CN213569002U - Construction elevator attaches wall mounting structure - Google Patents

Construction elevator attaches wall mounting structure Download PDF

Info

Publication number
CN213569002U
CN213569002U CN202022491188.8U CN202022491188U CN213569002U CN 213569002 U CN213569002 U CN 213569002U CN 202022491188 U CN202022491188 U CN 202022491188U CN 213569002 U CN213569002 U CN 213569002U
Authority
CN
China
Prior art keywords
wall
guide rail
rail frame
auxiliary
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022491188.8U
Other languages
Chinese (zh)
Inventor
赖萃旺
周永杰
刘得伏
孙国来
贺伟萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Yi'an Construction Machinery Co ltd
Original Assignee
Guangzhou Yi'an Construction Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Yi'an Construction Machinery Co ltd filed Critical Guangzhou Yi'an Construction Machinery Co ltd
Priority to CN202022491188.8U priority Critical patent/CN213569002U/en
Application granted granted Critical
Publication of CN213569002U publication Critical patent/CN213569002U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

The utility model belongs to the technical field of construction elevators, in particular to a wall-attached mounting structure of a construction elevator, the lower surface of an auxiliary guide rail frame is connected with the inner wall thread of an auxiliary bottom frame through a high-strength bolt, the left side surface and the right side surface of the auxiliary guide rail frame are fixedly connected with the outer surface of a diagonal draw tube through a tube clamp, the auxiliary guide rail frame, the auxiliary bottom frame, an auxiliary standard section, a wall-attached connecting tube and a guide rail frame are arranged, the auxiliary guide rail frame is formed by connecting a plurality of sections of auxiliary standard sections through high-strength bolts, both sides of the auxiliary standard section are reinforced and stabilized by diagonal draw tubes, the wall-attached connecting tube is reinforced and stabilized at the horizontal position of each wall-attached, the wall-attached mounting problem that the guide rail frame is far away from a building is effectively solved through the wall-attached connecting tube, the wall-attached mounting structure is not limited by distance, the application of the auxiliary guide rail frame can ensure that, the stress limit is higher, and the original potential safety hazard is solved.

Description

Construction elevator attaches wall mounting structure
Technical Field
The utility model belongs to the technical field of the construction elevator, concretely relates to construction elevator attaches wall mounting structure.
Background
Construction elevators are generally referred to as construction elevators, but construction elevators comprise a broader definition and construction platforms also belong to the construction elevator series. The simple construction elevator consists of a lift car, a driving mechanism, a standard knot, an attached wall, a chassis, a fence, an electrical system and the like, is a manned cargo-carrying construction machine frequently used in buildings, is comfortable and safe to ride due to the unique box body structure, is usually matched with a tower crane to use on a construction site, generally has the carrying capacity of 0.3-3.6 tons, and has the running speed of 1-96M/min and the like. Construction elevators produced in China are more and more mature and gradually move to the international world.
The existing installation scheme aiming at the longer distance between the guide rail frame and the bottom of the building mainly changes the wall attachment structure, increases the installation distance of the wall attachment, or increases the connection mechanism and lengthens the connection frame to increase the installation distance. The two modes change the original wall-attached structure to different degrees, have certain potential safety hazard, and the lengthening distance is limited within 6 meters, so that the problem that the distance between the building and the guide rail frame is far cannot be completely solved.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a construction elevator attaches wall mounting structure has the characteristics of solving the building and guide rail frame distance far away.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a construction elevator attaches wall mounting structure, includes auxiliary guide rail frame, auxiliary guide rail frame's lower surface passes through the inner wall threaded connection of high strength bolt and supplementary chassis, auxiliary guide rail frame's the left and right sides face passes through the outer fixed surface connection of pipe strap and diagonal tube, auxiliary guide rail frame's surface passes through the pipe strap and is connected with the outer fixed surface who attaches the wall connecting pipe, the left and right sides of attaching the upper surface of wall connecting pipe passes through high strength bolt and attaches the inner wall threaded connection of wall frame, and two attach the one side that wall frame is relative through attaching the left surface fixed connection of wall connecting pipe and guide rail frame, guide rail frame's the left and right sides face is provided with two cage respectively.
Furthermore, the auxiliary guide rail frame comprises auxiliary standard joints, and the auxiliary guide rail frame is formed by connecting a plurality of auxiliary standard joints through high-strength bolts.
Furthermore, the left side surface and the right side surface of the auxiliary guide rail frame are used for fixing the two inclined pull pipes on the outer surface of the auxiliary guide rail frame in a crossing manner through pipe clamps.
Further, the wall-attached connecting pipes are respectively arranged at the horizontal position of each wall-attached part.
Further, the suspension cage is arranged between the auxiliary guide rail bracket and the guide rail bracket.
Further, the guide rail frame comprises standard knots, and the outer surface of the elevator guide rail frame is fixedly connected with the inner wall of the wall-attached frame through a wall-attached and high-strength bolts.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses, through setting up the auxiliary guide rail frame, the auxiliary bottom frame, the auxiliary standard festival, attach wall connecting pipe and guide rail frame, the auxiliary guide rail frame is formed by the festival of the auxiliary standard of multisection with high strength bolted connection, the bottom auxiliary standard festival is connected with the auxiliary bottom frame through high strength bolt, the both sides of auxiliary standard festival are all strengthened firmly with oblique stay tube, attach the horizontal position of wall at each way and strengthen firmly with attaching the wall connecting pipe, connect elevator guide rail frame and attaching the wall connecting pipe through attaching the wall, thereby effectively solve guide rail frame and building apart from attaching the wall installation problem far away, and not restricted by the distance, the application of auxiliary guide rail frame can make to attach the wall installation more stable, the atress limit is also higher, original potential safety hazard has been solved.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a half-section structure viewed from the middle left of the present invention;
fig. 3 is a schematic structural view from the top of the present invention;
in the figure: 1. an auxiliary guide rail frame; 11. an auxiliary standard section; 2. a guide rail bracket; 21. a standard section; 3. a wall-attached frame; 4. a pipe clamp; 5. obliquely pulling the pipe; 6. a wall-attached connecting pipe; 7. an auxiliary chassis; 8. a suspension cage.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides the following technical solutions: a wall-attached mounting structure of a construction elevator comprises a guide rail frame 1, an auxiliary standard section 11, a guide rail frame 2, a standard section 21, a wall-attached frame 3, a pipe clamp 4, an inclined pull pipe 5, a wall-attached connecting pipe 6, an auxiliary underframe 7 and a suspension cage 8, the lower surface of the auxiliary guide rail bracket 1 is in threaded connection with the inner wall of the auxiliary bottom bracket 7 through a high-strength bolt, the left and right side surfaces of the auxiliary guide rail frame 1 are fixedly connected with the outer surface of an inclined pull pipe 5 through pipe clamps 4, the outer surface of the auxiliary guide rail bracket 1 is fixedly connected with the outer surface of a wall-attached connecting pipe 6 through a pipe clamp 4, the left side and the right side of the upper surface of the wall-attached connecting pipe 6 are in threaded connection with the inner wall of the wall-attached frame 3 through high-strength bolts, and the opposite surfaces of the two wall attaching frames 3 are fixedly connected with the left side surface of the guide rail frame 2 through wall attaching connecting pipes 6, and two suspension cages 8 are respectively arranged on the left side surface and the right side surface of the guide rail frame 2.
As shown in fig. 1, the auxiliary guide rail frame 1 is provided with the auxiliary standard knot 11, the auxiliary guide rail frame 1 is formed by connecting a plurality of auxiliary standard knots 11 through high-strength bolts, and the auxiliary guide rail frame 1 is formed by connecting a plurality of auxiliary standard knots 11 through high-strength threads, so that the auxiliary guide rail frame 1 formed by a plurality of auxiliary standard knots 11 can be supplemented with the guide rail frame 2, the wall-attached installation is more stable, and the stress limit is higher.
As shown in fig. 1 and 2, two inclined pull pipes 5 are fixed on the outer surface of the auxiliary rail frame 1 by crossing through pipe clamps 4 by providing the left and right side surfaces of the auxiliary rail frame 1, and the two inclined pull pipes 5 are fixed on the outer surface of the auxiliary rail frame 1 by crossing, so that the auxiliary rail frame 1 can be fixed by the inclined pull pipes 5, and the auxiliary rail frame 1 is more stable.
As shown in fig. 2 and 3, the wall-attached connecting pipes 6 are arranged at the horizontal positions of the respective wall attachments, so that the wall attachments can be fixed by the wall-attached connecting pipes 6, and the wall attachments are more stable during operation.
As shown in fig. 3, the two cages 8 are arranged on the left and right sides of the rail frame and are parallel to each other, so that the cages 8 are more stable and safer in the lifting process.
As shown in fig. 1, the guide rail frame 2 includes a standard section 21, and the outer surface of the elevator guide rail frame 2 is fixedly connected with the inner wall of the wall attaching frame 3 through the wall attaching and high-strength bolts, and the wall attaching frame 3 is fixed through the wall attaching and high-strength bolts on the outer surface of the elevator guide rail frame 2, so that the elevator guide rail frame 2 and the auxiliary guide rail frame 1 are more stable, and the problem of wall attaching installation of the guide rail frame 2 and a building far away is effectively solved.
Example 1
A kind of construction hoist attaches the wall mounting structure, as shown in fig. 1, fig. 2 and fig. 3, first the body shelf, link span, attaching the wall connecting pipe 6, auxiliary bottom bracket 7 and lengthening the shelf assembly of the wall shelf 3 on the ground, and adjust the length of attaching the wall shelf 3, the bolt does not need to be tightened too much, start left cage and right cage at the same time, rise synchronously, open to the cage top rail and level and attach the wall mounting position, keep the stress balance of the guide rail frame 2, reduce the verticality error, fix the arm attaching the wall shelf 3 on the standard festival 21 with four bolts, needn't tighten the bolt too much first, in order to adjust the position, hang the mounting position on the wall shelf 3 that the ground assembles with the tower crane, install the body shelf and bolt attaching the wall at first, put down the wall shelf 3 slowly, until the auxiliary bottom shelf 7 is connected with the pre-buried plate outside the building beam; after the auxiliary bottom frame 7 and the embedded plate are spot-welded, the verticality and the levelness of the guide rail frame 2 are measured after the positions of all parts of the wall attaching frame 3 are adjusted, all bolts are screwed, finally, a lifting hook of the tower crane is taken off, and then the elevator is slowly started to ensure that the suspension cage 8 does not collide with the wall attaching frame 3.
Bottom auxiliary standard festival 11 is connected with supplementary chassis 7 through the high strength bolt, 11 both sides of auxiliary standard festival are all strengthened firmly with slide tube 5, it is firm to strengthen with attaching wall connecting pipe 6 at each horizontal position of attaching the wall, connect lift guide rail frame 2 and attaching wall connecting pipe 6 through attaching the wall, thereby effectively solve guide rail frame 2 and building apart from attaching the wall installation problem far away, and do not receive the distance restriction, the application of auxiliary guide rail frame 1 can make and attach the wall installation more stable, the atress limit is also higher.
The utility model discloses a theory of operation and use flow: the utility model discloses, when using, auxiliary guide rail frame 1 is formed by the supplementary standard festival 11 high strength bolted connections of multisection, the supplementary standard festival 11 of bottom is connected with supplementary chassis 7 through the high strength bolt, 11 both sides of supplementary standard festival are all strengthened firmly with slide pipe 5, attach the horizontal position of wall with attaching wall connecting pipe 6 and strengthen firmly at each way, through attaching the wall to lift guide rail frame 2 with attach wall connecting pipe 6 and connect, thereby can effectively solve guide rail frame 2 and building apart from attaching the wall installation problem far away, and not restricted by the distance, auxiliary guide rail frame 1's application can make and attach the wall installation more stable, the atress limit is also higher.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a construction elevator attaches wall mounting structure, includes auxiliary guide rail frame (1), its characterized in that: the lower surface of auxiliary guide rail frame (1) passes through the inner wall threaded connection of high strength bolt and auxiliary chassis (7), the left and right sides face of auxiliary guide rail frame (1) passes through pipe strap (4) and the outer fixed surface of inclined stay tube (5) is connected, the surface of auxiliary guide rail frame (1) passes through pipe strap (4) and attaches the outer fixed surface of wall connecting pipe (6) to be connected, the left and right sides of the upper surface that attaches wall connecting pipe (6) passes through the high strength bolt and attaches the inner wall threaded connection of wall frame (3), and two attach the left surface fixed connection of wall frame (3) relative one side through attaching wall connecting pipe (6) and guide rail frame (2), the left and right sides face of guide rail frame (2) is provided with two cage (8) respectively.
2. The construction elevator wall attachment mounting structure according to claim 1, wherein: the auxiliary guide rail frame (1) comprises auxiliary standard joints (11), and the auxiliary guide rail frame (1) is formed by connecting a plurality of auxiliary standard joints (11) through high-strength bolts.
3. The construction elevator wall attachment mounting structure according to claim 1, wherein: the left side surface and the right side surface of the auxiliary guide rail frame (1) are used for fixing two inclined pull tubes (5) on the outer surface of the auxiliary guide rail frame (1) in a crossed manner through tube clamps (4).
4. The construction elevator wall attachment mounting structure according to claim 1, wherein: the wall-attached connecting pipes (6) are respectively arranged at the horizontal position of each wall.
5. The construction elevator wall attachment mounting structure according to claim 1, wherein: the two suspension cages (8) are arranged on the left side and the right side of the guide rail frame and are parallel to each other.
6. The construction elevator wall attachment mounting structure according to claim 1, wherein: the guide rail frame (2) comprises standard sections (21), and the outer surface of the guide rail frame (2) of the elevator is fixedly connected with the inner wall of the wall-attached frame (3) through a wall and a high-strength bolt.
CN202022491188.8U 2020-11-02 2020-11-02 Construction elevator attaches wall mounting structure Active CN213569002U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022491188.8U CN213569002U (en) 2020-11-02 2020-11-02 Construction elevator attaches wall mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022491188.8U CN213569002U (en) 2020-11-02 2020-11-02 Construction elevator attaches wall mounting structure

Publications (1)

Publication Number Publication Date
CN213569002U true CN213569002U (en) 2021-06-29

Family

ID=76532608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022491188.8U Active CN213569002U (en) 2020-11-02 2020-11-02 Construction elevator attaches wall mounting structure

Country Status (1)

Country Link
CN (1) CN213569002U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113501404A (en) * 2021-07-27 2021-10-15 中国建筑一局(集团)有限公司 Ultrahigh construction elevator and wall attaching method for same
CN115321314A (en) * 2022-07-01 2022-11-11 北京城建七建设工程有限公司 Construction elevator attachment frame and installation method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113501404A (en) * 2021-07-27 2021-10-15 中国建筑一局(集团)有限公司 Ultrahigh construction elevator and wall attaching method for same
CN115321314A (en) * 2022-07-01 2022-11-11 北京城建七建设工程有限公司 Construction elevator attachment frame and installation method thereof
CN115321314B (en) * 2022-07-01 2023-08-29 北京城建七建设工程有限公司 Construction elevator attaching frame and installation method thereof

Similar Documents

Publication Publication Date Title
CN213569002U (en) Construction elevator attaches wall mounting structure
CN212478241U (en) Novel steel structure spherical net rack ceiling conversion layer connecting structure
CN108002210A (en) C-type hanging apparatus under a kind of beam, plate
WO2023213039A1 (en) Safe continuous wall attachment device for high-rise buildings
CN207244452U (en) A kind of suspension bridge vice saddle adjusting apparatus in place
CN220376298U (en) Hanging basket lifting device
CN210714046U (en) Device for lifting inverted chimney steel inner cylinder by using steel twisted rope hydraulic pressure
CN201809032U (en) Self-adjusting stay device with combinable hanger
CN207861716U (en) C-type hanging apparatus under a kind of beam, plate
CN206693060U (en) A kind of hoisting device for the lifting of suspension bridge saddle bearing plate
CN212926873U (en) Nonstandard attached connecting structure of building construction lifter
CN212295588U (en) Triangular truss for high-rise building construction
CN210393401U (en) Hoisting and positioning device for stand column
CN112942777A (en) Ultrahigh-layer periphery protection cyclic telescopic detachable cantilever structure and mounting method
CN103225390B (en) Hollow facade pulley guide attached-type lifting scaffold
CN109972845A (en) Method for mounting steel roof truss
CN220183816U (en) Suspension bridge reinforcing apparatus
CN219507418U (en) Lengthened attachment structure for steel structure beam construction lifter
CN220723293U (en) A three-point hoist device for arc girder steel
CN212503648U (en) Hoisting device for side mounting of unit module
CN209703990U (en) Girder structures under a kind of attachment type raise scaffold movable guide wheel
CN217172928U (en) Hoisting fixing device
CN209618821U (en) A kind of circulation jacking lifting system
CN221216936U (en) Wall-riding type installation hanging bracket of high-altitude hoisting equipment
CN219906623U (en) Adjusting device for wall-attached horizontal angle of construction lifter

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant