CN114961728B - Method for mining area without coal pillars for comprehensively preventing and controlling rock burst and gas - Google Patents

Method for mining area without coal pillars for comprehensively preventing and controlling rock burst and gas Download PDF

Info

Publication number
CN114961728B
CN114961728B CN202210694884.XA CN202210694884A CN114961728B CN 114961728 B CN114961728 B CN 114961728B CN 202210694884 A CN202210694884 A CN 202210694884A CN 114961728 B CN114961728 B CN 114961728B
Authority
CN
China
Prior art keywords
mining area
coal
mining
gas
comb
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210694884.XA
Other languages
Chinese (zh)
Other versions
CN114961728A (en
Inventor
王博
姜福兴
冯国瑞
李竹
吴文达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan University of Technology
Original Assignee
Taiyuan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan University of Technology filed Critical Taiyuan University of Technology
Priority to CN202210694884.XA priority Critical patent/CN114961728B/en
Publication of CN114961728A publication Critical patent/CN114961728A/en
Application granted granted Critical
Publication of CN114961728B publication Critical patent/CN114961728B/en
Priority to ZA2023/04365A priority patent/ZA202304365B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Remote Sensing (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

The invention relates to a mining area coal pillar-free mining method for comprehensively preventing and controlling rock burst and gas. Pre-splitting a coal body before mining, pre-pumping gas and preventing rock burst by utilizing a pre-mining area arranged in a coal seam for coal transportation and uphill construction pre-splitting pumping bedding hole; meanwhile, the rail ascending is arranged in a rock stratum of a coal seam bottom plate, the comb-shaped drill holes are used for full-stage gas extraction, and the comb-shaped drill holes are used for returning air ascending in a rear mining area, so that the requirement of special returning air ascending can be met without influencing the recovery of the ascending coal pillars in the front mining area. The invention can realize the comprehensive control of rock burst and gas, and can greatly improve the control effect of gas and the recovery rate of coal.

Description

Stope coal pillar-free mining method for comprehensively preventing rock burst and gas
Technical Field
The invention relates to the field of rock burst and gas prevention and control in coal mining, in particular to a mining area coal pillar-free mining method for comprehensively preventing and controlling the rock burst and the gas.
Background
Rock burst refers to the dynamic phenomenon of sudden and violent destruction of coal and rock masses around a roadway or a working face due to the instantaneous release of elastic deformation energy, often accompanied by coal and rock mass throwing, loud sound and air waves, and is one of the major disasters of coal mines. Meanwhile, gas is usually present in the coal seam, and coal and gas outburst is easily generated when rock burst and gas coexist, so that the rock burst and the gas need to be prevented and controlled during coal seam mining, and the aim is to reduce the gas outburst (impact) caused by the gas on one hand and reduce the harm of the gas to mine ventilation, such as gas poisoning and gas explosion on the other hand. In the prior art, the prevention and control of rock burst are mostly pre-splitting pressure relief, and the technology is mature; to the gas prevention and cure problem, the Y type ventilation mode of commonly using improves the gas emission effect, and it sets up dedicated return air at the mining area border and goes up the mountain, changes the U type ventilation mode of traditional one time of advancing into the Y type ventilation mode of two one-in-one-out, has improved the gas emission effect greatly, but this kind of ventilation mode is owing to set up a dedicated return air more and goes up the mountain, consequently can improve the tunnelling work load in tunnel and increased the coal column simultaneously and reserve the volume of establishing, has wasted coal resource.
Disclosure of Invention
Aiming at the defects in the prior art, the invention provides a method for mining area coal pillar-free mining by comprehensively preventing and controlling rock burst and gas, which can improve the gas control effect and the coal recovery rate and comprises the following steps:
a. tunneling the upper mountain of the track of the mining area and the upper mountain of the coal transporting of the mining area, wherein the upper mountain of the track of the mining area is positioned in the rock stratum at the lower part of the coal seam on the left side, and the upper mountain of the coal transporting of the mining area is positioned in the coal seam on the right side; excavating an air inlet gallery of the mining area and a coal transporting gallery of the mining area from the top of the coal transporting of the mining area to the left along the trend, and respectively communicating the air inlet gallery of the front mining area and the coal transporting gallery of the front mining area; the connection roadway of the horizontal roadway of the mining area is driven upwards from the track of the mining area and is respectively connected with the air inlet horizontal roadway of the mining area and the coal transporting horizontal roadway of the mining area;
b. taking the upward mountain of the track of the front mining area as the upward mountain of the return air of the mining area;
c. constructing pre-splitting extraction bedding drill holes in coal bodies from the coal transporting upward mountains to the left side and the right side of a front mining area, and performing coal body cracking pressure relief and gas pre-extraction;
d. constructing comb-shaped drilling holes from the upper mountain of the track of the front mining area to the right rock stratum;
e. taking a harvesting roadway of a front mining area as a cutting hole of the mining area;
f. adopting a gob-side entry retaining technology to carry out working face stoping, and adopting a Y-shaped ventilation mode to carry out ventilation on the working face of the mining area;
g. and in the stoping process of the working face of the mining area, the comb-shaped drill holes are used for continuously extracting gas.
Preferably, the strike longwall face is arranged only on the left side in the mining area, and mining is sequentially carried out from top to bottom.
Preferably, in the step b, a return air connecting roadway is tunneled from the upper mountain of the track of the front mining area to the upper return air roadway to form the upper mountain of the return air of the mining area.
Preferably, in the step d, the comb-shaped drill hole comprises a comb-shaped drill hole horizontal section located in the coal seam and a comb-shaped drill hole vertical section which vertically extends to the coal seam from the comb-shaped drill hole horizontal section at intervals, and the comb-shaped drill hole is used for gas pre-extraction.
Preferably, in the step d, the density of the comb drilling constructed below the O-shaped slit ring is greater than that of the comb drilling constructed at other positions, and/or the density of the vertical section of the comb drilling constructed below the O-shaped slit ring is greater than that of the comb drilling constructed at other positions.
Preferably, in the step f, air is fed from an air inlet gallery of the mining area and a coal transporting gallery of the mining area, and air is returned from the coal transporting gallery of the mining area along the gob-side entry retaining section.
Has the advantages that: 1. according to the invention, the longwall working face is arranged on the left side of the mining area, the coal pillars on the upper mountain of the mining area of the front mining area are directly arranged in the working face of the rear mining area, and the gob-side entry retaining is adopted, so that the non-coal pillar mining of the whole mining area is realized, and the rock burst caused by stress concentration formed by the retained coal pillars is avoided.
2. The method comprises the steps of constructing pre-splitting extraction bedding drill holes by utilizing a coal conveying upward construction arranged in a coal seam in a front mining area, and performing coal body pre-splitting, gas pre-extraction and rock burst prevention before mining; meanwhile, the rail is arranged in the rock stratum of the coal seam bottom plate, and the comb-shaped drilling holes are used for full-stage gas extraction (before mining, during mining and after mining), so that the danger of rock burst, gas explosion and poisoning of the working face can be solved, and the danger of gas explosion and fire hazard of a goaf can be solved.
3. The invention can realize the comprehensive control of rock burst and gas, and can greatly improve the control effect of gas and the recovery rate of coal.
Drawings
FIG. 1 is a layout diagram of a stope pillar-free mining method for the comprehensive control of rock burst and gas in the invention;
FIG. 2 is a schematic drawing of stoping of a coal pillar-free mining method for a mining area for comprehensive control of rock burst and gas in the invention;
in the figure: the method comprises the following steps of (1) a main transportation roadway 1, a main return air roadway 2, a return air connection roadway 3, a pre-splitting extraction bedding borehole 4, a comb borehole 5, a comb borehole horizontal section 51 and a comb borehole vertical section 52;
the method comprises the following steps of (1) ascending F1 on a track of a front mining area, ascending F2 on coal conveying of the front mining area, a connecting roadway F3 of a drift of the front mining area, an air inlet drift F4 of the front mining area, a coal conveying drift F5 of the front mining area, a working roadway F6 of the front mining area and a goaf F7 of the front mining area;
the method comprises the following steps of ascending the mountain B1 on the track of the mining area, ascending the coal transporting roadway B2 of the mining area, connecting roadway B3 of the roadway of the mining area, air inlet roadway B4 of the mining area, coal transporting roadway B5 of the mining area, cutting hole B6 of the mining area, working surface B7 of the mining area, goaf B8 of the mining area and gob-side entry retaining section B9 of the coal transporting roadway of the mining area.
Detailed Description
The technical solution of the present invention is described in more detail below with reference to the drawings in the embodiments of the present invention.
As shown in fig. 1-2, a method for mining without pillars in a mining area for comprehensive control of rock burst and gas comprises the following steps:
a. upwards digging a track upper mountain B1 entering and exiting the mining area and a coal transporting upper mountain B2 of the mining area from a large transportation roadway 1 along a trend, wherein the track upper mountain B1 of the mining area is positioned in stable sandstone of about 15m at the left part of the lower part of a coal bed, the coal transporting upper mountain B2 of the mining area is positioned in the coal bed at the right part, and the horizontal distance between the two is 30m; the utilization rate of the track ascending is high, the track ascending is used for bearing the work of drainage, waste rock discharge, material transportation and the like, the track ascending is arranged in a rock stratum, the maintenance is facilitated, the transport ascending is mainly used for bearing the coal transportation work, the influence of other production processes is small, namely, a roadway is small in disturbance and can be arranged in a coal seam, the construction progress is improved, and the mining area can be favorably and quickly enter a production stage;
the coal conveying upper mountain B2 of the mining area is excavated towards the left to enter and exit the air inlet gallery B4 of the mining area and the coal conveying gallery B5 of the mining area, and the air inlet gallery F4 of the front mining area and the coal conveying gallery F5 of the front mining area are respectively communicated to form a working surface B7 of the mining area, the air inlet gallery B4 of the mining area is positioned on the upper side of the inclination and is close to the air return upper mountain 2, and the air inlet gallery B4 of the mining area and the coal conveying gallery B5 of the mining area are both arranged in a coal bed; 4 working faces are designed in the mining area in the same way, the width of each working face is about 200m, and the propelling length is about 1000m;
a roadway connection roadway B3 of the mining area is excavated from the upper left part of the upper mountain B1 of the track of the mining area to connect an air inlet roadway B4 of the mining area and a coal transporting roadway B5 of the mining area;
b. the front mining area on the left side and the main mining area on the right side adopt the same roadway arrangement, gas extraction and coal body extraction modes; upwards tunneling a return air connecting roadway 3 to a return air main roadway 2 from the upper end part of the track ascending F1 of the front mining area to form return air ascending of the mining area;
c. constructing pre-splitting extraction bedding drill holes 4 from a coal transporting upward mountain F2 of a front mining area to coal bodies on the left side and the right side, firstly carrying out fracturing on the coal bodies to be stoped through the pre-splitting extraction bedding drill holes 4 to form a gas migration channel, simultaneously carrying out pressure relief after the coal bodies are fractured to have a prevention and control effect on impact ground, and then carrying out gas pre-extraction by using the pre-splitting extraction bedding drill holes 4 (only the pre-splitting extraction bedding drill holes 4 are indicated in a second working face of the mining area in figures 1-2), wherein the extracted gas is transported from an air returning upward mountain of the mining area to the ground through a gas extraction pipeline;
bedding drilling is a well-known gas drilling construction mode in the field, wherein the whole drilling is arranged in a coal seam, drilling is carried out along the coal seam, a gas migration channel is formed by fracturing a coal body after the drilling construction is finished, and then gas extraction is carried out; the long drilling hole is adopted to construct along the working face, so that the moving times of the drilling machine can be reduced, and the construction efficiency is improved; the construction quantity, the spacing and the pre-splitting pressure of bedding drill holes can be comprehensively determined according to the gas endowment quantity, the gas adsorption strength, the gas extraction radius and the like;
d. constructing a comb-shaped drilling hole 5 from the upward F1 of a track of a front mining area to the right, wherein the comb-shaped drilling hole 5 comprises a comb-shaped drilling hole horizontal section 51 positioned in a rock layer and a comb-shaped drilling hole vertical section 52 vertically extending upwards to the coal layer at intervals from the comb-shaped drilling hole horizontal section 51, gas pre-extraction is carried out by utilizing the comb-shaped drilling hole (the comb-shaped drilling hole 5 is only indicated in a third working face in the figure 1-2), and extracted gas is transported from the return air upward of the mining area to the ground through a gas extraction pipeline; when the comb-shaped drilling hole is constructed, the horizontal section can be constructed in parallel to a coal seam; the construction density of the comb-shaped drilling hole 5 below the O-shaped slit ring is higher than that of other positions, and/or the construction density of the comb-shaped drilling hole vertical section 52 below the O-shaped slit ring is higher than that of other positions.
The comb-shaped drilling hole is a gas extraction drilling hole arrangement form emerging in recent years, and is a special form of directional drilling hole, and as the disturbance on the hole wall of the drilling hole at the turning position is large during the construction of the directional drilling hole, the hole is easy to collapse, the comb-shaped drilling hole, particularly a horizontal section (a main hole section) of the comb-shaped drilling hole needs to be constructed in a stable rock stratum, while the invention comprehensively considers the maintenance requirement of going up the mountain, the construction requirement of the gas extraction drilling hole and an extraction process, and carries out the selection and collocation of construction positions;
bedding drilling is a common drilling arrangement mode for gas extraction, and has the advantages of high construction speed, high efficiency and good early treatment effect; however, the existing adsorbability of gas in a coal seam in China is strong, the gas is influenced by the construction quality of the drill hole, the gas pre-extraction amount of the front-stage bedding drill hole is limited, when a working face is exploited, a coal body is greatly disturbed by exploitation, a large number of cracks develop and are communicated, so that a large amount of gas is gushed, and the bedding drill hole is difficult to play a role in the working face recovery process.
e. The left side of the mining area is only provided with a strike long wall working face, and mining is carried out sequentially from top to bottom; performing gob-side entry retaining (inclined along a goaf F7 of the front mining area) at a receiving position of the front mining area, reserving a receiving entry F6 of the front mining area as a cutting hole B6 of a next mining area, namely the current mining area, and directly moving coal mining equipment (such as a coal mining machine, a hydraulic support, a scraper conveying and receiving machine, a crusher, a reversed loader and the like) positioned in the last (namely the lowest) working face of the front mining area into the cutting hole of the first (namely the uppermost) working face of the current mining area through the receiving entry F6 of the front mining area;
f. stoping the working face B7 of the mining area by adopting a gob-side entry retaining technology (along the trend of the goaf B8 of the mining area), namely using a coal-conveying gallery of the previous working face as an air inlet gallery of the next working face; meanwhile, ventilation of a working face B7 of the mining area is carried out in a Y-shaped ventilation mode, namely air is fed from an air inlet gallery B4 of the mining area and a coal transporting gallery B5 of the mining area, and air is returned from a gob-side entry retaining section B9 of the coal transporting gallery of the mining area;
wherein, the coal transportation line specifically is: from the coal mining position, passing through a coal transporting roadway B5 of the mining area, a coal transporting uphill B2 of the mining area and a large transporting roadway 1; the pedestrian line reaches the coal mining position through a main transportation roadway 1, a track climbing B1 of the mining area, a gallery connecting roadway B3 of the mining area and an air inlet gallery B4 of the mining area.
The ventilation circuit specifically is: fresh air enters a coal mining position through a main transportation roadway 1, a track climbing roadway B1 of the mining area, a roadway connection roadway B3 of the mining area, an air inlet roadway B4 of the mining area and a coal transporting roadway B5 of the mining area to become ventilation air, and then the ventilation air is discharged through a gob-side entry retaining section B9 of the coal transporting roadway of the mining area, a roadway connection roadway F3 of the front mining area, a return air climbing (comprising the track climbing roadway F1 of the front mining area and the return air connection roadway 3) of the mining area and a return air main roadway 2; meanwhile, an air door is arranged in the roadway to guide an air flow line.
Through the arrangement of the mining areas and the working faces in the mining areas in the steps a-b and f, the coal pillar-free mining of the whole mining area can be realized, namely, the coal pillars on the mountains of the mining area and the section coal pillars between the working faces in the prior art are cancelled, the coal pillar-free mining of the whole mining area is realized, and the phenomenon that the reserved coal pillars form stress concentration and further rock burst is generated is avoided.
g. In the stoping process of the working face B7 of the mining area, the comb-shaped drill holes 5 are used for continuously extracting gas, so that not only can the coal body to be mined be pre-extracted, but also the gas in the goaf can be extracted, and the fire is effectively prevented and extinguished; and the extracted gas is transported to the ground from the return air uphill of the mining area through a gas extraction pipeline.

Claims (5)

1. A stope pillar-free mining method for comprehensively preventing rock burst and gas is characterized by comprising the following steps:
a. tunneling the upper mountain of the track of the mining area and the upper mountain of the coal transporting of the mining area, wherein the upper mountain of the track of the mining area is positioned in the rock stratum at the lower part of the coal seam on the left side, and the upper mountain of the coal transporting of the mining area is positioned in the coal seam on the right side; excavating an air inlet gallery of the mining area and a coal transporting gallery of the mining area from the coal transporting uphill to the left along the trend of the mining area, and respectively communicating the air inlet gallery of the front mining area and the coal transporting gallery of the front mining area; the connection roadway of the horizontal roadway of the mining area is driven upwards from the track of the mining area and is respectively connected with the air inlet horizontal roadway of the mining area and the coal transporting horizontal roadway of the mining area;
b. taking the upward mountain of the track of the front mining area as the upward mountain of the return air of the mining area;
c. constructing pre-splitting extraction bedding drill holes in coal bodies from the upward mountains of the coal transported in the front mining area to the left side and the right side, and performing coal body fracturing pressure relief and gas pre-extraction;
d. constructing comb-shaped drilling holes from the upper mountain of the track of the front mining area to the right rock stratum;
e. taking a harvesting roadway of a front mining area as a cutting hole of the mining area;
f. adopting a gob-side entry retaining technology to carry out working face stoping, and adopting a Y-shaped ventilation mode to carry out ventilation on the working face of the mining area;
g. in the stoping process of the working face of the mining area, the comb-shaped drill holes are used for continuously extracting gas.
2. The stope pillar-free mining method according to claim 1, wherein only the left side in the stope is provided with a strike longwall face, and mining is performed sequentially from top to bottom.
3. The mining method without the coal pillars in the mining area according to claim 1 or 2, wherein in the step b, a return air connecting roadway is tunneled from the upper mountain of the track of the front mining area to the upper return air main roadway to form the upper return air mountain of the mining area.
4. The mining area coal pillar-free mining method according to claim 1 or 2, wherein in the step d, the comb-shaped drill hole comprises a comb-shaped drill hole horizontal section located in the rock stratum and a comb-shaped drill hole vertical section vertically extending upwards to the coal stratum at intervals from the comb-shaped drill hole horizontal section, and the comb-shaped drill hole is used for gas pre-extraction.
5. The mining method without coal pillars in the mining area according to claim 1 or 2, wherein in the step f, the Y-shaped ventilation mode is air intake from an air intake gallery of the mining area and a coal transporting gallery of the mining area, and air return is performed from the coal transporting gallery of the mining area along the gob-side entry retaining section.
CN202210694884.XA 2022-06-20 2022-06-20 Method for mining area without coal pillars for comprehensively preventing and controlling rock burst and gas Active CN114961728B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202210694884.XA CN114961728B (en) 2022-06-20 2022-06-20 Method for mining area without coal pillars for comprehensively preventing and controlling rock burst and gas
ZA2023/04365A ZA202304365B (en) 2022-06-20 2023-04-12 Mining method without coal pillar in mining area for comprehensive prevention and control of rock burst and gas

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210694884.XA CN114961728B (en) 2022-06-20 2022-06-20 Method for mining area without coal pillars for comprehensively preventing and controlling rock burst and gas

Publications (2)

Publication Number Publication Date
CN114961728A CN114961728A (en) 2022-08-30
CN114961728B true CN114961728B (en) 2022-12-13

Family

ID=82964309

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210694884.XA Active CN114961728B (en) 2022-06-20 2022-06-20 Method for mining area without coal pillars for comprehensively preventing and controlling rock burst and gas

Country Status (2)

Country Link
CN (1) CN114961728B (en)
ZA (1) ZA202304365B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116971817B (en) * 2023-09-25 2023-12-12 太原理工大学 High-gas working face ventilation method for alternately entering and returning air in gallery

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1102455A (en) * 1994-07-04 1995-05-10 河南省地质矿产厅 Z-shape coal mining method with road driving along next goaf to top (on-dip)
RU2325528C1 (en) * 2007-01-17 2008-05-27 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" Method to control hard-caving roof
CN102392642A (en) * 2011-11-02 2012-03-28 王晓利 Method for arranging roadways on coal-pillar-free stope
RU2462593C1 (en) * 2011-03-14 2012-09-27 Учреждение Российской академии наук Институт угля Сибирского отделения РАН (ИУ СО РАН) Method of development of thick steep coal bed in straps downstream
CN104179520A (en) * 2014-08-26 2014-12-03 山西潞安环保能源开发股份有限公司 Z-shaped ventilation method and system for gob-side entry of coalface
CN106121646A (en) * 2016-08-22 2016-11-16 中煤西安设计工程有限责任公司 Underground mine exploiting field formula without digging laneway without coal column coal-mining method
CN107725097A (en) * 2017-10-31 2018-02-23 中国矿业大学(北京) Method is controlled altogether without coal pillar mining gas and coal spontaneous combustion in a kind of Qie Dingcheng lanes
CN107725053A (en) * 2017-11-08 2018-02-23 山东科技大学 Lane is reserved for one's own use without pillar mining method suitable for the exploiting field of gently inclined seam
CN109798116A (en) * 2019-04-04 2019-05-24 中国矿业大学(北京) Realize double-vane arrangement working face exploiting field or zone entirely without coal column method
CN111255456A (en) * 2020-02-24 2020-06-09 中国矿业大学 Mine advancing type filling roadway mining method
CN114592866A (en) * 2022-02-25 2022-06-07 太原理工大学 Residual coal resource mining area full mining method with paste partially filled

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1102455A (en) * 1994-07-04 1995-05-10 河南省地质矿产厅 Z-shape coal mining method with road driving along next goaf to top (on-dip)
RU2325528C1 (en) * 2007-01-17 2008-05-27 Государственное образовательное учреждение высшего профессионального образования "Санкт-Петербургский государственный горный институт имени Г.В. Плеханова (технический университет)" Method to control hard-caving roof
RU2462593C1 (en) * 2011-03-14 2012-09-27 Учреждение Российской академии наук Институт угля Сибирского отделения РАН (ИУ СО РАН) Method of development of thick steep coal bed in straps downstream
CN102392642A (en) * 2011-11-02 2012-03-28 王晓利 Method for arranging roadways on coal-pillar-free stope
CN104179520A (en) * 2014-08-26 2014-12-03 山西潞安环保能源开发股份有限公司 Z-shaped ventilation method and system for gob-side entry of coalface
CN106121646A (en) * 2016-08-22 2016-11-16 中煤西安设计工程有限责任公司 Underground mine exploiting field formula without digging laneway without coal column coal-mining method
CN107725097A (en) * 2017-10-31 2018-02-23 中国矿业大学(北京) Method is controlled altogether without coal pillar mining gas and coal spontaneous combustion in a kind of Qie Dingcheng lanes
CN107725053A (en) * 2017-11-08 2018-02-23 山东科技大学 Lane is reserved for one's own use without pillar mining method suitable for the exploiting field of gently inclined seam
CN109798116A (en) * 2019-04-04 2019-05-24 中国矿业大学(北京) Realize double-vane arrangement working face exploiting field or zone entirely without coal column method
CN111255456A (en) * 2020-02-24 2020-06-09 中国矿业大学 Mine advancing type filling roadway mining method
CN114592866A (en) * 2022-02-25 2022-06-07 太原理工大学 Residual coal resource mining area full mining method with paste partially filled

Also Published As

Publication number Publication date
ZA202304365B (en) 2023-11-29
CN114961728A (en) 2022-08-30

Similar Documents

Publication Publication Date Title
CN108612530B (en) Mining method for hanging wall surrounding rock crushing inclined medium-thickness ore body
CN105587318B (en) A kind of method of mining by the way of filling of the parallel middle thickness orebody group continuous stoping of low-angle dip
CN104533416B (en) Pole big thick ore body massive mechanical non-pillar sublevel caving mining methods
CN101105129B (en) Mining environment reconstructed continuous mining afterwards filling mining method
CN104481539B (en) From kerve tight-face blasting caved stopes
CN111335894B (en) Horizontal subsection small short wall fully mechanized caving mining method for steep thick coal seam
CN102844522A (en) Underground mining
CN105422102B (en) A kind of vertical medium-length hole ore blast subsection access back-filling method
CN109505606B (en) Pre-roof-control mechanized sublevel open stoping subsequent filling mining method
CN113653492B (en) Method for preventing rock burst in filling mining
CN103104260A (en) Comprehensive-conventional mechanical mining double-unit face coal mining method under complicated geological conditions
CN114961728B (en) Method for mining area without coal pillars for comprehensively preventing and controlling rock burst and gas
CN114592867A (en) Temporary top pillar induced caving and sill pillar-free sublevel caving combined mining method
CN109026005A (en) A kind of comprehensive mechanization falls mine stripping method
CN105370280B (en) A kind of double-deck thin jade ore deposit nondestructive blasting mining methods of underground low-angle dip
CN111894667B (en) Upward double-layered drift filling mining method for recoverable support shield of broken ore body
CN110671148B (en) One-hole multi-open ground grouting filling method above coal pillar
CN104879128B (en) Severe inclined thick coal seam coal winning technology based on the advanced pre- quick-fried reduction of top coal
CN116291444A (en) Safe, efficient and low-lean mining method
CN115288777A (en) Comprehensive treatment method for gas on fully mechanized coal mining face
CN113236252B (en) Single-route bottomless column sublevel caving method cover stratum long-distance drilling grouting method
CN109973091B (en) Coal mining method for multi-branch coal body
CN111101945B (en) Excavation mining method for once-propelled segmental rock drilling stage along trend of ore body
CN111997611B (en) Steeply inclined ore body inclination raise sublevel mining method
CN216617508U (en) Super-thick coal seam non-pillar layered top coal caving coal mining system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant