CN115321314A - Construction elevator attachment frame and installation method thereof - Google Patents

Construction elevator attachment frame and installation method thereof Download PDF

Info

Publication number
CN115321314A
CN115321314A CN202210768854.9A CN202210768854A CN115321314A CN 115321314 A CN115321314 A CN 115321314A CN 202210768854 A CN202210768854 A CN 202210768854A CN 115321314 A CN115321314 A CN 115321314A
Authority
CN
China
Prior art keywords
rod
base
construction elevator
installation
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210768854.9A
Other languages
Chinese (zh)
Other versions
CN115321314B (en
Inventor
白黎明
王玉
唐旭
张林飞
张敏
马泽阳
金明阳
马龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Urban Construction No7 Engineering Co Ltd
Original Assignee
Beijing Urban Construction No7 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Construction No7 Engineering Co Ltd filed Critical Beijing Urban Construction No7 Engineering Co Ltd
Priority to CN202210768854.9A priority Critical patent/CN115321314B/en
Publication of CN115321314A publication Critical patent/CN115321314A/en
Application granted granted Critical
Publication of CN115321314B publication Critical patent/CN115321314B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B11/00Main component parts of lifts in, or associated with, buildings or other structures
    • B66B11/0005Constructional features of hoistways
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B19/00Mining-hoist operation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B50/00Energy efficient technologies in elevators, escalators and moving walkways, e.g. energy saving or recuperation technologies

Abstract

The application relates to the field of construction elevators, in particular to a construction elevator attaching frame and an installation method thereof. The construction elevator installation method has the advantages that the installation difficulty of the construction elevator can be reduced, the potential safety hazard of the construction elevator is reduced, and the effect of construction site requirements is met.

Description

Construction elevator attachment frame and installation method thereof
Technical Field
The application relates to the field of construction elevators, in particular to a construction elevator attachment frame and an installation method thereof.
Background
The construction hoist is also called a construction elevator, is a manned cargo-carrying construction machine frequently used in buildings, and is comfortable and safe to ride due to the unique box body structure. The construction hoist generally includes a wall-attached bracket vertically installed on the building structure, a car slidably coupled to the wall-attached bracket, and a driving device for driving the car to move on the wall-attached bracket to perform lifting. When the construction elevator is used, the wall-attached support is required to be installed on a building structure, and the lift car of the construction elevator moves up and down along the wall-attached support under the driving of the driving device so as to realize the up-and-down lifting of people/goods, and the construction elevator becomes important equipment for vertical transportation on a construction site at present.
In order to ensure the installation stability of the wall attaching support and the running stability of the lift car, the distance between the wall attaching support and two adjacent attachment points of a building structure is not more than 6m when the wall attaching support is installed at present. However, with the increase of modern requirements, such as warehouses, cold storages, factory buildings and the like, the floor height of each floor reaches 9 meters or 10 meters, and in the 10-meter suspension space, the attachment point of the construction elevator with the building structure cannot be found by the wall-attached support, so that the construction elevator is difficult to install, has large potential safety hazard, and cannot meet the requirements of a construction site.
Disclosure of Invention
In order to reduce the installation difficulty of a construction elevator, reduce the potential safety hazard of the construction elevator and meet the requirements of a construction site, the application provides a construction elevator attachment frame and an installation method thereof.
In a first aspect, the present application provides a construction elevator adheres to frame, adopts following technical scheme:
the utility model provides a construction elevator adheres to frame, includes sets up the frame body that adheres to for attaching the wall support and providing the attachment point between adjacent two-layer building floor, it includes the base of rigid coupling on the building structure bottom plate, installs to adhere to the frame body bracing piece on the base and install be used for on the bracing piece with attach the supplementary link of wall leg joint.
Through adopting above-mentioned technical scheme, when the distance between adjacent two-layer floor surpassed 6 meters and lead to attaching the wall support and can't find with building structure's attachment point, can directly install this construction elevator between two-layer floor and attach the frame, the base that will attach the frame body is fixed on building structure, and need adnexed height according to attaching the wall support, select the bracing piece of suitable height, install auxiliary connection frame in bracing piece suitable position, directly will attach wall leg joint on auxiliary connection frame, can fix the position of attaching wall support and auxiliary connection frame, the realization is to attaching to the wall support. The installation is very simple, has significantly reduced construction elevator's the installation degree of difficulty, simultaneously owing to can be to attaching the suitable attachment point of wall leg joint, also greatly reduced construction elevator's potential safety hazard, ensured the requirement of job site.
Optionally, a movable rod is inserted into one end of the support rod, which is far away from the base, and a first accommodating groove for the movable rod to be inserted into is formed in one end of the support rod, which is far away from the base. .
Through adopting above-mentioned technical scheme, the setting dismantled of bracing piece and movable rod for when the transportation, can dismantle the movable rod from the bracing piece, it is more convenient to transport.
Optionally, the movable rod is provided with many, many the movable rod end to end plug-in connection, the auxiliary connection frame is installed and is kept away from on the movable rod of base.
Through adopting above-mentioned technical scheme, can be according to the attachment point height who attaches the wall support, select the movable rod of suitable quantity to adapt to the not high laminar height and attach the requirement of attaching of wall support.
Optionally, many a pole of being connected with supplementary mounting bracket in the movable rod is called the installation pole, and all the other movable rods all call extension bar, the installation pole with be provided with between the base be used for right the installation pole is drawn and is held in order to increase the pull rod of installation pole installation stability, the pull rod encircles the axis interval of installation pole is provided with a plurality ofly, the pull rod the base with constitute triangular bearing structure between the installation pole.
Through adopting above-mentioned technical scheme, can draw the installation pole and hold, increase the support stability of installation pole, guarantee to attach the auxiliary stability of wall support.
Optionally, the pull rod comprises a lower rod hinged to the mounting seat, an upper rod hinged to the side wall of the mounting rod, and a pull rod detachably connected between the upper rod and the lower rod.
Through adopting above-mentioned technical scheme, when the floor height difference of building and make the required attachment point height of attaching the wall support different, can select the movable rod of suitable quantity as required, also select the pulling rod of suitable length simultaneously for no matter what the quantity of movable rod is, the pull rod all can adapt to the height of movable rod and draw in order to hold the movable rod.
Optionally, one end of the upper rod, which is far away from the mounting rod, and one end of the lower rod, which is far away from the base, are both rotatably connected with threaded cylinders, and two ends of the pulling rod are respectively in threaded connection with the two threaded cylinders.
Through adopting above-mentioned technical scheme, realize pulling the dismantled connection of pole, simultaneously, twist into the length in the screw thread section of thick bamboo through changing the pulling pole, can change the holistic length of pull rod, realize the regulation to the taut degree of pull rod, it is more convenient to operate.
Optionally, one end of the supporting rod, which is far away from the base, is detachably connected with a telescopic rod, and one end of the telescopic rod, which is far away from the supporting rod, is used for abutting against a ceiling.
Through adopting above-mentioned technical scheme, when this construction elevator adheres to a frame too high, can keep away from the one end installation telescopic link of base at the bracing piece for telescopic link upper end butt is on the ceiling, thereby adheres to this construction elevator and puts up the centre gripping firmly between the bottom plate and the ceiling of floor, for the installation stability of further guarantee adhesion frame, increases the safety guarantee that attaches the wall support and adhere to the back.
Optionally, the attachment frame body further comprises a mounting seat for fixing on the ceiling, and the mounting seat is detachably connected with the telescopic rod.
Through adopting above-mentioned technical scheme, the telescopic link passes through the mount pad to be fixed on the ceiling, has increased the installation stability of telescopic link, avoids telescopic link tip and ceiling to produce relative slip, and the mount pad also can increase the area of contact of telescopic link case and mount pad simultaneously, guarantees the installation stability of telescopic link and ceiling.
Optionally, the attaching frame bodies are provided with a plurality of bases, and the bases of two adjacent attaching frame bodies are connected with the mounting seat.
Through adopting above-mentioned technical scheme, the base of last floor can link together with the mount pad of next floor, increases the installation intensity and the installation stability of base and mount pad.
In a second aspect, the application provides a method for installing a construction elevator attachment frame, which adopts the following technical scheme:
a method for installing a construction elevator attachment frame includes the following steps:
the device comprises a mounting base and a mounting seat; placing a base on a bottom plate of a floor to be installed, placing an installation base of a next floor on a ceiling of the next floor, and connecting the installation base with the base through a screw rod penetrating through the floor; installing another group of bases and installation bases on a ceiling of a floor to be installed and a bottom plate of the previous floor;
selecting and installing extension bars, selecting a proper number of extension bars according to the positions to be attached to the wall-attached support, inserting the extension bars on the support rods, and sequentially installing the rest extension bars;
mounting a mounting rod, and inserting the mounting rod on the uppermost extension rod;
installing a telescopic rod, inserting the telescopic rod into the upper end of the installation rod, and adjusting the length of the telescopic rod to enable the telescopic rod to be abutted between the installation rod and the installation seat;
and installing a pull rod, selecting a pull rod with proper length, and screwing two ends of the pull rod on the two thread cylinders.
Through adopting above-mentioned technical scheme, the screw rod through wearing to locate the floor with the mount pad of last floor and next floor links together, then pegs graft the extension bar of suitable quantity on the base as required, installs the installation pole of installing supplementary mounting bracket on the extension bar at last. Place the telescopic link between installation pole and mount pad, adjust the length of telescopic link and make the telescopic link firmly install between installation pole and mount pad to accomplish the installation that the construction elevator adheres to the frame, and can guarantee the construction elevator after the installation and adhere to the installation stability of frame, in order to provide more stable attachment point for attaching the wall support, guarantee to attach the security performance of wall support.
In summary, the present application includes at least one of the following beneficial technical effects:
1. according to the construction elevator attaching frame, the attaching point can be provided between the two floors for the wall attaching frame by arranging the construction elevator attaching frame between the two floors of the building, so that the mounting difficulty of the construction elevator is reduced, the potential safety hazard of the construction elevator is reduced, and the requirement of site construction is met;
2. according to the wall-attached support, the plurality of movable rods and the pull rods detachably connected between the upper rod and the lower rod are arranged, so that the proper number of movable rods can be selected according to the floor height of a building, the pull rods with proper length can be selected, and the attachment requirements of wall-attached supports with different floor heights can be met;
3. the setting of telescopic link and mount pad for when improving the installation stability and the installation intensity of base, can also with the construction elevator adhere to installing firmly between the bottom plate and the ceiling of floor, guarantee the installation fastness and the installation stability of construction elevator adhering to the frame, and then guarantee to adhere to the adnexed fastness of wall support, guarantee construction elevator's construction safety nature.
Drawings
Fig. 1 is a schematic view showing the overall structure of a construction hoist attachment frame according to the present application.
Fig. 2 is a schematic view illustrating a sectional shape of a support rod in the construction hoist attachment frame.
Fig. 3 is a schematic sectional view of a support rod and a movable rod structure in the construction hoist attachment frame.
Fig. 4 is a front view, semi-sectional, schematic view of the construction hoist attachment frame of the present application.
Fig. 5 is a schematic view of a telescopic rod structure in the attachment frame of the construction hoist.
Fig. 6 is a schematic flow chart of a method of installing a construction elevator attachment frame.
Description of reference numerals: 1. a base; 11. fixing the rod; 12. a reinforcing bar; 13. a connecting rod; 2. a support bar; 21. an outer frame; 22. an inner frame; 23. a first accommodating groove; 3. an auxiliary connecting frame; 4. a movable rod; 41. lengthening a rod; 42. mounting a rod; 43. a plug-in part; 44. a second accommodating groove; 5. a pull rod; 51. a rod is arranged; 52. a lower rod; 53. pulling a rod; 54. a threaded barrel; 6. a telescopic rod; 61. a first lever; 611. a first limit plate; 62. a second lever; 621. a second limiting plate; 63. a connecting cylinder; 7. a mounting seat; 71. a butting rod; 72. a third accommodating groove; 8. a screw.
Detailed Description
The present application is described in further detail below with reference to figures 1-6.
The embodiment of the application discloses construction elevator adheres to frame. Referring to fig. 1, the construction elevator attaching frame comprises attaching frame bodies which are arranged between two adjacent layers of building floors and used for providing attaching points for the wall attaching support, the attaching frame bodies can be provided with a plurality of attaching frame bodies according to the number of floors, and each attaching frame body is installed on each layer of floor and used for providing support for the wall attaching support in the suspended space between the two layers of floors.
Referring to fig. 1, the attachment frame body comprises a base 1 fixedly connected to a bottom plate of the building structure, a support rod 2 vertically arranged on the base 1, and an auxiliary connection frame 3 arranged on the support rod 2 and used for being connected with an attachment wall support, wherein the attachment wall support is arranged on the auxiliary connection frame 3, so that an auxiliary support point can be provided for the attachment wall support, and the installation stability of the attachment wall support is guaranteed.
Wherein, base 1 includes three dead levers 11 of end to end connection, constitutes triangular bearing structure between three dead levers 11, and has stiffener 12 in one of them angle department rigid coupling of triangle-shaped to increase base 1's whole support intensity.
Meanwhile, a connecting rod 13 is fixedly connected to the base 1, and the connecting rod 13 is fixedly connected to the base 1 and the reinforcing rod 12 at the same time, so that the base 1 and the reinforcing rod 12 are fixedly connected together.
Referring to fig. 1, when the position that the wall attaching bracket needs the attachment point is higher, one end that can keep away from base 1 at bracing piece 2 sets up movable rod 4, and movable rod 4 can be provided with one and also can be provided with many as required, and specific can need the attached point to confirm with the distance of floor bottom plate according to the attached bracket, and auxiliary link 3 can the snap-on a movable rod 4 of top, and this application explains with movable rod 4 sets up two as an example. Of the two movable rods 4, one rod connected to the support rod 2 is called an extension rod 41, one rod located at an end away from the support rod 2 is called an installation rod 42, and the auxiliary link 3 is installed on the installation rod 42.
Referring to fig. 2, specifically, the support rod 2 is similar to the movable rod 4 in structure, and includes an outer frame 21 located outside and an inner frame 22 located inside the outer frame 21, the outer frame 21 and the inner frame 22 are formed by two channel steel openings being arranged oppositely, and the channel steel opening direction of the outer frame 21 is perpendicular to the channel steel opening direction of the inner frame 22, and the support rod 2 or the movable rod 4 is formed integrally by welding two channel steels of the outer frame 21 and two channel steels of the inner frame 22.
Referring to fig. 3, the support rod 2 and the movable rod 4 are different in that the height of the inner frame 22 of the support rod 2 is lower than that of the outer frame 21, and the inner frame 22 of the support rod 2 is flush with one end of the outer frame 21 and the other end thereof forms a first receiving groove 23 into which the movable rod 4 is inserted in the outer frame 21. During installation, the end, which is flush with the inner frame 22 and the outer frame 21, of the support rod 2 is welded and fixed with the base 1, and the movable rod 4 is inserted into the accommodating space.
The height of the inner frame 22 of the movable rod 4 is the same as that of the outer frame 21, but the inner frame 22 of the movable rod 4 and the outer frame 21 are arranged in a staggered manner in the length direction of the movable rod 4, so that one end of the inner frame 22 extends out of the end of the outer frame 21 to form a plug-in part 43, and the other end is positioned in the outer frame 21 to form a second accommodating groove 44, into which the plug-in part 43 is inserted and which is in the same shape as the first accommodating groove 23, at the end of the outer frame 21. During installation, the inserting portion 43 of the extension bar 41 can be inserted into the first accommodating groove 23, and the inserting portion 43 of the installation bar 42 can be inserted into the first accommodating groove 23 of the extension bar 41, so that the assembly of the support bar 2 can be completed.
Referring to fig. 1, when the installation position of the auxiliary link 3 is excessively high, the support stability of the movable bar 4 will be difficult to secure, making the attachment of the wall attachment bracket unstable. Therefore, in order to improve the stability of the attachment of the upper end of the active lever 4, a pull rod 5 for pulling the attachment rod 42 is provided between the attachment rod 42 and the base 1. The pull rods 5 are arranged at intervals around the axis of the support rod 2, the application takes the example that the pull rods 5 are arranged in three numbers, the three pull rods 5 are respectively positioned at any three sides, one side without the pull rods 5 is used for facing the wall-attached support during installation, and a triangular support structure is formed among the pull rods 5, the base 1 and the support rod 2.
Referring to fig. 1 and 4, the pulling rod 5 includes an upper rod 51 hinged on a side wall of the mounting rod 42, a lower rod 52 hinged on the base 1, and a pulling rod 53 detachably connected between the upper rod 51 and the lower rod 52. When different numbers of extension bars 41 are selected as required to change the height of the auxiliary connecting frame 3, the pull rod 53 with a proper length can be correspondingly selected, and the pull rod 53 with a corresponding length is installed between the upper rod 51 and the lower rod 52 to adapt to the pulling and holding of the support rods 2 with different lengths, so that the situation that the pull rod 5 cannot pull and hold the movable rod 4 due to the change of the lengths of the support rods 2 is avoided.
Specifically, one end of the upper rod 51, which is far away from the mounting rod 42, and one end of the lower rod 52, which is far away from the base 1, are rotatably connected with thread cylinders 54, two ends of the pulling rod 53 are respectively in threaded connection with the two thread cylinders 54, and the two ends of the pulling rod 53 are screwed into the thread cylinders 54, so that the pulling rod 53 can be connected. And the whole length of the pull rod 5 can be adjusted by adjusting the length of the pull rod 53 screwed into the thread cylinder 54, so that the length of the pull rod 5 can be finely adjusted.
Referring to fig. 1, in order to further improve the supporting stability of the movable bar 4, the telescopic bar 6 is detachably connected to one end of the installation bar 42 away from the extension bar 41, and one end of the telescopic bar 6 away from the support bar 2 can be abutted against the ceiling, so that the construction elevator attachment frame is clamped between the bottom plate and the ceiling of the floor, thereby ensuring the installation stability of the construction elevator attachment frame.
Referring to fig. 4 and 5, a mounting seat 7 is fixedly connected to the ceiling, the mounting seat 7 has the same structure as the base 1, a butting rod 71 having the same shape as the support rod 2 is fixedly connected to the mounting seat 7, and a third accommodating groove 72 is formed at one end of the butting rod 71 away from the mounting seat 7. One end of the telescopic rod 6, which is far away from the supporting rod 2, can be inserted in the third accommodating groove 72, and the telescopic length of the telescopic rod 6 is adjusted, so that the construction elevator attaching frame can be firmly clamped between the bottom plate and the ceiling of the floor, and the installation is firmer and more stable.
Wherein, between two adjacent attached frame main parts, be located a mount pad 7 of lower floor and be located the base 1 on upper strata and connect through wearing to establish the screw rod 8 on the floor board between for mount pad 7 and base 1 can both be fixed more firmly.
Referring to fig. 4 and 5, the telescopic link 6 includes a first rod 61 inserted in the second receiving groove 44, a second rod 62 inserted in the third receiving groove 72, and a connecting cylinder 63 screw-coupled between the first rod 61 and the second rod 62. The cross section of one end of the first rod 61 inserted into the second receiving groove 44 is rectangular, the cross section of the other end of the second rod 62 is circular, a first limiting plate 611 is fixedly connected to the first rod 61, the first limiting plate 611 is located at the joint of the first rod 61 with the rectangular cross section and the second rod with the circular cross section to limit the limit length of the first rod 61 inserted into the second receiving groove 44, and meanwhile, an external thread connected with the connecting cylinder 63 in a threaded manner is processed on the outer wall of the end of the first rod 61 with the circular cross section. The cross section of one end of the second rod 62 inserted in the third accommodating groove 72 is rectangular, the cross section of the other end of the second rod 62 is circular, a second limiting plate 621 is fixedly connected to the second rod 62, the second limiting plate 621 is located at the joint where the cross section is rectangular and the cross section is circular to limit the limit length of the second rod 62 inserted in the third accommodating groove 72, and meanwhile, an external thread connected with the connecting cylinder 63 in a threaded manner is processed on the outer wall of one end of the second rod 62 where the cross section is circular. Wherein, the external screw thread that processes on first pole 61 and the external screw thread that processes on second pole 62 revolve to opposite direction for when revolving to revolve to twist connecting cylinder 63 and rotate, can drive first pole 61 and second pole 62 simultaneously screw in connecting cylinder 63 or simultaneously screw out from connecting cylinder 63, in order to adjust the length of telescopic link 6, and the back of just adjusting to finish, the relative position between first pole 61 and the second pole 62 also keeps fixing.
The implementation principle of the construction elevator attaching frame in the embodiment of the application is as follows: during the use, directly will be located the mount pad 7 on the superstructure and be located base 1 on the superstructure and connect through wearing to locate the screw rod 8 on the floor board to fix the relative position between mount pad 7 and the base 1 through the gasket nut. Then select suitable quantity extension bar 41 to install in proper order in the upper end of bracing piece 2 according to the height that the wall attached support needs the attachment point, install movable rod 4 in the upper end of extension bar 41 again, will attach the wall support coupling on supplementary link 3. When the height of the auxiliary connecting frame 3 is too high, the telescopic rod 6 with a proper length can be selected, and the telescopic rod 6 is installed between the installation rod 42 and the abutting rod 71, so that the installation stability of the auxiliary frame of the construction hoist is maintained. And finally, selecting a pulling rod 53 with a proper length, and installing the pulling rod 53 between the upper rod 51 and the lower rod 52 to realize the pulling and holding of the auxiliary connecting frame 3 and complete the installation of the construction elevator attaching frame.
It can be understood that, when the mounting seat 7 is mounted, the mounting seat 7 with the abutting rod 71 and the mounting seat 7 without the abutting rod 71 can be selected according to requirements, and the use is more flexible.
The embodiment of the application discloses a method for installing a construction elevator attachment frame. Referring to fig. 6, the method of installing the construction elevator attachment frame includes the steps of,
the mounting base 1 and the mounting base 7; place base 1 on the bottom plate of waiting to install the floor, place mount pad 7 on the ceiling of next floor, wear to establish base 1, mount pad 7 and floor board between the two with screw rod 8 simultaneously on, fix the position of screw rod 8 on base 1 and fix the position of screw rod 8 on mount pad 7 through the gasket nut to the realization is fixed mount pad 7 and base 1 on the floor board simultaneously, accomplishes the installation of mount pad 7 and base 1. Then another set of bases 1 and mounting seats 7 is fixed to the ceiling of the floor to be installed and to the floor of the previous floor.
Selecting and installing an extension bar 41; according to the position to which the wall-attached bracket needs to be attached, a proper number of extension bars 41 are selected, then one extension bar 41 is inserted into the first accommodating groove 23 on the support bar 2, and then the other extension bars 41 are sequentially inserted into the second accommodating groove 44 on the next extension bar 41.
Mounting the mounting rod 42; the end of the mounting rod 42 remote from the auxiliary connecting frame 3 is inserted into the second receiving groove 44 of the uppermost extension rod 41.
Selecting to install a telescopic rod 6; whether the telescopic rod 6 needs to be installed is determined according to needs, when the telescopic rod 6 needs to be installed, the telescopic rod 6 with the proper length is selected, the telescopic rod 6 is inserted into the second accommodating groove 44 in the upper end of the installation rod 42, the length of the telescopic rod 6 is adjusted, the upper end of the telescopic rod 6 is inserted into the third accommodating groove 72 in the abutting rod 71, and the telescopic rod 6 abuts between the installation rod 42 and the abutting rod 71.
Installing a pull rod 5; the pull rod 5 with a proper length is selected, and both ends of the pull rod 5 are screwed in the two threaded cylinders 54.
The implementation principle of the installation method of the attachment frame of the construction elevator in the embodiment of the application is as follows: the installation of the attachment frame of the construction elevator can be completed only by fixing the base 1 and the mounting seat 7 on the floor plate through the screw rod 8 and the nut, then directly inserting the movable rod 4 on the support rod 2, inserting the telescopic rod 6 on the movable rod 4 and the abutting rod 71, screwing the pulling rod 53 into the thread cylinder 54, and the attachment frame of the construction elevator is very simple and convenient to install.
The above are preferred embodiments of the present application, and the scope of protection of the present application is not limited thereto, so: equivalent changes in structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (10)

1. The utility model provides a construction elevator adheres to frame which characterized in that: including setting up the attachment frame body for attaching the wall support and providing the attachment point between adjacent two-layer building floor, the attachment frame body includes base (1) of rigid coupling on the building structure bottom plate, installs bracing piece (2) on base (1) and install be used for on bracing piece (2) with attach wall leg joint's supplementary link (3).
2. The construction elevator attachment frame according to claim 1, wherein: the support rod (2) is far away from one end of the base (1) and is spliced with a movable rod (4), and one end of the support rod (2) far away from the base (1) is provided with a first accommodating groove (23) for the movable rod (4) to be inserted into.
3. The construction elevator attachment frame according to claim 2, wherein: the movable rod (4) is provided with a plurality of movable rods, the movable rods (4) are connected end to end in an inserting mode, and the auxiliary connecting frame (3) is installed on the movable rod (4) far away from the base (1).
4. The construction elevator attachment frame according to claim 2, wherein: many a pole of being connected with supplementary mounting bracket in movable rod (4) is called installation pole (42), and remaining movable rod (4) all are called extension bar (41), installation pole (42) with be provided with between base (1) and be used for right installation pole (42) are drawn and are held pull rod (5) with increase installation pole (42) installation stability, pull rod (5) encircle the axis interval of installation pole (42) is provided with a plurality ofly, pull rod (5) base (1) with constitute triangular bearing structure between installation pole (42).
5. The construction elevator attachment frame according to claim 4, wherein: the pull rod (5) comprises a lower rod (52) hinged to the mounting seat (7), an upper rod (51) hinged to the side wall of the mounting rod (42) and a pull rod (53) detachably connected between the upper rod (51) and the lower rod (52).
6. The construction elevator attachment frame according to claim 5, wherein: the upper rod (51) is far away from one end of the mounting rod (42) and the lower rod (52) is far away from one end of the base (1) and is connected with a thread cylinder (54) in a rotating mode, and two ends of the pulling rod (53) are respectively in threaded connection with the two thread cylinders (54).
7. The construction elevator attachment frame according to claim 1, wherein: the supporting rod (2) is far away from one end of the base (1) and is detachably connected with a telescopic rod (6), and one end of the telescopic rod (6) far away from the supporting rod (2) is used for abutting against the ceiling.
8. The construction elevator attachment frame according to claim 7, wherein: the attachment frame body further comprises a mounting seat (7) used for being fixed to the ceiling, and the mounting seat (7) is detachably connected with the telescopic rod (6).
9. The construction elevator attachment frame according to claim 8, wherein: the attaching frame is characterized in that a plurality of attaching frame bodies are arranged, and the bases (1) of two adjacent attaching frame bodies are connected with the mounting seat (7).
10. A method for installing a construction elevator attachment frame is characterized in that: the method comprises the following steps:
a mounting base (1) and a mounting seat (7); the method comprises the following steps of placing a base (1) on a bottom plate of a floor to be installed, placing an installation seat (7) on a ceiling of the next floor, and connecting the installation seat (7) with the base (1) through a screw (8) penetrating through the floor; another group of bases (1) and mounting seats (7) are mounted on the ceiling of the floor to be mounted and the bottom plate of the previous floor;
selecting and installing extension bars (41), selecting a proper number of extension bars (41) according to the positions to be attached to the wall-attached support, inserting the extension bars (41) on the support bars (2), and sequentially installing the rest extension bars (41);
mounting a mounting rod (42), and inserting the mounting rod (42) on the uppermost extension rod (41);
installing a telescopic rod (6), inserting the telescopic rod (6) at the upper end of the installation rod (42), and adjusting the length of the telescopic rod (6) to enable the telescopic rod (6) to abut against between the installation rod (42) and the installation seat (7);
installing a pull rod (5), selecting the pull rod (5) with proper length, and screwing two ends of the pull rod (5) on the two threaded cylinders (54).
CN202210768854.9A 2022-07-01 2022-07-01 Construction elevator attaching frame and installation method thereof Active CN115321314B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210768854.9A CN115321314B (en) 2022-07-01 2022-07-01 Construction elevator attaching frame and installation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210768854.9A CN115321314B (en) 2022-07-01 2022-07-01 Construction elevator attaching frame and installation method thereof

Publications (2)

Publication Number Publication Date
CN115321314A true CN115321314A (en) 2022-11-11
CN115321314B CN115321314B (en) 2023-08-29

Family

ID=83918462

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210768854.9A Active CN115321314B (en) 2022-07-01 2022-07-01 Construction elevator attaching frame and installation method thereof

Country Status (1)

Country Link
CN (1) CN115321314B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003238056A (en) * 2003-03-10 2003-08-27 Matsushita Electric Works Ltd Fixing structure for elevator driving device
CN209097983U (en) * 2018-09-29 2019-07-12 云南建投第十建设有限公司 Adjustable sizing building hoist attachment device
CN210064825U (en) * 2019-05-31 2020-02-14 深圳中物智建科技有限公司 A lift platform adheres to frame for building site
CN210558742U (en) * 2019-06-28 2020-05-19 张家港市荣达建筑机械制造有限公司 Wall attaching frame for installing standard joints in construction elevator
CN212249112U (en) * 2020-05-09 2020-12-29 南通安恒智能科技发展有限公司 Adjustable integral plate type support of attached lifting scaffold
CN213569002U (en) * 2020-11-02 2021-06-29 广州逸安工程机械有限公司 Construction elevator attaches wall mounting structure
CN113460827A (en) * 2021-07-16 2021-10-01 广西壮族自治区特种设备检验研究院 Angle readable construction elevator attachment frame

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003238056A (en) * 2003-03-10 2003-08-27 Matsushita Electric Works Ltd Fixing structure for elevator driving device
CN209097983U (en) * 2018-09-29 2019-07-12 云南建投第十建设有限公司 Adjustable sizing building hoist attachment device
CN210064825U (en) * 2019-05-31 2020-02-14 深圳中物智建科技有限公司 A lift platform adheres to frame for building site
CN210558742U (en) * 2019-06-28 2020-05-19 张家港市荣达建筑机械制造有限公司 Wall attaching frame for installing standard joints in construction elevator
CN212249112U (en) * 2020-05-09 2020-12-29 南通安恒智能科技发展有限公司 Adjustable integral plate type support of attached lifting scaffold
CN213569002U (en) * 2020-11-02 2021-06-29 广州逸安工程机械有限公司 Construction elevator attaches wall mounting structure
CN113460827A (en) * 2021-07-16 2021-10-01 广西壮族自治区特种设备检验研究院 Angle readable construction elevator attachment frame

Also Published As

Publication number Publication date
CN115321314B (en) 2023-08-29

Similar Documents

Publication Publication Date Title
JP2018070362A (en) Elevator installation method
CN208899886U (en) Cantilever frame platform
CN105888229A (en) All-steel attached scaffold mounting method
CN109132843B (en) The installation method of super-section metal bellows in a kind of vertical shaft
CN214834605U (en) A climb a structure that adheres to for structure disappearance layer
CN115321314A (en) Construction elevator attachment frame and installation method thereof
JP4391649B2 (en) Elevator hoist support device
CN109958819A (en) A kind of gas pipeline laying method and its supporting structure
CN204529015U (en) A kind of V-type elevator wall-attached frame
CN110980478A (en) Construction lifting system
CN211141292U (en) Special bracket for integral hoisting of air pipe
CN213174742U (en) Top bracing steel stand structure
CN211622543U (en) Hanging basket control device
CN209567734U (en) A kind of simple Special-purpose lifting device
CN113501404A (en) Ultrahigh construction elevator and wall attaching method for same
CN208749088U (en) A kind of floor support plate oblique pull support construction
CN215802523U (en) Glass curtain wall connecting structure
CN112627487A (en) Climbing frame attachment structure suitable for decorative constructional column
CN204901559U (en) Hall ceiling lamp mounting structure
CN214885646U (en) Material platform drawknot connecting piece
JP2005146772A (en) Roof supporting structural body unit, large space roof structure and construction methods of them
CN218031775U (en) Steel structure mounting bracket
CN218492725U (en) Vertical butt joint adjusting device of steel construction
CN211524011U (en) Safety operation cage externally hung on boundary beam
CN212336763U (en) Curtain wall installation guide rail device fixed on roof flower frame beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant