CN114875771B - 一种铺轨基地桥梁的设计及施工方法 - Google Patents
一种铺轨基地桥梁的设计及施工方法 Download PDFInfo
- Publication number
- CN114875771B CN114875771B CN202210406458.1A CN202210406458A CN114875771B CN 114875771 B CN114875771 B CN 114875771B CN 202210406458 A CN202210406458 A CN 202210406458A CN 114875771 B CN114875771 B CN 114875771B
- Authority
- CN
- China
- Prior art keywords
- bridge
- line
- frame
- frame bridge
- newly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 19
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 23
- 239000010959 steel Substances 0.000 claims abstract description 23
- 238000000034 method Methods 0.000 claims description 11
- 230000007704 transition Effects 0.000 claims description 11
- 238000009434 installation Methods 0.000 claims description 4
- 238000004064 recycling Methods 0.000 claims description 2
- 239000011150 reinforced concrete Substances 0.000 description 5
- 102000010637 Aquaporins Human genes 0.000 description 1
- 108010063290 Aquaporins Proteins 0.000 description 1
- 230000003247 decreasing effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 230000003137 locomotive effect Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011513 prestressed concrete Substances 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D15/00—Movable or portable bridges; Floating bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/06—Arrangement, construction or bridging of expansion joints
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/12—Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210406458.1A CN114875771B (zh) | 2022-04-18 | 2022-04-18 | 一种铺轨基地桥梁的设计及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210406458.1A CN114875771B (zh) | 2022-04-18 | 2022-04-18 | 一种铺轨基地桥梁的设计及施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114875771A CN114875771A (zh) | 2022-08-09 |
CN114875771B true CN114875771B (zh) | 2023-12-01 |
Family
ID=82669170
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210406458.1A Active CN114875771B (zh) | 2022-04-18 | 2022-04-18 | 一种铺轨基地桥梁的设计及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114875771B (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10032448A1 (de) * | 2000-07-04 | 2002-01-17 | Heiko Tilebein | Ersatz einer Brücke |
CN111997406A (zh) * | 2020-09-02 | 2020-11-27 | 中铁第六勘察设计院集团有限公司 | 一种铁路站场的过渡改造方法 |
CN113026539A (zh) * | 2021-04-16 | 2021-06-25 | 中铁第四勘察设计院集团有限公司 | 一种整体现浇框架桥上接轨结构及施工方法 |
CN113944107A (zh) * | 2021-10-28 | 2022-01-18 | 中铁二十局集团有限公司 | 一种陆地矮墩桥梁路基填筑式上桥通道及其施工方法 |
CN216006573U (zh) * | 2021-09-26 | 2022-03-11 | 中铁上海设计院集团有限公司 | 一种用于高速铁路跨越深厚岩溶覆盖区新型桥跨结构 |
CN217324965U (zh) * | 2022-04-18 | 2022-08-30 | 中铁上海设计院集团有限公司 | 一种永临结合的铺轨基地桥梁 |
-
2022
- 2022-04-18 CN CN202210406458.1A patent/CN114875771B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10032448A1 (de) * | 2000-07-04 | 2002-01-17 | Heiko Tilebein | Ersatz einer Brücke |
CN111997406A (zh) * | 2020-09-02 | 2020-11-27 | 中铁第六勘察设计院集团有限公司 | 一种铁路站场的过渡改造方法 |
CN113026539A (zh) * | 2021-04-16 | 2021-06-25 | 中铁第四勘察设计院集团有限公司 | 一种整体现浇框架桥上接轨结构及施工方法 |
CN216006573U (zh) * | 2021-09-26 | 2022-03-11 | 中铁上海设计院集团有限公司 | 一种用于高速铁路跨越深厚岩溶覆盖区新型桥跨结构 |
CN113944107A (zh) * | 2021-10-28 | 2022-01-18 | 中铁二十局集团有限公司 | 一种陆地矮墩桥梁路基填筑式上桥通道及其施工方法 |
CN217324965U (zh) * | 2022-04-18 | 2022-08-30 | 中铁上海设计院集团有限公司 | 一种永临结合的铺轨基地桥梁 |
Also Published As
Publication number | Publication date |
---|---|
CN114875771A (zh) | 2022-08-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110106751B (zh) | 一种适用于crtsⅱ型板式无砟轨道的沉降调整方法 | |
CN106758590B (zh) | 用于不停运条件下更换铁路轨道的施工便梁及施工方法 | |
KR102105230B1 (ko) | 기존 철도선로와 철도운행을 유지하는 철도교량 시공방법 | |
CN217324965U (zh) | 一种永临结合的铺轨基地桥梁 | |
KR100415768B1 (ko) | 철도교의 강교를 슬래브교로 치환하는 공법 및 그 가설구조 | |
KR100924306B1 (ko) | 이동형 가로보를 갖는 가설교량의 시공방법 | |
CN114875771B (zh) | 一种铺轨基地桥梁的设计及施工方法 | |
CN208830061U (zh) | 一种装配式无砟轨道单元板及无砟轨道板 | |
CN215104790U (zh) | 既有铁路下穿框架桥施工的加固结构 | |
CN113026540B (zh) | 一种新建桥墩箱梁整体平移的桥上接轨系统及方法 | |
CN113026539A (zh) | 一种整体现浇框架桥上接轨结构及施工方法 | |
CN209975279U (zh) | 一种适用于crtsⅱ型板式无砟轨道的沉降调整结构 | |
CN112796232A (zh) | 既有铁路下穿框架桥施工的加固结构 | |
CN109826059B (zh) | 一种在车站主体安装起重设备配合拼装轨排的施工方法 | |
RU2352705C1 (ru) | Способ укладки верхнего строения пути | |
CN107245960A (zh) | 一种用于城市高架桥更新的分段式施工系统及方法 | |
CN220789399U (zh) | 一种拼装道岔梁 | |
CN220847057U (zh) | 一种吊装施工铁路简支梁 | |
CN217896102U (zh) | 一种行走于铁路专用线上的汽车运煤通道结构 | |
CN109797609A (zh) | 小半径曲线铁路整体折线架空装置及方法 | |
CN212128691U (zh) | 一种地铁轨枕置换临时支撑用钢支墩 | |
CN215104297U (zh) | 一种双联式单向预应力轨枕 | |
JP3665909B2 (ja) | 橋梁の改築工法 | |
CN107604823A (zh) | 一种通过铁路过渡运梁的施工方法 | |
CN214882899U (zh) | 一种整体现浇框架桥上接轨结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Chen Jie Inventor after: Liu Jianhong Inventor after: Pan Xiangwen Inventor after: Dai Hanchao Inventor after: Zhao Zhiming Inventor after: Jiang Yong Inventor after: Liu Simeng Inventor after: Guo Hua Inventor after: Chen Niannian Inventor before: Chen Jie Inventor before: Pan Xiangwen Inventor before: Dai Hanchao Inventor before: Zhao Zhiming Inventor before: Jiang Yong Inventor before: Liu Simeng Inventor before: Guo Hua Inventor before: Chen Niannian |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |