, English truss, floor steel bar, concrete manufacture.
The above, be only the utility model preferred embodiment, the parts such as English truss can take different structures, therefore the scope of the utility model enforcement can not be limited with this, namely the equivalence change done according to the utility model claim and description with modify, all should still belong in scope that the utility model patent contains.
Claims (2)
1. a floor plate structure for steel concrete integrated building, is characterized in that: it comprises flooring frame, English truss, floor steel bar, concrete; Described English truss and floor steel bar intersect along both direction in length and breadth respectively and are fixed in flooring frame, the two ends of English truss respectively a protruding hook and this hook through flooring frame, a protruding hook and this hook are through flooring frame respectively for the two ends of floor steel bar, and concrete casting is filled in flooring frame inside casing and is wrapped on English truss and floor steel bar.
2. the floor plate structure of steel concrete integrated building according to claim 1, is characterized in that: the side of the flooring frame between described adjacent two floor plates is provided with inserting slot construction, to be fixedly connected with between adjacent two floor plates.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420498399.6U CN204163251U (en) | 2014-09-01 | 2014-09-01 | The floor plate structure of steel concrete integrated building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420498399.6U CN204163251U (en) | 2014-09-01 | 2014-09-01 | The floor plate structure of steel concrete integrated building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204163251U true CN204163251U (en) | 2015-02-18 |
Family
ID=52536955
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420498399.6U Expired - Fee Related CN204163251U (en) | 2014-09-01 | 2014-09-01 | The floor plate structure of steel concrete integrated building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204163251U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105908922A (en) * | 2016-04-11 | 2016-08-31 | 黑龙江建筑职业技术学院 | Water retaining roof of building and construction method of water retaining roof |
CN106522436A (en) * | 2016-12-22 | 2017-03-22 | 中冶京诚工程技术有限公司 | Prefabricated assembled light floor |
-
2014
- 2014-09-01 CN CN201420498399.6U patent/CN204163251U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105908922A (en) * | 2016-04-11 | 2016-08-31 | 黑龙江建筑职业技术学院 | Water retaining roof of building and construction method of water retaining roof |
CN105908922B (en) * | 2016-04-11 | 2017-12-08 | 黑龙江建筑职业技术学院 | Building water-ponding roof and construction method |
CN106522436A (en) * | 2016-12-22 | 2017-03-22 | 中冶京诚工程技术有限公司 | Prefabricated assembled light floor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103635640B (en) | Wall system | |
KR101314081B1 (en) | Retaining wall and upeer structure connection method for rahmen structure | |
CN107401217B (en) | A kind of beamless hollow floor-chamber concrete-filled steel tube shear wall combined structure system and method | |
CN105839666A (en) | Total-prefabricated superimposed assembly type underground pipe gallery and connecting node thereof | |
CN105113665B (en) | The prefabrication and lifting wall of fabricated structure | |
CN105464214B (en) | Steel concrete integrated building manufacturing method | |
CN104631512A (en) | Post-cast strip beam and slab construction method adopting formwork hanging method | |
CN206748695U (en) | The prefabricated edges of boards mould of zigzag | |
CN103938785A (en) | Precast concrete member | |
CN204163191U (en) | Steel concrete integrated building | |
CN203238780U (en) | Prefabricated stirrup cage of beam column core area | |
CN106320537A (en) | Prefabricated concrete-filled square steel tube column and steel girder connecting joint | |
CN204112525U (en) | Band perps precast shear wall structure in strong concrete precast frame | |
CN204163251U (en) | The floor plate structure of steel concrete integrated building | |
CN203685208U (en) | End-shaping steel template for double-lining trolley for tunnel | |
CN103912095A (en) | Precast reinforced concrete member | |
CN204645415U (en) | A kind of precast beam with liner plate | |
CN105113701B (en) | The precast wall body of fabricated structure | |
CN204163293U (en) | The roof structure of steel concrete integrated building | |
CN204626637U (en) | The girder steel agent structure of steel concrete integrated building | |
CN203160693U (en) | Detachable water stopping screw | |
CN109869044A (en) | A kind of modularization dismounting enclosure wall | |
CN214497993U (en) | Assembled formwork wall board | |
CN105696453A (en) | Steel-concrete composite beam | |
CN211873406U (en) | Precast concrete hollow wall structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150218 Termination date: 20150901 |
|
EXPY | Termination of patent right or utility model |