CN115044719A - Method for judging charge level position by lowering charge level and damping down - Google Patents

Method for judging charge level position by lowering charge level and damping down Download PDF

Info

Publication number
CN115044719A
CN115044719A CN202210666226.XA CN202210666226A CN115044719A CN 115044719 A CN115044719 A CN 115044719A CN 202210666226 A CN202210666226 A CN 202210666226A CN 115044719 A CN115044719 A CN 115044719A
Authority
CN
China
Prior art keywords
charge level
blast furnace
content
judging
gas component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202210666226.XA
Other languages
Chinese (zh)
Other versions
CN115044719B (en
Inventor
王元生
强农厂
李向伟
张庆喜
尹腾
郑华伟
宋钊
王作军
李昕
郭大磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Iron and Steel Co Ltd
Original Assignee
Wuhan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Iron and Steel Co Ltd filed Critical Wuhan Iron and Steel Co Ltd
Priority to CN202210666226.XA priority Critical patent/CN115044719B/en
Publication of CN115044719A publication Critical patent/CN115044719A/en
Application granted granted Critical
Publication of CN115044719B publication Critical patent/CN115044719B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B5/00Making pig-iron in the blast furnace
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/24Test rods or other checking devices

Abstract

A method for judging the position of a charge level by lowering the charge level and damping down relates to the field of blast furnace ironmaking. The method for judging the position of the burden surface by descending the burden surface is to slightly stop the blast furnace before stopping the blast furnace by descending the burden surface, and start descending the burden surface to stop the blast furnace when the blast furnace is rebleed to a normal state under a furnace condition; when the charge level is lowered to the blast furnace bosh part, measuring the gas component at the top of the blast furnace once every 25-35min, and when the gas component meets the following conditions, judging that the tuyere is blown empty and the charge level is lowered below the tuyere plane of the blast furnace: CO in coal gas 2 The content is increased to the content of CO in the coal gas detected in the previous step 2 2-2.6 times of the content; h in coal gas 2 And the ratio of the content of CO is 0.8-1.1; n in coal gas 2 The content is increased to more than 80 percent. The method for judging the position of the charge level by damping down the charge level does not need to manually detect the blast furnace material through the blast furnace tuyere, but judges the position of the charge level through the gas component at the top of the blast furnace, thereby safely, efficiently and conveniently determining damping down and stoppingAnd (7) stopping the process.

Description

Method for judging position of charge level by lowering charge level to stop blowing
Technical Field
The application relates to the field of blast furnace iron making, in particular to a method for judging the position of a charge level by lowering the charge level and damping down.
Background
The long-time operation of the blast furnace can cause the erosion and damage of refractory materials of a cooling wall and a furnace bottom, which affects the safety of the blast furnace and needs the shutdown overhaul or the intermediate overhaul. Before the blast furnace is stopped, the blast furnace is usually firstly subjected to the lowering of the charge level and the damping down, and then the construction operations of residual iron placing, hearth material cleaning, cooling wall overhauling and the like are carried out. The changes of parameters such as water injection quantity, stockline depth, air quantity and the like of the furnace top are monitored and controlled in the process of blowing down and blowing out of the blast furnace by lowering the stock level of the blast furnace, the temperature of the furnace top is controlled to avoid burning and damage furnace top equipment, and H in coal gas is controlled 2 The content is to avoid knocking, thereby ensuring safe and efficient furnace shutdown. During the damping down process, the air is gradually reduced and the pressure is reduced until the charge level is reduced to be below the plane of the tuyere, and the charge level reducing process can be finished when the tuyere is blown empty. The blowing-out of the tuyere can take the tuyere as a construction access passage after damping down and is one of necessary means for reducing the difficulty of cleaning materials in the furnace after damping down.
In the process of lowering the charge level and damping down, a mechanical stock rod and a radar stock rod are required to detect the charge level and judge the position of the charge level in the furnace. However, when the charge level is lowered to the lower part of the furnace body and is close to the furnace waist, the temperature in the blast furnace is increased, and a steel wire rope of the mechanical gauge rod is easy to melt, so that a heavy hammer at the lower end of the gauge rod falls off, and the charge level cannot be measured; when the stock level is further lowered from the furnace waist to the furnace belly, the tuyere becomes dark gradually or even completely black due to the falling of furnace wall slag crust, the accurate position of the stock level is difficult to judge through the tuyere peephole, and whether the tuyere blows empty can not be judged. At the moment, the small cover of the air opening needs to be opened, hard devices such as an oxygen tube and the like are manually inserted into the air opening, and the material position condition at the front end of the air opening is detected; the method for manually detecting the charge level can cause blast furnace gas to be blown out from the tuyere, is not beneficial to the safety of detection personnel, and has low efficiency.
Therefore, a method for accurately and efficiently judging the charge level position without opening a tuyere small cover is needed to ensure the safe operation of lowering the charge level, blowing down and blowing out.
Disclosure of Invention
The application aims to provide a method for judging the position of a charge level by descending the charge level and damping down, which does not need to manually detect the blast furnace material through a blast furnace tuyere, but accurately judges the position of the charge level through the gas component at the top of the blast furnace, thereby safely, efficiently and conveniently determining the damping down stop time.
The embodiment of the application is realized as follows:
the embodiment of the application provides a method for judging the position of a charge level by lowering the charge level and damping down, which comprises the following steps:
arranging a small damping down before damping down and blowing down at the charge level of the blast furnace, and starting damping down at the charge level when the blast furnace is rebleed to the normal state of the furnace condition;
when the charge level of the blast furnace is lowered to the furnace belly part of the blast furnace body, measuring the gas component of the furnace top every 25-35min, and judging that the tuyere is blown empty and the charge level is lowered below the tuyere plane of the blast furnace when the gas component meets the following conditions: CO in coal gas 2 The content is increased to the content of CO in the previous detection coal gas component 2 2-2.6 times of the content; h in coal gas component 2 And the ratio of the content of CO is 0.8-1.1; n in coal gas component 2 The content is increased to more than 80 percent.
In some alternative embodiments, a gas composition meter is installed for measuring the top gas composition during the scheduled lull.
In some alternative embodiments, the static pressure port of the blast furnace shaft is dredged when a small rest is arranged.
In some alternative embodiments, during a minor break, the mechanical bougie is lengthened and the fire protection process of the blast furnace roof equipment is enhanced.
The beneficial effect of this application is: the method for judging the charge level position by lowering the charge level and damping down comprises the following steps: arranging a small damping down before the blast furnace is stopped when the blast furnace is downed, and starting to downed when the blast furnace is rebleed to the normal state of the furnace condition and the damping down of the charge level; when the charge level of the blast furnace is lowered to the bosh part of the blast furnace body, measuring the gas component of the top of the blast furnace every 25-35min, and when the gas component meets the following conditions, judging that the tuyere is blown empty and the charge level is lowered below the tuyere plane of the blast furnace: CO in coal gas 2 The content is increased to the content of CO in the gas component detected in the previous time 2 2-2.6 times of the content; h in coal gas component 2 And the ratio of the content of CO is 0.8-1.1; n in coal gas component 2 The content is increased to more than 80 percent. The method for judging the position of the charge level by damping down the charge level can accurately judge the position of the charge level by the coal gas component at the top of the blast furnace without manually detecting the blast furnace material through a blast furnace tuyere, so that the damping down stop time can be safely, efficiently and conveniently determined.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings that are required to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present application and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained from the drawings without inventive effort.
FIG. 1 is a gas component content meter for measuring a top gas component every 30min in a method for judging a charge level position by lowering the charge level down in an embodiment of the application;
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application, and it is obvious that the described embodiments are some embodiments of the present application, but not all embodiments. The components of the embodiments of the present application, generally described and illustrated in the figures herein, can be arranged and designed in a wide variety of different configurations.
Thus, the following detailed description of the embodiments of the present application, presented in the accompanying drawings, is not intended to limit the scope of the claimed application, but is merely representative of selected embodiments of the application. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
The characteristics and performance of the method for determining the position of the charge level by blowing down the charge level are further described in detail with reference to the following embodiments.
Example 1
3200m for certain iron and steel works 3 The blast furnace is stopped after the blast furnace is cooled down due to the damage of the cooling wall, and the method comprises the following steps: .
Step one, preparing for blowing down and stopping the blast furnace by lowering the charge level, arranging small blowing down before blowing down and stopping the blast furnace by lowering the charge level, installing a gas component tester for detecting gas components at the top of the blast furnace, installing a spray water-fetching device at the top of the blast furnace, and dredging static pressure holes of the blast furnace to be communicated with N 2 2 mechanical measuring rods are lengthened to 26m, and fire prevention treatment is carried out on equipment such as a bleeding valve oil cylinder at the top of the blast furnace.
Step two, formulating a damping plan of the blast furnace charge level reduction, comprising air quantity control, damping charge calculation, furnace top water-filling control scheme and H in coal gas components 2 The upper limit of the content, the gas component measuring frequency of 30min, the gas recovery scheme preparation and the like, and provide basis for damping down ending time, damping down parameter control and gas recovery time.
And step three, re-blasting the blast furnace until the blast furnace is in a normal state, blowing down the material, and starting to descend the material level to blow down. In the blowing-down and blowing-out process, the air is gradually reduced and the pressure is reduced along with the reduction of the charge level, according to the blast furnaceTop gas temperature and H in gas 2 Controlling the water-fetching flow rate according to the content change, measuring the material level height by using a mechanical measuring rod, measuring the top gas component once every 30min, and drawing a gas component curve as shown in figure 1.
Step four, when the charge level is lowered to the furnace belly part at the lower part of the furnace body, a heavy hammer at the lower end of the mechanical stock rod falls off, and the charge level position is difficult to directly judge; and when the charge level is lowered to the position below the furnace belly, the tuyere is frequently hung with slag to be completely black, and whether the charge level is lowered to the position below the central line of the tuyere is judged according to the coal gas components.
The criterion is that the following criteria are satisfied: s1, CO in coal gas component 2 The content of CO is increased to the content of CO in the previous primary coal gas component 2 2-2.6 times of the content; s2, H in coal gas component 2 And the content ratio of CO is 0.8-1.1; s3, N in coal gas component 2 The content is increased to more than 80 percent.
Step five, as can be seen in FIG. 1, CO is measured at the 16 th time of the gas component measurement 2 The content of CO in the 15 th coal gas component before 30min was 16.5% (see Table 1) 2 2.5 times of the content of 6.6 percent; h in the 16 th coal gas 2 And the ratio of the CO content is 0.77/0.78 and is approximately equal to 0.99, N 2 Content 82%; therefore, the tuyere is judged to be blown empty, and the charge level is lowered to the position below the central line of the tuyere.
TABLE 1 15 th and 16 th tests of blast furnace top gas composition
Figure BDA0003691710530000051
And sixthly, when the charge level is determined to be reduced to be below the central line of the tuyere, damping down to 0 after 15 minutes, and finishing reducing the charge level.
And seventhly, after blowing down and stopping the furnace, the actual position of the charge level can be seen to be below the central line of the tuyere, and the fact that the charge level position is judged to be accurate and feasible according to the coal gas components is verified.
According to the method for judging the position of the charge level by descending the charge level to stop blowing, when the charge level begins to descend to stop blowing on the blast furnace, the components of the gas at the top of the furnace are measured every 25-35min when the charge level is reduced to the lower furnace belly part of the furnace body, and the components of the gas are drawnCurve, as CO in the coal gas component 2 The content of CO is increased to the content of the CO in the previous primary coal gas 2 2-2.6 times of the content of H in the coal gas 2 And the content ratio of CO is 0.8-1.1, and N is contained in the coal gas component 2 When the content is increased to more than 80 percent, judging that the charge level is reduced below the central line of the tuyere, because the following reactions occur in the blast furnace:
C+O 2 =CO 2 (1)
CO 2 +C=2CO (2)
the material at the upper part of the rotary area is gradually reduced, and CO generated by burning coke is gradually reduced 2 The diffusion (reaction 1) rapidly proceeds to the upper region of the raceway, and the number of direct reduction reactions (reaction 2) decreases, which causes a decrease in the CO concentration in the gas and a decrease in the CO2 concentration.
At the same time, the following reactions also occur in the blast furnace:
C+H 2 O=CO+H 2 (3)
2H 2 +O 2 =2H 2 O (4)
2CO+O 2 =2CO 2 (5)
CO+FeO=Fe+CO 2 (6)
H 2 +FeO=Fe+H 2 (7)
when the tuyere is blown out, the material above the raceway is difficult to cover above the raceway, resulting in the above-mentioned oxidation reaction 3 and oxidation reaction 4 developing, and CO is produced 2 Diffusion to the upper part of the blast furnace, resulting in difficulty in performing the direct reduction reaction 2; CO and H 2 The content is drastically reduced, and the FeO reduction reaction 6 and the FeO reduction reaction 7 are difficult to progress.
Thus, when the material is emptied by the blast air in the tuyere area, it is achieved that:
A. mainly oxidation reaction 1 exists in the blast furnace, oxidation reactions 4 and 5 are carried out in small quantity, and CO is caused 2 Increased content, usually of CO 2 The content of CO in the gas component is increased to the previous time (about 30min interval) 2 2-2.6 times of the content;
B. the reduction reactions 2, 6 and 7 are difficult to proceed, causing H 2 And a reduction in CO content; at the same time, the water gas reaction 3 is carried out in small amounts, in which case H 2 Substantially corresponding to the volume fraction of CO, H in the gas composition 2 And a CO content ratio of about 0.8 to 1.1.
C. Blast air composition N 2 :78.09%,O 2 : 20.95%, at which point the oxidation reaction consumed O 2 This results in a relative increase in the content of N2 in the gas component, typically to above 80%.
In conclusion, when the charge level is lowered to the position below the furnace belly, the tuyere is frequently coated with slag to be completely black, the coal gas component at the top of the furnace is measured every 30min, and when CO in the coal gas component 2 The content of CO is increased to the content of CO in the previous primary coal gas component 2 2-2.6 times of the content of H in the coal gas 2 And the content ratio of CO is 0.8-1.1, and N is contained in the coal gas component 2 When the content is increased to more than 80 percent, judging that the charge level is lowered below the central line of the tuyere.
The embodiments described above are some, but not all embodiments of the present application. The detailed description of the embodiments of the present application is not intended to limit the scope of the claimed application, but is merely representative of selected embodiments of the application. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.

Claims (4)

1. A method for judging the position of a charge level by lowering the charge level to stop blowing is characterized by comprising the following steps:
arranging a small damping down before damping down and blowing down at the charge level of the blast furnace, and starting damping down at the charge level when the blast furnace is rebleed to the normal state of the furnace condition;
when the charge level of the blast furnace is lowered to the furnace belly part of the blast furnace body, measuring the gas component of the furnace top every 25-35min, and judging that the tuyere is blown empty and the charge level is lowered below the tuyere plane of the blast furnace when the gas component meets the following conditions: CO in coal gas 2 The content is increased to the content of CO in the gas component detected in the previous time 2 2-2.6 times of the content; h in coal gas component 2 And the ratio of the content of CO is 0.8-1.1; n in coal gas component 2 The content is increased to more than 80 percent.
2. The method for judging the position of the charge level by damping down the charge level according to claim 1, wherein a gas composition meter is installed for detecting the composition of the top gas when damping down is scheduled.
3. The method for judging the position of the charge level by damping down the charge level according to claim 1, wherein the static pressure hole of the blast furnace shaft is dredged when the damping down is arranged.
4. The method for judging the position of the charge level by lowering the charge level down according to claim 1, wherein when the small break is arranged, the mechanical stock rod is lengthened and the fire-proof treatment of the blast furnace top equipment is enhanced.
CN202210666226.XA 2022-06-13 2022-06-13 Method for judging material level position by reducing material level damping down Active CN115044719B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210666226.XA CN115044719B (en) 2022-06-13 2022-06-13 Method for judging material level position by reducing material level damping down

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210666226.XA CN115044719B (en) 2022-06-13 2022-06-13 Method for judging material level position by reducing material level damping down

Publications (2)

Publication Number Publication Date
CN115044719A true CN115044719A (en) 2022-09-13
CN115044719B CN115044719B (en) 2023-09-22

Family

ID=83161839

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210666226.XA Active CN115044719B (en) 2022-06-13 2022-06-13 Method for judging material level position by reducing material level damping down

Country Status (1)

Country Link
CN (1) CN115044719B (en)

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55104406A (en) * 1979-02-05 1980-08-09 Nippon Steel Corp Operating method of blast furnace
JPH01319614A (en) * 1988-06-17 1989-12-25 Kawasaki Steel Corp Method of operating blast furnace
RU2131928C1 (en) * 1998-05-06 1999-06-20 Акционерное общество "Новолипецкий металлургический комбинат" Method of blast-furnace blowing-down
JP2001073014A (en) * 1999-09-03 2001-03-21 Nkk Corp Lowered stock level operation in blast furnace
JP2006057175A (en) * 2004-08-24 2006-03-02 Jfe Steel Kk Method for igniting furnace top part at stopping time of blasting in blast furnace
JP2007254897A (en) * 2007-06-04 2007-10-04 Jfe Steel Kk Method for lowered level operation in blast furnace
CN102041332A (en) * 2010-12-31 2011-05-04 攀钢集团钢铁钒钛股份有限公司 Blowing-out descending stockline control method for blast furnace
CN102925606A (en) * 2012-11-30 2013-02-13 攀钢集团成都钢钒有限公司 Forecasting method for descending depth of material surface of blast furnace during furnace shutting down
CN103305646A (en) * 2013-05-21 2013-09-18 河北钢铁股份有限公司唐山分公司 Sounding rod debugging device for determining datum point of blast-furnace charge level and debugging and positioning method of device
CN104531924A (en) * 2014-12-18 2015-04-22 东北大学 Blast furnace charge distribution real-time forecasting system and blast furnace charge distribution real-time forecasting method
CN105714006A (en) * 2014-12-03 2016-06-29 天津天铁冶金集团有限公司 Method for blast furnace stopping for heavy maintenance
CN107858466A (en) * 2017-11-11 2018-03-30 江阴兴澄特种钢铁有限公司 The Forecasting Methodology of charge level depth during a kind of blast furnace level-lowering blowing out
CN108842015A (en) * 2018-07-26 2018-11-20 山西太钢不锈钢股份有限公司 A method of judging charge level position in the furnace of blast furnace
CN110117683A (en) * 2019-04-29 2019-08-13 柳州钢铁股份有限公司 Stockline dropping is to air port novel environment friendly blowing out operating method
CN112430693A (en) * 2020-10-14 2021-03-02 首钢京唐钢铁联合有限责任公司 Blast furnace charge level lowering and blowing-out control method and device
CN112941258A (en) * 2021-02-09 2021-06-11 武汉钢铁有限公司 Method for controlling oxygen content in process of lowering stock line of blast furnace recovered coal gas
CN113186362A (en) * 2021-03-16 2021-07-30 江阴兴澄特种钢铁有限公司 Method for judging damping down time during blast furnace overhaul material level lowering

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS55104406A (en) * 1979-02-05 1980-08-09 Nippon Steel Corp Operating method of blast furnace
JPH01319614A (en) * 1988-06-17 1989-12-25 Kawasaki Steel Corp Method of operating blast furnace
RU2131928C1 (en) * 1998-05-06 1999-06-20 Акционерное общество "Новолипецкий металлургический комбинат" Method of blast-furnace blowing-down
JP2001073014A (en) * 1999-09-03 2001-03-21 Nkk Corp Lowered stock level operation in blast furnace
JP2006057175A (en) * 2004-08-24 2006-03-02 Jfe Steel Kk Method for igniting furnace top part at stopping time of blasting in blast furnace
JP2007254897A (en) * 2007-06-04 2007-10-04 Jfe Steel Kk Method for lowered level operation in blast furnace
CN102041332A (en) * 2010-12-31 2011-05-04 攀钢集团钢铁钒钛股份有限公司 Blowing-out descending stockline control method for blast furnace
CN102925606A (en) * 2012-11-30 2013-02-13 攀钢集团成都钢钒有限公司 Forecasting method for descending depth of material surface of blast furnace during furnace shutting down
CN103305646A (en) * 2013-05-21 2013-09-18 河北钢铁股份有限公司唐山分公司 Sounding rod debugging device for determining datum point of blast-furnace charge level and debugging and positioning method of device
CN105714006A (en) * 2014-12-03 2016-06-29 天津天铁冶金集团有限公司 Method for blast furnace stopping for heavy maintenance
CN104531924A (en) * 2014-12-18 2015-04-22 东北大学 Blast furnace charge distribution real-time forecasting system and blast furnace charge distribution real-time forecasting method
CN107858466A (en) * 2017-11-11 2018-03-30 江阴兴澄特种钢铁有限公司 The Forecasting Methodology of charge level depth during a kind of blast furnace level-lowering blowing out
CN108842015A (en) * 2018-07-26 2018-11-20 山西太钢不锈钢股份有限公司 A method of judging charge level position in the furnace of blast furnace
CN110117683A (en) * 2019-04-29 2019-08-13 柳州钢铁股份有限公司 Stockline dropping is to air port novel environment friendly blowing out operating method
CN112430693A (en) * 2020-10-14 2021-03-02 首钢京唐钢铁联合有限责任公司 Blast furnace charge level lowering and blowing-out control method and device
CN112941258A (en) * 2021-02-09 2021-06-11 武汉钢铁有限公司 Method for controlling oxygen content in process of lowering stock line of blast furnace recovered coal gas
CN113186362A (en) * 2021-03-16 2021-07-30 江阴兴澄特种钢铁有限公司 Method for judging damping down time during blast furnace overhaul material level lowering

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
胡玉平等: "柳钢5号高炉快速安全停炉操作", pages 59 - 61 *

Also Published As

Publication number Publication date
CN115044719B (en) 2023-09-22

Similar Documents

Publication Publication Date Title
CN102071272B (en) Method for blowing out blast furnace
CN105821175B (en) A kind of protecting method with splash slag of control converter profile
CN108950126B (en) Method for quickly reducing height of converter bottom
US20120312124A1 (en) System for furnace slopping prediction and lance optimization
US20220177987A1 (en) Method for predicting slopping in converter, method for operating converter, and system for predicting slopping in converter
CN104962680A (en) Converter dry method dust-removing explosion-venting control method
CN115044719A (en) Method for judging charge level position by lowering charge level and damping down
CN107841593B (en) A kind of auxiliary material nitrogen seal device and its control method
BR112017006451B1 (en) METHOD AND DEVICE TO DETERMINE THE IGNITION TIME IN AN OXYGEN STEEL MANUFACTURING PROCESS
US8097063B2 (en) System for furnace slopping prediction and lance optimization
JP2019135320A (en) Method for detecting slag formation in converter
KR101258767B1 (en) Monitoring apparatus for refractories abrasion of electric furnace
JP2007186759A (en) Method for operating blast furnace
CN106048113A (en) Method for treating large slow materials through blast furnace
CN110851497A (en) Method for detecting whether converter oxygen blowing is not ignited
CN110989406A (en) Automatic control system and control method for ladle bottom argon blowing soft stirring of LF (ladle furnace)
KR100994047B1 (en) A method for making up for furnace loss temperature
KR100862158B1 (en) Apparatus ang method for controlling temperature to protect gas explosion of furnace top
JP2018083983A (en) Vacuum degassing method and vacuum degasser
JP2000212618A (en) Operation of blast furnace
KR20240020532A (en) Depression method of slopping during converter blowing
CN117625877A (en) Method for improving gas recovery rate of steelmaking converter
JP2024014725A (en) Blast furnace operating method
CN112899432A (en) Converter smelting method based on flue gas analysis
KR20030052414A (en) A system for drilling a blocked pressure detection hole by using an air motor

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant