CN114518292A - Model test device and test method for high-speed railway roadbed of inclined crossing karez - Google Patents
Model test device and test method for high-speed railway roadbed of inclined crossing karez Download PDFInfo
- Publication number
- CN114518292A CN114518292A CN202210153381.1A CN202210153381A CN114518292A CN 114518292 A CN114518292 A CN 114518292A CN 202210153381 A CN202210153381 A CN 202210153381A CN 114518292 A CN114518292 A CN 114518292A
- Authority
- CN
- China
- Prior art keywords
- model
- karez
- subgrade
- speed railway
- load
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 41
- 238000010998 test method Methods 0.000 title claims abstract description 9
- 238000012544 monitoring process Methods 0.000 claims abstract description 22
- 238000000034 method Methods 0.000 claims abstract description 12
- 238000006243 chemical reaction Methods 0.000 claims abstract description 11
- 230000003993 interaction Effects 0.000 claims abstract description 9
- 238000009933 burial Methods 0.000 claims abstract description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 19
- 238000006073 displacement reaction Methods 0.000 claims description 16
- 230000003068 static effect Effects 0.000 claims description 15
- 239000002689 soil Substances 0.000 claims description 12
- 239000000463 material Substances 0.000 claims description 10
- 230000000694 effects Effects 0.000 claims description 7
- 239000004576 sand Substances 0.000 claims description 6
- 239000005341 toughened glass Substances 0.000 claims description 6
- 230000009471 action Effects 0.000 claims description 3
- 238000004364 calculation method Methods 0.000 claims description 3
- 239000004927 clay Substances 0.000 claims description 3
- 238000005429 filling process Methods 0.000 claims description 3
- 229910000831 Steel Inorganic materials 0.000 claims description 2
- 239000010959 steel Substances 0.000 claims description 2
- 230000007246 mechanism Effects 0.000 abstract description 4
- 239000010410 layer Substances 0.000 description 8
- 238000010276 construction Methods 0.000 description 4
- 239000003673 groundwater Substances 0.000 description 4
- 230000002262 irrigation Effects 0.000 description 3
- 238000003973 irrigation Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 230000002787 reinforcement Effects 0.000 description 3
- 239000006260 foam Substances 0.000 description 2
- 230000000877 morphologic effect Effects 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 125000004122 cyclic group Chemical group 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 239000002344 surface layer Substances 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N3/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N3/08—Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N3/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N3/32—Investigating strength properties of solid materials by application of mechanical stress by applying repeated or pulsating forces
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N2203/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N2203/0001—Type of application of the stress
- G01N2203/0005—Repeated or cyclic
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
- G01N2203/00—Investigating strength properties of solid materials by application of mechanical stress
- G01N2203/0014—Type of force applied
- G01N2203/0016—Tensile or compressive
- G01N2203/0019—Compressive
Landscapes
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Analytical Chemistry (AREA)
- Biochemistry (AREA)
- General Health & Medical Sciences (AREA)
- General Physics & Mathematics (AREA)
- Immunology (AREA)
- Pathology (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
Description
技术领域technical field
本发明涉及岩土工程技术领域,特别是涉及一种斜跨坎儿井的高速铁路路基的模型试验装置及试验方法。The invention relates to the technical field of geotechnical engineering, in particular to a model test device and a test method for a high-speed railway roadbed with an oblique spanning karez.
背景技术Background technique
坎儿井是干旱和半干旱地区开发利用浅层地下水进行自流灌溉的一种古老的地下水利灌溉工程,在我国主要分布在新疆地区。坎儿井是由人工开挖的竖井、具有一定纵坡的暗渠、地面输水的明渠和小型蓄水池四部分共同组成。暗渠是坎儿井的主体部分,利用暗渠的坡度小于地面坡度和地下水面坡度,可以把地下水自流引出地面,从而供给农业灌溉和居民生活使用。竖井沿暗渠分布,一般间隔约15~30m,底部与暗渠连通,深度一般在5~60m,最大的可达80m 以上,主要起通风和修建时排土的作用。Karez is an ancient groundwater conservancy irrigation project developed and utilized shallow groundwater for artesian irrigation in arid and semi-arid areas. It is mainly distributed in Xinjiang in my country. A karez is composed of four parts: an artificially excavated shaft, an underdrain with a certain longitudinal slope, an open channel for water conveyance on the ground, and a small reservoir. The underdrain is the main part of the karez, and the slope of the underdrain is smaller than the slope of the ground and the groundwater surface, and the groundwater can be drawn out of the ground by itself, so as to supply agricultural irrigation and residential use. The shafts are distributed along the culvert, generally at an interval of about 15-30m, and the bottom is connected to the culvert. The depth is generally 5-60m, and the maximum can reach more than 80m, mainly for ventilation and soil drainage during construction.
现今世界各地坎儿井均存在不同程度的消亡,其主要原因是各种自然和人为因素造成的坎儿井塌陷,尤其是未经加固暗渠的塌陷。而在工程研究中,坎儿井暗渠具有与矿场采空区、岩溶溶洞等相似的结构形式。对于被高速铁路路基跨越的坎儿井,未经加固的暗渠极有可能会在路基荷载和列车运行时产生的荷载作用下发生塌陷,引起相连地基的破坏,进而影响上部高铁路基稳定以及列车行车安全。因此有必要对高铁线路下伏坎儿井暗渠在荷载作用下的稳定性进行研究。Karezes all over the world are dying to varying degrees. The main reason is the collapse of karezes caused by various natural and human factors, especially the collapse of unreinforced culverts. In engineering research, the karst well has a structure similar to mine goaf, karst cave and so on. For the karez that is crossed by the high-speed railway subgrade, the unreinforced culvert is very likely to collapse under the load of the subgrade and the load generated by the train running, causing damage to the connected subgrade, which in turn affects the stability of the upper high-speed railway subgrade and the safety of trains. Therefore, it is necessary to study the stability of the karez under the load of the high-speed rail line.
新建高铁路基工程常倾斜交叉跨越坎儿井暗渠。针对坎儿井,当高铁路基以不同交角压覆在坎儿井暗渠上时,外力作用效果不同,会使得坎儿井产生不同的力学响应。因此需要明确交角对坎儿井暗渠-上方路基相互作用的影响机制,从而建立不同交角跨越坎儿井暗渠的稳定性评价方法,确定倾斜跨坎儿井高速铁路路基的加固处理范围。The new high-speed railway foundation project often crosses over the karez well ditch inclined and crossed. For the karez, when the high-speed railway foundation is overlaid on the karez underdrain at different intersection angles, the effect of external force is different, which will make the karez produce different mechanical responses. Therefore, it is necessary to clarify the influence mechanism of the intersection angle on the interaction between the karez well underdrain and the subgrade above, so as to establish a stability evaluation method for crossing the karez well underdrain with different intersection angles, and determine the reinforcement treatment range of the inclined cross-karez high-speed railway subgrade.
目前国内尚无有关坎儿井地区高速铁路路基的设计方案,本发明技术的提出可以填补我国高速铁路路基坎儿井地区室内模型试验装置方面的技术空白,为以后我国西北地区乃至其他国家高铁建设贡献一份力量。At present, there is no design scheme for high-speed railway subgrade in the karez area in my country. The technology of the present invention can fill the technical gap of the indoor model test device in the high-speed railway subgrade in the karez area in my country, and contribute to the construction of high-speed railways in the northwest region of China and other countries in the future. .
发明内容SUMMARY OF THE INVENTION
针对现有技术中的上述问题,本发明旨在提供一种斜跨坎儿井的高速铁路路基的模型试验装置及试验方法,其用于研究不同暗渠与线路交角和暗渠到上方地基深度对坎儿井暗渠塌陷机理的影响,进而分析跨坎儿井高速铁路路基结构的稳定性,确定高速列车动荷载作用下倾斜跨越的坎儿井高速铁路路基所需的加固处理范围,解决了现有技术中研究高速铁路路基坎儿井地区室内模型试验装置方面存在技术空白的问题。In view of the above-mentioned problems in the prior art, the present invention aims to provide a model test device and test method for a high-speed railway subgrade across the karez well, which are used to study the collapse of the karez well underdrain at different angles of intersection between the underdrain and the line and the depth of the underdrain to the upper foundation. Then, the stability of the subgrade structure of the cross-karez high-speed railway was analyzed, and the reinforcement treatment range required for the subgrade of the Kanerjing high-speed railway that inclined across the high-speed train under the dynamic load of the high-speed train was determined. There is a technical gap in the model test device.
为了达到上述发明目的,本发明采用的技术方案如下:In order to achieve the above-mentioned purpose of the invention, the technical scheme adopted in the present invention is as follows:
提供了一种用于隧道波纹板支护结构的接头构造,其包括反力架,模型装置、加载装置、监测系统和数据采集系统;Provided is a joint structure for a tunnel corrugated plate support structure, which includes a reaction force frame, a model device, a loading device, a monitoring system and a data acquisition system;
模型装置包括模型箱,模型箱内设置有模型路基和设置在模型路基下方的模型地基,模型地基中设置有采用PVC管模拟的坎儿井暗渠和坎儿井竖井;所述坎儿井暗渠与线路交角为θ,交角θ为0~90°,在不同交角θ下,获得坎儿井暗渠的塌陷破坏与变形规律;The model device includes a model box, and the model box is provided with a model subgrade and a model foundation arranged below the model subgrade, and the model foundation is provided with a karez well underdrain and a karez well shaft simulated by a PVC pipe; θ ranges from 0 to 90°, under different intersection angles θ, the collapse failure and deformation laws of karez well underdrains are obtained;
加载装置与反力架连接,加载装置用于对模型路基施加静载和动载;The loading device is connected with the reaction frame, and the loading device is used to apply static and dynamic loads to the model subgrade;
监测系统包括设置在模型路基和模型地基表面的位移计、设置在坎儿井暗渠和坎儿井竖井表面的应变计、设置在模型路基和模型地基内的土压力盒和设置在模型地基内的含水率计;数据采集系统与监测系统电性连接。The monitoring system includes displacement gauges arranged on the surface of the model roadbed and model foundation, strain gauges arranged on the surface of the karez well underdrain and karez well shaft, an earth pressure cell arranged in the model roadbed and the model foundation, and a water content meter arranged in the model foundation; The data acquisition system is electrically connected with the monitoring system.
进一步地,模型箱包括材料为型钢的框架和设置在框架侧壁上的透明钢化玻璃;模型箱的内部尺寸为2.0m×2.0m×1.5m,透明钢化玻璃的厚度为30mm。Further, the model box includes a frame made of profiled steel and transparent tempered glass arranged on the side wall of the frame; the inner size of the model box is 2.0m×2.0m×1.5m, and the thickness of the transparent tempered glass is 30mm.
进一步地,加载装置包括用于对模型路基施加静载的千斤顶和用于对模型路基施加动载的伺服激振器,伺服激振器用于模拟高速铁路列车对模型路基施加的动荷载,伺服激振器的动载频率为5Hz,动载动应力幅值为10kN。Further, the loading device includes a jack for applying static load to the model subgrade and a servo vibration exciter for applying dynamic load to the model subgrade. The dynamic load frequency of the vibrator is 5Hz, and the dynamic load dynamic stress amplitude is 10kN.
进一步地,加载装置还包括下表面设置有混凝土垫层的加载板,千斤顶和伺服激振器通过加载板对模型路基施加静载和动载。Further, the loading device further includes a loading plate with a concrete cushion on the lower surface, and the jack and the servo vibration exciter apply static and dynamic loads to the model roadbed through the loading plate.
进一步地,坎儿井暗渠和坎儿井竖井内设置有带有远程开关阀的水囊。Further, a water bladder with a remote on-off valve is arranged in the karez underdrain and the karez shaft.
进一步地,模型地基和模型箱内壁之间设置有缓冲装置,缓冲装置包括缓冲垫和刚性挡板,缓冲垫两侧壁分别与模型地基侧壁和刚性挡板侧壁接触,刚性挡板的另一侧侧壁与模型箱的内壁接触。Further, a buffer device is provided between the model foundation and the inner wall of the model box. The buffer device includes a buffer pad and a rigid baffle. The two side walls of the buffer pad are respectively in contact with the model foundation side wall and the rigid baffle side wall. One side wall is in contact with the inner wall of the model box.
本方案还提供了一种斜跨坎儿井的高速铁路路基的模型试验装置的试验方法,用于研究不同暗渠与线路交角和暗渠到上方地基深度对坎儿井暗渠塌陷机理的影响,进而分析跨坎儿井高速铁路路基结构的稳定性,确定高速列车动荷载作用下倾斜跨越的坎儿井高速铁路路基所需的加固处理范围,其方法包括以下步骤:This scheme also provides a test method for the model test device of the high-speed railway subgrade across the karez well, which is used to study the influence of different culvert and line intersection angles and the depth of the culvert to the upper foundation on the collapse mechanism of the karez well culvert, and then analyze the cross-karez high-speed railway. The stability of the subgrade structure is determined, and the reinforcement treatment range required for the subgrade of the Kanerjing high-speed railway that is inclined across the high-speed train under the dynamic load of the high-speed train is determined, and the method includes the following steps:
S1:模型尺寸计算S1: Model size calculation
以不发生边界效应为基准设定模型试验相似比,并根据相似比计算模型箱中填筑的模型路基、模型地基和PVC管的尺寸以及所需填土的质量;Set the model test similarity ratio on the basis of no boundary effect, and calculate the size of the model roadbed, model foundation and PVC pipe filled in the model box and the quality of the required filling according to the similarity ratio;
S2:填筑试样S2: Filling sample
采用落砂法分层填筑,每层相似材料填筑完成后进行平整、压密,确保填筑过程中每层土的干密度相同;在设计埋深下,将PVC管道放置至模型地基中模拟坎儿井暗渠或竖井;坎儿井暗渠与线路交角为θ,交角θ为0~90°,模拟坎儿井暗渠的PVC管道中预先放置水囊,待模型地基填筑完成后,对水囊排水,得到无支护空洞模拟坎儿井暗渠;The falling sand method is used for layered filling. After each layer of similar materials is filled, it is leveled and compacted to ensure that the dry density of each layer of soil is the same during the filling process; at the designed burial depth, PVC pipes are placed in the model foundation. Simulate the karez well underdrain or shaft; the intersection angle between the karez well underdrain and the line is θ, and the intersection angle θ is 0 to 90°. Water bladders are pre-placed in the PVC pipes of the simulated karez well underdrains. After the model foundation is filled, the water bladders are drained to obtain no support. Null guards simulate karez underdrains;
S3:布置监测系统S3: Deploy monitoring system
模型路基和模型地基中埋设土压力盒和含水率计、PVC管道上安装应变计、模型路基和模型地基表面安装位移计;并将土压力盒、含水率计、应变计和位移计与数据采集系统电性连接;数据采集系统测试监测系统的读数是否正常,如正常进入步骤4,否则进行排查直至读数正常;Earth pressure cells and water content gauges are embedded in the model subgrade and model foundation, strain gauges are installed on PVC pipes, and displacement gauges are installed on the surface of the model subgrade and model foundation; The system is electrically connected; the data acquisition system tests whether the reading of the monitoring system is normal, if it is normal, go to
S4:布置加载装置S4: Arrange the loading device
加载装置与反力架连接,并在加载板上设置一层混凝土垫层;The loading device is connected with the reaction frame, and a layer of concrete cushion is arranged on the loading plate;
S5:静载加载S5: Static load loading
千斤顶对试样进行加载,间隔1min记录一次数据,当千斤顶加载到比列车荷载高时,停止加载,并记录和整理数据;The jack loads the sample, and the data is recorded every 1 min. When the jack is loaded higher than the train load, the loading is stopped, and the data is recorded and sorted;
S6:动载加载S6: dynamic loading
激振器以幅值5kN频率10Hz的正弦波形态对试样加载,用以模拟高速列车荷载,观测并记录监测系统数据,直至PVC管破坏或动力循环次数达到10000 次时,激振器停止对试样加载;The vibration exciter loads the sample in the form of a sine wave with an amplitude of 5kN and a frequency of 10Hz to simulate the load of a high-speed train, observe and record the data of the monitoring system, until the PVC pipe is damaged or the number of power cycles reaches 10,000, the vibration exciter stops. sample loading;
S7:卸载;S7: uninstall;
S8:根据监测系统采集的物理参数,分析并确定坎儿井对高速铁路路基的相互作用。S8: According to the physical parameters collected by the monitoring system, analyze and determine the interaction of the karez on the high-speed railway subgrade.
步骤S8进一步包括:Step S8 further includes:
土压力盒数据获得动载阶段时模型路基和模型地基结构中的土压力分布,进而获取动应力在水平方向和竖向方向的衰减规律,得出高铁荷载对高速铁路路基的影响分布和作用范围;The soil pressure distribution in the model subgrade and the model subgrade structure during the dynamic load stage is obtained from the earth pressure box data, and then the attenuation law of the dynamic stress in the horizontal and vertical directions is obtained, and the influence distribution and action range of the high-speed railway load on the high-speed railway subgrade are obtained. ;
根据位移计采集的位移参数获得动载阶段时模型路基和模型地基的沉降,得到坎儿井的存在对路基沉降的影响;According to the displacement parameters collected by the displacement meter, the settlement of the model subgrade and the model subgrade during the dynamic load stage is obtained, and the influence of the existence of the karez on the settlement of the subgrade is obtained;
根据应变计采集的应变参数获得动载阶段时坎儿井暗渠和坎儿井竖井的应变量,得到列车荷载对坎儿井变形的影响;将模型试验结果用于评估高速铁路路基倾斜跨越坎儿井相互作用影响范围。According to the strain parameters collected by the strain gauges, the strains of the karez wells and karez wells in the dynamic load stage were obtained, and the influence of the train load on the deformation of the karez wells was obtained.
进一步地,根据模型试验结果确定高速铁路路基倾斜跨越坎儿井相互作用影响范围的方法为:Further, according to the model test results, the method to determine the influence range of the high-speed railway subgrade slope crossing the karez interaction is as follows:
分析动应力在水平方向、竖向方向的衰减规律σx,σy,得到高铁荷载的影响范围s1;分析动荷载下坎儿井地基的沉降d,得到坎儿井存在对路基沉降的影响s2;分析动荷载下不同位置坎儿井暗渠Qy和竖井的变形量Qx,得到列车荷载对坎儿井变形的影响s3,得到距离为Scr时的列车荷载下的坎儿井竖井和暗渠不需要加固;σXmax,σYmax为交叉位置地基处的最大水平和竖向动应力;dy为地基表面的沉降量,dymax为最大沉降量;Q为监测的不同位置的坎儿井的变形量,交叉中心位置的暗渠最大变形量为Qmax;竖井的变形量取竖井直径(Sd) 的10%;Analyze the attenuation laws σx and σy of dynamic stress in the horizontal and vertical directions, and obtain the influence range s1 of the high-speed rail load; analyze the settlement d of the karez well foundation under the dynamic load, and obtain the influence s2 of the existence of the karez on the settlement of the subgrade; Position the karez underdrain Qy and the deformation quantity Qx of the shaft, obtain the influence s3 of the train load on the deformation of the karez , and obtain the karez shaft and underdrain under the train load when the distance is Scr. The maximum horizontal and vertical dynamic stress; dy is the settlement of the foundation surface, dymax is the maximum settlement; Q is the deformation of the karez in different positions monitored, and the maximum deformation of the underdrain at the cross center position is Qmax; the deformation of the shaft is taken as 10% of shaft diameter (Sd);
当满足:σx<0.1σXmax、σy<0.1σYmax、dy<0.1dy max、Qy<0.1Qy max和Qx<0.1Sd 时,确定Scr为临界距离,在临界距离外动荷载对坎儿井对影响可以忽略,确定动荷载的影响范围。When σ x <0.1σ Xmax , σ y <0.1σ Ymax , d y <0.1d y max , Q y <0.1Q y max and Qx<0.1Sd , determine Scr as the critical distance, and move outside the critical distance The influence of the load on the karez can be ignored, and the influence range of the dynamic load is determined.
与现有技术相比,本发明的有益效果为:Compared with the prior art, the beneficial effects of the present invention are:
1、本发明能够在室内有效模拟不同坎儿井交角、埋深等工况下,跨坎儿井高速铁路路基的工作情况,并通过测试元件得到较为精确的数据;能够针对性的研究在不同交角下,坎儿井暗渠的塌陷破坏与变形规律、列车荷载对坎儿井变形的影响、暗渠存在对于路基沉降的影响、动应力在地基中的衰减规律和坎儿井土拱效应的形态演变过程等。1. The present invention can effectively simulate the working conditions of cross-karez high-speed railway subgrade under different working conditions such as karez crossing angles and burial depths indoors, and obtain more accurate data through testing components; The collapse failure and deformation laws of culverts, the influence of train loads on the deformation of the karez, the influence of the existence of culverts on the settlement of the subgrade, the attenuation law of dynamic stress in the foundation, and the morphological evolution process of the soil arching effect of the karez.
2、本发明可结合试验结果综合评估高速铁路路基倾斜跨越坎儿井相互作用影响范围,确定倾斜跨坎儿井路基和地基所需处理区域,为实际坎儿井地区高速铁路路基施工打下良好的理论基础,且试验的装置以及过程较为简便,方便在实验室内进行操作。2. The present invention can comprehensively evaluate the interaction influence range of the high-speed railway subgrade across the karez in combination with the test results, determine the required treatment area for the inclined cross-karez subgrade and the foundation, and lay a good theoretical foundation for the construction of the high-speed railway subgrade in the actual karez area. The device and the process are relatively simple and convenient to operate in the laboratory.
附图说明Description of drawings
图1为斜跨坎儿井的高速铁路路基的模型试验装置的结构示意图。FIG. 1 is a schematic structural diagram of a model test device for a high-speed railway subgrade across a karez well.
其中,1、模型箱;2、模型路基;3、模型地基;4、坎儿井暗渠;5、坎儿井竖井;6、反力架;7、加载装置;8、位移计;9、应变计;10、土压力盒; 11、含水率计;12、加载板。Among them, 1, model box; 2, model roadbed; 3, model foundation; 4, karez well underdrain; 5, karez well shaft; 6, reaction force frame; 7, loading device; 8, displacement gauge; 9, strain gauge; 10, Earth pressure cell; 11. Moisture meter; 12. Loading plate.
具体实施方式Detailed ways
下面对本发明的具体实施方式进行描述,以便于本技术领域的技术人员理解本发明,但应该清楚,本发明不限于具体实施方式的范围,对本技术领域的普通技术人员来讲,只要各种变化在所附的权利要求限定和确定的本发明的精神和范围内,这些变化是显而易见的,一切利用本发明构思的发明创造均在保护之列。The specific embodiments of the present invention are described below to facilitate those skilled in the art to understand the present invention, but it should be clear that the present invention is not limited to the scope of the specific embodiments. For those of ordinary skill in the art, as long as various changes Such changes are obvious within the spirit and scope of the present invention as defined and determined by the appended claims, and all inventions and creations utilizing the inventive concept are within the scope of protection.
如图1所示,本发明提供了一种斜跨坎儿井的高速铁路路基的模型试验装置,包括反力架6,模型装置、加载装置7、监测系统和数据采集系统。As shown in FIG. 1 , the present invention provides a model test device for a high-speed railway subgrade across a karez well, including a
其中,模型装置包括模型箱1,模型箱1由框架和设置在框架侧壁上的透明钢化玻璃组成,其尺寸以不发生边界效应为基准。Wherein, the model device includes a model box 1, and the model box 1 is composed of a frame and transparent tempered glass arranged on the side wall of the frame, and its size is based on the absence of boundary effects.
模型箱1内设置有模型路基2和设置在模型路基2下方的模型地基3,模型地基3中设置有采用PVC管模拟的坎儿井暗渠4和坎儿井竖井5;为了模型试验开展方便,试验模型尺寸相似比可取为20。根据相似比,标准断面进行设计的基床表层宽度为8.2m,路堤底面宽23.2m,高度5m,边坡坡度为1∶1.5,则相应的模型路基2的基床表层宽为41cm,路堤底面宽116cm,路基高度25 cm。则模型箱1尺寸如下:模型箱1高度为地基高度加路基高度并且预留一定安全空间,因此模型箱1的高度取1.5m,模型箱1的宽度和长度为地基底面长,取2m。因此实际选定的模型箱1内部尺寸为2.0m×2.0m×1.5m(长×宽×高)。此外,透明钢化玻璃厚30mm。坎儿井地区的土层多为黏土质砂,采用黏土质砂材料作为模型试验中模型路基2和模型地基3。The model box 1 is provided with a
选用PVC管模拟坎儿井是由于PVC管抗拉强度高,但是在高压下会产生破坏,符合坎儿井特性。在PVC管内设置有带有远程开关阀的水囊,PVC管和水囊直径取7.5cm,以模拟实际直径1.5m的坎儿井暗渠4或竖井5。在模型填筑时,采用水囊事先填充PVC管,以避免其在模型成型前即发生破坏。模型填筑完后,通过将打开远程开关阀水囊中的水排出,即完成了坎儿井暗渠4的模拟。The use of PVC pipe to simulate karez is due to the high tensile strength of PVC pipe, but it will be damaged under high pressure, which is in line with the characteristics of karez. A water bladder with a remote switch valve is arranged in the PVC pipe, and the diameter of the PVC pipe and the water bladder is 7.5 cm to simulate a karez well 4 or
加载装置7与反力架6连接,加载装置7用于对模型路基2施加静载和动载;加载装置7分为静载装置和动载装置。静载装置和动载装置通过加载板12 实现对模型路基2施加静载和动载,同时在加载板12下方设有一层混凝土垫层,用于使加载装置7产生的荷载均匀的分布在路基之上。模型地基3和模型箱1 内壁之间设置有缓冲装置,缓冲装置包括缓冲垫和刚性挡板,缓冲垫可以为泡沫板,缓冲垫两侧壁分别与模型地基3侧壁和刚性挡板侧壁接触,刚性挡板的另一侧侧壁与模型箱1的内壁接触,在地基土边上先布有泡沫板等柔性缓冲材料,再在柔性缓冲材料外布置刚性挡板,以防止动载施加过程中激振器对试验装置产生损害。The
优选但不局限地,静载加载采用千斤顶对试样进行加载,间隔1min记录一次数据,当加载到比列车荷载稍高时即停止加载。动载加载采用伺服激振器设备,其由液压伺服加载系统和加载作动器组成,加载板12的尺寸为2.0m×0.3m ×0.03m(长×宽×高),最大动力荷载加载值可达200kN,最高动力加载频率可达100Hz,能够充分模拟高速铁路路基在动荷载作用下的工作情况。利用激振器对试样进行正弦循环荷载形式的加载,每各加载循环均观测并记录数据,此时即停止加载。Preferably, but not limitedly, a jack is used to load the sample in static load loading, data is recorded every 1 min, and the loading is stopped when the load is slightly higher than the train load. The dynamic load is loaded with a servo exciter device, which consists of a hydraulic servo loading system and a loading actuator. The size of the
监测系统包括设置在模型路基2和模型地基3表面的位移计8、设置在坎儿井暗渠4和坎儿井竖井5表面的应变计9、设置在模型路基2和模型地基3内的土压力盒10和设置在模型地基3内的含水率计11;数据采集系统与监测系统电性连接,数据采集系统可以采用计算机。The monitoring system includes a
利用位移计8、应变计9、土压力盒10、含水率计11等传感器,静态数据采集仪及相应的测试分析系统,测定在自重作用和路基荷载作用下位移、土压力和含水率的变化规律。Using
本发明还提供一种斜跨坎儿井的高速铁路路基的模型试验装置的试验方法,包括以下步骤:The present invention also provides a test method for a model test device for a high-speed railway roadbed with an oblique spanning karez, comprising the following steps:
S1:模型尺寸计算S1: Model size calculation
以不发生边界效应为基准设定模型试验相似比,并根据相似比计算模型箱1 中填筑的模型路基2、模型地基3和PVC管的尺寸以及所需填土的质量;为研究暗渠与路基荷载中心线间的交角对路基结构稳定性的影响,可选用0~90°等多个不同的角度对暗渠进行布置;为研究暗渠埋深对路基结构稳定性的影响,暗渠到上方地基深度H可选用3~7倍暗渠直径;横断面上暗渠与荷载中心位置的距离,可根据模拟工点暗渠的实际需求确定。The model test similarity ratio is set on the basis of no boundary effect, and the size of the
S2:填筑试样S2: Filling sample
采用落砂法分层填筑,每层相似材料填筑完成后进行平整、压密,确保填筑过程中每层土的干密度相同,具体为每层相似材料填筑完成后需要进行初次的整平,整平后在土体表面铺设一块木板,利用固定质量的砝码通过木板的传力作用对填筑的相似材料进行压密,每层砂的锤击次数相同,待压密后再次用水平尺调整高差使填土表面保持平整;在设计埋深下,将PVC管道放置至模型地基3中模拟坎儿井暗渠4或竖井5;模拟坎儿井暗渠4的PVC管道中预先放置水囊,待模型地基3填筑完成后,对水囊排水,得到无支护空洞模拟坎儿井暗渠4;The falling sand method is used for layered filling. After each layer of similar materials is filled, it is leveled and compacted to ensure that the dry density of each layer of soil is the same during the filling process. Specifically, after each layer of similar materials is filled, an initial Leveling: After leveling, lay a plank on the soil surface, and use a fixed mass of weights to compress the similar materials to be filled through the force transmission of the plank. Adjust the height difference with a spirit level to keep the filling surface flat; under the designed burial depth, place the PVC pipe in the
S3:布置监测系统S3: Deploy monitoring system
模型路基2和模型地基3中埋设土压力盒10和含水率计11、PVC管道上安装应变计9、模型路基2和模型地基3表面安装位移计8;并将土压力盒10、含水率计11、应变计9和位移计8与数据采集系统电性连接;数据采集系统测试监测系统的读数是否正常,如正常进入步骤4,否则进行排查直至读数正常;The
S4:布置加载装置7S4: Arrange the
将加载部分放在水泥垫板之上,使加载装置7产生的荷载均匀的分布在路基之上,垫板厚度宜为50mm;Put the loading part on the cement backing plate, so that the load generated by the
S5:静载加载S5: Static load loading
千斤顶对试样进行加载,加载速率不宜过快,间隔1min记录一次数据,当千斤顶加载到比列车荷载高时,停止加载,并记录和整理数据;The jack loads the sample, the loading rate should not be too fast, and the data is recorded at an interval of 1 min. When the jack is loaded to a higher value than the train load, the loading is stopped, and the data is recorded and sorted;
S6:动载加载S6: dynamic loading
激振器以幅值5kN频率10Hz的正弦波形态对试样加载,用以模拟高速列车荷载,观测并记录监测系统数据,直至PVC管破坏或动力循环次数达到10000 次时,激振器停止对试样加载;The vibration exciter loads the sample in the form of a sine wave with an amplitude of 5kN and a frequency of 10Hz to simulate the load of a high-speed train, observe and record the data of the monitoring system, until the PVC pipe is damaged or the number of power cycles reaches 10,000, the vibration exciter stops. sample loading;
S7:卸载;需注意安全,应当先确保加载装置7开关关闭后再进行卸载;S7: Unloading; attention should be paid to safety, and it should be ensured that the switch of the
S8:根据监测系统采集的物理参数,分析并确定坎儿井对高速铁路路基的相互作用。S8: According to the physical parameters collected by the monitoring system, analyze and determine the interaction of the karez on the high-speed railway subgrade.
步骤S8进一步包括:试验结束后,土压力盒10数据获得动载阶段时模型路基2和模型地基3结构中的土压力分布,进而获取动应力在水平方向和竖向方向的衰减规律,得出高铁荷载对高速铁路路基的影响分布和作用范围;Step S8 further includes: after the end of the test, the
根据位移计8采集的位移参数获得动载阶段时模型路基2和模型地基3的沉降,得到坎儿井的存在对路基沉降的影响;According to the displacement parameters collected by the
根据应变计9采集的应变参数获得动载阶段时坎儿井暗渠4和坎儿井竖井5 的应变量,得到列车荷载对坎儿井变形的影响;将模型试验结果用于评估高速铁路路基倾斜跨越坎儿井相互作用影响范围。According to the strain parameters collected by the strain gauge 9, the strains of the karez well 4 and the karez well
进一步地,根据模型试验结果确定高速铁路路基倾斜跨越坎儿井相互作用影响范围的方法为:Further, according to the model test results, the method to determine the influence range of the high-speed railway subgrade slope crossing the karez interaction is as follows:
分析动应力在水平方向、竖向方向的衰减规律σx,σy,得到高铁荷载的影响范围s1;分析动荷载下坎儿井地基的沉降d,得到坎儿井存在对路基沉降的影响s2;分析动荷载下不同位置坎儿井暗渠Qy和竖井的变形量Qx,得到列车荷载对坎儿井变形的影响s3,得到距离为Scr时的列车荷载下的坎儿井竖井和暗渠不需要加固;σXmax,σYmax为交叉位置地基处的最大水平和竖向动应力;dy为地基表面的沉降量,dymax为最大沉降量;Q为监测的不同位置的坎儿井的变形量,交叉中心位置的暗渠最大变形量为Qmax;竖井的变形量取竖井直径(Sd) 的10%;Analyze the attenuation laws σx and σy of dynamic stress in the horizontal and vertical directions, and obtain the influence range s1 of the high-speed rail load; analyze the settlement d of the karez well foundation under the dynamic load, and obtain the influence s2 of the existence of the karez on the settlement of the subgrade; Position the karez underdrain Qy and the deformation quantity Qx of the shaft, obtain the influence of the train load on the deformation of the karez , s3, and obtain the distance Scr. The karez shaft and underdrain under the train load do not need to be reinforced; The maximum horizontal and vertical dynamic stress; dy is the settlement of the foundation surface, dymax is the maximum settlement; Q is the deformation of the karez in different positions monitored, and the maximum deformation of the underdrain at the cross center is Qmax; the deformation of the shaft is taken as 10% of shaft diameter (Sd);
当满足:σx<0.1σXmax、σy<0.1σYmax、dy<0.1dy max、Qy<0.1Qy max和Qx<0.1Sd 时,确定Scr为临界距离,在临界距离外动荷载对坎儿井对影响可以忽略,确定动荷载的影响范围。When σ x <0.1σ Xmax , σ y <0.1σ Ymax , d y <0.1d y max , Q y <0.1Q y max and Qx<0.1Sd , determine Scr as the critical distance, and move outside the critical distance The influence of the load on the karez can be ignored, and the influence range of the dynamic load is determined.
综上,本发明能够在室内有效模拟不同坎儿井交角、埋深等工况下,跨坎儿井高速铁路路基的工作情况,并通过测试元件得到较为精确的数据;能够针对性的研究在不同交角下,坎儿井暗渠4的塌陷破坏与变形规律、列车荷载对坎儿井变形的影响、暗渠存在对于路基沉降的影响、动应力在地基中的衰减规律和坎儿井土拱效应的形态演变过程等,可结合试验结果综合评估高速铁路路基倾斜跨越坎儿井相互作用影响范围,确定倾斜跨坎儿井路基和地基所需处理区域,为实际坎儿井地区高速铁路路基施工打下良好的理论基础,且试验的装置以及过程较为简便,方便在实验室内进行操作。To sum up, the present invention can effectively simulate the working conditions of cross-karez high-speed railway subgrade under different working conditions such as karez crossing angles and burial depths indoors, and obtain relatively accurate data through testing components; The collapse failure and deformation laws of the
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210153381.1A CN114518292B (en) | 2022-02-18 | 2022-02-18 | Model test device and test method for high-speed railway subgrade inclined across karez |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210153381.1A CN114518292B (en) | 2022-02-18 | 2022-02-18 | Model test device and test method for high-speed railway subgrade inclined across karez |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114518292A true CN114518292A (en) | 2022-05-20 |
CN114518292B CN114518292B (en) | 2023-09-22 |
Family
ID=81599464
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210153381.1A Active CN114518292B (en) | 2022-02-18 | 2022-02-18 | Model test device and test method for high-speed railway subgrade inclined across karez |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114518292B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117150817A (en) * | 2023-10-26 | 2023-12-01 | 湖南大学 | Combined door type anti-floating frame design method based on soil arch effect |
Citations (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120010828A1 (en) * | 2009-10-16 | 2012-01-12 | Dynatest International A/S | Determination of subgrade modulus and stiffness of pavement layers for measurement of bearing capacity under fast moving wheel load |
CN102736123A (en) * | 2012-07-11 | 2012-10-17 | 北京交通大学 | Forecasting method of ground collapse induced by constructing on upper half-section of circular shallow-buried tunnel |
CN103308401A (en) * | 2013-07-01 | 2013-09-18 | 浙江大学 | Preparation method for railway road bed large-week acceleration loading physical model test device |
CN105004654A (en) * | 2015-07-30 | 2015-10-28 | 中铁西北科学研究院有限公司 | Testing machine and method for analogue simulation of freeze-thaw cycle destruction of sandy soil in well mouth of karez and method |
CN107037195A (en) * | 2016-10-31 | 2017-08-11 | 中国地质大学(武汉) | Water-level fluctuation influences experimental rig and method to lower sleeping ice sheet talus slope stability |
CN107238693A (en) * | 2017-06-30 | 2017-10-10 | 重庆工程职业技术学院 | A kind of underground water leakage induces the experimental rig and its application method of surface collapse |
CN107515025A (en) * | 2017-07-17 | 2017-12-26 | 西安理工大学 | Evaluation method of disease grade of ancient city wall |
CN108589458A (en) * | 2018-05-05 | 2018-09-28 | 黑龙江省交通科学研究所 | A kind of highway in seasonal frost region roadbed height control method based on stabilized soil pavement |
CN108959189A (en) * | 2018-06-07 | 2018-12-07 | 长安大学 | A method of it calculating Canal in Loess Area roadbed and underlies dark cave marginal stability |
CN108986624A (en) * | 2018-08-20 | 2018-12-11 | 成都理工大学 | Saturating type cap rock is collapsed to because of experimental provision under upper resistance |
CN210397923U (en) * | 2019-08-02 | 2020-04-24 | 江西省昭昀建设工程有限公司 | Pipeline pre-embedding device for hydraulic engineering |
CN111456762A (en) * | 2020-04-09 | 2020-07-28 | 长安大学 | A kind of karez tunnel reinforcement method with grouting of borehole wall and local anti-seepage of culvert |
CN111562077A (en) * | 2020-07-14 | 2020-08-21 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | High-speed railway roadbed comprehensive test system and method |
CN111610094A (en) * | 2020-05-29 | 2020-09-01 | 西南交通大学 | Model test device and test method for high-speed railway subgrade passing through karez |
CN111636361A (en) * | 2020-06-10 | 2020-09-08 | 西南交通大学 | Model test device and method for karez well foundation collapse under train load |
EP3712589A1 (en) * | 2018-04-23 | 2020-09-23 | Northeastern University | Test apparatus and method for key roof block collapse in bidirectional static-dynamic loading |
CN111879536A (en) * | 2020-08-25 | 2020-11-03 | 西安建筑科技大学 | Test device and method for simulating operation vibration of subway tunnel train |
CN111982720A (en) * | 2020-08-25 | 2020-11-24 | 西安建筑科技大学 | Test device and method for simulating saturated stratum subway circulating vibration influence |
WO2021008278A1 (en) * | 2019-07-12 | 2021-01-21 | 河南理工大学 | High-speed railway goaf foundation pseudo-dynamic loading model test apparatus and method |
CN113267613A (en) * | 2021-07-21 | 2021-08-17 | 中国科学院地质与地球物理研究所 | Experimental system for simulating fault creep and stick-slip staggered tunnel structure |
CN113569312A (en) * | 2021-06-21 | 2021-10-29 | 山东大学 | Method for evaluating and pre-controlling safety margin of empty road under urban underground construction scene |
CN113706901A (en) * | 2021-08-31 | 2021-11-26 | 重庆交通大学 | Intelligent prevention, control and early warning system for accidents at entrance section of highway tunnel |
-
2022
- 2022-02-18 CN CN202210153381.1A patent/CN114518292B/en active Active
Patent Citations (22)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20120010828A1 (en) * | 2009-10-16 | 2012-01-12 | Dynatest International A/S | Determination of subgrade modulus and stiffness of pavement layers for measurement of bearing capacity under fast moving wheel load |
CN102736123A (en) * | 2012-07-11 | 2012-10-17 | 北京交通大学 | Forecasting method of ground collapse induced by constructing on upper half-section of circular shallow-buried tunnel |
CN103308401A (en) * | 2013-07-01 | 2013-09-18 | 浙江大学 | Preparation method for railway road bed large-week acceleration loading physical model test device |
CN105004654A (en) * | 2015-07-30 | 2015-10-28 | 中铁西北科学研究院有限公司 | Testing machine and method for analogue simulation of freeze-thaw cycle destruction of sandy soil in well mouth of karez and method |
CN107037195A (en) * | 2016-10-31 | 2017-08-11 | 中国地质大学(武汉) | Water-level fluctuation influences experimental rig and method to lower sleeping ice sheet talus slope stability |
CN107238693A (en) * | 2017-06-30 | 2017-10-10 | 重庆工程职业技术学院 | A kind of underground water leakage induces the experimental rig and its application method of surface collapse |
CN107515025A (en) * | 2017-07-17 | 2017-12-26 | 西安理工大学 | Evaluation method of disease grade of ancient city wall |
EP3712589A1 (en) * | 2018-04-23 | 2020-09-23 | Northeastern University | Test apparatus and method for key roof block collapse in bidirectional static-dynamic loading |
CN108589458A (en) * | 2018-05-05 | 2018-09-28 | 黑龙江省交通科学研究所 | A kind of highway in seasonal frost region roadbed height control method based on stabilized soil pavement |
CN108959189A (en) * | 2018-06-07 | 2018-12-07 | 长安大学 | A method of it calculating Canal in Loess Area roadbed and underlies dark cave marginal stability |
CN108986624A (en) * | 2018-08-20 | 2018-12-11 | 成都理工大学 | Saturating type cap rock is collapsed to because of experimental provision under upper resistance |
WO2021008278A1 (en) * | 2019-07-12 | 2021-01-21 | 河南理工大学 | High-speed railway goaf foundation pseudo-dynamic loading model test apparatus and method |
CN210397923U (en) * | 2019-08-02 | 2020-04-24 | 江西省昭昀建设工程有限公司 | Pipeline pre-embedding device for hydraulic engineering |
CN111456762A (en) * | 2020-04-09 | 2020-07-28 | 长安大学 | A kind of karez tunnel reinforcement method with grouting of borehole wall and local anti-seepage of culvert |
CN111610094A (en) * | 2020-05-29 | 2020-09-01 | 西南交通大学 | Model test device and test method for high-speed railway subgrade passing through karez |
CN111636361A (en) * | 2020-06-10 | 2020-09-08 | 西南交通大学 | Model test device and method for karez well foundation collapse under train load |
CN111562077A (en) * | 2020-07-14 | 2020-08-21 | 中国铁道科学研究院集团有限公司铁道建筑研究所 | High-speed railway roadbed comprehensive test system and method |
CN111879536A (en) * | 2020-08-25 | 2020-11-03 | 西安建筑科技大学 | Test device and method for simulating operation vibration of subway tunnel train |
CN111982720A (en) * | 2020-08-25 | 2020-11-24 | 西安建筑科技大学 | Test device and method for simulating saturated stratum subway circulating vibration influence |
CN113569312A (en) * | 2021-06-21 | 2021-10-29 | 山东大学 | Method for evaluating and pre-controlling safety margin of empty road under urban underground construction scene |
CN113267613A (en) * | 2021-07-21 | 2021-08-17 | 中国科学院地质与地球物理研究所 | Experimental system for simulating fault creep and stick-slip staggered tunnel structure |
CN113706901A (en) * | 2021-08-31 | 2021-11-26 | 重庆交通大学 | Intelligent prevention, control and early warning system for accidents at entrance section of highway tunnel |
Non-Patent Citations (6)
Title |
---|
YUAN JINKE ET AL.: "Identification of Highway Collapse Based on Degree of Seismic Damage", 《JOURNAL OF HIGHWAY AND TRANSPORTATION RESEARCH AND DEVELOPMENT》, vol. 30, no. 3, pages 101 - 104 * |
孙萍等: "黄土地区公路暗穴顶板临界厚度的确定方法", 《中国公路学报》, vol. 19, no. 2, pages 12 - 17 * |
彭建兵等: "车辆动载荷作用下黄土暗穴对路基稳定性影响的数值分析", vol. 19, no. 4, pages 17 - 22 * |
邓亚虹: "车辆动载荷作用下路基下伏黄土暗穴稳定性分析", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》, no. 1, pages 71 - 78 * |
邓亚虹等: "公路黄土暗穴临界稳定埋深回归的预测方法及其程序实现", 《岩土力学》, vol. 29, no. 6, pages 1613 - 1617 * |
黄强兵等: "黄土边坡暗穴对公路桥梁的致灾机理分析", 《水文地质工程地质》, no. 4, pages 1 - 5 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117150817A (en) * | 2023-10-26 | 2023-12-01 | 湖南大学 | Combined door type anti-floating frame design method based on soil arch effect |
CN117150817B (en) * | 2023-10-26 | 2024-02-02 | 湖南大学 | Combined door type anti-floating frame design method based on soil arch effect |
Also Published As
Publication number | Publication date |
---|---|
CN114518292B (en) | 2023-09-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108061687B (en) | Geotechnical engineering simulation test platform for researching potential failure surface | |
CN102094432B (en) | Model for causing ground setting due to engineering environment effect and test method thereof | |
CN103882894B (en) | Prestressed concrete pipe pile horizontal bearing characteristic test model and test method | |
CN103616493B (en) | A kind of three-dimensional artificial rainfall reservoir landslide physical experiments equipment | |
CN202433536U (en) | Physical model testing system for tunnel-penetrated ground crack zone | |
CN106596268B (en) | A kind of multi-water immersion working condition simulation test model box and test method | |
CN201060186Y (en) | A foundation and slope engineering model test platform | |
CN101086494A (en) | Foundation and slope engineering model test platform | |
CN112964563A (en) | Simulation box for simulating long-term tunnel settlement under subway operation load and test method | |
CN110967252A (en) | Device for simulating the influence of shield tunnel construction on existing tunnels and its use method | |
CN111796072B (en) | High-steep slope vibrating table test system under rainfall condition and construction test method thereof | |
Jiang et al. | Experimental study on the migration regularity of sand outside a large, deep-water, open caisson during sinking | |
CN111610094B (en) | Model test device and test method for high-speed railway subgrade passing through karez | |
CN105182404A (en) | Landslide Simulation System | |
CN102519811A (en) | Model and method for testing deformation and stress variation law of intensity attenuation roadbed | |
CN104900130A (en) | Foundation pit pouring demonstrator and foundation pit pouring experiment research method thereof | |
CN103645061A (en) | Lattice anchoring technology large-scale physical model test method | |
CN108362856A (en) | The bath scaled model experimental device of the highly dense area ground long-term settlement in simcity | |
Su | Laboratory pull-out testing study on soil nails in compacted completely decomposed granite fill | |
CN105604105A (en) | Experiment model and method for simulating differential settlement of foundation based on water bag method | |
CN106096162A (en) | A kind of method determining shield support pressure and mathematical model thereof and construction method | |
CN111638136A (en) | High-speed rail foundation dynamic loading model test device and method for underlying underground engineering | |
CN114518292B (en) | Model test device and test method for high-speed railway subgrade inclined across karez | |
CN209447406U (en) | The simulator of non-fragment orbit surface layer of subgrade bed frost boiling disease | |
Pathak et al. | Wetting-drying behaviour of geogrid-reinforced clay under working load conditions |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |