CN114808752B - 钢桁梁双顶托举顶推安装方法 - Google Patents
钢桁梁双顶托举顶推安装方法 Download PDFInfo
- Publication number
- CN114808752B CN114808752B CN202210452131.8A CN202210452131A CN114808752B CN 114808752 B CN114808752 B CN 114808752B CN 202210452131 A CN202210452131 A CN 202210452131A CN 114808752 B CN114808752 B CN 114808752B
- Authority
- CN
- China
- Prior art keywords
- steel truss
- truss girder
- steel
- joist
- supporting beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/06—Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Abstract
本发明提供一种钢桁梁双顶托举顶推安装方法,在钢桁梁每个下弦杆节底部处焊接一钢垫板,在每个永久墩和临时墩的墩顶两侧分别顺桥向设一支撑梁,两支撑梁内侧分别设两个步履千斤顶,每侧的两个步履千斤顶顶部顺桥向搭设一托梁,支撑梁和托梁的长度大于两个钢桁梁节段的长度;开始顶推时,各千斤顶先同步向上顶升,通过托梁将钢桁梁向上托举至脱离支撑梁,并将钢桁梁向前推送一个行程,然后将钢桁梁降落到支撑梁上,千斤顶携托梁回到初始位置,开始下个顶推循环。本发明只需对钢桁梁节点处进行简单加强,加固成本低;钢桁梁支点一直在节点位置,能避免钢桁梁变形,且跨越能力和负载能力都得到加强。
Description
技术领域
本发明属于桥梁施工技术领域,涉及采用顶推法进行梁体安装,具体涉及一种钢桁梁的双顶托举顶推安装方法。
背景技术
梁体顶推安装技术是一种仅需在纵桥向布置少量中间支点即可实现超大型梁体大跨径快速安装就位的方法,因其少支点、重负载、大跨越的优点,在当前桥梁施工中被广泛运用。
传统顶推方法有以下特点:一是顶升千斤顶直接顶举梁体,二是在每一个墩柱、临时支墩两侧分别只布置一台千斤顶,三是受梁体结构及自重限制,临时墩跨距一般不超过80米。
钢桁梁为节段式桁架结构,相邻节段的上弦杆间和下弦杆间通过螺栓连接,梁体结构抗力不连续。采用传统的顶推法施工时,由于支点处反力大、应力集中,容易变形,梁体结构在施工阶段应力远大于后期运营阶段应力,需对结构进行系列性加强,导致施工成本增加。尤其是当梁体自重荷载集度大,或因航道限宽、跨越障碍物导致中间支点间距无法减小时,简单的加强已无法解决问题,需对结构进行重新设计,大幅增加抗力构件,这无论从建设成本还是从结构的科学性都是不合理的,导致顶推方法相对其他施工方法没有了优势。
发明内容
本发明的目的是针对上述问题,提供一种钢桁梁双顶托举顶推安装方法,采用托梁支撑钢桁梁下弦节点,改善钢桁梁受力状态,避免梁体应力集中导致变形,采用双千斤顶顶推托梁并带动钢桁梁前移,实现钢桁梁快速安装。
本发明的技术方案如下:
一种钢桁梁双顶托举顶推安装方法,其特征在于:
(1)在钢桁梁每个下弦杆节底部处设置一钢垫板,钢垫板的顶面与下弦杆底面完全接触并焊接,钢垫板底面粘贴橡胶垫块;
(2)在每个永久墩和临时墩的墩顶两侧分别顺桥向设一支撑梁,两支撑梁内侧分别设两个步履千斤顶,每侧的两个步履千斤顶顶部顺桥向搭设一托梁,支撑梁和托梁的长度大于两个钢桁梁节段的长度;
(3)顶推前,托梁的初始高度低于支撑梁,钢桁梁支撑在墩顶两侧的支撑梁上,开始顶推时,各千斤顶先同步向上顶升,通过托梁将钢桁梁向上托举至脱离支撑梁;
(4)各步履千斤顶同步向前推送钢桁梁,达到最大行程时,千斤顶竖向回落,将钢桁梁降落到支撑梁上;
(5)托梁完全脱离钢桁梁底部后,步履千斤顶携托梁回到初始位置,开始下个顶推循环,逐步将钢桁梁顶推过跨。
本发明与现有技术相比,具有以下有益效果:
1、仅对钢桁梁节点处进行了简单加强,加固成本低。在整个顶推过程中,钢桁梁梁底的支点在节点位置,下弦杆一直处于最佳的“拉压杆”受力状态,施工应力小,无需对下弦杆进行专门加强,尤其是对于自重荷载集度很大的钢桁梁,在不对钢桁梁进行大量加固时,这种方法是目前最优的。
2、顶推时钢桁梁的支点一直位于节点,整个施工过程中,钢桁梁局部和整体受力状态均和运营阶段相仿,因此可大幅度提高临时支墩的间距,成本也将大幅降低。
3、保留了传统顶推法的所有优点。顶推技术的“少支点、重负载、大跨越”的优点没有任何削弱,且“重负载”的能力更加突出。
附图说明
图1是本发明在临时墩上设置步履千斤顶及托梁的横桥向结构示意图;
图2是本发明在立式墩上设置支撑梁的顺桥向结构示意图;
图3是本发明顶推钢桁梁时的横桥向状态示意图;
图4是本发明顶推钢桁梁时的顺桥向状态示意图;
图5是向前顶推一个钢桁梁节段后的状态示意图。
具体实施方式
本发明的具体实施方式如下:
(1)如图1、图2所示,在钢桁梁1每个下弦杆节底部处设置一钢垫板2,钢垫板的顶面与下弦杆底面完全接触并焊接,钢垫板底面粘贴橡胶垫块。橡胶垫块用于顶升和落梁时保护梁体。
(2)在每个永久墩和临时墩3的墩顶两侧分别顺桥向设一支撑梁4,两支撑梁内侧分别设两个步履千斤顶5,每侧的两个步履千斤顶顶部顺桥向搭设一托梁6,支撑梁和托梁的长度大于两个钢桁梁节段的长度。托梁和支撑梁顶面按钢桁梁顶推时的变形量设置预拱度。
本发明具体实施时,临时墩3采用钢管支架,钢管支架横桥向和顺桥向分别设两个钢管立柱,每个钢管立柱上设一步履千斤顶。
(3)顶推前,托梁6的初始高度低于支撑梁4,钢桁梁1支撑在墩顶两侧的支撑梁4上。钢桁梁两个节段底部的垫板与支撑梁接触。
如图3所示,开始顶推时,各千斤顶5先同步向上顶升,通过托梁6将钢桁梁向上托举至脱离支撑梁。托梁与钢桁梁两个节段底部的垫板与接触。
(4)如图4所示,各步履千斤顶同步向前推送钢桁梁。达到最大行程时,千斤顶竖向回落,将钢桁梁降落到支撑梁上。
(5)托梁完全脱离钢桁梁底部后,步履千斤顶携托梁回到初始位置,开始下个顶推循环,逐步将钢桁梁顶推过跨。图5是顶推一个钢桁梁节段后的状态示意图。
由图2、图4和图5可以看到,钢桁梁的支点始终位于节点处,能避免下弦杆直接受力导致变形;节点处通过垫板进行了加强,且托梁或支撑梁始终与钢桁梁底部有两个节点的垫板接触,保证钢桁梁受力平衡。
Claims (1)
1.一种钢桁梁双顶托举顶推安装方法,其特征在于:
(1)在钢桁梁每个下弦杆节底部处设置一钢垫板,钢垫板的顶面与下弦杆底面完全接触并焊接,钢垫板底面粘贴橡胶垫块;
(2)在每个永久墩和临时墩的墩顶两侧分别顺桥向设一支撑梁,两支撑梁内侧分别设两个步履千斤顶,每侧的两个步履千斤顶顶部顺桥向搭设一托梁,支撑梁和托梁的长度大于两个钢桁梁节段的长度;
(3)顶推前,托梁的初始高度低于支撑梁,钢桁梁支撑在墩顶两侧的支撑梁上,开始顶推时,各千斤顶先同步向上顶升,通过托梁将钢桁梁向上托举至脱离支撑梁;
(4)各步履千斤顶同步向前推送钢桁梁,达到最大行程时,千斤顶竖向回落,将钢桁梁降落到支撑梁上;
(5)托梁完全脱离钢桁梁底部后,步履千斤顶携托梁回到初始位置,开始下个顶推循环,逐步将钢桁梁顶推过跨。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210452131.8A CN114808752B (zh) | 2022-04-27 | 2022-04-27 | 钢桁梁双顶托举顶推安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210452131.8A CN114808752B (zh) | 2022-04-27 | 2022-04-27 | 钢桁梁双顶托举顶推安装方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114808752A CN114808752A (zh) | 2022-07-29 |
CN114808752B true CN114808752B (zh) | 2023-09-05 |
Family
ID=82509995
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210452131.8A Active CN114808752B (zh) | 2022-04-27 | 2022-04-27 | 钢桁梁双顶托举顶推安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114808752B (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1147723A (en) * | 1966-04-01 | 1969-04-02 | Strabag Bau Ag | Method of constructing multi-span bridges or the like |
JP2003138522A (ja) * | 2001-10-31 | 2003-05-14 | Kajima Corp | 橋梁の押出し工法 |
KR20120050945A (ko) * | 2012-04-05 | 2012-05-21 | 원대연 | 복합트러스 거더교 가설을 위한 개량압출공법 |
CN107905117A (zh) * | 2017-12-21 | 2018-04-13 | 中国铁建大桥工程局集团有限公司 | 适用于高墩大跨度钢桁梁桥顶推施工方法 |
CN109577201A (zh) * | 2018-11-15 | 2019-04-05 | 中铁十四局集团第三工程有限公司 | 一种用于钢桁梁顶推的步履式施工装置及其施工方法 |
WO2021057145A1 (zh) * | 2019-09-29 | 2021-04-01 | 中铁大桥局集团有限公司 | 墩顶短滑道梁上架设节段钢梁的方法 |
-
2022
- 2022-04-27 CN CN202210452131.8A patent/CN114808752B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1147723A (en) * | 1966-04-01 | 1969-04-02 | Strabag Bau Ag | Method of constructing multi-span bridges or the like |
JP2003138522A (ja) * | 2001-10-31 | 2003-05-14 | Kajima Corp | 橋梁の押出し工法 |
KR20120050945A (ko) * | 2012-04-05 | 2012-05-21 | 원대연 | 복합트러스 거더교 가설을 위한 개량압출공법 |
CN107905117A (zh) * | 2017-12-21 | 2018-04-13 | 中国铁建大桥工程局集团有限公司 | 适用于高墩大跨度钢桁梁桥顶推施工方法 |
CN109577201A (zh) * | 2018-11-15 | 2019-04-05 | 中铁十四局集团第三工程有限公司 | 一种用于钢桁梁顶推的步履式施工装置及其施工方法 |
WO2021057145A1 (zh) * | 2019-09-29 | 2021-04-01 | 中铁大桥局集团有限公司 | 墩顶短滑道梁上架设节段钢梁的方法 |
Also Published As
Publication number | Publication date |
---|---|
CN114808752A (zh) | 2022-07-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106948268B (zh) | 变截面钢箱梁顶推组合装置及使用方法 | |
CN202492807U (zh) | 钢箱梁步履式多点顶推施工系统 | |
CN110230268B (zh) | 先连续后简支的钢桁组合梁桥施工方法 | |
CN114808752B (zh) | 钢桁梁双顶托举顶推安装方法 | |
CN109629450B (zh) | 钢箱梁悬臂拼装横向线形匹配调整装置、系统及方法 | |
CN209836805U (zh) | 钢箱梁悬臂拼装横向线形匹配调整装置及系统 | |
CN114837103B (zh) | 钢箱梁双顶托举顶推安装方法 | |
CN111218893B (zh) | 新增墩柱承载钢桁梁加固跨既有线桥梁的施工方法 | |
CN211772949U (zh) | 上跨既有线钢纵梁顶推安装体系 | |
CN212103678U (zh) | 台阶式导梁前端结构 | |
CN210596966U (zh) | 一种大跨径钢混组合桥梁结构 | |
CN112411353A (zh) | 一种纵向分段栓接的预制装配式钢混组合梁及施工方法 | |
CN219280493U (zh) | 一种钢箱梁免吊装施工顶推装置 | |
CN111926690A (zh) | 一种新型预制拼装桥墩 | |
CN218116176U (zh) | 用于推移道岔连续钢箱梁的千斤顶的找平桁架式辅助装置 | |
CN220847133U (zh) | 一种桥梁预应力混凝土连续梁单点顶推安装系统 | |
CN219195677U (zh) | 曲线梁顶推装置 | |
CN115404786B (zh) | 一种钢混组合梁顶推施工方法 | |
CN217579811U (zh) | 一种具有双重耗能措施的桥梁三柱墩抗震加固结构 | |
CN214831861U (zh) | 一种地震损伤桥墩快速加固结构 | |
CN220767688U (zh) | 一种可用于伸缩缝固定的两用反力装置 | |
CN110258358B (zh) | 采用吊推支架施工变高度钢梁的方法 | |
CN114703764B (zh) | 一种高铁倾斜箱梁调平移位施工方法 | |
CN219772718U (zh) | 大跨径钢箱梁临时拼装支架 | |
CN218508243U (zh) | 一种桥墩的多点同步环抱式落梁装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |