CN114506802B - 一种桥梁施工用便于移动的升降台 - Google Patents

一种桥梁施工用便于移动的升降台 Download PDF

Info

Publication number
CN114506802B
CN114506802B CN202210163250.1A CN202210163250A CN114506802B CN 114506802 B CN114506802 B CN 114506802B CN 202210163250 A CN202210163250 A CN 202210163250A CN 114506802 B CN114506802 B CN 114506802B
Authority
CN
China
Prior art keywords
plate
clamping
groove
fixedly connected
sliding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210163250.1A
Other languages
English (en)
Other versions
CN114506802A (zh
Inventor
徐大芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Yucheng Qianli Construction Engineering Co ltd
Original Assignee
Wuhan Yucheng Qianli Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Yucheng Qianli Construction Engineering Co ltd filed Critical Wuhan Yucheng Qianli Construction Engineering Co ltd
Priority to CN202210163250.1A priority Critical patent/CN114506802B/zh
Publication of CN114506802A publication Critical patent/CN114506802A/zh
Application granted granted Critical
Publication of CN114506802B publication Critical patent/CN114506802B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F11/00Lifting devices specially adapted for particular uses not otherwise provided for
    • B66F11/04Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations
    • B66F11/042Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations actuated by lazy-tongs mechanisms or articulated levers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66FHOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
    • B66F17/00Safety devices, e.g. for limiting or indicating lifting force
    • B66F17/006Safety devices, e.g. for limiting or indicating lifting force for working platforms
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05CBOLTS OR FASTENING DEVICES FOR WINGS, SPECIALLY FOR DOORS OR WINDOWS
    • E05C19/00Other devices specially designed for securing wings, e.g. with suction cups

Abstract

本发明公开了一种桥梁施工用便于移动的升降台,涉及升降台技术领域,包括底盘、支撑组件和固定组件,所述底盘前后两侧对称设置有动力轮,所述升降杆下方固定连接有垫板,用于支撑装置的所述支撑组件对称设置于垫板左右两侧,所述底盘上方中央固定连接有双轴电机,所述驱动轮前后两侧设置有传动轮,所述双向螺杆左右两端对称嵌合连接有固定块,所述底盘上表面左右两侧对称开设有滑槽,所述滑块下表面嵌合连接有滚珠,所述连杆上方外侧转动连接有固定销,用于固定滑块位置的所述固定组件设置于滑块中部。该桥梁施工用便于移动的升降台,与现有的普通升降台相比,便于移动且可以对升降高度进行较为精确的控制,方便人员施工。

Description

一种桥梁施工用便于移动的升降台
技术领域
本发明涉及升降台技术领域,具体为一种桥梁施工用便于移动的升降台。
背景技术
桥梁施工是指按照设计内容,建造桥梁的过程,主要指桥梁施工技术与施工组织、施工管理和施工质量等内容,对于城市道路的桥梁施工来说,桥梁施工用升降台是进行桥梁施工时所用到的施工器械,方便施工人员进行工程作业。
现有的桥梁施工用升降台在使用时不便于移动,在调节高度时大多使用液压杆进行升降,对升降高度的控制不够精准,因此,我们提供了一种桥梁施工用便于移动的升降台。
发明内容
针对现有技术的不足,本发明提供了一种桥梁施工用便于移动的升降台,解决了上述背景技术中提出的问题。
为实现以上目的,本发明通过以下技术方案予以实现:一种桥梁施工用便于移动的升降台,包括底盘、支撑组件和固定组件,所述底盘前后两侧对称设置有动力轮,且底盘下表面左右两侧对称固定连接有升降杆,所述升降杆下方固定连接有垫板,用于支撑装置的所述支撑组件对称设置于垫板左右两侧,所述底盘上方中央固定连接有双轴电机,且双轴电机左右两侧对称固定连接有驱动轮,所述驱动轮前后两侧设置有传动轮,且传动轮中央固定连接有双向螺杆,所述双向螺杆左右两端对称嵌合连接有固定块,所述底盘上表面左右两侧对称开设有滑槽,且滑槽内嵌合连接有滑块,所述滑块下表面嵌合连接有滚珠,且滑块和固定块上方转动连接有连杆,所述连杆上方外侧转动连接有固定销,且固定销上方固定连接有底板,所述底板下表面左右两侧对称开设有滑轨,且滑轨内嵌合连接有滑板,用于固定滑块位置的所述固定组件设置于滑块中部。
优选的,所述底板上表面外侧固定连接有围框,且围框外侧固定连接有围板,所述围板外表面对称固定连接有四组隔板,所述隔板内侧表面开设有隔槽,且隔槽内嵌合连接有隔块,所述底板上表面左右两侧对称固定连接有伸缩杆,且右侧伸缩杆上方转动连接有撑板,所述撑板下表面左侧开设有移槽,且移槽内嵌合连接有转杆,所述撑板上方前后两侧和左侧固定连接有围栏,且撑板上表面开设有嵌槽,所述嵌槽内嵌合连接有门轴,且门轴前方固定连接有门板,所述后方围栏表面开设有围槽,用于锁定门板的所述锁定组件设置于前方的围栏右上部。
优选的,所述每组隔板均设置有九个,且每块隔板均与外侧隔槽内的隔块固定连接,所述隔板之间通过隔块与隔槽滑动连接,且隔板之间相互贴合,最内侧的所述隔块与围板固定连接,且围板边长大于底板,所述撑板通过右侧伸缩杆与底板转动连接,且撑板通过转杆与左侧伸缩杆转动连接,所述转杆与左侧伸缩杆固定连接,且转杆通过左侧伸缩杆与右侧滑动连接,所述门轴通过嵌槽与撑板滑动连接,且门板通过门轴与撑板转动连接,所述门轴通过围槽与围栏滑动连接。
优选的,所述锁定组件包括锁腔、锁槽、锁簧、锁板、锁孔、锁块和锁杆,所述锁腔右方设置有锁槽,且锁腔内固定连接有锁簧,所述锁簧上方固定连接有锁板,且锁板右部开设有锁孔,所述锁孔内固定连接有锁块,且锁块左方设置有锁杆。
优选的,所述锁板通过锁簧与锁腔弹性连接,且锁板通过锁腔与围栏滑动连接,所述锁杆与门板固定连接,且锁杆通过锁槽与围栏滑动连接,所述锁杆通过锁块和锁孔与锁板嵌合连接。
优选的,所述支撑组件包括导槽、导轨、导杆、导板、卡轨、卡腔、卡板、卡块、卡孔、卡槽、卡簧、卡杆和拉板,所述导槽上方设置有导轨,且导轨内嵌合连接有导杆,所述导杆外侧设置有导板,所述导轨上方设置有卡轨,且卡轨外侧设置有卡腔,所述卡轨内滑动连接有卡板,且卡板外侧设置有卡块,所述卡板上部开设有卡孔,所述卡腔上方设置有卡槽,且卡槽内固定连接有卡簧,所述卡簧内侧固定连接有卡杆,且卡杆外端固定连接有拉板。
优选的,所述导板与垫板转动连接,且导板通过垫板与导轨滑动连接,所述导板通过导杆与导槽转动连接,且导杆通过导板与导轨滑动连接,所述卡板通过卡轨与底盘滑动连接,且卡块通过卡板与卡腔滑动连接,所述卡杆通过卡簧与卡槽弹性连接,且卡杆通过卡孔与卡板滑动连接。
优选的,所述固定组件包括固定腔、限位槽、气动杆、限位板、弹簧、固定板和固定槽,所述固定腔左右两侧对称开设有限位槽,且固定腔内固定连接有气动杆,所述气动杆下方固定连接有限位板,且限位板下方固定连接有弹簧,所述弹簧下方固定连接有固定板,且固定板下方设置有固定槽。
优选的,所述限位板与限位槽嵌合连接,且限位板通过气动杆和限位槽与固定腔滑动连接,所述固定板通过弹簧与限位板弹性连接,且固定板通过限位板与固定腔滑动连接,所述固定板与固定槽嵌合连接。
优选的,所述驱动轮通过履带与传动轮构成传动结构,且双向螺杆通过传动轮与固定块转动连接,所述滑块与双向螺杆螺纹连接,且滑块通过双向螺杆与滑槽滑动连接,所述连杆之间转动连接,且滑块通过连杆与滑板构成传动结构,所述滑板与连杆转动连接,且滑板通过连杆与滑轨滑动连接。
本发明提供了一种桥梁施工用便于移动的升降台,具备以下有益效果:该桥梁施工用便于移动的升降台,便于移动且可以对升降高度进行较为精确的控制,方便人员施工;
1、本发明通过双轴电机的设置,使得在使用装置时,升降杆可以将垫板降下,令动力轮离开地面,对装置进行固定,需要移动装置时,只需将垫板升起便可通过动力轮对装置进行移动,双轴电机可以通过驱动轮带动传动轮转动,从而使得双向螺杆带动滑块在滑槽内移动,进而带动连杆移动,对底板进行升降,双向螺杆和滑块的螺纹连接可以达到对滑块进行精确控制,进而对升降高度进行控制,且在滑块移动时,滑槽可以对滑块的移动轨迹进行限制,避免滑块偏斜,在连杆移动的过程中可以带动滑板在滑轨内滑动,从而为底板提供稳固支撑,保证底板的稳定。
2、本发明通过支撑组件的设置,使得升降杆带动垫板下降后,导板和导杆可以被固定翼带动在导轨和导槽内滑动,当导杆移动到卡板外侧后,卡板带动卡块在卡轨和卡腔内下降,当卡孔与卡杆对齐后,卡杆在卡簧的作用下通过卡孔穿过卡板,将卡板固定在卡轨内,从而通过卡板和卡块对导杆和导板进行限制,为底座提供支撑,减轻升降杆的负担,避免升降杆长时间的受力而损坏,需要移动装置时,只需通过拉板拔出卡杆,便可将卡板从卡轨内拔出,解除卡板对导杆的限制。
3、本发明通过固定组件的设置,使得在对装置进行升高时,滑块可以通过固定腔带动固定板移动,且在移动过程中固定板可以将弹簧压缩并滑入固定腔内,当滑块停止移动后,固定板可以在弹簧的作用下滑出固定腔并嵌入固定槽内,从而对滑块的位置进行固定,避免在底板的压力作用下滑块产生位移,且在对装置进行降低时,气动杆可以带动限位板在限位槽内上升,从而将固定板收入固定腔内,便于滑块移动,降低完毕后气动杆带动限位板复位,便可使得固定板嵌入固定槽,再次将滑块固定。
4、本发明通过伸缩杆的设置,使得在对装置高度进行调节时,可以通过伸缩杆带动撑板进行二次高度调节,且当左侧伸缩杆伸缩长度与右侧伸缩杆不一致时,左侧伸缩杆可以带动转杆在移槽内滑动,从而对撑板的倾斜度进行调节,使得装置在倾斜地面上停留时也可以保持撑板的水平状态,且在装置进行升降时,围板可以通过隔块和隔槽带动隔板一起移动,使得隔板可以保持对围框下方的空间进行密闭,避免外界杂物落入而导致装置运转出现故障。
5、本发明通过锁定组件的设置,使得施工人员站上撑板后,可以通过门板将门轴向右拉出,嵌槽和围槽可以对门轴的移动轨迹进行限制,保证门板竖直,在门轴移动到嵌槽右端后,转动门板使门板与前方的围栏贴合,门板带动锁杆滑入锁槽,锁杆通过锁块将锁板顶起并进入锁孔后,锁板在锁簧的作用下下降,通过卡块和卡孔使卡杆与卡板嵌合,对门板进行固定,避免在施工过程中门板松动造成危险。
附图说明
图1为本发明一种桥梁施工用便于移动的升降台的剖视主视结构示意图;
图2为本发明一种桥梁施工用便于移动的升降台的图1中A处放大后的结构示意图;
图3为本发明一种桥梁施工用便于移动的升降台的图1中B处放大后的结构示意图;
图4为本发明一种桥梁施工用便于移动的升降台的图1中C处放大后的结构示意图;
图5为本发明一种桥梁施工用便于移动的升降台的图1中D处放大后的结构示意图;
图6为本发明一种桥梁施工用便于移动的升降台的半剖视右侧视结构示意图;
图7为本发明一种桥梁施工用便于移动的升降台的图6中E处放大后的结构示意图;
图中:1、底盘;2、动力轮;3、升降杆;4、垫板;5、支撑组件;501、导槽;502、导轨;503、导杆;504、导板;505、卡轨;506、卡腔;507、卡板;508、卡块;509、卡孔;510、卡槽;511、卡簧;512、卡杆;513、拉板;6、双轴电机;7、驱动轮;8、传动轮;9、双向螺杆;10、固定块;11、滑槽;12、滑块;13、滚珠;14、连杆;15、固定销;16、底板;17、滑轨;18、滑板;19、固定组件;1901、固定腔;1902、限位槽;1903、气动杆;1904、限位板;1905、弹簧;1906、固定板;1907、固定槽;20、围框;21、围板;22、隔板;23、隔槽;24、隔块;25、伸缩杆;26、撑板;27、移槽;28、转杆;29、围栏;30、嵌槽;31、门轴;32、门板;33、围槽;34、锁定组件;3401、锁腔;3402、锁槽;3403、锁簧;3404、锁板;3405、锁孔;3406、锁块;3407、锁杆。
具体实施方式
请参阅图1至图7,本发明提供一种技术方案:一种桥梁施工用便于移动的升降台,包括底盘1、支撑组件5和固定组件19,底盘1前后两侧对称设置有动力轮2,且底盘1下表面左右两侧对称固定连接有升降杆3,升降杆3下方固定连接有垫板4,用于支撑装置的支撑组件5对称设置于垫板4左右两侧,底盘1上方中央固定连接有双轴电机6,且双轴电机6左右两侧对称固定连接有驱动轮7,驱动轮7前后两侧设置有传动轮8,且传动轮8中央固定连接有双向螺杆9,双向螺杆9左右两端对称嵌合连接有固定块10,底盘1上表面左右两侧对称开设有滑槽11,且滑槽11内嵌合连接有滑块12,滑块12下表面嵌合连接有滚珠13,且滑块12和固定块10上方转动连接有连杆14,连杆14上方外侧转动连接有固定销15,且固定销15上方固定连接有底板16,底板16下表面左右两侧对称开设有滑轨17,且滑轨17内嵌合连接有滑板18,用于固定滑块12位置的固定组件19设置于滑块12中部,驱动轮7通过履带与传动轮8构成传动结构,且双向螺杆9通过传动轮8与固定块10转动连接,滑块12与双向螺杆9螺纹连接,且滑块12通过双向螺杆9与滑槽11滑动连接,连杆14之间转动连接,且滑块12通过连杆14与滑板18构成传动结构,滑板18与连杆14转动连接,且滑板18通过连杆14与滑轨17滑动连接;
具体操作如下,通过双轴电机6的设置,使得在使用装置时,升降杆3可以将垫板4降下,令动力轮2离开地面,对装置进行固定,需要移动装置时,只需将垫板4升起便可通过动力轮2对装置进行移动,双轴电机6可以通过驱动轮7带动传动轮8转动,从而使得双向螺杆9带动滑块12在滑槽11内移动,进而带动连杆14移动,对底板16进行升降,双向螺杆9和滑块12的螺纹连接可以达到对滑块12进行精确控制,进而对升降高度进行控制,且在滑块12移动时,滑槽11可以对滑块12的移动轨迹进行限制,避免滑块12偏斜,在连杆14移动的过程中可以带动滑板18在滑轨17内滑动,从而为底板16提供稳固支撑,保证底板16的稳定;
请参阅图1、图4和图6,底板16上表面外侧固定连接有围框20,且围框20外侧固定连接有围板21,围板21外表面对称固定连接有四组隔板22,隔板22内侧表面开设有隔槽23,且隔槽23内嵌合连接有隔块24,底板16上表面左右两侧对称固定连接有伸缩杆25,且右侧伸缩杆25上方转动连接有撑板26,撑板26下表面左侧开设有移槽27,且移槽27内嵌合连接有转杆28,撑板26上方前后两侧和左侧固定连接有围栏29,且撑板26上表面开设有嵌槽30,嵌槽30内嵌合连接有门轴31,且门轴31前方固定连接有门板32,后方围栏29表面开设有围槽33,用于锁定门板32的锁定组件34设置于前方的围栏29右上部,每组隔板22均设置有九个,且每块隔板22均与外侧隔槽23内的隔块24固定连接,隔板22之间通过隔块24与隔槽23滑动连接,且隔板22之间相互贴合,最内侧的隔块24与围板21固定连接,且围板21边长大于底板16,撑板26通过右侧伸缩杆25与底板16转动连接,且撑板26通过转杆28与左侧伸缩杆25转动连接,转杆28与左侧伸缩杆25固定连接,且转杆28通过左侧伸缩杆25与右侧滑动连接,门轴31通过嵌槽30与撑板26滑动连接,且门板32通过门轴31与撑板26转动连接,门轴31通过围槽33与围栏29滑动连接;
具体操作如下,通过伸缩杆25的设置,使得在对装置高度进行调节时,可以通过伸缩杆25带动撑板26进行二次高度调节,且当左侧伸缩杆25伸缩长度与右侧伸缩杆25不一致时,左侧伸缩杆25可以带动转杆28在移槽27内滑动,从而对撑板26的倾斜度进行调节,使得装置在倾斜地面上停留时也可以保持撑板26的水平状态,且在装置进行升降时,围板21可以通过隔块24和隔槽23带动隔板22一起移动,使得隔板22可以保持对围框20下方的空间进行密闭,避免外界杂物落入而导致装置运转出现故障;
请参阅图1、图5、图6和图7,锁定组件34包括锁腔3401、锁槽3402、锁簧3403、锁板3404、锁孔3405、锁块3406和锁杆3407,锁腔3401右方设置有锁槽3402,且锁腔3401内固定连接有锁簧3403,锁簧3403上方固定连接有锁板3404,且锁板3404右部开设有锁孔3405,锁孔3405内固定连接有锁块3406,且锁块3406左方设置有锁杆3407,锁板3404通过锁簧3403与锁腔3401弹性连接,且锁板3404通过锁腔3401与围栏29滑动连接,锁杆3407与门板32固定连接,且锁杆3407通过锁槽3402与围栏29滑动连接,锁杆3407通过锁块3406和锁孔3405与锁板3404嵌合连接;
具体操作如下,通过锁定组件34的设置,使得施工人员站上撑板26后,可以通过门板32将门轴31向右拉出,嵌槽30和围槽33可以对门轴31的移动轨迹进行限制,保证门板32竖直,在门轴31移动到嵌槽30右端后,转动门板32使门板32与前方的围栏29贴合,门板32带动锁杆3407滑入锁槽3402,锁杆3407通过锁块3406将锁板3404顶起并进入锁孔3405后,锁板3404在锁簧3403的作用下下降,通过卡块508和卡孔509使卡杆512与卡板507嵌合,对门板32进行固定,避免在施工过程中门板32松动造成危险;
请参阅图1、图2和图6,支撑组件5包括导槽501、导轨502、导杆503、导板504、卡轨505、卡腔506、卡板507、卡块508、卡孔509、卡槽510、卡簧511、卡杆512和拉板513,导槽501上方设置有导轨502,且导轨502内嵌合连接有导杆503,导杆503外侧设置有导板504,导轨502上方设置有卡轨505,且卡轨505外侧设置有卡腔506,卡轨505内滑动连接有卡板507,且卡板507外侧设置有卡块508,卡板507上部开设有卡孔509,卡腔506上方设置有卡槽510,且卡槽510内固定连接有卡簧511,卡簧511内侧固定连接有卡杆512,且卡杆512外端固定连接有拉板513,导板504与垫板4转动连接,且导板504通过垫板4与导轨502滑动连接,导板504通过导杆503与导槽501转动连接,且导杆503通过导板504与导轨502滑动连接,卡板507通过卡轨505与底盘1滑动连接,且卡块508通过卡板507与卡腔506滑动连接,卡杆512通过卡簧511与卡槽510弹性连接,且卡杆512通过卡孔509与卡板507滑动连接;
具体操作如下,通过支撑组件5的设置,使得升降杆3带动垫板4下降后,导板504和导杆503可以被固定翼带动在导轨502和导槽501内滑动,当导杆503移动到卡板507外侧后,卡板507带动卡块508在卡轨505和卡腔506内下降,当卡孔509与卡杆512对齐后,卡杆512在卡簧511的作用下通过卡孔509穿过卡板507,将卡板507固定在卡轨505内,从而通过卡板507和卡块508对导杆503和导板504进行限制,为底座提供支撑,减轻升降杆3的负担,避免升降杆3长时间的受力而损坏,需要移动装置时,只需通过拉板513拔出卡杆512,便可将卡板507从卡轨505内拔出,解除卡板507对导杆503的限制;
请参阅图1和图3,固定组件19包括固定腔1901、限位槽1902、气动杆1903、限位板1904、弹簧1905、固定板1906和固定槽1907,固定腔1901左右两侧对称开设有限位槽1902,且固定腔1901内固定连接有气动杆1903,气动杆1903下方固定连接有限位板1904,且限位板1904下方固定连接有弹簧1905,弹簧1905下方固定连接有固定板1906,且固定板1906下方设置有固定槽1907,限位板1904与限位槽1902嵌合连接,且限位板1904通过气动杆1903和限位槽1902与固定腔1901滑动连接,固定板1906通过弹簧1905与限位板1904弹性连接,且固定板1906通过限位板1904与固定腔1901滑动连接,固定板1906与固定槽1907嵌合连接;
具体操作如下,通过固定组件19的设置,使得在对装置进行升高时,滑块12可以通过固定腔1901带动固定板1906移动,且在移动过程中固定板1906可以将弹簧1905压缩并滑入固定腔1901内,当滑块12停止移动后,固定板1906可以在弹簧1905的作用下滑出固定腔1901并嵌入固定槽1907内,从而对滑块12的位置进行固定,避免在底板16的压力作用下滑块12产生位移,且在对装置进行降低时,气动杆1903可以带动限位板1904在限位槽1902内上升,从而将固定板1906收入固定腔1901内,便于滑块12移动,降低完毕后气动杆1903带动限位板1904复位,便可使得固定板1906嵌入固定槽1907,再次将滑块12固定。
工作原理:在使用该桥梁施工用便于移动的升降台时,首先通过动力轮2移动装置至指定位置,然后升降杆3将垫板4降下,令动力轮2离开地面,对装置进行固定,升降杆3带动垫板4下降后,导板504和导杆503可以被固定翼带动在导轨502和导槽501内滑动,当导杆503移动到卡板507外侧后,卡板507带动卡块508在卡轨505和卡腔506内下降,当卡孔509与卡杆512对齐后,卡杆512在卡簧511的作用下通过卡孔509穿过卡板507,将卡板507固定在卡轨505内,从而通过卡板507和卡块508对导杆503和导板504进行限制,为底座提供支撑,减轻升降杆3的负担,避免升降杆3长时间的受力而损坏,需要移动装置时,只需通过拉板513拔出卡杆512,便可将卡板507从卡轨505内拔出,解除卡板507对导杆503的限制,再将垫板4升起便可通过动力轮2对装置进行移动,双轴电机6可以通过驱动轮7带动传动轮8转动,从而使得双向螺杆9带动滑块12在滑槽11内移动,进而带动连杆14移动,对底板16进行升降,双向螺杆9和滑块12的螺纹连接可以达到对滑块12进行精确控制,进而对升降高度进行控制,且在滑块12移动时,滑槽11可以对滑块12的移动轨迹进行限制,避免滑块12偏斜,在连杆14移动的过程中可以带动滑板18在滑轨17内滑动,从而为底板16提供稳固支撑,保证底板16的稳定,在对装置进行升高时,滑块12可以通过固定腔1901带动固定板1906移动,且在移动过程中固定板1906可以将弹簧1905压缩并滑入固定腔1901内,当滑块12停止移动后,固定板1906可以在弹簧1905的作用下滑出固定腔1901并嵌入固定槽1907内,从而对滑块12的位置进行固定,避免在底板16的压力作用下滑块12产生位移,且在对装置进行降低时,气动杆1903可以带动限位板1904在限位槽1902内上升,从而将固定板1906收入固定腔1901内,便于滑块12移动,降低完毕后气动杆1903带动限位板1904复位,便可使得固定板1906嵌入固定槽1907,再次将滑块12固定,在对装置高度进行调节时,可以通过伸缩杆25带动撑板26进行二次高度调节,且当左侧伸缩杆25伸缩长度与右侧伸缩杆25不一致时,左侧伸缩杆25可以带动转杆28在移槽27内滑动,从而对撑板26的倾斜度进行调节,使得装置在倾斜地面上停留时也可以保持撑板26的水平状态,且在装置进行升降时,围板21可以通过隔块24和隔槽23带动隔板22一起移动,使得隔板22可以保持对围框20下方的空间进行密闭,避免外界杂物落入而导致装置运转出现故障,施工人员站上撑板26后,可以通过门板32将门轴31向右拉出,嵌槽30和围槽33可以对门轴31的移动轨迹进行限制,保证门板32竖直,在门轴31移动到嵌槽30右端后,转动门板32使门板32与前方的围栏29贴合,门板32带动锁杆3407滑入锁槽3402,锁杆3407通过锁块3406将锁板3404顶起并进入锁孔3405后,锁板3404在锁簧3403的作用下下降,通过卡块508和卡孔509使卡杆512与卡板507嵌合,对门板32进行固定,避免在施工过程中门板32松动造成危险,这就是该桥梁施工用便于移动的升降台的工作原理。

Claims (6)

1.一种桥梁施工用便于移动的升降台,包括底盘(1)、支撑组件(5)和固定组件(19),其特征在于,所述底盘(1)前后两侧对称设置有动力轮(2),且底盘(1)下表面左右两侧对称固定连接有升降杆(3),所述升降杆(3)下方固定连接有垫板(4),用于支撑装置的所述支撑组件(5)对称设置于垫板(4)左右两侧,所述底盘(1)上方中央固定连接有双轴电机(6),且双轴电机(6)左右两侧对称固定连接有驱动轮(7),所述驱动轮(7)前后两侧设置有传动轮(8),且传动轮(8)中央固定连接有双向螺杆(9),所述双向螺杆(9)左右两端对称嵌合连接有固定块(10),所述底盘(1)上表面左右两侧对称开设有滑槽(11),且滑槽(11)内嵌合连接有滑块(12),所述滑块(12)下表面嵌合连接有滚珠(13),且滑块(12)和固定块(10)上方转动连接有连杆(14),所述连杆(14)上方外侧转动连接有固定销(15),且固定销(15)上方固定连接有底板(16),所述底板(16)下表面左右两侧对称开设有滑轨(17),且滑轨(17)内嵌合连接有滑板(18),用于固定滑块(12)位置的所述固定组件(19)设置于滑块(12)中部;
所述支撑组件(5)包括导槽(501)、导轨(502)、导杆(503)、导板(504)、卡轨(505)、卡腔(506)、卡板(507)、卡块(508)、卡孔(509)、卡槽(510)、卡簧(511)、卡杆(512)和拉板(513),所述导槽(501)上方设置有导轨(502),且导轨(502)内嵌合连接有导杆(503),所述导杆(503)外侧设置有导板(504),所述导轨(502)上方设置有卡轨(505),且卡轨(505)外侧设置有卡腔(506),所述卡轨(505)内滑动连接有卡板(507),且卡板(507)外侧设置有卡块(508),所述卡板(507)上部开设有卡孔(509),所述卡腔(506)上方设置有卡槽(510),且卡槽(510)内固定连接有卡簧(511),所述卡簧(511)内侧固定连接有卡杆(512),且卡杆(512)外端固定连接有拉板(513);
所述导板(504)与垫板(4)转动连接,且导板(504)通过垫板(4)与导轨(502)滑动连接,所述导板(504)通过导杆(503)与导槽(501)转动连接,且导杆(503)通过导板(504)与导轨(502)滑动连接,所述卡板(507)通过卡轨(505)与底盘(1)滑动连接,且卡块(508)通过卡板(507)与卡腔(506)滑动连接,所述卡杆(512)通过卡簧(511)与卡槽(510)弹性连接,且卡杆(512)通过卡孔(509)与卡板(507)滑动连接;
所述固定组件(19)包括固定腔(1901)、限位槽(1902)、气动杆(1903)、限位板(1904)、弹簧(1905)、固定板(1906)和固定槽(1907),所述固定腔(1901)左右两侧对称开设有限位槽(1902),且固定腔(1901)内固定连接有气动杆(1903),所述气动杆(1903)下方固定连接有限位板(1904),且限位板(1904)下方固定连接有弹簧(1905),所述弹簧(1905)下方固定连接有固定板(1906),且固定板(1906)下方设置有固定槽(1907);
所述限位板(1904)与限位槽(1902)嵌合连接,且限位板(1904)通过气动杆(1903)和限位槽(1902)与固定腔(1901)滑动连接,所述固定板(1906)通过弹簧(1905)与限位板(1904)弹性连接,且固定板(1906)通过限位板(1904)与固定腔(1901)滑动连接,所述固定板(1906)与固定槽(1907)嵌合连接。
2.根据权利要求1所述的一种桥梁施工用便于移动的升降台,其特征在于:所述底板(16)上表面外侧固定连接有围框(20),且围框(20)外侧固定连接有围板(21),所述围板(21)外表面对称固定连接有四组隔板(22),所述隔板(22)内侧表面开设有隔槽(23),且隔槽(23)内嵌合连接有隔块(24),所述底板(16)上表面左右两侧对称固定连接有伸缩杆(25),且右侧伸缩杆(25)上方转动连接有撑板(26),所述撑板(26)下表面左侧开设有移槽(27),且移槽(27)内嵌合连接有转杆(28),所述撑板(26)上方前后两侧和左侧固定连接有围栏(29),且撑板(26)上表面开设有嵌槽(30),所述嵌槽(30)内嵌合连接有门轴(31),且门轴(31)前方固定连接有门板(32),所述围栏(29)后方表面开设有围槽(33),围栏(29)右上部设置有用于锁定门板(32)的锁定组件(34)。
3.根据权利要求2所述的一种桥梁施工用便于移动的升降台,其特征在于:所述隔板(22)每组均设置有九个,且每块隔板(22)均与外侧隔槽(23)内的隔块(24)固定连接,所述隔板(22)之间通过隔块(24)与隔槽(23)滑动连接,且隔板(22)之间相互贴合,最内侧的所述隔块(24)与围板(21)固定连接,且围板(21)边长大于底板(16),所述撑板(26)通过右侧伸缩杆(25)与底板(16)转动连接,且撑板(26)通过转杆(28)与左侧伸缩杆(25)转动连接,所述转杆(28)与左侧伸缩杆(25)固定连接,且转杆(28)通过左侧伸缩杆(25)与右侧滑动连接,所述门轴(31)通过嵌槽(30)与撑板(26)滑动连接,且门板(32)通过门轴(31)与撑板(26)转动连接,所述门轴(31)通过围槽(33)与围栏(29)滑动连接。
4.根据权利要求2所述的一种桥梁施工用便于移动的升降台,其特征在于:所述锁定组件(34)包括锁腔(3401)、锁槽(3402)、锁簧(3403)、锁板(3404)、锁孔(3405)、锁块(3406)和锁杆(3407),所述锁腔(3401)右方设置有锁槽(3402),且锁腔(3401)内固定连接有锁簧(3403),所述锁簧(3403)上方固定连接有锁板(3404),且锁板(3404)右部开设有锁孔(3405),所述锁孔(3405)内固定连接有锁块(3406),且锁块(3406)左方设置有锁杆(3407)。
5.根据权利要求4所述的一种桥梁施工用便于移动的升降台,其特征在于:所述锁板(3404)通过锁簧(3403)与锁腔(3401)弹性连接,且锁板(3404)通过锁腔(3401)与围栏(29)滑动连接,所述锁杆(3407)与门板(32)固定连接,且锁杆(3407)通过锁槽(3402)与围栏(29)滑动连接,所述锁杆(3407)通过锁块(3406)和锁孔(3405)与锁板(3404)嵌合连接。
6.根据权利要求1所述的一种桥梁施工用便于移动的升降台,其特征在于:所述驱动轮(7)通过履带与传动轮(8)构成传动结构,且双向螺杆(9)通过传动轮(8)与固定块(10)转动连接,所述滑块(12)与双向螺杆(9)螺纹连接,且滑块(12)通过双向螺杆(9)与滑槽(11)滑动连接,所述连杆(14)之间转动连接,且滑块(12)通过连杆(14)与滑板(18)构成传动结构,所述滑板(18)与连杆(14)转动连接,且滑板(18)通过连杆(14)与滑轨(17)滑动连接。
CN202210163250.1A 2022-02-22 2022-02-22 一种桥梁施工用便于移动的升降台 Active CN114506802B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210163250.1A CN114506802B (zh) 2022-02-22 2022-02-22 一种桥梁施工用便于移动的升降台

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210163250.1A CN114506802B (zh) 2022-02-22 2022-02-22 一种桥梁施工用便于移动的升降台

Publications (2)

Publication Number Publication Date
CN114506802A CN114506802A (zh) 2022-05-17
CN114506802B true CN114506802B (zh) 2023-09-08

Family

ID=81554554

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210163250.1A Active CN114506802B (zh) 2022-02-22 2022-02-22 一种桥梁施工用便于移动的升降台

Country Status (1)

Country Link
CN (1) CN114506802B (zh)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000145914A (ja) * 1998-11-17 2000-05-26 Tsubakimoto Chain Co 逆転防止機構付直線作動機
CN103787230A (zh) * 2014-02-27 2014-05-14 张家港市华机环保新能源科技有限公司 一种用于输送lng气瓶的双剪叉式升降平台
CN204932138U (zh) * 2015-09-12 2016-01-06 赵文霞 一种心内科诊疗床
CN105565227A (zh) * 2015-12-18 2016-05-11 天津市五源钢制品有限公司 一种高空安全操作台
CN206719368U (zh) * 2017-04-28 2017-12-08 丁庆慈 一种防倾斜的摩托车支架
CN108933561A (zh) * 2018-08-29 2018-12-04 安徽普生源生物科技有限公司 一种光伏太阳能发电多角度朝阳装置
CN212315410U (zh) * 2020-03-18 2021-01-08 河北唐银钢铁有限公司 一种氧枪头安装用升降小车
CN112374412A (zh) * 2020-11-12 2021-02-19 太仓治誓机械设备科技有限公司 太阳能电池板架设辅助平台
CN213849394U (zh) * 2020-10-16 2021-08-03 张家港金陵教育产业有限公司 一种课桌椅站脚
CN214831954U (zh) * 2021-01-28 2021-11-23 潘杰 一种公路桥梁施工用支撑托架
CN114017599A (zh) * 2021-11-03 2022-02-08 中仿智能科技(上海)股份有限公司 一种飞行模拟器用升降装置

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6375631B2 (en) * 2000-02-07 2002-04-23 Rdh Enterprises, Llc Apparatus for performing spinal therapy

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000145914A (ja) * 1998-11-17 2000-05-26 Tsubakimoto Chain Co 逆転防止機構付直線作動機
CN103787230A (zh) * 2014-02-27 2014-05-14 张家港市华机环保新能源科技有限公司 一种用于输送lng气瓶的双剪叉式升降平台
CN204932138U (zh) * 2015-09-12 2016-01-06 赵文霞 一种心内科诊疗床
CN105565227A (zh) * 2015-12-18 2016-05-11 天津市五源钢制品有限公司 一种高空安全操作台
CN206719368U (zh) * 2017-04-28 2017-12-08 丁庆慈 一种防倾斜的摩托车支架
CN108933561A (zh) * 2018-08-29 2018-12-04 安徽普生源生物科技有限公司 一种光伏太阳能发电多角度朝阳装置
CN212315410U (zh) * 2020-03-18 2021-01-08 河北唐银钢铁有限公司 一种氧枪头安装用升降小车
CN213849394U (zh) * 2020-10-16 2021-08-03 张家港金陵教育产业有限公司 一种课桌椅站脚
CN112374412A (zh) * 2020-11-12 2021-02-19 太仓治誓机械设备科技有限公司 太阳能电池板架设辅助平台
CN214831954U (zh) * 2021-01-28 2021-11-23 潘杰 一种公路桥梁施工用支撑托架
CN114017599A (zh) * 2021-11-03 2022-02-08 中仿智能科技(上海)股份有限公司 一种飞行模拟器用升降装置

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
黄景仁,陈甘章.野战便携式输液架.东南国防医药.1997,(第01期),73-74. *

Also Published As

Publication number Publication date
CN114506802A (zh) 2022-05-17

Similar Documents

Publication Publication Date Title
CN207748814U (zh) 一种低压配电安装操作平台
CN114506802B (zh) 一种桥梁施工用便于移动的升降台
CN111170237A (zh) 一种机械结构稳定的电力安全工作平台
CN112503368A (zh) 一种建筑施工用测绘仪器支护装置
CN114856149B (zh) 一种可升降的脚手架
CN208220624U (zh) 一种电力用维修辅助爬梯
CN219652610U (zh) 一种电网施工用安全升降架
CN207582455U (zh) 一种土建打夯机
CN219429610U (zh) 一种电力工程施工用便捷升降设备
CN220815650U (zh) 一种隧道施工用可伸缩平台装置
CN220789451U (zh) 一种桥梁外侧施工悬架
CN219009819U (zh) 一种带稳定机构的升降装置
CN211234345U (zh) 一种顶进桥涵位置测试装置
CN213286931U (zh) 一种高度可调实验台
CN220384582U (zh) 一种多功能绘图桌
CN211594954U (zh) 一种建筑用升降机支架
CN219178921U (zh) 一种垂向侧向加载台架系统
CN220526080U (zh) 一种多轴运动精密隔振物理光学平台
CN220505069U (zh) 一种隧道围岩加固结构
CN216406165U (zh) 模板结构及模板系统
CN216429165U (zh) 一种临时舞台搭建用钢架结构
CN210156536U (zh) 一种雷达天线阵面的举升装置
CN214189063U (zh) 一种多功能语言教学平台
CN218318515U (zh) 一种集装箱底架结构
CN218994928U (zh) 一种落球冲击试验机

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20230808

Address after: 430050 25/F, Building G, Xinyang Square, Sixin Avenue, Hanyang District, Wuhan City, Hubei Province

Applicant after: Wuhan Yucheng Qianli Construction Engineering Co.,Ltd.

Address before: 810600 No. 9, A6 community, high speed railway new area, Ping'an District, Haidong City, Qinghai Province

Applicant before: Xu Dafang

GR01 Patent grant
GR01 Patent grant