CN114809583A - Transversely-sliding hanging basket for building construction and mounting method - Google Patents
Transversely-sliding hanging basket for building construction and mounting method Download PDFInfo
- Publication number
- CN114809583A CN114809583A CN202210627673.4A CN202210627673A CN114809583A CN 114809583 A CN114809583 A CN 114809583A CN 202210627673 A CN202210627673 A CN 202210627673A CN 114809583 A CN114809583 A CN 114809583A
- Authority
- CN
- China
- Prior art keywords
- steel
- pulley
- fixed
- hanger body
- shaped
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
- E04G3/32—Hoisting devices; Safety devices
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/001—Safety or protective measures against falling down relating to scaffoldings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/007—Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/14—Railings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Movable Scaffolding (AREA)
Abstract
The invention discloses a hanging basket capable of transversely sliding for building construction and an installation method, wherein the hanging basket comprises a steel hanging bracket body for bearing operating personnel, a first inverted U-shaped hook is fixed at the top of the left side of the steel hanging bracket body, a first pulley is fixed in the first inverted U-shaped hook through a first pulley shaft, the first pulley is arranged on a first sliding rail, the first sliding rail is arranged on first L-shaped hanging parts which are longitudinally arranged at intervals, and the first L-shaped hanging parts are fixed on first original structure channel steel; the fixed second of the right side top of steel hanger body is fallen the U type couple, through the fixed second pulley of second pulley shaft in the second falls the U type couple, the second pulley is arranged in on the second slide rail, the second slide rail sets up on the second L type flying piece that vertical interval set up, these a little second L type flying pieces are fixed on the former structure channel-section steel of second, the gag lever post is fixed to the bottom of the second that falls the U type couple, the epaxial first locking hole of second pulley passes through retaining member locking with the second locking hole on the gag lever post.
Description
Technical Field
The invention relates to the technical field of constructional engineering equipment, in particular to a hanging basket capable of sliding transversely for building construction and an installation method.
Background
The hanging basket is a building tool for high-altitude operation in building engineering, and is used for curtain wall installation and outer wall cleaning. The basket is a kind of basket that can replace the traditional scaffold. The method is widely accepted in high-rise operations such as outer wall construction, curtain wall installation, heat insulation construction, maintenance and outer wall cleaning of high-rise multi-storey buildings, and can be used for the operation of large-scale tank bodies, bridges, dams and other projects. According to different construction difficulties and construction places, various non-standard hanging baskets such as an annular hanging basket for a chimney, a hanging basket for a ship, a detection hanging basket in a furnace, an overlong hanging basket for a bridge, an elevator installation hanging basket and a rail type sliding hanging basket can be produced, the hanging baskets can be divided into a steel frame electric hanging basket and an aluminum alloy electric hanging basket according to materials, and the hanging baskets can be divided into a manual hanging basket and an electric hanging basket according to different power sources for lifting.
Disclosure of Invention
The invention provides a hanging basket capable of transversely sliding for building construction and an installation method aiming at the problems and the defects in the prior art.
The invention solves the technical problems through the following technical scheme:
the invention provides a hanging basket capable of transversely sliding for building construction, which is characterized by comprising a steel hanging bracket body for bearing operating personnel, wherein a first inverted U-shaped hook is fixed at the top of the left side of the steel hanging bracket body, a first pulley is fixed in the first inverted U-shaped hook through a first pulley shaft, the first pulley is arranged on a first sliding rail and is in sliding fit with the first sliding rail, the first sliding rail is arranged on first L-shaped hanging parts which are longitudinally arranged at intervals, and the first L-shaped hanging parts are fixed on first original structure channel steel.
The right side top of steel hanger body is fixed with the second type of falling U couple, be fixed with the second pulley through the second pulley shaft in the second type of falling U couple, the second pulley is arranged in on the second slide rail and is joined in marriage mutually with the second slide rail cunning, the second slide rail sets up on the second L type flying piece that vertical interval set up, and these some second L type flying pieces are fixed on the second primary structure channel-section steel, the bottom of the second type of falling U couple is fixed with the gag lever post, the epaxial first locking hole of second pulley passes through retaining member locking with the second locking hole on the gag lever post.
Preferably, the steel hanger body is formed by welding angle steels.
Preferably, the steel hanger body is welded with round pipes and angle steel to form a local enclosure, the bottom plate of the steel hanger body is a thick wood bottom plate, and the wood bottom plate is nailed with anti-skid battens.
Preferably, the steel hanger body is coated with silver paint, and the thickness of the coating is 120 microns.
Preferably, a first steel cable hole is formed in the left angle steel of the steel hanger body, one end of the first steel cable is connected with the first steel cable hole, and the other end of the first steel cable is connected with the first original structure channel steel.
Preferably, a second steel cable hole is formed in the right angle steel of the steel hanger body, one end of the second steel cable is connected with the second steel cable hole, and the other end of the second steel cable is connected with the second original structure channel steel.
The invention also provides a method for installing the transversely sliding hanging basket for building construction, which is characterized by comprising the following steps of:
s1, fixing first L-shaped hanging pieces at the bottom of the first original-structure channel steel, wherein the first L-shaped hanging pieces are longitudinally arranged at intervals, first slide rails are arranged on the first L-shaped hanging pieces, fixing second L-shaped hanging pieces at the bottom of the second original-structure channel steel, the second L-shaped hanging pieces are longitudinally arranged at intervals, and second slide rails are arranged on the second L-shaped hanging pieces;
s2, welding a first inverted U-shaped hook at the top of the left side of a steel hanger body for bearing operating personnel, wherein a first pulley is fixed in the first inverted U-shaped hook through a first pulley shaft, the first pulley is arranged on a first sliding rail and is matched with the first sliding rail in a sliding manner, welding a second inverted U-shaped hook at the top of the right side of the steel hanger body, a second pulley is fixed in the second inverted U-shaped hook through a second pulley shaft, and the second pulley is arranged on a second sliding rail and is matched with the second sliding rail in a sliding manner;
s3, a limiting rod is fixed at the bottom of the second inverted U-shaped hook, a first locking hole is formed in the second pulley shaft, and a second locking hole is formed in the limiting rod;
and S4, when the steel hanger body slides to the target position, the first locking hole on the second pulley shaft and the second locking hole on the limiting rod are locked through the locking piece.
Preferably, the following steps are included after step S4:
s5, one end of the first steel cable is connected with a first steel cable hole formed in the left angle steel of the steel hanger body, the other end of the first steel cable is connected with the first original structure channel steel, one end of the second steel cable is connected with a second steel cable hole formed in the right angle steel of the steel hanger body, and the other end of the second steel cable is connected with the second original structure channel steel.
On the basis of the common knowledge in the field, the above preferred conditions can be combined randomly to obtain the preferred embodiments of the invention.
The positive progress effects of the invention are as follows:
to unconventional, special-shaped construction position, the work load is little, the working face dispersion, it is troublesome, hard, with high costs and work efficiency low to set up full hall scaffold frame, and this lateral shifting portable construction hanging flower basket weight is little, simple structure, and artifical transport of accessible and equipment need not to borrow crane or other mounting tool, and lateral shifting is convenient, receives external condition constraint nature little, and work efficiency is high.
Drawings
Fig. 1 is a schematic view of a laterally slidable construction basket according to a preferred embodiment of the present invention.
Fig. 2 is a partially enlarged right side view of a basket for construction according to a preferred embodiment of the present invention.
Fig. 3 is a side view of a steel hanger body according to a preferred embodiment of the present invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. All other embodiments, which can be obtained by a person skilled in the art without any inventive step based on the embodiments of the present invention, are within the scope of the present invention.
As shown in fig. 1-3, the present embodiment provides a hanging basket capable of sliding laterally for building construction, which includes a steel hanger body 1 for bearing operators, a first inverted U-shaped hook 2 is fixed at the top of the left side of the steel hanger body 1, a first pulley 4 is fixed in the first inverted U-shaped hook 2 through a first pulley shaft 3, the first pulley 4 is disposed on a first sliding rail (sampling channel steel) 5 and is in sliding fit with the first sliding rail 5, the first sliding rail 5 is disposed on a first L-shaped hanging piece 6 disposed at a longitudinal interval, and the first L-shaped hanging pieces 6 are fixed on a first original structure channel steel 7.
The right side top of steel hanger body 1 is fixed with the second type of falling U couple 8, be fixed with second pulley 10 through second pulley shaft 9 in the second type of falling U couple 8, second pulley 10 is arranged in on second slide rail (sampling channel-section steel) 11 and is joined in marriage with second slide rail 11 mutually cunning, second slide rail 11 sets up on the second L type of longitudinal separation setting flying piece 12, and these some second L type flying pieces 12 are fixed on second primary structure channel-section steel 13, the bottom of second type of falling U couple 8 is fixed with gag lever post 14, the second locking hole on the first locking hole on the second pulley shaft 9 and the gag lever post 14 is locked through retaining member 15.
The steel hanger body 1 is formed by welding L50 x 4 angle steel 16, wherein in order to enable a welding surface to be firmer and more reliable, the welding is carried out by increasing the meshing area, and mutually meshed notches are cut at the welding surface.
The steel hanger body 1 is welded with the angle steel 16 through 26X 2.5 round pipes 17 to form a local enclosure, the bottom plate of the steel hanger body 1 is a wooden bottom plate with the thickness of 20mm, and anti-skid battens are nailed on the wooden bottom plate.
Moreover, a first steel cable hole is formed in the left angle steel of the steel hanger body 1, one end of a first steel cable 18 is connected with the first steel cable hole, and the other end of the first steel cable is connected with the first original structural channel steel 7; a second steel cable hole is formed in the right angle steel of the steel hanging bracket body 1, one end of a second steel cable 19 is connected with the second steel cable hole, and the other end of the second steel cable is connected with a second original structure channel steel, so that safety and stability of the hanging basket are guaranteed.
After the manufacture, all steel components and welding parts are coated with silver powder paint, and the thickness of the coating is 120 mu m.
The embodiment also provides an installation method of the hanging basket capable of sliding transversely for building construction, which comprises the following steps:
s1, fixing first L-shaped hanging pieces 6 at the bottom of a first original structure channel steel 7 by using 2M 12 bolts, wherein the first L-shaped hanging pieces 6 are longitudinally arranged at intervals, first sliding rails 5 are arranged on the first L-shaped hanging pieces 6, fixing second L-shaped hanging pieces 12 at the bottom of a second original structure channel steel 13 by using 2M 12 bolts, the second L-shaped hanging pieces 12 are longitudinally arranged at intervals, and second sliding rails 11 are arranged on the second L-shaped hanging pieces 12.
S2, a left side top welding of steel hanger body 1 for bearing operating personnel has first type of falling U couple 2, be fixed with first pulley 4 through first pulley shaft 3 in the first type of falling U couple 2, first pulley 4 is arranged in on first slide rail 5 and is joined in marriage with first slide rail 5 mutually cunning, the right side top welding of steel hanger body 1 has second type of falling U couple 8, be fixed with second pulley 10 through second pulley shaft 9 in the second type of falling U couple 8, second pulley 10 is arranged in on second slide rail 11 and is joined in marriage mutually cunning with second slide rail 11.
S3, a limiting rod 14 is fixed to the bottom of the second inverted-U-shaped hook 8, a first locking hole is formed in the second pulley shaft 9, and a second locking hole is formed in the limiting rod 14.
And S4, when the steel hanger body 1 slides to the target position, the first locking hole on the second pulley shaft 9 and the second locking hole on the limiting rod 14 are locked through the locking piece 15.
S5, one end of the first steel cable 18 is connected with a first steel cable hole formed in the left angle steel of the steel hanger body 1, the other end of the first steel cable is connected with the first original structure channel steel 7, one end of the second steel cable 19 is connected with a second steel cable hole formed in the right angle steel of the steel hanger body 1, and the other end of the second steel cable is connected with the second original structure channel steel 13.
The working process and principle of the embodiment are as follows:
when the hanging basket is used, an operator can place the first pulley 4 on the first sliding rail 5 and place the second pulley 10 on the second sliding rail 11 by using a winch or a chain block, and the operator directly enters the hanging basket from a construction operation surface. The safety rope on the body of an operator is hung at the node part of the angle steel of the steel hanger, the operator can disperse the working surface in the hanging basket with safety protection, the workload is low, the work such as the installation of the special-shaped decoration, the curtain wall, the lamp, the identification sign and the like of a scaffold is not suitable to be erected, the operator can move the hanging basket forward and backward by moving the whole hanging basket so as to be convenient for moving operation, specifically, the first pulley 4 slides on the first slide rail 5, the second pulley 10 slides on the second slide rail 11, when the hanging basket slides to a target position, the first locking hole on the second pulley shaft 9 and the second locking hole on the limiting rod 14 are locked through the locking part 15, so that the hanging basket does not move, the left angle steel of the steel hanger body 1 and the first original structure channel steel 7 are connected by adopting the first steel cable 18, the right angle steel of the steel hanger body 1 and the second original structure channel steel 13 are connected by adopting the second steel cable 19, the hanging basket is safer and more stable.
While specific embodiments of the invention have been described above, it will be appreciated by those skilled in the art that these are by way of example only, and that the scope of the invention is defined by the appended claims. Various changes and modifications to these embodiments may be made by those skilled in the art without departing from the spirit and scope of the invention, and these changes and modifications are within the scope of the invention.
Claims (8)
1. A hanging basket capable of sliding transversely for building construction is characterized by comprising a steel hanging bracket body for bearing operating personnel, wherein a first inverted U-shaped hook is fixed at the top of the left side of the steel hanging bracket body, a first pulley is fixed in the first inverted U-shaped hook through a first pulley shaft, the first pulley is arranged on a first sliding rail and is in sliding fit with the first sliding rail, the first sliding rail is arranged on first L-shaped hanging pieces which are longitudinally arranged at intervals, and the first L-shaped hanging pieces are fixed on first original structure channel steel;
the right side top of steel hanger body is fixed with the second type of falling U couple, be fixed with the second pulley through the second pulley shaft in the second type of falling U couple, the second pulley is arranged in on the second slide rail and is joined in marriage mutually with the second slide rail cunning, the second slide rail sets up on the second L type flying piece that vertical interval set up, and these some second L type flying pieces are fixed on the second primary structure channel-section steel, the bottom of the second type of falling U couple is fixed with the gag lever post, the epaxial first locking hole of second pulley passes through retaining member locking with the second locking hole on the gag lever post.
2. A laterally slidable gondola for construction as set forth in claim 1 wherein said steel hanger body is welded with angle iron.
3. The transversely slidable gondola for construction as set forth in claim 2, wherein the steel hanger body is welded with angle steel to form a partial enclosure, and the bottom plate of the steel hanger body is a thick wooden bottom plate with skidproof battens nailed thereon.
4. A laterally slidable gondola for construction as set forth in claim 3, characterized in that the steel hanger body is painted with silver paint and the coating thickness is 120 μm.
5. A transversely slidable gondola for construction as set forth in claim 2, wherein the steel hanger body has a first steel cable hole formed in a left angle steel, and one end of the first steel cable is connected to the first steel cable hole and the other end is connected to the first original structural channel steel.
6. A transversely slidable gondola for construction as set forth in claim 2, wherein the steel hanger body has a second steel cable hole formed in the right angle steel, and one end of the second steel cable is connected to the second steel cable hole and the other end is connected to the second original structural channel steel.
7. A method for installing a transversely-sliding hanging basket for building construction is characterized by comprising the following steps:
s1, fixing first L-shaped hanging pieces at the bottom of the first original-structure channel steel, wherein the first L-shaped hanging pieces are longitudinally arranged at intervals, first slide rails are arranged on the first L-shaped hanging pieces, fixing second L-shaped hanging pieces at the bottom of the second original-structure channel steel, the second L-shaped hanging pieces are longitudinally arranged at intervals, and second slide rails are arranged on the second L-shaped hanging pieces;
s2, welding a first inverted U-shaped hook on the top of the left side of a steel hanger body for bearing operating personnel, fixing a first pulley in the first inverted U-shaped hook through a first pulley shaft, wherein the first pulley is arranged on a first sliding rail and is in sliding fit with the first sliding rail, welding a second inverted U-shaped hook on the top of the right side of the steel hanger body, fixing a second pulley in the second inverted U-shaped hook through a second pulley shaft, and wherein the second pulley is arranged on a second sliding rail and is in sliding fit with the second sliding rail;
s3, a limiting rod is fixed at the bottom of the second inverted U-shaped hook, a first locking hole is formed in the second pulley shaft, and a second locking hole is formed in the limiting rod;
and S4, when the steel hanger body slides to the target position, the first locking hole on the second pulley shaft and the second locking hole on the limiting rod are locked through the locking piece.
8. A method of installing a laterally slidable gondola for construction as set forth in claim 7, which comprises the following steps after step S4:
s5, one end of the first steel cable is connected with a first steel cable hole formed in the left angle steel of the steel hanger body, the other end of the first steel cable is connected with the first original structure channel steel, one end of the second steel cable is connected with a second steel cable hole formed in the right angle steel of the steel hanger body, and the other end of the second steel cable is connected with the second original structure channel steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210627673.4A CN114809583A (en) | 2022-06-06 | 2022-06-06 | Transversely-sliding hanging basket for building construction and mounting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210627673.4A CN114809583A (en) | 2022-06-06 | 2022-06-06 | Transversely-sliding hanging basket for building construction and mounting method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114809583A true CN114809583A (en) | 2022-07-29 |
Family
ID=82520307
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210627673.4A Pending CN114809583A (en) | 2022-06-06 | 2022-06-06 | Transversely-sliding hanging basket for building construction and mounting method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114809583A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6302238B1 (en) * | 1999-07-15 | 2001-10-16 | Mark A. Preusser | Support structure for suspending a work surface below a girder |
CN203856186U (en) * | 2014-05-20 | 2014-10-01 | 中建安装工程有限公司 | Suspension type manned pulley trolley for mounting large-scaled storage tank subsidiary facilities |
CN204609266U (en) * | 2015-04-20 | 2015-09-02 | 中建安装工程有限公司 | A kind of Mobile operating platform for the construction of piping lane comprehensive pipeline |
CN108277971A (en) * | 2018-04-09 | 2018-07-13 | 上海市机械施工集团有限公司 | A kind of translatable formula operating platform for the curtain wall construction that is suitable for cornicing |
CN209008748U (en) * | 2018-09-19 | 2019-06-21 | 泰州市天泰制药机械厂 | A kind of bicycle use lock |
CN211313313U (en) * | 2019-07-02 | 2020-08-21 | 中机国能电力工程有限公司 | Hanging basket device for pipe support aerial operation |
-
2022
- 2022-06-06 CN CN202210627673.4A patent/CN114809583A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6302238B1 (en) * | 1999-07-15 | 2001-10-16 | Mark A. Preusser | Support structure for suspending a work surface below a girder |
CN203856186U (en) * | 2014-05-20 | 2014-10-01 | 中建安装工程有限公司 | Suspension type manned pulley trolley for mounting large-scaled storage tank subsidiary facilities |
CN204609266U (en) * | 2015-04-20 | 2015-09-02 | 中建安装工程有限公司 | A kind of Mobile operating platform for the construction of piping lane comprehensive pipeline |
CN108277971A (en) * | 2018-04-09 | 2018-07-13 | 上海市机械施工集团有限公司 | A kind of translatable formula operating platform for the curtain wall construction that is suitable for cornicing |
CN209008748U (en) * | 2018-09-19 | 2019-06-21 | 泰州市天泰制药机械厂 | A kind of bicycle use lock |
CN211313313U (en) * | 2019-07-02 | 2020-08-21 | 中机国能电力工程有限公司 | Hanging basket device for pipe support aerial operation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201221193Y (en) | High altitude packway ceiling construction operating platform | |
CN209066843U (en) | A kind of steel structural overhead construction one-man service's nacelle device | |
CN206722429U (en) | A kind of roofing color corrugated sheet steel transportation system | |
CN110748139B (en) | Hanging basket support system | |
CN207700708U (en) | A kind of shellring shape ceiling mounted tracks of unit glass curtain wall | |
CN106848938A (en) | Cable testing bridge hanging installation method under a kind of High Altitude Platform | |
CN203654702U (en) | Operating platform for construction of reinforced concrete chimney | |
CN104153586A (en) | Construction method for installing purline through suspension cable cranes | |
CN114809583A (en) | Transversely-sliding hanging basket for building construction and mounting method | |
CN210002838U (en) | Device for mounting steel structure vestibule color plate | |
CN212866808U (en) | Construction hanging basket | |
CN206346500U (en) | Compact simplified arm extending type straddle truck | |
CN113738089A (en) | Hanging basket integral installation construction method of specially-made hanging mechanism device | |
CN111155748B (en) | Quick jacking device for mounting building gypsum boards | |
CN107013013A (en) | A kind of steel structure lift shaft standard knot hoisting fixture and technique | |
CN206799012U (en) | A kind of concrete batten transport of small space and installation tool group | |
CN215167853U (en) | Hanging basket suspension mechanism | |
JP3950800B2 (en) | Suspension scaffold | |
CN214899827U (en) | High-altitude outdoor cable terminal operation platform | |
CN212478505U (en) | Detachable hanging flower basket truss support device | |
CN106995187A (en) | A kind of concrete batten transport of small space and installation tool group | |
CN104806001A (en) | Safety operation platform for sliding and lifting of elevator shaft guide rail and construction method | |
CN206987295U (en) | A kind of steel structure lift shaft standard knot hoisting fixture | |
CN109987501A (en) | A kind of device threaded off in Quick air in steel structure hoisting and tripping method | |
CN204626927U (en) | The sliding safe operation platform of elevator shaft guide rail |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |