CN205558227U - Last people scaffold frame of dismouting can relapse - Google Patents

Last people scaffold frame of dismouting can relapse Download PDF

Info

Publication number
CN205558227U
CN205558227U CN201620389414.2U CN201620389414U CN205558227U CN 205558227 U CN205558227 U CN 205558227U CN 201620389414 U CN201620389414 U CN 201620389414U CN 205558227 U CN205558227 U CN 205558227U
Authority
CN
China
Prior art keywords
post
lower floor
upper strata
landing slab
node
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620389414.2U
Other languages
Chinese (zh)
Inventor
祝磊
顾辰
宁波
赵书军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Zhengyuantong Commerce And Trade Co Ltd
Yungang Grottoes Research Institute
Beijing University of Civil Engineering and Architecture
Original Assignee
Beijing Zhengyuantong Commerce And Trade Co Ltd
Yungang Grottoes Research Institute
Beijing University of Civil Engineering and Architecture
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Zhengyuantong Commerce And Trade Co Ltd, Yungang Grottoes Research Institute, Beijing University of Civil Engineering and Architecture filed Critical Beijing Zhengyuantong Commerce And Trade Co Ltd
Priority to CN201620389414.2U priority Critical patent/CN205558227U/en
Application granted granted Critical
Publication of CN205558227U publication Critical patent/CN205558227U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a last people scaffold frame of dismouting can relapse, including post, roof beam, landing slab, ladder and suspension cable, the post includes upper post and lower floor's post, the roof beam includes upper roof beam and lower floor's roof beam, the node is installed to the tip of lower floor's post, it has the bolt hole to open on the node, same size's node is installed to the bottom of upper strata post, it has the bolt hole to open on the node of upper strata post, the landing slab is installed respectively at the both ends of upper strata roof beam and lower floor's roof beam, it has the bolt hole to open on the landing slab, the side of upper strata post and lower floor's post all is provided with the bolt hole, pass through bolted connection between landing slab and the roof beam, link to each other through the ladder between the landing slab, link to each other through the suspension cable between the tip of upper strata post and between the tip of lower floor's post. This structrual installation is swift, and it is convenient to dismantle, and single scantling is little, and light in weight is convenient for transport and deposit, the component specification is unified, makes things convenient for the bulk production and the popularization of component, this structure user can be based on the actual conditions of oneself and select the quantity on layer and the quantity of assembling the unit, is applicable to the various condition.

Description

A kind of can upper people's scaffold of repeated disassembled and assembled
Technical field
This utility model relates to a kind of scaffold, a kind of can upper people's scaffold of repeated disassembled and assembled.
Background technology
Along with quickening and the prosperity of various places real estate of Urbanization in China, the high buildings and large mansions of various places start to build, scaffold Also it is seen everywhere.A kind of device conventional when scaffold is to build a building, scaffold refers to that job site is operative and solves The various supports vertically and horizontally transported and set up, refer to be used on construction site exterior wall, inside fitting or floor height are higher cannot be straight Connect the place of construction, mainly for the upper and lower operation of workmen or perimeter security net are gone along with sb. to guard him and high-altitude installation component.Send out through for many years Exhibition, in field of civil engineering, scaffold is widely used.But currently used scaffold there is also some Shortcoming, these shortcomings include: install and dismantle inconvenience, and parts are overweight and excessive thus inconvenient transport and depositing, and use Component specification disunity, affects the unified of parts and produces and assembled.
Utility model content
The purpose of this utility model be to provide a kind of can upper people's scaffold of repeated disassembled and assembled, to solve above-mentioned background technology proposes Problem.
For achieving the above object, the following technical scheme of this utility model offer:
A kind of can upper people's scaffold of repeated disassembled and assembled, including post, beam, landing slab, ladder and suspension cable, described post includes upper strata Post and lower floor's post, beam includes upper strata beam and lower floor's beam, and the end of lower floor's post is provided with node, and node has bolt hole, upper strata The bottom of post is provided with an equal amount of node, and the node of upper strata post has the bolt hole matched with lower floor Column border node, upper strata The two ends of beam and lower floor's beam are separately installed with landing slab, and landing slab has bolt hole, and the side of upper strata post and lower floor's post is respectively provided with The bolt hole matched with landing slab, the upper and lower surface of upper strata beam and lower floor's beam is had to be provided with 2 through bolts hole, platform Being bolted between plate and beam, be connected by ladder between landing slab, there is the groove matched with landing slab thickness ladder end Steel, is connected by suspension cable between the end of upper strata post and between the end of lower floor's post.
As further program of the utility model: upper strata post, lower floor's post, landing slab, upper strata beam and lower floor's beam all use steel or Aluminum alloy materials makes.
As further program of the utility model: be bolted connection between ladder and landing slab.
As further program of the utility model: the quantity of node and landing slab upper bolt hole is four.
Compared with prior art, the beneficial effects of the utility model are: this structure is quick for installation, and detachability is good, convenient disassembly, Single scantling is little, lightweight, it is simple to transports and deposits;Component uniform specification, facilitates a large amount of of component to produce and promote; This structure user can select quantity and the quantity of unit of layer according to the practical situation of oneself, it is adaptable to various situations;This knot It is heavy that structure improves traditional pin hand cradle, and the defect of installing/dismounting complex steps can be applicable among practice of construction, and using effect is good.
Accompanying drawing explanation
Fig. 1 is can the structural representation of upper people's scaffold of repeated disassembled and assembled.
Fig. 2 is can the structural representation of ladder and landing slab junction in upper people's scaffold of repeated disassembled and assembled.
Fig. 3 is can the structural representation of upper people's scaffold central sill and landing slab junction of repeated disassembled and assembled.
Fig. 4 is can the structural representation of upper people's scaffold post at the middle and upper levels of repeated disassembled and assembled.
Fig. 5 is can the structural representation of upper people's scaffold beam at the middle and upper levels of repeated disassembled and assembled.
Wherein: 1-node, 2-upper strata post, 3-lower floor post, 4-lower floor beam, 5-upper strata beam, 6-landing slab, 7-ladder, 8-is oblique Drag-line.
Detailed description of the invention
Below in conjunction with detailed description of the invention, the technical scheme of this patent is described in more detail.
Refer to Fig. 1-5, a kind of can upper people's scaffold of repeated disassembled and assembled, including post, beam, landing slab 6, ladder 7 and suspension cable 8, described post includes upper strata post 2 and lower floor's post 3, and beam includes upper strata beam 5 and lower floor's beam 4, and the end of lower floor's post 3 is provided with joint Point 1, node 1 has bolt hole, and the bottom of upper strata post 2 is provided with an equal amount of node 1, on the node 1 of upper strata post 2 Having the bolt hole matched with lower floor post 3 node 1, the two ends of upper strata beam 4 and lower floor's beam 5 are separately installed with landing slab 6, Having bolt hole on landing slab 6, the side of upper strata post 2 and lower floor's post 3 is provided with the bolt hole matched with landing slab 6, The upper and lower surface of upper strata beam 5 and lower floor's beam 4 is provided with 2 through bolts hole, between landing slab 6 and beam by bolt even Connecing, be connected by ladder 7 between landing slab 6, there are the channel-section steel matched with landing slab 6 thickness, upper strata post 2 in ladder 7 end End between and the end of lower floor's post 3 between be connected by suspension cable 8.Upper strata post 2, lower floor's post 3, landing slab 6, on Layer beam 5 and lower floor's beam 4 all use steel or aluminum alloy materials to make, and sturdy and durable, service life is long.Ladder 7 and landing slab 6 Between be bolted connection.The quantity of node 1 and landing slab 6 upper bolt hole is four.
Operation principle of the present utility model is: this structure can use same way assembly multilamellar, first by upper strata post 2 and lower floor The node 1 of post 3 aligns, and makes to be bolted connection upper strata post 2 and lower floor's post 3, then by upper strata beam 5 and lower floor's beam 4 Node and upper strata post 2 align with the bolt hole on lower floor post 3, and use bolt to be fastenedly connected respectively, other node 1 Method of attachment is identical, after all nodes 1 have connected, is alignd with the bolt hole on beam by the bolt hole of landing slab 6, and makes With bolt, landing slab 6 is fastenedly connected with beam, after landing slab to be installed, by the bolt hole at ladder 7 channel-section steel and landing slab 6 The bolt hole alignment matched, uses bolt to be fastenedly connected with landing slab 6 by ladder 7, carries out the connection of next layer the most successively, User selects the quantity of layer according to the practical situation of oneself, and suspension cable 8 can reinforce intensity and the steadiness of entirety.This structure Quick for installation, detachability is good, convenient disassembly, and single scantling is little, lightweight, it is simple to transports and deposits;Component specification Unified, facilitate a large amount of of component to produce and promote;This structure user can according to oneself practical situation select layer quantity and The quantity of unit, it is adaptable to various situations;It is heavy that this structure improves traditional pin hand cradle, the defect of installing/dismounting complex steps, Can be applicable among practice of construction, using effect is good.
Above the better embodiment of this patent is explained in detail, but this patent is not limited to above-mentioned embodiment, at this In the ken that the those of ordinary skill in field is possessed, it is also possible to make various change on the premise of without departing from this patent objective Change.

Claims (4)

1. one kind can upper people's scaffold of repeated disassembled and assembled, it is characterised in that a kind of can upper people's scaffold of repeated disassembled and assembled, including post, Beam, landing slab, ladder and suspension cable, described post includes upper strata post and lower floor's post, and beam includes upper strata beam and lower floor's beam, lower floor's post End node is installed, node has bolt hole, the bottom of upper strata post is provided with an equal amount of node, the joint of upper strata post Having the bolt hole matched with lower floor Column border node on point, the two ends of upper strata beam and lower floor's beam are separately installed with landing slab, landing slab On have bolt hole, the side of upper strata post and lower floor's post is provided with the bolt hole matched with landing slab, upper strata beam and lower floor's beam Upper and lower surface be provided with 2 through bolts hole, be bolted between landing slab and beam, between landing slab by ladder Son is connected, and there is the channel-section steel matched with landing slab thickness ladder end, between the end of upper strata post and between the end of lower floor's post It is connected by suspension cable.
The most according to claim 1 can upper people's scaffold of repeated disassembled and assembled, it is characterised in that described upper strata post, lower floor's post, Landing slab, upper strata beam and lower floor's beam all use steel or aluminum alloy materials to make, and can multilamellar, multiple-unit assembly.
The most according to claim 1 and 2 can upper people's scaffold of repeated disassembled and assembled, it is characterised in that described ladder and platform It is bolted connection between plate.
The most according to claim 3 can upper people's scaffold of repeated disassembled and assembled, it is characterised in that on described node and landing slab The quantity of bolt hole is four.
CN201620389414.2U 2016-05-03 2016-05-03 Last people scaffold frame of dismouting can relapse Expired - Fee Related CN205558227U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620389414.2U CN205558227U (en) 2016-05-03 2016-05-03 Last people scaffold frame of dismouting can relapse

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620389414.2U CN205558227U (en) 2016-05-03 2016-05-03 Last people scaffold frame of dismouting can relapse

Publications (1)

Publication Number Publication Date
CN205558227U true CN205558227U (en) 2016-09-07

Family

ID=56805776

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620389414.2U Expired - Fee Related CN205558227U (en) 2016-05-03 2016-05-03 Last people scaffold frame of dismouting can relapse

Country Status (1)

Country Link
CN (1) CN205558227U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105756331A (en) * 2016-05-03 2016-07-13 北京建筑大学 Scaffolding capable of being repeatedly disassembled and assembled and to which people can climb

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105756331A (en) * 2016-05-03 2016-07-13 北京建筑大学 Scaffolding capable of being repeatedly disassembled and assembled and to which people can climb

Similar Documents

Publication Publication Date Title
CN204715722U (en) A kind of all steel attachment type raise scaffold
CN105298099A (en) Modular suspension type steel tube fastener scaffold operating platform and erecting method thereof
CN107902545B (en) Horse way air pipe hoisting construction device and construction method
CN104878867B (en) Integrated structure of ceiling keel and double-layer construction platform and manufacturing method thereof
CN104032967A (en) Hoisting construction method for prefabricated assembly-type frame structure members
CN107762161B (en) A kind of energy-saving assembled system of steel residential structure and installation method
CN201176703Y (en) Tripod for construction of hyperbola cooling tower cylinder
CN205134919U (en) Modularization suspension type steel tubes clamps scaffold operation platform
CN203820287U (en) Composite steel carrying pole for hoisting roof tiles of steel structure workshops
CN205558227U (en) Last people scaffold frame of dismouting can relapse
CN204728554U (en) Integral structure of ceiling keel and double-layer construction platform
CN105756331A (en) Scaffolding capable of being repeatedly disassembled and assembled and to which people can climb
CN103835369B (en) Extensible high-altitude conjoined steel structure
CN204703394U (en) A kind of eaves structure of modularization mobile house
CN204311776U (en) A kind of integrated lightweight steel construction room of antidetonation
CN206158146U (en) Novel building section of thick bamboo well construction operation platform
CN207228591U (en) A kind of architectural engineering scaffold
CN105464218B (en) One kind landing truss bearing pin connecting joint structure
CN103643790B (en) It is applicable to the self-crawling type operating platform of colossal column
CN210798251U (en) But scaffold of automatically regulated height
CN113550550A (en) Overhanging unit type scaffold convenient to assemble and disassemble
CN203320920U (en) Cantilever frame for high-rise building sloping roof outer eave construction and protection at gable
CN207974315U (en) Furred ceiling vertically receives side load carrier
CN204959978U (en) Show house floor roof beam and outer wall structure
CN205933036U (en) Pipe truss installation is with high altitude parts overhead hoist

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160907

CF01 Termination of patent right due to non-payment of annual fee