CN109886838A - Smart city operation management platform based on CIM - Google Patents

Smart city operation management platform based on CIM Download PDF

Info

Publication number
CN109886838A
CN109886838A CN201910085227.3A CN201910085227A CN109886838A CN 109886838 A CN109886838 A CN 109886838A CN 201910085227 A CN201910085227 A CN 201910085227A CN 109886838 A CN109886838 A CN 109886838A
Authority
CN
China
Prior art keywords
cim
module
project
plate
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910085227.3A
Other languages
Chinese (zh)
Inventor
施海斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Hope Construction Technology Co Ltd
Original Assignee
Hangzhou Hope Construction Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Hope Construction Technology Co Ltd filed Critical Hangzhou Hope Construction Technology Co Ltd
Priority to CN201910085227.3A priority Critical patent/CN109886838A/en
Publication of CN109886838A publication Critical patent/CN109886838A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of smart city operation management platform based on CIM, including platform interface and storage module;The storage module includes project brief information module, scene store module, feature operation storage module;The scene store module includes geology CIM model, underground pipe gallery CIM model and the show house CIM module established based on CIM;The platform interface is that project brief plate, scene application plate and feature operation plate and project dynamic plate are equipped in CIM buildings model using the CIM buildings model established based on CIM as carrier;The feature operation plate includes weather simulation module, architecture information module, component locating module, roam module, structure attribute module and measurement module.The present invention is by combining Project design administrative skill and CIM technology, to effectively manage to the work progress of building operation, realizes the movable coordinating and unifying of project management and Efficient Operation.

Description

Smart city operation management platform based on CIM
Technical field
The present invention relates to engineering management field, in particular to a kind of smart city operation management platform based on CIM.
Background technique
The management of engineering project is a complexity, arduous system engineering, is related to progress, quality, investment, contract, people Various work such as member, risk, Drawings and documents, numerous participating departments and unit, so that work that is common and coordinating is tired Difficulty, a large amount of information need effective management, and especially domestic three universal side engineerings increase the difficulty of engineering management.With The development of Internet technology and wireless communication technique, modern society stepped into the information age.Urban information model (City Information Modeling), is using urban information data as radix, it is established that three-dimensional city spatial model and The organic synthesis body of urban information.Have from GIS data+small scene BIM data+Internet of Things that range is large scene Machine combines.Traditional project management system has seemed more and more painstaking, has needed to find new Method and kit for.Exist at present In the work progress of building operation, due to not making full use of information technology, CIM technology, traditional Project design is relied solely on Management system has seemed more and more painstaking, can not fast and effectively be managed to construction project.
Summary of the invention
The object of the present invention is to provide a kind of smart city operation management platform based on CIM.The present invention pass through by City operation management technology, Project design administrative skill and CIM technology are combined together, can be effectively to building operation Work progress is managed, and the movable coordinating and unifying of project management and Efficient Operation are realized.
Technical solution of the present invention: a kind of smart city operation management platform based on CIM, including platform interface and storage Storing module;The storage module includes project brief information module, scene store module, feature operation storage module;
The scene store module include based on CIM establish geology CIM model, underground pipe gallery CIM model and Show house CIM module;
The platform interface is equipped in CIM buildings model using the CIM buildings model established based on CIM as carrier Project brief plate, scene application plate and feature operation plate and project dynamic plate;The project brief plate is used for Display project profile information module contents;The scene application plate includes geological analysis plate, underground pipe gallery plate and sample Board house shows plate, and the geological analysis block plate is for showing geology CIM model, and the underground pipe gallery plate is for showing Show underground pipe gallery CIM model, the show house shows plate for showing show house CIM model;
The feature operation plate includes weather simulation module, architecture information module, component locating module, roaming mould Block, structure attribute module and measurement module;The weather simulation module is for adjusting intensity of sunshine and weather in CIM model; The architecture information module is used to show the summary information of chosen building in CIM buildings model;The component is fixed Position module highlights the building element chosen in being used in CIM buildings model;The roam module is logical It crosses and constructs virtual portrait in CIM buildings model, CIM buildings model is gone sight-seeing using the virtual task of building;Described Structure attribute module is used to show the structure attribute table of chosen component in CIM buildings model;The measurement module is to pass through Component distance in CIM buildings model is measured by two-point measurement or clear distance measurement in CIM buildings model;
The project dynamic plate is used for display items purpose real-time dynamic information.
In the above-mentioned smart city operation management platform based on CIM, the project brief information module includes project Title, item address, project category, the project scale of construction, house amount, motor-driven parking stall, plot ratio, site coverage, construction unit, General contracting unit, BIM always seek advice from unit, designing unit, detection unit, audit unit and project summary information;The project is general Condition information is aobvious to pass through figure including construction period information, construction building area information, construction investment information and placement amount information The form of table is shown in project brief plate.
In smart city operation management platform above-mentioned based on CIM, the roam module include people's row roam module and Drive roam module;People's row roam module includes roam mode module, parameter setting module and operating instruction module;It is described unrestrained Swimming mode module includes first person mode, third person mode and free schema;The parameter setting module includes that camera moves Dynamic speed adjustment module, camera rotation speed adjustment module, task movement speed adjustment module.
In smart city operation management platform above-mentioned based on CIM, the real-time dynamic information include it is upper successor, Uplink time and upload content;It is described to upload the behaviour violating the regulations that content includes the local Construction Condition of projects, construction worker Make, the damage or replacement of concrete residue cleaning and construction machinery.
Compared with prior art, the invention has the following advantages:
The present invention is by combining city operation management, Project design administrative skill and CIM technology, thus effectively The work progress of building operation is managed on ground, realizes the movable coordinating and unifying of project management and Efficient Operation;This Platform interface described in invention is that item is equipped in CIM buildings model using the CIM buildings model established based on CIM as carrier Mesh brief introduction plate, scene application plate and feature operation plate and project dynamic plate, to all kinds of letters in projects Breath is summarized, so that data acquisition becomes directization and facilitation, promotes the validity for managing data, authenticity and timely Property, depth excavation is carried out to data various in project management, flexibly generates various reports, auxiliary is analyzed and predicted, The business cooperation for strengthening engineering construction project simultaneously, improves communication efficiency, reduces communication cost, realize project pipe Effective accumulation of reason experience and data is really realized and is brought benefits by advanced management, is conducive to in project building course It is managed and monitors.And virtual portrait is constructed in the CIM buildings model established based on CIM, next couple of CIM builds mould Type carries out comprehensive preview.
Detailed description of the invention
Fig. 1 is system framework schematic diagram of the invention;
Fig. 2 is the Operation interface diagram of project brief plate
Fig. 3 is the Operation interface diagram of geological analysis plate;
Fig. 4 is the Operation interface diagram of underground pipe gallery plate;
Fig. 5 is the Operation interface diagram of show house plate;
Fig. 6 is the Operation interface diagram of weather simulation module;
Fig. 7 is the Operation interface diagram of architecture information module;
Fig. 8 is the Operation interface diagram of component locating module;
Fig. 9 is the Operation interface diagram of people's row roam module;
Figure 10 is the Operation interface diagram for driving roam module;
Figure 11 is the Operation interface diagram of structure attribute module;
Figure 12 is the Operation interface diagram of measurement module;
Figure 13 is the display interface figure of project Dynamically Announce plate.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples, but is not intended as limiting the present invention Foundation.
Embodiment: a kind of smart city operation management platform based on CIM, as shown in attached drawing 1-13, including platform interface And storage module;The storage module includes project brief information module, scene store module, feature operation storage Module;
The scene store module include based on CIM establish geology CIM model, underground pipe gallery CIM model and Show house CIM module;Come preview is checked geology CIM model, underground pipe gallery CIM model and show house CIM module march into the arena Storage;
The platform interface is equipped in CIM buildings model using the CIM buildings model established based on CIM as carrier Project brief plate, scene application plate and feature operation plate and project dynamic plate;As shown in Fig. 2, the project letter Jie's plate is for showing project profile information module contents;The scene application plate includes geological analysis plate, buried pipe Corridor plate and show house show plate, as shown in figure 3, the geological analysis block plate for showing geology CIM model, is such as schemed Shown in 4, the underground pipe gallery plate is for showing underground pipe gallery CIM model, as shown in figure 5, the show house display board Block is for showing show house CIM model;
The project brief information module includes project name, item address, project category, the project scale of construction, house family Several, motor-driven parking stall, plot ratio, site coverage, construction unit, general contracting unit, BIM always seek advice from unit, designing unit, detection list Position, audit unit and project summary information;The aobvious project overview information includes construction period information, construction building area Information, construction investment information and placement amount information are shown by way of chart in project brief plate, are convenient for For being understood in detail project under construction.
The feature operation plate includes weather simulation module, architecture information module, component locating module, roaming mould Block, structure attribute module and measurement module;As shown in fig. 6, the weather simulation module is for adjusting sunshine in CIM model Intensity and weather;By adjusting intensity of sunshine and weather in CIM model, the CIM buildings model under varying environment is carried out pre- It lookes at, CIM buildings model is checked convenient for comprehensive;As shown in fig. 7, the architecture information module is used in CIM The architecture information of chosen building is shown in buildings model;As shown in Fig. 8, the component locating module in CIM for building It builds in model and the building element chosen is highlighted;Convenient for checking and positioning.As shown in Figure 9 and Figure 10, described unrestrained Trip module is gone sight-seeing in CIM buildings model by constructing virtual portrait;As shown in figure 11, the structure attribute mould Block is used to show the structure attribute table of selected selected component in CIM buildings model;As shown in figure 12, the measurement module It is by being surveyed by two-point measurement or clear distance measurement to component distance in CIM buildings model in CIM buildings model Amount;
In the structure attribute table include component name, component major class, component group, ownership floor, size marking, Structure material, model and manufacturer.
The roam module includes people's row roam module and drives roam module, is by constructing in CIM buildings model Virtual portrait or vehicle carry out roaming preview to CIM buildings model;Roam mode module is equipped in roam module and parameter is set Module is set, the roam mode module is for switching first person mode, third person mode or free schema, to build to CIM It builds model and carries out roaming preview;The parameter setting module is for adjusting roaming travel speed and roaming angle.
As shown in figure 13, the project dynamic plate is used for display items purpose real-time dynamic information;The real-time dynamic Information includes uploading people, uplink time and upload content;The upload content includes the local Construction Condition of projects, applies The operation against rules of work worker, concrete residue are cleared up and the damage or replacement of construction machinery.
The present invention is by by Project design administrative skill and CIM technology, thus effectively to the work progress of building operation It is managed, realizes the movable coordinating and unifying of project management and Efficient Operation;Heretofore described platform interface is Using the CIM buildings model established based on CIM as carrier, project brief plate, scene application plate are equipped in CIM buildings model Block and feature operation plate and project dynamic plate, to summarize to the various information in projects, so that data obtain Taking becomes directization and facilitation, promotes validity, authenticity and the timeliness of management data, to each in project management Kind data carry out depth excavation, flexibly generate various reports, auxiliary is analyzed and predicted, while strengthening engineering construction item Purpose business cooperation, improves communication efficiency, reduces communication cost, realizes effective product of project management experience and data It is tired, it really realizes and is brought benefits by advanced management, be conducive to be managed and monitor in project building course.And Virtual portrait is constructed in the CIM buildings model established based on CIM, next pair of CIM buildings model carries out comprehensive preview.

Claims (5)

1. the smart city operation management platform based on CIM, it is characterised in that: including platform interface and storage module;Described Storage module includes project brief information module, scene store module, feature operation storage module;
The scene store module includes geology CIM model, underground pipe gallery CIM model and the template established based on CIM Room CIM module;
The platform interface is that project is equipped in CIM buildings model using the CIM buildings model established based on CIM as carrier Brief introduction plate, scene application plate, feature operation plate and project dynamic plate;The project brief plate is used for display items Mesh profile information module contents;The scene application plate includes geological analysis plate, underground pipe gallery plate and template house show Show plate, the geological analysis block plate is for showing geology CIM model, and the underground pipe gallery plate is for showing buried pipe Corridor CIM model, the show house show plate for showing show house CIM model;
The feature operation plate includes weather simulation module, architecture information module, component locating module, roam module, structure Part attribute module and measurement module;The weather simulation module is for adjusting intensity of sunshine and weather in CIM model;Described Architecture information module is used to show the summary information of chosen building in CIM buildings model;The component locating module For being highlighted to the building element chosen in CIM buildings model;The roam module is by building in CIM It builds and constructs virtual portrait in model, CIM buildings model is gone sight-seeing using the virtual task of building;The structure attribute mould Block is used to show the structure attribute table of chosen component in CIM buildings model;The measurement module is by building mould in CIM Component distance in CIM buildings model is measured by two-point measurement or clear distance measurement in type;
The project dynamic plate is used for display items purpose real-time dynamic information.
2. the smart city operation management platform according to claim 1 based on CIM, it is characterised in that: the project Profile information module include project name, item address, project category, the project scale of construction, house amount, motor-driven parking stall, plot ratio, It is general that site coverage, construction unit, general contracting unit, BIM always seek advice from unit, designing unit, detection unit, audit unit and project Include information;The aobvious project overview information includes construction period information, construction building area information, construction investment information and placement Amount information is shown by way of chart in project brief plate.
3. the smart city operation management platform according to claim 1 based on CIM, it is characterised in that: the roaming mould Block includes people's row roam module and drives roam module, be by constructed in CIM buildings model virtual portrait or vehicle come pair CIM buildings model carries out roaming preview;Roam mode module and parameter setting module, the roam mode are equipped in roam module Module is for switching first person mode, third person mode or free schema, to carry out roaming preview to CIM buildings model; The parameter setting module is for adjusting roaming travel speed and roaming visual angle.
4. the smart city operation management platform according to claim 1 based on CIM, it is characterised in that: described is real-time Multidate information includes upper successor, uplink time and uploads content;It is described upload content include projects local Construction Condition, The operation against rules of construction worker, concrete residue are cleared up and the damage or replacement of construction machinery.
5. the smart city operation management platform according to claim 1 based on CIM, it is characterised in that: the component It include component name, component major class, component group, ownership floor, size marking, structure material, model and manufacture in attribute list Quotient.
CN201910085227.3A 2019-01-29 2019-01-29 Smart city operation management platform based on CIM Pending CN109886838A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910085227.3A CN109886838A (en) 2019-01-29 2019-01-29 Smart city operation management platform based on CIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910085227.3A CN109886838A (en) 2019-01-29 2019-01-29 Smart city operation management platform based on CIM

Publications (1)

Publication Number Publication Date
CN109886838A true CN109886838A (en) 2019-06-14

Family

ID=66927223

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910085227.3A Pending CN109886838A (en) 2019-01-29 2019-01-29 Smart city operation management platform based on CIM

Country Status (1)

Country Link
CN (1) CN109886838A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113268531A (en) * 2021-03-21 2021-08-17 苏州物图数字科技有限公司 CIM system working method based on BIM and GIS technology
CN113436750A (en) * 2021-03-15 2021-09-24 中国电建集团华东勘测设计研究院有限公司 Epidemic prevention supervision and control health system based on CIM platform
CN114329678A (en) * 2022-03-16 2022-04-12 中国建筑西南设计研究院有限公司 Intelligent building structure design system and method
CN115936638A (en) * 2023-03-15 2023-04-07 广东泰一高新技术发展有限公司 Safety management and control system and method based on geographic information influence analysis
CN116579067A (en) * 2023-07-05 2023-08-11 深圳市易图资讯股份有限公司 Geographic information receiving and processing system and method based on CIM platform

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104091215A (en) * 2014-07-22 2014-10-08 上海建科工程咨询有限公司 Project planning management system based on building information model
KR20150089806A (en) * 2014-01-28 2015-08-05 동서대학교산학협력단 A Visual Reality system for city space management, inquiry, estimation and permission to be applied a City Information Model streaming technology, and a method of using a City Information Model
CN106803150A (en) * 2017-01-20 2017-06-06 上海市地下空间设计研究总院有限公司 Municipal Engineering Construction progress msg management method and system based on BIM
CN106874436A (en) * 2017-01-31 2017-06-20 杭州市公安局上城区分局 The Multi-Source Image Data Fusion imaging system of three-dimensional police geographical information platform
CN106933961A (en) * 2017-01-31 2017-07-07 杭州市公安局上城区分局 Based on the three-dimensional police geographical information platform that commanding elevation automatically analyzes
CN107180066A (en) * 2017-01-31 2017-09-19 张军民 The three-dimensional police geographical information platform and system architecture encoded based on three dimensions
CN107492042A (en) * 2017-07-31 2017-12-19 长江勘测规划设计研究有限责任公司 Hydraulic and Hydro-Power Engineering implementation management method and system based on GIS+BIM
CN107622355A (en) * 2017-09-30 2018-01-23 长江勘测规划设计研究有限责任公司 Project cluster work progress digital management system and method
CN108830462A (en) * 2018-05-25 2018-11-16 中建三局安装工程有限公司 A kind of pipe gallery wisdom operation management platform and method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20150089806A (en) * 2014-01-28 2015-08-05 동서대학교산학협력단 A Visual Reality system for city space management, inquiry, estimation and permission to be applied a City Information Model streaming technology, and a method of using a City Information Model
CN104091215A (en) * 2014-07-22 2014-10-08 上海建科工程咨询有限公司 Project planning management system based on building information model
CN106803150A (en) * 2017-01-20 2017-06-06 上海市地下空间设计研究总院有限公司 Municipal Engineering Construction progress msg management method and system based on BIM
CN106874436A (en) * 2017-01-31 2017-06-20 杭州市公安局上城区分局 The Multi-Source Image Data Fusion imaging system of three-dimensional police geographical information platform
CN106933961A (en) * 2017-01-31 2017-07-07 杭州市公安局上城区分局 Based on the three-dimensional police geographical information platform that commanding elevation automatically analyzes
CN107180066A (en) * 2017-01-31 2017-09-19 张军民 The three-dimensional police geographical information platform and system architecture encoded based on three dimensions
CN107492042A (en) * 2017-07-31 2017-12-19 长江勘测规划设计研究有限责任公司 Hydraulic and Hydro-Power Engineering implementation management method and system based on GIS+BIM
CN107622355A (en) * 2017-09-30 2018-01-23 长江勘测规划设计研究有限责任公司 Project cluster work progress digital management system and method
CN108830462A (en) * 2018-05-25 2018-11-16 中建三局安装工程有限公司 A kind of pipe gallery wisdom operation management platform and method

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
余雨: "基于CIM 的建筑工程全生命周期管理研究", 《锋绘》 *
唐恬等: "增强现实三维建模在警用地理信息平台的应用", 《应用实践》 *
李一叶: "《BIM设计软件与制图 基于Revitd的制图实践》", 31 August 2017, 北京:北京理工大学出版社 *
耿丹: "基于城市信息模型(CIM)的智慧园区综合管理平台研究与设计", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113436750A (en) * 2021-03-15 2021-09-24 中国电建集团华东勘测设计研究院有限公司 Epidemic prevention supervision and control health system based on CIM platform
CN113268531A (en) * 2021-03-21 2021-08-17 苏州物图数字科技有限公司 CIM system working method based on BIM and GIS technology
CN113268531B (en) * 2021-03-21 2024-04-30 苏州物图数字科技有限公司 CIM system working method based on BIM and GIS technologies
CN114329678A (en) * 2022-03-16 2022-04-12 中国建筑西南设计研究院有限公司 Intelligent building structure design system and method
CN114329678B (en) * 2022-03-16 2023-02-03 中国建筑西南设计研究院有限公司 Intelligent building structure design system and method
CN115936638A (en) * 2023-03-15 2023-04-07 广东泰一高新技术发展有限公司 Safety management and control system and method based on geographic information influence analysis
CN116579067A (en) * 2023-07-05 2023-08-11 深圳市易图资讯股份有限公司 Geographic information receiving and processing system and method based on CIM platform
CN116579067B (en) * 2023-07-05 2024-03-08 深圳市易图资讯股份有限公司 Geographic information receiving and processing system and method based on CIM platform

Similar Documents

Publication Publication Date Title
CN109886838A (en) Smart city operation management platform based on CIM
CN110909972B (en) BIM-based steel structure full life cycle management system and method
CN107492042A (en) Hydraulic and Hydro-Power Engineering implementation management method and system based on GIS+BIM
Dunston Identification of application areas for Augmented Reality in industrial construction based on technology suitability
CA2750923C (en) Systems, methods and apparatus relating to generation, transmission, access and storage of virtual white line (vwl) images and data for excavation projects
KR100866830B1 (en) System and method for managing river using 3d based moving picture
KR100831605B1 (en) MASAIAI: MAnagement System of Application and Interpretation for Aerial Imagery
CN111369158A (en) BIM-based informatization quality management method and system
Martinelli et al. Methodology for an HBIM workflow focused on the representation of construction systems of built heritage
CN113869680A (en) Intelligent pile foundation construction management and control method and system
CN115456814A (en) Tunnel management platform taking construction organization as core
JP5114528B2 (en) Design and management support system for buried pipe work and civil engineering work
Schall et al. VIDENTE-3D visualization of underground infrastructure using handheld augmented reality
Guo et al. Implementation of CIM-related technologies within transportation projects
CN110599116A (en) Power grid decentralized collaborative design method and system based on cloud data center
Vähä et al. Survey on automation of the building construction and building products industry
Colucci et al. The development of a 2D/3D BIM-GIS web platform for planned maintenance of built and cultural heritage: The MAIN10ANCE project
Naik et al. GIS based 4D model development for planning and scheduling of a construction project
Su Construction crew productivity monitoring supported by location awareness technologies
Trisyanti et al. Low cost web-application for management of 3d digital building and complex based on BIM and GIS
Sharma et al. Location-based highway construction planning using geographic information systems
KR20110109710A (en) Three dimensional system and method for monitoring process
CN115062380A (en) Visual construction system based on BIM platform
Sabanovic et al. Demands on digital data capturing of TBM and conventional tunnel drives
Suchocki BIM for Infrastructure: integrating spatial and model data for more efficient contextual planning, design, construction and operation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190614