CN115187200B - Assembled computer lab construction management system based on BIM digital-analog separation - Google Patents

Assembled computer lab construction management system based on BIM digital-analog separation Download PDF

Info

Publication number
CN115187200B
CN115187200B CN202210810609.XA CN202210810609A CN115187200B CN 115187200 B CN115187200 B CN 115187200B CN 202210810609 A CN202210810609 A CN 202210810609A CN 115187200 B CN115187200 B CN 115187200B
Authority
CN
China
Prior art keywords
construction
management
model
progress
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210810609.XA
Other languages
Chinese (zh)
Other versions
CN115187200A (en
Inventor
刘向东
史振中
李树鹏
张琦
崔一鸣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Installation Group Co Ltd
Original Assignee
Shanxi Installation Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Installation Group Co Ltd filed Critical Shanxi Installation Group Co Ltd
Priority to CN202210810609.XA priority Critical patent/CN115187200B/en
Publication of CN115187200A publication Critical patent/CN115187200A/en
Application granted granted Critical
Publication of CN115187200B publication Critical patent/CN115187200B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/105Human resources
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/12Accounting
    • G06Q40/125Finance or payroll
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

The invention discloses an assembled machine room construction management system based on BIM digital-analog separation, which comprises an assembled machine room construction cooperation platform based on a construction flow, wherein the assembled machine room construction cooperation platform comprises a large screen display end, a Web application end and an APP application end, the large screen display end is used for displaying an overall progress cross road map, construction states and image progress and completion conditions of each work area, the Web application end performs digital-analog separation by adopting a BIM model lightweight technology according to the construction flow, and further a visual electronic sand table is built, so that the refined management in the construction process is realized, and the APP application end is used for checking site construction information and reporting feedback in time. According to the invention, under the advantages of shortening the construction period and reducing the cost of the assembly construction technology, the project is digitally managed, and effective data connection among a plurality of working procedures such as a prefabrication factory, a construction site, transportation and the like is provided in the process of design, construction and completion delivery, so that an effective scheduling basis is provided for resource allocation.

Description

Assembled computer lab construction management system based on BIM digital-analog separation
Technical Field
The invention belongs to the technical field of BIM (building information modeling) and assembly type, and particularly relates to an assembly type machine room construction management system based on BIM digital-analog separation.
Background
Along with the green construction and intelligent construction of the national advanced engineering project, the construction of the modularized assembly type machine room is rapidly developed, the fine factory prefabrication is highly matched with the BIM digital platform, the prefabrication rate of pipelines of the machine room is greatly improved, the construction speed of the machine room is accelerated, and the traditional construction site installation is gradually replaced. The civil engineering and the installation are simultaneously constructed, so that the total construction period of the machine room is greatly shortened.
In order to realize the management of the assembled construction, the invention forms a set of management method based on the assembled construction, and a digital management mode and a digital management system are formed by data after BIM model digital-analog separation.
Disclosure of Invention
The invention aims to provide an assembled machine room construction management system based on BIM digital-analog separation so as to solve the problems.
In order to achieve the above object, an embodiment of the present invention provides the following technical solution:
the utility model provides an assembled computer lab construction management system based on BIM digital-analog separation, includes the assembled computer lab construction cooperation platform based on the work flow, assembled computer lab construction cooperation platform includes large screen show end, web application end and APP application end, large screen show end is used for showing overall progress cross road map, each work area construction state and image progress and completion condition, the Web application end carries out digital-analog separation through adopting BIM model lightweight technique according to the work flow, and then builds visual electronic sand table, realizes the management of refining in the work flow, APP application end is used for looking over on-the-spot construction information to in time report feedback.
Further, the construction states of each work area comprise three states including non-construction, construction in progress and future construction, the image progress and completion conditions comprise three states including advanced, normal and retarded, and the overall progress cross road map, the construction states of each work area, the image progress and the completion conditions are displayed at the large screen display end by adopting different colors.
Further, the Web application side comprises system management, project management, model management, assembly part management, electronic sand table, field labor management and data management, wherein the project management is used for managing project information.
Further, the system management includes organization management, rights management, user management, and flow management, and the rights management includes role management and rights management.
Further, the model management comprises model professional maintenance, model structure maintenance and model file management, wherein the model file management comprises model uploading, model previewing, model version control, model transcoding and model state.
Further, the assembly part management comprises a component type, a component mark, a component two-dimensional code and a component code, the APP end can acquire component information by scanning the component two-dimensional code, and the component two-dimensional code comprises information of an installation position and an elevation of an assembly module.
Further, the electronic sand table is used for automatically analyzing codes in the BIM model to code into a data main chain, so that an effective database and a resource library are formed, and the electronic sand table is used for planning a progress plan of assembly construction, managing construction production and tracking data of field assembly, and realizing fine management in the construction process.
Further, the on-site labor management includes labor member management including labor team, labor staff, labor fee payment case and gate management.
Further, the data management comprises construction data management and custom data management, and the construction data content comprises a working section, a progress and an assembly part.
Further, the APP application end has the functions of project rotation, proxy, BIM model, quality safety, progress filling, project bar watching, project data and sweeping.
Compared with the prior art, the invention has the following advantages:
according to the invention, under the advantages of shortening the construction period and reducing the cost of the assembly construction technology, the project is digitally managed, and effective data connection among a plurality of working procedures such as a prefabrication factory, a construction site, transportation and the like is provided in the process of design, construction and completion delivery, so that an effective scheduling basis is provided for resource allocation.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings that are required to be used in the embodiments or the description of the prior art will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments described in the present invention, and other drawings may be obtained according to the drawings without inventive effort to those skilled in the art.
FIG. 1 is a system diagram of an assembled machine room construction collaboration platform in accordance with an embodiment of the present invention;
FIG. 2 is a diagram of a Web application side system in accordance with one embodiment of the present invention;
FIG. 3 is a diagram of a system management system according to an embodiment of the invention;
FIG. 4 is a diagram of a model management system in accordance with one embodiment of the present invention;
FIG. 5 is a diagram of an assembly management system according to an embodiment of the present invention;
FIG. 6 is a diagram of a schedule management system according to an embodiment of the present invention;
FIG. 7 is a diagram of a quality safety system according to an embodiment of the present invention;
FIG. 8 is a diagram of an electronic sand table system in accordance with an embodiment of the present invention;
FIG. 9 is a diagram of a field labor management system in accordance with one embodiment of the present invention;
FIG. 10 is a system diagram of worker Cheng Jingliang in accordance with one embodiment of the invention;
FIG. 11 is a diagram of a data management system according to an embodiment of the invention;
FIG. 12 is a diagram of an APP end system in an embodiment of the present invention;
fig. 13 is a general construction view of an embodiment of the present invention.
Detailed Description
The present invention will be described in detail below with reference to the embodiments shown in the drawings. The embodiments are not intended to limit the invention, but structural, methodological or functional modifications from the embodiments are within the scope of the invention.
The invention discloses an assembled machine room construction management system based on BIM digital-analog separation, which is shown by referring to fig. 1-12 and comprises an assembled machine room construction collaboration platform based on a construction flow, wherein the assembled machine room construction collaboration platform comprises a large screen display end, a Web application end and an APP application end.
The construction process is mainly focused on a design stage, a deepened design stage, a factory assembly module processing stage and a field assembly and installation stage.
In addition, the design stage and the deepening design stage mainly comprise equipment type selection and equipment data collection, equipment arrangement, module design, profile steel selection, damping design, foundation design, drainage ditch optimization, pipe group splitting and combining and support and hanger arrangement deepening drawing.
Referring to fig. 1 to 12, the large screen display end includes a projector and a display screen, and the display screen is used for displaying an overall progress cross-road map, construction states of each work area, image progress and completion conditions.
Wherein, each work area construction state comprises three states of construction incapability, construction in progress and future construction.
In addition, the image progress and the completion condition, namely the construction progress of a single professional model, show that the interrelationship of the actual progress of the individual components and the planned progress comprises three states of advance, normal and retard.
Specifically, the overall progress cross road map, the construction state and the image progress of each work area and the completion condition are displayed on a display screen by adopting different colors.
Preferably, the overall progress cross road map is displayed in a first level, namely gray display, the construction state of each work area is displayed in a basic mode, and the image progress and the completion condition are displayed in a second level.
Referring to fig. 2-12, the Web application end performs digital-to-analog separation by adopting a BIM model lightweight technology according to a construction flow, so as to construct a visual electronic sand table, realize fine management in the construction process, and the APP application end is used for checking on-site construction information and reporting feedback in time.
The Web application end comprises system management, project management, model management, assembly management, electronic sand tables, site labor management and data management, wherein the project management is used for managing project information.
In addition, the system management includes organization management, rights management, user management, and flow management, and the rights management includes role management and rights management.
In particular, model management includes model specialized maintenance, model structure maintenance, and model file management, wherein model file management includes model upload, model preview, model version control, model transcoding, and model state.
Preferably, the model states include a history state and a reuse state.
In addition, assembly management comprises component types, component marks, component two-dimensional codes and component codes, and the APP end can acquire component information by scanning the component two-dimensional codes.
Preferably, the two-dimensional code of the component comprises information such as an installation position, elevation and the like of the assembly module, the model is encoded into a data main chain to form an effective database and a resource library, and the effective database and resource library are used for the establishment of an assembly construction progress plan, the management of construction production and the data tracking of field assembly, so that the fine organization management in the construction process is realized.
Referring to fig. 1-12, the electronic sand table integrates data and graphic elements such as equipment data, equipment arrangement, module design, profile steel model selection, shock absorption design, foundation design, drainage ditch optimization, pipe group splitting and combining, support and hanger arrangement and the like, is used for automatically analyzing codes in a BIM model to form a data main chain by the codes, forms an effective database and a resource library, and is used for planning an assembly type construction progress plan, managing construction production and tracking on-site assembly data, so that fine management in a construction process is realized.
The on-site labor management comprises labor team, labor staff, labor entrance, labor attendance, labor return, labor cost payment and gate management.
In addition, the data management includes construction data management and custom data management, and the construction data content includes process, progress, assembly and other data.
Referring to fig. 1-12, the Web application also includes progress management, quality safety, and engineering net-work.
Wherein the content of the progress management includes a progress plan and progress execution.
In addition, quality safety includes quality control points and problem correction orders.
When the problem correction bill is created, a correction bill flow needs to be defined, and the problem correction bill also has functions of adding, processing and inquiring.
Specifically, the engineering net quantity includes engineering code maintenance and net quantity statistics.
Referring to fig. 1-12, the APP application has functions of item rotation, proxy, BIM model, quality security, progress filling, item bar watching, item data, and sweep.
And the APP application end is also provided with a home page, an address book, a message and a my layout.
When the method is specifically used, referring to FIG. 13, the early stage of project construction adopts a factory processing mode to complete module manufacture, large-caliber pipe section cutting and pipe row assembly, and fully utilizes factory large-scale hoisting and transporting machinery to efficiently complete module assembly and hoisting operation;
according to the construction flow, an assembled machine room construction cooperative platform is established, links such as design, module prefabrication, construction and the like are connected in series by the assembled machine room construction cooperative platform, digital-to-analog separation is performed by adopting a BIM model light-weight technology, a visual electronic sand table is realized by combining a WebGL technology, data and graphic elements such as equipment data, equipment arrangement, module design, profile steel type selection, shock absorption design, foundation design, drainage ditch optimization, pipe group splitting and combination, support and hanger arrangement and the like are integrated by the electronic sand table, codes in the BIM model can be automatically analyzed to be encoded into a data main chain, an effective database and a resource library are formed, and the method is used for compiling a progress plan of assembled construction, managing construction production and tracking data assembled on site, so that fine organization management in the construction process is realized;
in addition, the assembled machine room construction collaboration platform not only realizes the conventional data management, security management, quality management, technical management, progress management, personnel management and other factors, but also provides a plurality of personalized functions, namely, the two-dimensional codes are posted at the doorways of all functional rooms, and the typesetting drawing, the manufacturing method and the corresponding three-dimensional effect of the wall top land of the room are included, so that the model and assembly module rechecking function is realized; after the assembly module arrives at the site, the APP application end scans information such as two-dimensional codes on the component, acquires information such as installation positions, elevations and the like of the assembly module, and is convenient to view; the safety and quality problems can be found, reported, reformed, examined and reformed to the whole closed loop workflow meeting the requirements on the mobile terminal;
in addition, the site progress block and the Gantt chart project a site large screen, the primary display is used for displaying the state of the whole three-dimensional model (gray display), the foundation is used for displaying the construction state of each construction area (construction is impossible, construction is in progress and construction is possible in the future), the secondary display is used for displaying the construction progress of the single professional model, the interrelationship (advanced, lagged and the like) between the actual progress and the planned progress of the individual components is displayed, and the three-dimensional model is distinguished by different colors, so that the observation is convenient.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.
Furthermore, it should be understood that although the present disclosure describes embodiments, not every embodiment contains only one independent technical solution, and that such description is provided for clarity only, and that the technical solutions of the embodiments may be appropriately combined to form other embodiments that will be understood by those skilled in the art.

Claims (5)

1. The assembly type machine room construction management system based on BIM digital-analog separation is characterized by comprising an assembly type machine room construction cooperation platform based on a construction flow, wherein the assembly type machine room construction cooperation platform comprises a large screen display end, a Web application end and an APP application end, the large screen display end is used for displaying an overall progress cross-road map, construction states and image progress and completion conditions of each work area, the Web application end performs digital-analog separation by adopting a BIM model light-weight technology according to the construction flow, and further a visual electronic sand table is built, so that refined management in the construction process is realized, and the APP application end is used for checking site construction information and timely reporting feedback; the construction states of each work area comprise three states of construction incapability, construction in progress and construction in the future, the image progress and the completion situation comprise three states of advancing, normal and lagging, and the overall progress cross road map, the construction states of each work area, the image progress and the completion situation are displayed at the large screen display end by adopting different colors; the Web application end comprises system management, project management, model management, assembly management, electronic sand tables, site labor management and data management, wherein the project management is used for managing project information; the model management comprises model professional maintenance, model structure maintenance and model file management, wherein the model file management comprises model uploading, model previewing, model version control, model transcoding and model state; the assembly part management comprises a component type, a component mark, a component two-dimensional code and a component code, wherein the APP end can acquire component information by scanning the component two-dimensional code, and the component two-dimensional code comprises information of an installation position and an elevation of an assembly module; the electronic sand table is used for automatically analyzing codes in the BIM model to form a data main chain by codes, an effective database and a resource library are formed, and the electronic sand table is used for planning a progress plan of assembly construction, managing construction production and tracking data of field assembly, so that fine management in the construction process is realized.
2. The building information management system based on BIM digital-analog separation according to claim 1, wherein the system management comprises organization management, authority management, user management and flow management, and the authority management comprises role management and authority management.
3. The building information management system based on BIM digital-analog separation according to claim 1, wherein the on-site labor management includes labor member management, labor cost payment and gate management, and the labor member includes labor team, labor team and labor staff.
4. The BIM digital-analog separation based assembly machine room construction management system according to claim 1, wherein the data management comprises construction data management and custom data management, and the construction data content comprises a working section, a progress and an assembly.
5. The assembly type machine room construction management system based on BIM digital-analog separation according to claim 1, wherein the APP application end has the functions of project rotation, proxy, BIM model, quality safety, progress filling, project bar watching, project data and one sweep.
CN202210810609.XA 2022-07-11 2022-07-11 Assembled computer lab construction management system based on BIM digital-analog separation Active CN115187200B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210810609.XA CN115187200B (en) 2022-07-11 2022-07-11 Assembled computer lab construction management system based on BIM digital-analog separation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210810609.XA CN115187200B (en) 2022-07-11 2022-07-11 Assembled computer lab construction management system based on BIM digital-analog separation

Publications (2)

Publication Number Publication Date
CN115187200A CN115187200A (en) 2022-10-14
CN115187200B true CN115187200B (en) 2023-05-16

Family

ID=83517002

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210810609.XA Active CN115187200B (en) 2022-07-11 2022-07-11 Assembled computer lab construction management system based on BIM digital-analog separation

Country Status (1)

Country Link
CN (1) CN115187200B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116109281B (en) * 2023-04-10 2023-06-23 中建安装集团有限公司 Machine room equipment self-adaptive management system and method based on cloud computing

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109544051A (en) * 2019-01-25 2019-03-29 中铁三局集团广东建设工程有限公司 A kind of construction management application platform based on BIM technology application
JP2022067634A (en) * 2020-10-20 2022-05-06 ウソン ユニバーシティ コーオペレーション オブ インダストリアル エデュケーショナル プログラム Bim railroad infrastructure-enterprise information management system and method therefor

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9064219B2 (en) * 2010-05-05 2015-06-23 J. E. Dunn Construction Group, Inc. System and method for managing facility content and equipment information
CN107622355B (en) * 2017-09-30 2021-07-06 长江勘测规划设计研究有限责任公司 Digital management system and method for project group construction process
CN109087048A (en) * 2018-08-17 2018-12-25 青岛理工大学 Assembled architecture component method for tracing based on two dimensional code
CN109215470A (en) * 2018-10-31 2019-01-15 广西路桥工程集团有限公司 A kind of goods electronic sand map system and its construction method based on BIM+GIS
CN112001680A (en) * 2020-08-27 2020-11-27 四川公路桥梁建设集团有限公司 BIM-based highway engineering management system
CN113177768A (en) * 2020-11-10 2021-07-27 国网青海省电力公司 Intelligent engineering platform based on comprehensive digital management of capital construction whole process
CN113361975A (en) * 2021-07-16 2021-09-07 安徽富煌钢构股份有限公司 BIM + wisdom building site management platform system
CN114399265A (en) * 2021-12-08 2022-04-26 国网上海市电力公司 Electric power engineering construction project overall process management and control system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109544051A (en) * 2019-01-25 2019-03-29 中铁三局集团广东建设工程有限公司 A kind of construction management application platform based on BIM technology application
JP2022067634A (en) * 2020-10-20 2022-05-06 ウソン ユニバーシティ コーオペレーション オブ インダストリアル エデュケーショナル プログラム Bim railroad infrastructure-enterprise information management system and method therefor

Also Published As

Publication number Publication date
CN115187200A (en) 2022-10-14

Similar Documents

Publication Publication Date Title
CN110909972B (en) BIM-based steel structure full life cycle management system and method
Li et al. Integrating RFID and BIM technologies for mitigating risks and improving schedule performance of prefabricated house construction
CN110008648B (en) Intelligent building site integration implementation method based on BIM model
Wong et al. Toward low-carbon construction processes: the visualisation of predicted emission via virtual prototyping technology
Kaner et al. Case studies of BIM adoption for precast concrete design by mid-sized structural engineering firms
CN107622355A (en) Project cluster work progress digital management system and method
CN109544051A (en) A kind of construction management application platform based on BIM technology application
CN106845919A (en) Construction information collection processing method
CN107808349A (en) Existing building operation management system based on BIM technology
CN107862153A (en) A kind of transformer station digitizes managing and control system
CN103440600A (en) BIM (Building Information Modeling) risk monitoring system and method of multilayer 4D (4-Dimensional) model
Yu et al. Smarter construction site management using the latest information technology.
WO2021121098A1 (en) Three-dimensional model application method and system for nuclear power engineering modular construction
CN104866952A (en) Three-dimensional digital management implementation method for hydropower station engineering project
CN115187200B (en) Assembled computer lab construction management system based on BIM digital-analog separation
Andelin et al. Creating shared value in a construction project–a case study
CN115456814A (en) Tunnel management platform taking construction organization as core
CN109886838A (en) Smart city operation management platform based on CIM
CN111539690A (en) Construction project collaborative management method and system based on BIM
CN209486723U (en) A kind of construction management application platform based on BIM technology application
Laurini et al. Technology 4.0 for buildings management: from building site to the interactive building book
CN112884290A (en) BIM-based field construction management method
CN112465390A (en) BIM-based subway station construction progress management method
CN210072621U (en) BIM management-based deepened transformation system for vehicle section with ultra-large cover body
CN116562802A (en) Intelligent construction application platform of track traffic based on BIM

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant