CN114353302A CN202111445675.3A CN202111445675A CN114353302A CN 114353302 A CN114353302 A CN 114353302A CN 202111445675 A CN202111445675 A CN 202111445675A CN 114353302 A CN114353302 A CN 114353302A
Authority
CN
China
Prior art keywords
rod
air pipe
air duct
roof
air
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202111445675.3A
Other languages
Chinese (zh)
Other versions
CN114353302B (en
Inventor
柳志威
洪浩
王威
王利勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Diyuan Jieneng Engineering Co ltd
Original Assignee
Hubei Diyuan Jieneng Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Diyuan Jieneng Engineering Co ltd filed Critical Hubei Diyuan Jieneng Engineering Co ltd
Priority to CN202111445675.3A priority Critical patent/CN114353302B/en
Publication of CN114353302A publication Critical patent/CN114353302A/en
Application granted granted Critical
Publication of CN114353302B publication Critical patent/CN114353302B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/02Ducting arrangements
    • F24F13/0254Ducting arrangements characterised by their mounting means, e.g. supports

Abstract

The utility model relates to a roof air duct mounting structure, in particular to the field of roof pipeline mounting, which comprises a roof wall surface, a first air duct base, a second air duct base and a jack, wherein the first air duct base and the second air duct base are slidably mounted on the roof wall surface through a base body sliding part; the bottom end of the first air pipe seat is sequentially hinged with a first swing rod and a second swing rod which can swing left and right in a vertical plane, the spare end of the second swing rod is provided with a limiting groove, and the second air pipe seat is provided with a limiting rod which can be inserted into the limiting groove; an air pipe positioning piece used for positioning the air pipe body is arranged at the joint of the first swing rod and the second swing rod, and the free end of the second swing rod is connected with a pull rod assembly arranged on the wall surface of the roof; the jack has a plurality ofly, and the bottom of every jack all is installed subaerial through the movably installation of walking car, and every jack top is connected with the tuber pipe rack that is used for placing the tuber pipe body. This application has the effect that improves the convenient degree of tuber pipe body installation.

Description

Roof air pipe mounting structure
Technical Field
The application relates to the field of roof pipeline installation, in particular to a roof air pipe installation structure.
Background
The air duct is a duct system for conveying and distributing air, is usually used for air supply, oil smoke exhaust or dust removal, is made of various metal materials, and commonly comprises galvanized iron sheets, stainless steel and the like.
A chinese patent application No. 201820298288.9, which discloses a suspension rod with one end fixed in the roof and an air pipe hung at the bottom end of the suspension rod; one side of the air pipe close to the suspender is fixedly connected with a connecting rod; the suspension rod is connected with the connecting rod through a damping component.
To the correlation technique among the above-mentioned, because above-mentioned tuber pipe hoisting structure need operating personnel hand to drag tuber pipe to roof when hoist tuber pipe to roof to make the top surface of tuber pipe and roof keep the level, then carrying out subsequent installation operation, the inventor thinks that the mode of adopting the hand rest is difficult to the steady maintenance of tuber pipe level in roof department, the follow-up installation of the tuber pipe of being inconvenient for, so this remains to be improved.
Disclosure of Invention
In order to improve the convenient degree of installation of tuber pipe, this application provides a roof tuber pipe mounting structure.
The application provides a roof tuber pipe mounting structure adopts following technical scheme:
a roof air pipe mounting structure comprises a roof wall surface, a first air pipe seat, a second air pipe seat and a jack, wherein the first air pipe seat and the second air pipe seat are slidably mounted on the roof wall surface through seat body sliding parts;
the bottom end of the first air pipe seat is sequentially hinged with a first swing rod and a second swing rod which can swing left and right in a vertical plane, the spare end of the second swing rod is provided with a limit groove, and the second air pipe seat is provided with a limit rod which can be inserted into the limit groove;
an air pipe positioning piece used for positioning an air pipe body is arranged at the joint of the first swing rod and the second swing rod, and the free end of the second swing rod is connected with a pull rod assembly arranged on the wall surface of a roof;
the lifting device comprises a plurality of jacks, wherein the bottom end of each jack is movably arranged on the ground through a walking vehicle, and the top end of each jack is connected with an air pipe placing frame for placing an air pipe body;
the connection position of the first swing rod and the second swing rod is located between two adjacent jacks, and the lowest point of the connection position of the first swing rod and the second swing rod is located between the maximum jacking height and the minimum jacking height of the jacks.
By adopting the technical scheme, the air pipe placing frame can jack the air pipe body to a proper height under the help of the jack, then the second swing rod can penetrate through the bottom end of the air pipe body and pull the end part of the air pipe body from bottom to top under the help of the pull rod assembly, and in the pulling process, the air pipe body can automatically roll down to the joint of the first swing rod and the second swing rod, and at the moment, an operator can lock the joint of the first swing rod and the second swing rod through the air pipe positioning piece; when the end part of the air pipe body moves upwards to correspond to the position of the second air pipe seat, an operator can fix the first swing rod and the second swing rod at proper positions of the roof through the first air pipe seat and the second air pipe seat, and then the subsequent air pipe body can be installed; in conclusion, in the whole process of installing the air pipe body, the installation of the air pipe body can be realized only by the jack and the two swing rods (including the first swing rod and the second swing rod), so that the subsequent installation is performed by the air pipe body in comparison with the manual support of the air pipe body, and the installation convenience of the air pipe body can be greatly improved.
Optionally, the pedestal slider is including installing the fixing base on the roof wall, be equipped with the spout of opening towards ground on the fixing base, and be located the baffle of spout port department, all be connected with on first tuber pipe seat and the second tuber pipe seat and be located tuber pipe slider in the spout.
Through adopting above-mentioned technical scheme, under the effect of tuber pipe slider and spout, first tuber pipe seat and second tuber pipe seat can slide on the roof wall, and operating personnel can adjust the position of first tuber pipe seat and second tuber pipe seat as required in real time to the mounted position that lets the tuber pipe body is more accurate.
Optionally, the first air duct seat comprises two bearing seats installed on the air duct sliding block at intervals, an air duct swing rod is connected between the two bearing seats, and the end of the first swing rod is sleeved on the air duct swing rod.
Through adopting above-mentioned technical scheme, first swinging arms both can be on vertical plane the horizontal hunting, and articulated each other between first swinging arms and the first tuber pipe seat, and operating personnel can be comparatively convenient with the tuber pipe body remove to the junction of first swinging arms and second swinging arms to it is more convenient to let this application installation.
Optionally, the second air duct base includes two air duct limiting blocks installed on the air duct slider at intervals, the bottom end of each limiting block is connected with a two-piece stay wire hoop, and the limiting rod is located on the two-piece stay wire hoops.
Through adopting above-mentioned technical scheme, under the effect of biplate staple bolt and gag lever post of acting as go-between, when the tuber pipe body rises to suitable position, the second swinging arms can swing to correspond with the position of second tuber pipe seat, and operating personnel can insert the gag lever post to the spacing groove of second swinging arms on to fix the position of second swinging arms, and then realize fixing the position of tuber pipe body.
Optionally, the air duct placing frame comprises an air duct placing seat connected with the top end of the jack, an air duct supporting rod is connected to the air duct placing seat, and the output end of the air duct supporting rod is connected with a U-shaped supporting frame in a U shape.
Through adopting above-mentioned technical scheme, this application also can shelve the tuber pipe body on U type support frame, and the tuber pipe is placed the frame and can not disturb the tuber pipe body at the in-process of jacking tuber pipe body, and then has realized arranging of tuber pipe rack.
Optionally, the air pipe positioning piece comprises an air pipe positioning rope, one end of the air pipe positioning rope is connected with the first swing rod, and the other end of the air pipe positioning rope is connected with the second swing rod.
Through adopting above-mentioned technical scheme, tuber pipe location rope can play certain positioning action to the tuber pipe body, prevents the tuber pipe body at the in-process off tracking that rises to let the structural stability of this application higher.
Optionally, the first swinging rod and/or the second swinging rod is connected with a hose clamp at the joint of the first swinging rod and the second swinging rod.
Through adopting above-mentioned technical scheme, the larynx hoop can carry out further spacingly to the position of tuber pipe body when the tuber pipe body is located the junction of first swinging arms and second swinging arms to let the tuber pipe body can be more firm install in the junction of first swinging arms and second swinging arms.
Optionally, the pull rod assembly comprises a pulley block installed on the wall surface of the roof, a pull rod rope is arranged on the pulley block and connected with the end of the second swing rod, and the other end of the pull rod rope is connected with a pull rod fixing block placed on the ground.
Through adopting above-mentioned technical scheme, the assembly pulley can not only let operating personnel conveniently rise the second swing pipe to suitable height, can reduce the pulling force of operating personnel when promoting the tuber pipe body moreover to it is more convenient to let this application use.
In summary, the present application includes at least one of the following beneficial technical effects:
the air pipe placing frame can jack the air pipe body to a proper height under the help of the jack, so that the second swing rod can penetrate through the bottom end of the air pipe body and pull the end part of the air pipe body from bottom to top under the help of the pull rod assembly, and the air pipe body can automatically roll down to the joint of the first swing rod and the second swing rod in the process of pulling the end part of the air pipe body from bottom to top, and at the moment, an operator can lock the joint of the first swing rod and the second swing rod through the air pipe positioning piece;
when the end part of the air pipe body moves upwards to correspond to the position of the second air pipe seat, an operator can fix the first swing rod and the second swing rod at proper positions of a roof through the first air pipe seat and the second air pipe seat, and the air pipe body can be installed;
at the in-process of whole installation tuber pipe body, because this application only need can realize the installation of tuber pipe body through jack and two swinging arms (including first swinging arms and second swinging arms), the tuber pipe body installation of event this application is comparatively convenient.
Drawings
Fig. 1 is a schematic overall structure diagram of an embodiment of the present application.
Reference numerals: 1. a roof wall surface; 21. a first duct base; 22. a second duct base; 23. a limiting rod; 24. a bearing seat; 25. an air duct swing lever; 26. an air pipe limiting block; 27. a double-piece stay wire hoop; 31. a first swing lever; 32. a second swing lever; 33. a limiting groove; 4. a jack; 5. a seat body sliding part; 51. a fixed seat; 52. a chute; 53. a baffle plate; 54. an air duct sliding block; 6. an air pipe positioning piece; 61. a wind pipe positioning rope; 62. a hose clamp; 7. a drawbar assembly; 71. a pulley block; 72. a pull rod cord; 73. a pull rod fixing block; 8. an air duct placing rack; 81. an air pipe placing seat; 82. an air pipe supporting rod; 83. a U-shaped support frame; 9. an air duct body; 92. and (4) the ground.
Detailed Description
The present application is described in further detail below with reference to fig. 1.
The embodiment of the application discloses roof tuber pipe mounting structure. Referring to fig. 1, the present application mainly provides a roof air duct installation structure aiming at the problem that hoisting is relatively inconvenient in the installation process of an air duct tube body before improvement, and the roof air duct installation structure can be used for quickly and conveniently installing the air duct tube body on a roof accurately, and comprises a roof wall surface 1, a first air duct seat 21, a second air duct seat 22 and a jack 4, wherein the first air duct seat 21 and the second air duct seat 22 are installed on the roof wall surface 1 in a slidable manner through a seat body sliding part 5.
Referring to fig. 1, during actual operation, jack 4 has a plurality ofly (preferably 2-3), jack 4 is vertical setting, and the bottom of every jack 4 all is mobilizable through the walking car and installs on ground 92, operating personnel can be as required, through the walking car with jack 4 remove to suitable the mounted position department of treating, utilize jack 4 to carry out the lifting to tuber pipe body 9, for the stability between improvement tuber pipe body 9 and the jack 4, fixedly connected with is used for placing tuber pipe body 9's tuber pipe rack 8 on the top of every jack 4.
Referring to fig. 1, the air duct placing rack 8 includes an air duct placing seat 81 connected to the top end of the jack 4, an air duct supporting rod 82 is connected to the air duct placing seat 81, and an output end of the air duct supporting rod 82 is connected to a U-shaped supporting frame 83 arranged in a U shape. The air pipe body 9 is placed on the U-shaped support frame 83, so that the air pipe body 9 can be further limited to swing left and right in the ascending process, and the ascending and descending stability of the air pipe body 9 is improved. Then, an operator can pull up the second air pipe seat 22 under the action of the pulley block 71 after the second air pipe seat 22 passes through the air pipe body 9, so that the air pipe body 9 is fixed at the connection position of the first air pipe seat 21 and the second air pipe seat 22 through the air pipe positioning piece 6.
Referring to fig. 1, the seat body sliding member 5 includes a fixed seat 51 installed on the roof wall surface 1, the fixed seat 51 is provided with a sliding slot 52 with an opening facing the ground 92, and a baffle 53 located at a port of the sliding slot 52, and the first duct seat 21 and the second duct seat 22 are both connected with a duct sliding block 54 located in the sliding slot 52. The first and second air duct seats 21 and 22 can slide on the roof wall surface 1 through the air duct slide block 54, so that an operator can adjust the positions of the first and second air duct seats 21 and 22 in real time.
Referring to fig. 1, the first duct base 21 includes two bearing seats 24 mounted on the duct slider 54 at intervals, the first swing rod 31 can swing left and right on a vertical plane, a duct swing rod 25 is connected between the two bearing seats 24, and an end of the first swing rod 31 is sleeved on the duct swing rod 25. The operator can move the air duct body 9 to the connection position of the first swing lever 31 and the second swing lever 32 conveniently.
Referring to fig. 1, the second duct seat 22 includes two duct stoppers 26 installed on the duct slider 54 at intervals, and each stopper bottom is connected with a two-piece stay wire anchor ear 27, so that when the duct body 9 rises to a proper position, an operator can insert the limiting rod 23 into the limiting groove 33 of the second swing rod 32, thereby fixing the position of the second swing rod 32, and the limiting rod 23 is located on the two-piece stay wire anchor ears 27.
Referring to fig. 1, a first swing rod 31 and a second swing rod 32 capable of swinging left and right in a vertical plane are sequentially hinged to the bottom end of a first wind pipe seat 21, a limit groove 33 is arranged at the free end of the second swing rod 32, and a limit rod 23 capable of being inserted into the limit groove 33 is arranged on a second wind pipe seat 22; an air pipe positioning piece 6 used for positioning the air pipe body 9 is installed at the joint of the first swing rod 31 and the second swing rod 32, and the free end of the second swing rod 32 is connected with a pull rod assembly 7 installed on the roof wall surface 1.
Referring to fig. 1, the connection of the first swing lever 31 and the second swing lever 32 is located between two adjacent jacks 4, and the lowest point of the connection of the first swing lever 31 and the second swing lever 32 is located between the maximum jacking height and the minimum jacking height of the jacks 4.
Referring to fig. 1, under the combined action of the air duct sliding block 54, the baffle 53 and the sliding chute 52, the first air duct seat 21 and the second air duct seat 22 can form shaft shoulder limiting with the respective connected fixing seat 51, so that the first air duct seat 21 and the second air duct seat 22 can slide on the roof wall surface 1, and an operator can conveniently adjust the positions of the first air duct seat 21 and the second air duct seat 22 as required; meanwhile, under the action of the air duct swing rod 25, the first air duct seat 21 is hinged to the fixed seat 51, so that the arrangement of the seat body sliding part 5 is realized.
Referring to fig. 1, the air duct positioning member 6 includes an air duct positioning rope 61 to fix the air duct body 9 at the joint of the first swing lever 31 and the second swing lever 32, so as to prevent the air duct body 9 from deviating during the ascending process, one end of the air duct positioning rope 61 is connected with the first swing lever 31, and the other end of the air duct positioning rope 61 is connected with the second swing lever 32. Preferably, the throat band 62 is connected to the first swing lever 31 and/or the second swing lever 32 at the connection position of the first swing lever 31 and the second swing lever 32, and the throat band 62 can further limit the position of the air duct body 9 when the air duct body 9 is located at the connection position of the first swing lever 31 and the second swing lever 32. Thus, the present application can be more firmly installed at the connection point of the first swing lever 31 and the second swing lever 32 by the cooperation of the duct positioning cord 61 and the throat band 62.
Referring to fig. 1, during actual operation, the throat hoop 62 and the two-piece stay anchor ear 27 of the present application are both in the prior art, and the present application limits the air duct body 9 through the throat hoop 62 to fix the air duct body 9 at the joint of the first swing arm 31 and the second swing arm 32, and the two-piece stay anchor ear 27 mainly functions to limit the end of the second swing arm 32 to firmly connect the second swing arm 32 and the second fixing seat 51 together.
Referring to fig. 1, the pull rod assembly 7 includes a pulley block 71 installed on the roof wall surface 1 to enable an operator to conveniently lift the second swing pipe to a proper height and reduce the pulling force of the operator when lifting the air duct body 9, a pull rod rope 72 is installed on the pulley block 71, the pull rod rope 72 is connected with the end of the second swing rod 32, and the other end of the pull rod rope is connected with a pull rod fixing block 73 placed on the ground 92 to form a certain pulling force on the second swing rod 32. In actual operation, the pulley block 71 of the present application is a prior art, and comprises a fixed pulley and a movable pulley.
The implementation principle of the roof air pipe installation structure provided by the embodiment of the application is as follows: when the air duct body 9 needs to be installed on a fixed position, the positions of the first air duct seat 21 and the second air duct seat 22 are adjusted according to a design drawing, after the first air duct seat 21 and the second air duct seat 22 are adjusted to proper positions, the air duct body 9 is lifted to a proper height through at least two jacks 4 and the air duct placing rack 8, then the pull rod rope 72 on the pull rod assembly 7 is connected with the end part of the second swing rod 32, the second swing rod 32 is positioned below the air duct body 9, then the pull rod rope 72 on the pull rod fixing block 73 is manually pulled, the end part of the second swing rod 32 is lifted upwards, the air duct body 9 can slide to the connection part of the first swing rod 31 and the second swing rod 32 in the process that the second swing rod 32 is lifted upwards, and at the moment, preferably, an operator can fix the air duct body 9 through the air duct positioning piece 6, prevent tuber pipe body 9 off tracking, after second tuber pipe seat 22 rose to suitable position (the position of the through-hole of placing gag lever post 23 on the position of the spacing groove 33 on the second swinging arms 32 and the second tuber pipe seat 22 this moment corresponds), insert gag lever post 23 to the spacing groove 33 on the second swinging arms 32 on, also accomplish this moment and install tuber pipe body 9 on roof wall 1, and at last, operating personnel only need on roof wall 1 to the tuber pipe body 9 fix a position can.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a roof tuber pipe mounting structure which characterized in that: the wind pipe support comprises a roof wall surface (1), a first wind pipe support (21), a second wind pipe support (22) and a jack (4), wherein the first wind pipe support (21) and the second wind pipe support (22) are slidably mounted on the roof wall surface (1) through a base body sliding part (5);
the bottom end of the first air pipe seat (21) is sequentially hinged with a first swinging rod (31) and a second swinging rod (32) which can swing left and right in a vertical plane, the free end of the second swinging rod (32) is provided with a limiting groove (33), and the second air pipe seat (22) is provided with a limiting rod (23) which can be inserted into the limiting groove (33);
an air pipe positioning piece (6) used for positioning an air pipe body (9) is installed at the joint of the first swing rod (31) and the second swing rod (32), and the free end of the second swing rod (32) is connected with a pull rod assembly (7) installed on a roof wall surface (1);
the lifting device is characterized in that a plurality of jacks (4) are arranged, the bottom end of each jack (4) is movably arranged on the ground (92) through a traveling vehicle, and the top end of each jack (4) is connected with an air pipe placing frame (8) for placing an air pipe body (9);
the connection position of the first swing rod (31) and the second swing rod (32) is positioned between two adjacent jacks (4), and the lowest point of the connection position of the first swing rod (31) and the second swing rod (32) is positioned between the maximum jacking height and the minimum jacking height of the jacks (4).
2. The roof air duct mounting arrangement of claim 1, wherein: pedestal slider (5) are including installing fixing base (51) on roof wall face (1), be equipped with spout (52) that the opening faces ground (92) on fixing base (51), and be located baffle (53) of spout (52) port department, all be connected with on first tuber pipe seat (21) and the second tuber pipe seat (22) and be located tuber pipe slider (54) in spout (52).
3. The roof air duct mounting arrangement of claim 2, wherein: the first air pipe seat (21) comprises two bearing seats (24) which are arranged on an air pipe sliding block (54) at intervals, an air pipe swinging rod (25) is connected between the two bearing seats (24), and the end part of the first swinging rod (31) is sleeved on the air pipe swinging rod (25).
4. The roof air duct mounting arrangement of claim 3, wherein: the second air duct seat (22) comprises two air duct limiting blocks (26) which are arranged on the air duct sliding block (54) at intervals, the bottom end of each limiting block is connected with a double-piece stay wire hoop (27), and the limiting rod (23) is located on the two double-piece stay wire hoops (27).
5. The roof air duct mounting arrangement of claim 1 or 2 or 3 or 4, wherein: the air pipe placing frame (8) comprises an air pipe placing seat (81) connected with the top end of the jack (4), an air pipe supporting rod (82) is connected to the air pipe placing seat (81), and the output end of the air pipe supporting rod (82) is connected with a U-shaped supporting frame (83).
6. The roof air duct mounting arrangement of claim 5, wherein: the air pipe positioning piece (6) comprises an air pipe positioning rope (61), one end of the air pipe positioning rope (61) is connected with the first swing rod (31), and the other end of the air pipe positioning rope (61) is connected with the second swing rod (32).
7. The roof air duct mounting arrangement of claim 6, wherein: the first swinging rod (31) and/or the second swinging rod (32) is connected with a throat hoop (62) at the connection part of the first swinging rod (31) and the second swinging rod (32).
8. The roof air duct mounting arrangement of claim 7, wherein: the pull rod assembly (7) comprises a pulley block (71) installed on the roof wall surface (1), a pull rod rope (72) is arranged on the pulley block (71), the pull rod rope (72) is connected with the end of the second swinging rod (32), and the other end of the pull rod rope (72) is connected with a pull rod fixing block (73) placed on the ground (92).
CN202111445675.3A 2021-11-30 2021-11-30 Roof air pipe mounting structure Active CN114353302B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111445675.3A CN114353302B (en) 2021-11-30 2021-11-30 Roof air pipe mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111445675.3A CN114353302B (en) 2021-11-30 2021-11-30 Roof air pipe mounting structure

Publications (2)

Publication Number Publication Date
CN114353302A true CN114353302A (en) 2022-04-15
CN114353302B CN114353302B (en) 2023-01-24

Family

ID=81097226

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111445675.3A Active CN114353302B (en) 2021-11-30 2021-11-30 Roof air pipe mounting structure

Country Status (1)

Country Link
CN (1) CN114353302B (en)

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09210253A (en) * 1996-02-07 1997-08-12 Masayoshi Oie Bracing structure for suspension and bracing connection material
JPH09313047A (en) * 1996-05-29 1997-12-09 Chisso Corp Tool for stretching agricultural sheet and stretching
TW439720U (en) * 1998-04-28 2001-06-07 Sunny Wheel Ind Co Ltd Gudied locking structure for depositing hoist of bicycles
JP2004218800A (en) * 2003-01-17 2004-08-05 Takasago Thermal Eng Co Ltd Suspension support device, duct hanging structure, and duct hanging method
US7025308B1 (en) * 2003-04-15 2006-04-11 John Hill Apparatus for holding and positioning a pipe during installation
US20120266995A1 (en) * 2011-04-22 2012-10-25 JTB Steel Industries Inc. Method and apparatus for suspending duct by inserted corner members
CN207913082U (en) * 2018-03-12 2018-09-28 郑州福禄寿科技有限公司 Aerial Yoga body-building equipment
CN208951432U (en) * 2018-09-28 2019-06-07 中建二局第二建筑工程有限公司 Supporting frame with steel structure is used in air hose installation
CN210861453U (en) * 2019-10-19 2020-06-26 湖北洁能工程技术开发公司 Drawknot structure of adiabatic tuber pipe and roof beam
CN111425981A (en) * 2020-03-30 2020-07-17 中山市果度装饰工程有限公司 Building smoke discharging and ventilating structure
CN212174336U (en) * 2020-04-27 2020-12-18 北京天源建筑工程有限责任公司 Auxiliary air pipe installation equipment
CN212775970U (en) * 2020-08-07 2021-03-23 浙江工业职业技术学院 Indoor shock-absorbing support
CN113108450A (en) * 2021-04-23 2021-07-13 广州市水电设备安装有限公司 Air pipe installation construction method applied to high-rise building
CN214653341U (en) * 2021-04-30 2021-11-09 湖北嘉筑建设工程有限公司 Energy-saving air pipe mounting bracket
CN214780270U (en) * 2021-04-30 2021-11-19 济南四建集团智能消防工程有限责任公司 Hoisting device convenient for butt joint for installation of vertical air pipes in shaft

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09210253A (en) * 1996-02-07 1997-08-12 Masayoshi Oie Bracing structure for suspension and bracing connection material
JPH09313047A (en) * 1996-05-29 1997-12-09 Chisso Corp Tool for stretching agricultural sheet and stretching
TW439720U (en) * 1998-04-28 2001-06-07 Sunny Wheel Ind Co Ltd Gudied locking structure for depositing hoist of bicycles
JP2004218800A (en) * 2003-01-17 2004-08-05 Takasago Thermal Eng Co Ltd Suspension support device, duct hanging structure, and duct hanging method
US7025308B1 (en) * 2003-04-15 2006-04-11 John Hill Apparatus for holding and positioning a pipe during installation
US20120266995A1 (en) * 2011-04-22 2012-10-25 JTB Steel Industries Inc. Method and apparatus for suspending duct by inserted corner members
CN207913082U (en) * 2018-03-12 2018-09-28 郑州福禄寿科技有限公司 Aerial Yoga body-building equipment
CN208951432U (en) * 2018-09-28 2019-06-07 中建二局第二建筑工程有限公司 Supporting frame with steel structure is used in air hose installation
CN210861453U (en) * 2019-10-19 2020-06-26 湖北洁能工程技术开发公司 Drawknot structure of adiabatic tuber pipe and roof beam
CN111425981A (en) * 2020-03-30 2020-07-17 中山市果度装饰工程有限公司 Building smoke discharging and ventilating structure
CN212174336U (en) * 2020-04-27 2020-12-18 北京天源建筑工程有限责任公司 Auxiliary air pipe installation equipment
CN212775970U (en) * 2020-08-07 2021-03-23 浙江工业职业技术学院 Indoor shock-absorbing support
CN113108450A (en) * 2021-04-23 2021-07-13 广州市水电设备安装有限公司 Air pipe installation construction method applied to high-rise building
CN214653341U (en) * 2021-04-30 2021-11-09 湖北嘉筑建设工程有限公司 Energy-saving air pipe mounting bracket
CN214780270U (en) * 2021-04-30 2021-11-19 济南四建集团智能消防工程有限责任公司 Hoisting device convenient for butt joint for installation of vertical air pipes in shaft

Also Published As

Publication number Publication date
CN114353302B (en) 2023-01-24

Similar Documents

Publication Publication Date Title
CN201228207Y (en) Portable window hoister
CN109755725B (en) Mobile communication base station antenna
CN105347206A (en) Intelligent assisting platform for gas insulated substation (GIS) dismounting
CN108773766B (en) Pit-type health maintenance hoisting method and equipment for nodular cast iron pipe
CN114353302B (en) Roof air pipe mounting structure
CN205222531U (en) GIS dismouting intelligence auxiliary platform
CN203959697U (en) The equalizing bar of hoisting platform truss
CN205690011U (en) A kind of scalable speaker erecting by overhang
CN110182684A (en) Tower attachment horizontal installation ancillary equipment and the horizontal installation method of tower attachment
JP2000335884A (en) Winch device, and installation of bay window using same
CN213141328U (en) Hanging basket for mounting safety type outdoor high-rise building electrical appliances
CN204152219U (en) Side fascia stone tongs
CN213597522U (en) Architectural decoration auxiliary supporting device for building construction
CN210029804U (en) Movable lifting appliance for metal processing machinery
CN217722662U (en) Flue-cured tobacco lifting frame
CN213536977U (en) Portable mounting bracket of hoisting point
CN205901178U (en) Concrete pole tower overhead earth wire hoisting device
CN218429210U (en) Height-adjustable perforating device for ceiling construction
CN220485275U (en) Portable manned lifting operation equipment
CN110793111A (en) Air conditioner mounting rack
CN115095769B (en) Multi-angle unbiased butt joint supporting and hanging frame structure for ventilation equipment construction
CN219429524U (en) A finished product hoist device for draining cast iron pipe warehouse entry
CN212568121U (en) Waste gas sampling smoke gun support
CN219387246U (en) Cantilever type discharging platform structure
CN115493281B (en) Air pipe fixing structure applied to laboratory heating and ventilation equipment and mounting method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant