CN114482409A - 一种用于圆管柱自密实混凝土抛顶浇筑施工方法 - Google Patents
一种用于圆管柱自密实混凝土抛顶浇筑施工方法 Download PDFInfo
- Publication number
- CN114482409A CN114482409A CN202210169279.0A CN202210169279A CN114482409A CN 114482409 A CN114482409 A CN 114482409A CN 202210169279 A CN202210169279 A CN 202210169279A CN 114482409 A CN114482409 A CN 114482409A
- Authority
- CN
- China
- Prior art keywords
- concrete
- steel pipe
- partition plate
- steel
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/36—Columns; Pillars; Struts of materials not covered by groups E04C3/32 or E04C3/34; of a combination of two or more materials
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/02—Conveying or working-up concrete or similar masses able to be heaped or cast
- E04G21/06—Solidifying concrete, e.g. by application of vacuum before hardening
- E04G21/08—Internal vibrators, e.g. needle vibrators
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02W—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
- Y02W30/00—Technologies for solid waste management
- Y02W30/50—Reuse, recycling or recovery technologies
- Y02W30/91—Use of waste materials as fillers for mortars or concrete
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Description
项目 | 含泥量 | 泥块含量 |
指标 | ≤3.0% | ≤1.0% |
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210169279.0A CN114482409B (zh) | 2022-02-23 | 2022-02-23 | 一种用于圆管柱自密实混凝土抛顶浇筑施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202210169279.0A CN114482409B (zh) | 2022-02-23 | 2022-02-23 | 一种用于圆管柱自密实混凝土抛顶浇筑施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114482409A true CN114482409A (zh) | 2022-05-13 |
CN114482409B CN114482409B (zh) | 2023-04-11 |
Family
ID=81484884
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202210169279.0A Active CN114482409B (zh) | 2022-02-23 | 2022-02-23 | 一种用于圆管柱自密实混凝土抛顶浇筑施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114482409B (zh) |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002242306A (ja) * | 2001-02-19 | 2002-08-28 | Matsushita Electric Works Ltd | 接合金具の取付け方法と接合ピンおよび接合金具付き木材 |
JP2004300902A (ja) * | 2003-03-29 | 2004-10-28 | Takenaka Komuten Co Ltd | Cfh、cfh梁及びcfh柱 |
CN1720378A (zh) * | 2002-11-22 | 2006-01-11 | 泰克-特拉斯控股股份有限公司 | 组合梁 |
JP2007224509A (ja) * | 2006-02-21 | 2007-09-06 | Toda Constr Co Ltd | 鋼管コンクリートのダイアフラム形状 |
JP2011169058A (ja) * | 2010-02-19 | 2011-09-01 | Takenaka Komuten Co Ltd | グラウト注入方法、接合構造、及び建物 |
CN203947682U (zh) * | 2014-03-28 | 2014-11-19 | 润弘精密工程事业股份有限公司 | 钢柱结构 |
CN204059760U (zh) * | 2014-07-30 | 2014-12-31 | 西安市建筑工程总公司 | 一种方钢柱柱芯自密实混凝土浇筑施工结构 |
CN104712099A (zh) * | 2015-03-15 | 2015-06-17 | 北京工业大学 | 异形截面多腔钢管内置圆钢管混凝土组合巨型柱及作法 |
CN104895248A (zh) * | 2015-05-06 | 2015-09-09 | 浙江东南网架股份有限公司 | 一种钢管混凝土柱的柱顶连接节点及其灌浆方法 |
KR101865376B1 (ko) * | 2017-11-14 | 2018-06-07 | 주식회사 아이에스중공업 | 일체형 다이아프램이 내장된 cft기둥의 제작방법 및 이에 의해 제작된 cft기둥 |
KR101914411B1 (ko) * | 2018-02-08 | 2018-11-01 | 이한희 | 콘크리트 압송 파이프를 포함하는 선조립 기둥 및 이를 이용한 고층 건물의 콘크리트 타설 방법 |
CN208763187U (zh) * | 2018-05-04 | 2019-04-19 | 中国建筑股份有限公司 | 一种装配式混凝土柱脚节点结构 |
CN113550556A (zh) * | 2021-07-27 | 2021-10-26 | 中国建筑一局(集团)有限公司 | 一种用于高层建筑施工的爬模 |
CN214834050U (zh) * | 2021-03-30 | 2021-11-23 | 黑龙江威正恒建设集团有限公司 | 一种钢结构劲性柱 |
-
2022
- 2022-02-23 CN CN202210169279.0A patent/CN114482409B/zh active Active
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002242306A (ja) * | 2001-02-19 | 2002-08-28 | Matsushita Electric Works Ltd | 接合金具の取付け方法と接合ピンおよび接合金具付き木材 |
CN1720378A (zh) * | 2002-11-22 | 2006-01-11 | 泰克-特拉斯控股股份有限公司 | 组合梁 |
JP2004300902A (ja) * | 2003-03-29 | 2004-10-28 | Takenaka Komuten Co Ltd | Cfh、cfh梁及びcfh柱 |
JP2007224509A (ja) * | 2006-02-21 | 2007-09-06 | Toda Constr Co Ltd | 鋼管コンクリートのダイアフラム形状 |
JP2011169058A (ja) * | 2010-02-19 | 2011-09-01 | Takenaka Komuten Co Ltd | グラウト注入方法、接合構造、及び建物 |
CN203947682U (zh) * | 2014-03-28 | 2014-11-19 | 润弘精密工程事业股份有限公司 | 钢柱结构 |
CN204059760U (zh) * | 2014-07-30 | 2014-12-31 | 西安市建筑工程总公司 | 一种方钢柱柱芯自密实混凝土浇筑施工结构 |
CN104712099A (zh) * | 2015-03-15 | 2015-06-17 | 北京工业大学 | 异形截面多腔钢管内置圆钢管混凝土组合巨型柱及作法 |
CN104895248A (zh) * | 2015-05-06 | 2015-09-09 | 浙江东南网架股份有限公司 | 一种钢管混凝土柱的柱顶连接节点及其灌浆方法 |
KR101865376B1 (ko) * | 2017-11-14 | 2018-06-07 | 주식회사 아이에스중공업 | 일체형 다이아프램이 내장된 cft기둥의 제작방법 및 이에 의해 제작된 cft기둥 |
KR101914411B1 (ko) * | 2018-02-08 | 2018-11-01 | 이한희 | 콘크리트 압송 파이프를 포함하는 선조립 기둥 및 이를 이용한 고층 건물의 콘크리트 타설 방법 |
CN208763187U (zh) * | 2018-05-04 | 2019-04-19 | 中国建筑股份有限公司 | 一种装配式混凝土柱脚节点结构 |
CN214834050U (zh) * | 2021-03-30 | 2021-11-23 | 黑龙江威正恒建设集团有限公司 | 一种钢结构劲性柱 |
CN113550556A (zh) * | 2021-07-27 | 2021-10-26 | 中国建筑一局(集团)有限公司 | 一种用于高层建筑施工的爬模 |
Non-Patent Citations (2)
Title |
---|
丁一宁;刘亚军;刘思国;刘赫凯;: "钢纤维自密实混凝土梁抗剪性能的试验研究" * |
杨艳广;: "大型高铁站房预应力斜柱特殊结构施工技术" * |
Also Published As
Publication number | Publication date |
---|---|
CN114482409B (zh) | 2023-04-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105041336A (zh) | 一种超高性能混杂纤维混凝土盾构管片及其制备方法 | |
CN106438213B (zh) | 用于风力发电机的塔筒 | |
CN100398480C (zh) | 高强水泥砂浆及灌注该砂浆的施工方法 | |
CN104975570A (zh) | 钢管拱桥拱肋混凝土顶升浇注施工工法 | |
CN110439286A (zh) | 一种内衬加劲连接钢管混凝土柱减阻消振一次顶升施工方法 | |
CN107989049A (zh) | 一种框架护坡的施工方法 | |
CN107503286A (zh) | 一种对称顶升自密实型钢管拱施工工艺 | |
CN114482409B (zh) | 一种用于圆管柱自密实混凝土抛顶浇筑施工方法 | |
CN106320374B (zh) | 一种地铁车站用钢管柱及其施工工艺 | |
CN112031458A (zh) | 混凝土结构修复施工方法 | |
CN111502721A (zh) | 一种联巷混凝土联合支护结构及其施工方法 | |
CN114685124B (zh) | 一种预制轨顶风道拼装缝隙密封填补料及其施工方法 | |
CN114990997A (zh) | 一种装配式墩柱及其装配校正装置与装配施工方法 | |
CN103572702A (zh) | 大高差钢管内高标号混凝土一次性对称连续真空压注方法 | |
CN110593525A (zh) | 轨顶风道施工方法 | |
CN206221165U (zh) | 用于风力发电机的塔筒 | |
CN206143761U (zh) | 一种水泥搅拌桩掺砂装置 | |
CN110698129A (zh) | 一种钢管拱用混凝土及钢管混凝土拱桥 | |
CN113006071B (zh) | 一种小角度斜桩混凝土浇筑的施工方法 | |
CN218436598U (zh) | 一种装配式墩柱及其装配校正装置 | |
WO2024027029A1 (zh) | 浇筑装置及型钢混凝土的浇筑方法 | |
CN107935626A (zh) | 一种快硬早强型道路的施工方法 | |
CN110984079B (zh) | 自密实混凝土堆石坝施工方法 | |
CN117758930A (zh) | 一种可快速施工的钢管陶瓷混凝土牛腿柱及其施工方法 | |
CN105200920A (zh) | 高墩无支架翻模施工中的混凝土施工工艺 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhu Guangqiang Inventor after: Zhang Peng Inventor after: Yuan Mengying Inventor after: Yuan Neimeng Inventor after: Chen Rong Inventor after: Zeng Lin Inventor after: Feng Shan Inventor after: Lei Xiang Inventor after: Yang Libin Inventor after: Zhu Yunjie Inventor before: Zhu Guangqiang Inventor before: Zhang Peng Inventor before: Yuan Mengying Inventor before: Yuan Neimeng Inventor before: Chen Rong Inventor before: Zeng Lin Inventor before: Feng Shan Inventor before: Lei Xiang Inventor before: Yang Libin Inventor before: Zhu Yunjie |
|
CB03 | Change of inventor or designer information |