JP2004218800A - Suspension support device, duct hanging structure, and duct hanging method - Google Patents

Suspension support device, duct hanging structure, and duct hanging method Download PDF

Info

Publication number
JP2004218800A
JP2004218800A JP2003009538A JP2003009538A JP2004218800A JP 2004218800 A JP2004218800 A JP 2004218800A JP 2003009538 A JP2003009538 A JP 2003009538A JP 2003009538 A JP2003009538 A JP 2003009538A JP 2004218800 A JP2004218800 A JP 2004218800A
Authority
JP
Japan
Prior art keywords
hanging
deck plate
duct
folded portion
band
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2003009538A
Other languages
Japanese (ja)
Other versions
JP4365590B2 (en
Inventor
Yuji Hayakawa
雄二 早川
Hiroshi Sakurai
宏 桜井
Takeshi Fujii
剛 藤井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takasago Thermal Engineering Co Ltd
Burest Kogyo Kenkyusho
Original Assignee
Takasago Thermal Engineering Co Ltd
Burest Kogyo Kenkyusho
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takasago Thermal Engineering Co Ltd, Burest Kogyo Kenkyusho filed Critical Takasago Thermal Engineering Co Ltd
Priority to JP2003009538A priority Critical patent/JP4365590B2/en
Publication of JP2004218800A publication Critical patent/JP2004218800A/en
Application granted granted Critical
Publication of JP4365590B2 publication Critical patent/JP4365590B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
    • F24F13/02Ducting arrangements
    • F24F13/0254Ducting arrangements characterised by their mounting means, e.g. supports

Abstract

<P>PROBLEM TO BE SOLVED: To hang and support a duct from a ceiling concrete face with reduced cost and shortened construction time. <P>SOLUTION: A fitting body 30 is fitted into a hole 1a provided on a deck plate 1, concrete 3 is placed on an upper face of the deck plate 1, and a coming-off prevention bent part 22 is buried in the concrete face to expose a straight part 21 and a folded-back part 23 below a deck plate face. A tip of the folded-back part 23 is inserted into holes at both ends of a suspension band 40 holding a supported body 8, and both ends of the suspension band 40 are supported in a lower end part of the folded-back part 23. <P>COPYRIGHT: (C)2004,JPO&NCIPI

Description

【0001】
【発明の属する技術分野】
本発明は被支持体をコンクリート面から吊り下げ支持するための吊り下げ支持具に関する。
【0002】
【従来の技術及び発明が解決しようとする課題】
ビルディング、工場、倉庫、駅舎、その他建造物における空調工事において、空気(新鮮外気、冷気、暖気、排気)を搬送するために重量の大きい亜鉛鉄板製の円形ダクト(スパイラルダクト)が用いられているが、近年、天井吹出し口などに接続する末端のダクトは施工を容易簡略化して工事短縮化を図るため、可とう性に富み、断熱材を装着した軽量のフレキシブルダクトが用いられ、天井のコンクリート面から吊り下げ支持するようにしている。
【0003】
このようにダクトを天井コンクリート面から吊り下げるには、従来では、ダクトの上面に専用の受台を取付け、この受台と天井コンクリートに固定した係止具間を策条で結んで吊り下げする方法(特許文献1)、ダクトを囲む第1の番線の直線状の長さの異なる両端部を、くの字状に中央を曲げた第1の金属板の上下2つの小穴に挿通して両端部を第1の金属板に固定し、コンクリート面から垂下させた直線状の第2の番線の端部と、前記第1の番線の両端部のうちの片方とを、くの字状に中央を曲げた第2の金属板の上下2つの小穴に上下から貫通させて第2の金属板に第1、第2の番線を固定することによって、ダクトを天井コンクリート面から吊り下げ支持する方法(特許文献2)などがあった。
【0004】
【特許文献1】特開平8−285359号公報(第2頁、図1)
【特許文献2】実公昭58−25193号公報(第4頁、第1図)
【0005】
しかしながら、前者の方法では、ダクトの上面に予め専用の受台を設けなければならないためコスト高となり、また、後者では2つの金属板に上下から番線の端部を挿通しなければならないため作業が煩雑であった。
【0006】
このため、従来では、インサートを用いてダクトを吊り下げる方法も行われている。
即ち、図9に示すように、天井面を構成するデッキプレート1に穴1aをあけ、この穴1aに上側からインサート2を打ち込んでインサート2の下部2aがデッキプレート1の下側に露呈するようにし、次に、デッキプレート1の上側にコンクリート3を打設する。
【0007】
コンクリート打設後、インサート2のネジ穴2bに下側から吊りボルト4の上端部をネジ込んで固定する。
次に、吊りボルト4の下部にナット5を螺着し、L形金具6の水平部6aの取付け穴6bを通し、さらに下側からもう1つナット7を螺着して2つのナット5、7によってL形金具6を吊りボルト4の下部に固定する。
【0008】
次に、フレキシブルダクト8を包持させた吊りバンド9の両端9a、9bの穴10a、10bをL形金具6の垂直部6cの取付け穴6dに合わせてボルト11をこの取付け穴6dに通し、ナット12によって締め付けて吊りバンド9の両端9a、9bをL形金具6に固定する。
このようにしてフレキシブルダクト8を吊り下げ支持していた。
【0009】
しかしながら、このような従来の方法では、(イ)インサート2のデッキプレート1の穴1aへの打込み、(ロ)インサート2への吊りボルト4の取り付け、(ハ)吊りボルト4へのL形金具6の2個のナット5、7による取付け、(ニ)L形金具6への吊りバンド9のボルト11、ナット12による取付けという4つの作業が必要で、施工に手間がかかり、多大な時間がかかっていた。
【0010】
また、フレキシブルダクト8の重量が最大径の物でも1mあたり約2Kg程度であるのに、吊りボルト4やL形金具6を用いるのは、過剰設計であってコスト高となり、ナットやボルトなどの付属部品も量がかさみ、例えば大型ビルデイングでは無数の箇所にこの施工を行わなければならないため、施工者にとって大変な負担となっていた。
【0011】
本発明は以上のような問題を解決し、コストも安く施工時間も著しく短縮できるようにした吊り下げ支持具及びダクト吊り下げ構造並びにダクト吊り下げ方法を提供することを目的としている。
【0012】
【課題を解決するための手段】
前記目的を達成するために、本発明の請求項1の吊り下げ支持具は、
直線部と、前記直線部の上端に設けられた抜け防止曲げ部と、前記直線部の下端に設けられた折り返し部とで構成された線状体から成り、
デッキプレートにあけられた穴から上方に前記抜け防止曲げ部を位置させて、前記デッキプレートの上面にコンクリートを打設して前記抜け防止曲げ部をコンクリート面に埋設して前記デッキプレート面から下方に前記直線部及び折り返し部を露出させ、被支持体を包持させた吊りバンドの両端の穴に前記折り返し部の先端を挿通して、前記折り返し部の下端部に前記吊りバンドの両端を支持するようにしたことを特徴としている。
【0013】
また、本発明の請求項2の吊り下げ支持具は、
直線部と、前記直線部の上端に設けられた抜け防止曲げ部と、前記直線部の下端に設けられた折り返し部とで構成された線状体と、
前記線状体の抜け防止曲げ部の下方において前記直線部に装着された嵌合体とから成り、
デッキプレートにあけられた穴に前記嵌合体をはめ込み、前記デッキプレートの上面にコンクリートを打設して前記抜け防止曲げ部をコンクリート面に埋設して前記デッキプレート面から下方に前記直線部及び折り返し部を露出させ、被支持体を包持させた吊りバンドの両端の穴に前記折り返し部の先端を挿通して、前記折り返し部の下端部に前記吊りバンドの両端を支持するようにしたことを特徴としている。
【0014】
また、本発明の請求項5のダクト吊り下げ構造は、
デッキプレートにあけられた穴に嵌合体がはめ込まれ、
前記嵌合体を貫通した線状体の上端に一体的に設けられた抜け防止曲げ部が、前記デッキプレートの上面側においてコンクリート内に埋設され、
前記線状体及びその下端に一体的に設けられた折り返し部が前記デッキプレートの下面側に配され、
ダクトを包持させた吊りバンドの両端の穴に前記折り返し部が挿通されて前記吊りバンドの両端が前記折り返し部に保持されたことを特徴としている。
【0015】
また、本発明の請求項9のダクト吊り下げ方法は、
デッキプレートを敷設する工程と、
前記デッキプレートにダクトの敷設方向に沿って複数の穴をあける工程と、
直線部の上端に抜け防止曲げ部が設けられ、前記直線部の下端に折り返し部が設けられた前記直線部に前記抜け防止曲げ部の下方に嵌合体が装着された吊り下げ支持具を用いて、前記デッキプレートの前記穴に上面側から前記折り返し部及び前記直線部を前記デッキプレートの下方へと挿通させて前記嵌合体を前記穴にはめ込む工程と、
前記デッキプレートの上面側にコンクリートを打設して、前記抜け防止曲げ部を埋設する工程と、
前記デッキプレートの下方においてダクトを敷設し、吊りバンドを前記ダクトに巻囲し、前記折り返し部を前記吊りバンドの両端の穴に挿通させて前記折り返し部に前記吊りバンドを保持させる工程とを備えている。
【0016】
このようにしたため、コンクリート打設後に被支持体を包持させた吊りバンドの両端の穴に、前記折り返し部の先端を挿通するだけの極めて簡単な作業で、被支持体を吊り下げ支持することができる。
【0017】
より具体的には、コンクリート打設後のダクトの敷設は、ダクトを吊り込みながら吊りバンドを巻き回し、所定のバンド長さの位置で前記折り返し部にセットするだけでよいため、作業に著しい進捗がみられる。
【0018】
【発明の実施の形態】
以下、図面に基づいて本発明の実施の形態を説明する。
図1は本発明の一実施形態の吊り下げ支持具を示している。
【0019】
図1に示すように、この吊り下げ支持具は、被支持体(例えば空調用フレキシブルダクト)をコンクリート面から吊り下げ支持するためのものであって、線状体20と嵌合体30から成る。
【0020】
線状体20は断面円形の金属の細い棒体であって、直線部21と、この直線部21の上端に設けられた抜け防止曲げ部22と、直線部21の下端に設けられた折り返し部23とで構成されている。
【0021】
嵌合体30には、上下に軸心に沿って貫通穴31が設けられている。従って、折り返し部23を設ける前に、線状体20の直線部21をその下端部からこの貫通穴31に、抜け防止曲げ部22が嵌合体30の上端に当接するまで上方から差し込み、その後、直線部21の下端を上方へ折り返して折り返し部23を形成すればよい。
【0022】
このように構成された吊り下げ支持具は次のように使用する。
まず、図2に示すように、天井面を構成するデッキプレート1に穴1aをあける。
次に、デッキプレート1の穴1aに上面側から線状体20の折り返し部23及び直線部21を挿通し、デッキプレート1の穴1aに嵌合体30をはめ込む。これにより線状体20は直立してデッキプレート1にセットされる。
【0023】
なお、嵌合体30を下方に向かって径が漸減した切頭円錐形にすれば、穴1aに嵌合体30の上下方向の中間部がはまる。
【0024】
また、嵌合体30をゴムなどの弾性材で切頭円錐形に作成すれば、上方から穴1aに押し込むことによって穴1aの縁部に押圧されて弾性変形して嵌着されるから、穴1aの寸法に狂いがあっても適合し、コンクリート打設時の水分が穴1aから下方へ漏れにくいので、線状体20の錆の発生を防ぐことができる。
【0025】
次に、デッキプレート1の上面側にコンクリート3を打設して天井を形成する。
このようにして、抜け防止曲げ部22及び嵌合体30の上部がコンクリート3内に埋設され、デッキプレート1から下方に垂直方向に嵌合体30の下部、直線部21、折り返し部23が露出した状態になる。
【0026】
コンクリート養生が済んだ後、図2、図3、図4に示すように、フレキシブルダクト8を包持させた吊りバンド40の両端40a、40bの穴41a、41bに折り返し部23の先端を挿通して、折り返し部23の下端部に吊りバンド40の両端40a、40bを支持させる。
【0027】
このように、吊りバンド40の両端40a、40bの穴41a、41bに折り返し部23の先端を通すだけの簡単な作業で、フレキシブルダクト8を天井面から吊り下げ支持することができる。
【0028】
なお、吊りバンド40の両端40a、40bのうちの少なくとも一方の穴を吊りバンド40の長手方向に複数設ければ、複数の穴のいずれかを選択して折り返し部23を挿入することによって、フレキシブルダクト8の径の違いに対応させることができ、また、フレキシブルダクト8の高さを調整することもできる。
【0029】
なお、線状体20が弾性を有する金属棒体の場合には、図2のように折り返し部23の先端が直線部21に接近している場合には、折り返し部23の先端が直線部21から少し離れるように弾性変形させて吊りバンド40の両端40a、40bの穴41a、41bに折り返し部23の先端を挿通すればよい。
なお、図5のように折り返し部23の先端と直線部21との間に隙間を設けてもよい。
【0030】
なお、図6は施工されるダクトとの関係を示している。
図中、50はビルディングなどの建造物の垂直壁、51は垂直壁50で区画されて形成された縦穴であって、縦穴51に沿って送風用の縦ダクト52が階の上下方向に設置され、各階ごとに分岐ダクト53が垂直壁50の貫通部50a(天井板60と天井コンクリート面の中間にある)に挿入され、この分岐ダクト53から防火ダンパ54、風量調整ユニット55を介して、デッキプレート1の下方に長尺のフレキシブルダクト8aが接続され、このフレキシブルダクト8aに分配チャンバ56を介して複数のフレキシブルダクト8bが接続され、各フレキシブルダクト8bは天井板60の吹き出し口61に接続される。なお、縦ダクト52から風量調整ユニット55までは金属製である。
【0031】
従って、天井面を構成するデッキプレート1にこれらのフレキシブルダクト8a及びフレキシブルダクト8bを配設する方向に沿って適宜間隔で穴1aをあけて、前記した方法によって吊り下げ支持具でフレキシブルダクト8a、フレキシブルダクト8bをデッキプレート1から吊り下げ支持すればよい。
【0032】
デッキプレート1の代りに板材を用いる場合には、コンクリート養生後に板材を除去する際に吊り下げ支持具に衝突するので、前記したようにデッキプレート1に吊り下げ支持具を取り付ける。
【0033】
なお、抜け防止曲げ部22を図2〜5のように嵌合体30の上でリボン状に巻き嵌合体30の直径を越えて横切る形で載置されるのではなく、図7に示すように、線状体20が嵌合体30を上方に貫通してすぐに折り曲げられ、嵌合体30の半径を越えて横切る形で載置されている。
【0034】
なお、図1の実施形態では吊り下げ支持具は線状体20と嵌合体30とで構成した場合を示しているが、図8に示すように嵌合体を省いて線状体20のみで構成してもよい。
【0035】
【発明の効果】
以上のように本発明によれば、被支持体を包持させた吊りバンドの両端の穴に、前記折り返し部の先端を挿通するだけの極めて簡単な作業で、被支持体を吊り下げ支持することができ、施工時間を大幅に短縮できる。
【0036】
また、吊りボルトやL形金具や、ナットやボルトなどを必要としないので、大幅にコスト減を実現できる。
【0037】
また、線状体20は金属の細い棒体なので、障害物などがある場合、直線部21を曲げることによって、容易に障害物などを避けて被支持体を吊り下げ支持することができる。
【図面の簡単な説明】
【図1】本発明の一実施形態を示す斜視図
【図2】同実施形態の使用状態を示す断面図
【図3】同実施形態の使用状態を示す断面図
【図4】同実施形態の使用状態を示す斜視図
【図5】本発明の他の実施形態を示す正面図
【図6】本発明のダクト吊り下げ構造を示す概略図
【図7】本発明の他の実施形態を示す正面図
【図8】本発明の他の実施形態の使用状態を示す断面図
【図9】従来の吊り下げ支持装置を示す断面図
【符号の説明】
20 線状体
21 直線部
22 抜け防止曲げ部
23 折り返し部
30 嵌合体
31 貫通穴
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a hanging support for hanging and supporting a supported body from a concrete surface.
[0002]
Problems to be solved by the prior art and the invention
2. Description of the Related Art In air-conditioning works for buildings, factories, warehouses, station buildings, and other structures, a heavy zinc-iron circular duct (spiral duct) is used to carry air (fresh outside air, cold air, warm air, exhaust air). However, in recent years, the duct at the end connected to the ceiling outlet etc. has been used in order to simplify the construction easily and shorten the construction. It is suspended from the surface and supported.
[0003]
In order to suspend the duct from the concrete surface of the ceiling in this way, conventionally, a dedicated pedestal is mounted on the upper surface of the duct, and the pedestal and the fixing device fixed to the ceiling concrete are tied and suspended by a measure. Method (Patent Literature 1), by inserting both ends of a first line surrounding a duct, which have different linear lengths, into two upper and lower small holes of a first metal plate whose center is bent in a V shape. The part is fixed to a first metal plate, and an end of a linear second line hanging down from a concrete surface and one of both ends of the first line are centered in a U shape. A method of suspending and supporting a duct from a concrete surface of a ceiling by fixing the first and second wires to a second metal plate by vertically penetrating two small holes in the upper and lower portions of the second metal plate obtained by bending the second metal plate ( Patent Document 2) and the like.
[0004]
[Patent Document 1] JP-A-8-285359 (page 2, FIG. 1)
[Patent Document 2] JP-B-58-25193 (page 4, FIG. 1)
[0005]
However, in the former method, a dedicated pedestal must be provided in advance on the upper surface of the duct, which increases the cost. In the latter method, the end of the wire must be inserted into the two metal plates from above and below, thus requiring work. It was complicated.
[0006]
For this reason, conventionally, a method of suspending a duct using an insert has also been performed.
That is, as shown in FIG. 9, a hole 1a is made in the deck plate 1 constituting the ceiling surface, and the insert 2 is driven into the hole 1a from above to expose the lower portion 2a of the insert 2 to the lower side of the deck plate 1. Then, concrete 3 is cast on the upper side of the deck plate 1.
[0007]
After the concrete is cast, the upper end of the suspension bolt 4 is screwed into the screw hole 2b of the insert 2 from below and fixed.
Next, the nut 5 is screwed into the lower portion of the suspension bolt 4, passed through the mounting hole 6b of the horizontal portion 6a of the L-shaped bracket 6, and another nut 7 is further screwed from below to tighten the two nuts 5, The L-shaped bracket 6 is fixed to the lower part of the suspension bolt 4 by 7.
[0008]
Next, the bolts 11 are passed through the mounting holes 6d by aligning the holes 10a and 10b of both ends 9a and 9b of the suspension band 9 holding the flexible duct 8 with the mounting holes 6d of the vertical portion 6c of the L-shaped bracket 6. The two ends 9 a and 9 b of the suspension band 9 are fixed to the L-shaped bracket 6 by tightening with the nut 12.
In this way, the flexible duct 8 is suspended and supported.
[0009]
However, in such a conventional method, (a) driving of the insert 2 into the hole 1a of the deck plate 1, (b) attachment of the suspension bolt 4 to the insert 2, (c) L-shaped fitting to the suspension bolt 4 6 and two (4) mounting of the suspension band 9 to the L-shaped bracket 6 with the bolts 11 and the nuts 12 are required. It was hanging.
[0010]
Further, even though the weight of the flexible duct 8 is about 2 kg per 1 m even with a maximum diameter, the use of the suspension bolts 4 and the L-shaped brackets 6 is excessively designed and costly. The amount of attached parts is also large, and for example, in the case of a large building, this work must be performed at an infinite number of places, which has been a great burden for the installer.
[0011]
An object of the present invention is to solve the above problems and to provide a hanging support, a duct hanging structure, and a duct hanging method, which are inexpensive and can significantly reduce the construction time.
[0012]
[Means for Solving the Problems]
In order to achieve the above object, the hanging support according to claim 1 of the present invention comprises:
A straight line portion, a linear member formed by a bent portion provided at the upper end of the straight line portion and a folded portion provided at the lower end of the straight line portion,
Positioning the slip-off prevention bent portion above the hole drilled in the deck plate, casting concrete on the upper surface of the deck plate, embedding the slip-off prevention bent portion in the concrete surface, and lowering from the deck plate surface The straight portion and the folded portion are exposed, and the ends of the folded portion are inserted into the holes at both ends of the hanging band holding the supported body, and the both ends of the hanging band are supported at the lower end of the folded portion. It is characterized by doing.
[0013]
Further, the hanging support of claim 2 of the present invention is:
A linear part, a linear body composed of a bent part provided at the upper end of the linear part and a folded part provided at the lower end of the linear part,
A fitting body attached to the linear portion below the bend prevention part of the linear body,
The fitting body is fitted into a hole formed in the deck plate, concrete is poured into the upper surface of the deck plate, the bent-out preventing bent portion is buried in the concrete surface, and the straight portion and the folded portion are bent downward from the deck plate surface. The end of the folded portion is inserted through holes at both ends of the hanging band that exposes the portion and supports the supported body, and the lower end of the folded portion supports both ends of the hanging band. Features.
[0014]
Further, the duct suspension structure according to claim 5 of the present invention comprises:
The fitting is fitted into the hole made in the deck plate,
A detachment prevention bent portion integrally provided at an upper end of the linear body penetrating the fitting body is buried in concrete on the upper surface side of the deck plate,
A folded portion provided integrally with the linear body and its lower end is arranged on the lower surface side of the deck plate,
The folded portion is inserted into holes at both ends of the suspension band holding the duct, and both ends of the suspension band are held by the folded portion.
[0015]
In addition, the method for suspending a duct according to claim 9 of the present invention includes:
Laying a deck plate,
Drilling a plurality of holes in the deck plate along the duct laying direction,
A drop-off preventing bent portion is provided at the upper end of the straight portion, and a hanging support having a fitting below the slip-preventing bent portion is attached to the straight portion provided with a folded portion at the lower end of the straight portion. Inserting the fitting body into the hole by inserting the folded portion and the straight portion from below into the hole of the deck plate from below and down the deck plate;
Casting concrete on the upper surface side of the deck plate, and embedding the falling prevention bent portion,
Laying a duct below the deck plate, surrounding a suspension band around the duct, inserting the folded portion through holes at both ends of the suspension band, and holding the suspension band at the folded portion. ing.
[0016]
With this configuration, the supported member can be suspended and supported by a very simple operation of inserting the tip of the folded portion into the holes at both ends of the suspension band that holds the supported member after casting the concrete. Can be.
[0017]
More specifically, the laying of the duct after casting the concrete, winding the suspension band while hanging the duct, it is only necessary to set the folded portion at a position of a predetermined band length, a significant progress in the work Is seen.
[0018]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
FIG. 1 shows a hanging support according to an embodiment of the present invention.
[0019]
As shown in FIG. 1, the hanging support is for supporting a supported body (for example, a flexible duct for air conditioning) from a concrete surface, and includes a linear body 20 and a fitting body 30.
[0020]
The linear body 20 is a thin metal rod having a circular cross section, and includes a straight portion 21, a bent portion 22 provided at an upper end of the straight portion 21, and a folded portion provided at a lower end of the straight portion 21. 23.
[0021]
The fitting body 30 is provided with through holes 31 vertically along the axis. Therefore, before the folded portion 23 is provided, the straight portion 21 of the linear body 20 is inserted from above into the through hole 31 from the lower end thereof until the bending prevention portion 22 comes into contact with the upper end of the fitting body 30 from above. The folded portion 23 may be formed by folding the lower end of the straight portion 21 upward.
[0022]
The hanging support having such a configuration is used as follows.
First, as shown in FIG. 2, a hole 1a is formed in a deck plate 1 constituting a ceiling surface.
Next, the folded portion 23 and the linear portion 21 of the linear body 20 are inserted into the hole 1a of the deck plate 1 from the upper surface side, and the fitting body 30 is fitted into the hole 1a of the deck plate 1. Thus, the linear body 20 is set upright on the deck plate 1.
[0023]
If the fitting body 30 is formed into a truncated conical shape whose diameter gradually decreases downward, the vertical intermediate portion of the fitting body 30 fits into the hole 1a.
[0024]
Further, if the fitting body 30 is formed in a frustoconical shape using an elastic material such as rubber, the hole 1a is pressed into the hole 1a from above and pressed against the edge of the hole 1a to be elastically deformed and fitted. It is suitable even if the dimensions are out of order, and it is difficult for moisture at the time of concrete casting to leak downward from the hole 1a, so that the rust of the linear body 20 can be prevented.
[0025]
Next, concrete 3 is cast on the upper surface side of the deck plate 1 to form a ceiling.
In this manner, the upper part of the bending prevention part 22 and the fitting body 30 is buried in the concrete 3, and the lower part of the fitting body 30, the straight part 21, and the folded part 23 are exposed vertically downward from the deck plate 1. become.
[0026]
After the concrete curing is completed, as shown in FIGS. 2, 3 and 4, the tip of the folded portion 23 is inserted into the holes 41a and 41b of both ends 40a and 40b of the suspension band 40 holding the flexible duct 8. Then, both ends 40 a and 40 b of the suspension band 40 are supported by the lower end of the folded portion 23.
[0027]
In this manner, the flexible duct 8 can be suspended from the ceiling surface and supported by a simple operation of merely passing the tip of the folded portion 23 through the holes 41a and 41b of both ends 40a and 40b of the suspension band 40.
[0028]
If at least one of the two ends 40a, 40b of the hanging band 40 is provided in the longitudinal direction of the hanging band 40, the hole can be flexibly selected by selecting one of the plurality of holes and inserting the folded portion 23. The difference in diameter of the duct 8 can be accommodated, and the height of the flexible duct 8 can be adjusted.
[0029]
In the case where the linear body 20 is a metal rod having elasticity, when the end of the folded portion 23 approaches the linear portion 21 as shown in FIG. The end of the folded portion 23 may be inserted into the holes 41a and 41b of both ends 40a and 40b of the suspension band 40 by being elastically deformed to be slightly away from the suspension band 40.
Note that a gap may be provided between the tip of the folded portion 23 and the straight portion 21 as shown in FIG.
[0030]
FIG. 6 shows the relationship with the duct to be constructed.
In the figure, reference numeral 50 denotes a vertical wall of a building such as a building, and 51 denotes a vertical hole defined by the vertical wall 50. A vertical duct 52 for blowing air is installed along the vertical hole 51 in the vertical direction of the floor. For each floor, a branch duct 53 is inserted into the penetrating portion 50a (between the ceiling plate 60 and the ceiling concrete surface) of the vertical wall 50, and from this branch duct 53 via the fire damper 54 and the air volume adjustment unit 55, the deck is provided. A long flexible duct 8a is connected below the plate 1, and a plurality of flexible ducts 8b are connected to the flexible duct 8a via a distribution chamber 56. Each flexible duct 8b is connected to an outlet 61 of a ceiling plate 60. You. Note that the portion from the vertical duct 52 to the air volume adjusting unit 55 is made of metal.
[0031]
Therefore, holes 1a are formed at appropriate intervals in the direction in which the flexible ducts 8a and 8b are provided on the deck plate 1 constituting the ceiling surface, and the flexible ducts 8a, What is necessary is just to suspend and support the flexible duct 8b from the deck plate 1.
[0032]
When a plate material is used instead of the deck plate 1, the hanging support device is attached to the deck plate 1 as described above because the collision with the hanging support device occurs when the plate material is removed after curing the concrete.
[0033]
In addition, as shown in FIG. 7, the detachment preventing bent portion 22 is not placed on the fitting body 30 in a ribbon shape over the fitting body 30 as shown in FIGS. The linear body 20 is bent immediately after penetrating the fitting body 30 upward, and is placed so as to cross over the radius of the fitting body 30.
[0034]
In addition, in the embodiment of FIG. 1, the case where the hanging support is constituted by the linear body 20 and the fitting body 30 is shown. However, as shown in FIG. May be.
[0035]
【The invention's effect】
As described above, according to the present invention, the supported member is suspended and supported by a very simple operation of merely inserting the tip of the folded portion into the holes at both ends of the suspension band that holds the supported member. Can greatly reduce the construction time.
[0036]
Further, since a hanging bolt, an L-shaped bracket, a nut, a bolt, and the like are not required, the cost can be significantly reduced.
[0037]
Further, since the linear body 20 is a thin rod of metal, if there is an obstacle or the like, the supported body can be suspended and supported easily by bending the straight portion 21 so as to avoid the obstacle or the like.
[Brief description of the drawings]
FIG. 1 is a perspective view showing an embodiment of the present invention; FIG. 2 is a sectional view showing a use state of the embodiment; FIG. 3 is a sectional view showing a use state of the embodiment; FIG. FIG. 5 is a front view showing another embodiment of the present invention. FIG. 6 is a schematic view showing a duct hanging structure of the present invention. FIG. 7 is a front view showing another embodiment of the present invention. FIG. 8 is a cross-sectional view showing a use state of another embodiment of the present invention. FIG. 9 is a cross-sectional view showing a conventional hanging support device.
Reference Signs List 20 linear body 21 linear part 22 pull-out preventing bent part 23 folded part 30 fitting body 31 through hole

Claims (12)

被支持体を吊りバンドで包持してコンクリート面から吊り下げ支持するための吊り下げ支持具であって、
直線部と、前記直線部の上端に設けられた抜け防止曲げ部と、前記直線部の下端に設けられた折り返し部とで構成された線状体から成り、
デッキプレートにあけられた穴から上方に前記抜け防止曲げ部を位置させて、前記デッキプレートの上面にコンクリートを打設して前記抜け防止曲げ部をコンクリート面に埋設して前記デッキプレート面から下方に前記直線部及び折り返し部を露出させ、被支持体を包持させた吊りバンドの両端の穴に前記折り返し部の先端を挿通して、前記折り返し部の下端部に前記吊りバンドの両端を支持するようにしたことを特徴とする吊り下げ支持具。
A hanging support for supporting the supported body with a hanging band and suspending and supporting the supported body from a concrete surface,
A straight line portion, a linear member formed by a bent portion provided at the upper end of the straight line portion and a folded portion provided at the lower end of the straight line portion,
Positioning the slip-off prevention bent portion above the hole drilled in the deck plate, casting concrete on the upper surface of the deck plate, embedding the slip-off prevention bent portion in the concrete surface, and lowering from the deck plate surface The straight portion and the folded portion are exposed, and the ends of the folded portion are inserted into the holes at both ends of the hanging band holding the supported body, and the both ends of the hanging band are supported at the lower end of the folded portion. A hanging support tool characterized in that it is made.
被支持体を吊りバンドで包持してコンクリート面から吊り下げ支持するための吊り下げ支持具であって、
直線部と、前記直線部の上端に設けられた抜け防止曲げ部と、前記直線部の下端に設けられた折り返し部とで構成された線状体と、
前記線状体の抜け防止曲げ部の下方において前記直線部に装着された嵌合体とから成り、
デッキプレートにあけられた穴に前記嵌合体をはめ込み、前記デッキプレートの上面にコンクリートを打設して前記抜け防止曲げ部をコンクリート面に埋設して前記デッキプレート面から下方に前記直線部及び折り返し部を露出させ、被支持体を包持させた吊りバンドの両端の穴に前記折り返し部の先端を挿通して、前記折り返し部の下端部に前記吊りバンドの両端を支持するようにしたことを特徴とする吊り下げ支持具。
A hanging support for supporting the supported body with a hanging band and suspending and supporting the supported body from a concrete surface,
A linear part, a linear body composed of a bent part provided at the upper end of the linear part and a folded part provided at the lower end of the linear part,
A fitting body attached to the linear portion below the bend prevention part of the linear body,
The fitting body is fitted into a hole formed in the deck plate, concrete is poured into the upper surface of the deck plate, the bent-out preventing bent portion is buried in the concrete surface, and the straight portion and the folded portion are bent downward from the deck plate surface. The end of the folded portion is inserted through holes at both ends of the hanging band that exposes the portion and supports the supported body, and the lower end of the folded portion supports both ends of the hanging band. Characteristic hanging support.
前記嵌合体が、下側が小径となった柱状である請求項2記載の吊り下げ支持具。3. The hanging support according to claim 2, wherein the fitting has a columnar shape with a small diameter on the lower side. 前記嵌合体が弾性材からなる請求項2記載の吊り下げ支持具。The hanging support according to claim 2, wherein the fitting body is made of an elastic material. デッキプレートにあけられた穴に嵌合体がはめ込まれ、
前記嵌合体を貫通した線状体の上端に一体的に設けられた抜け防止曲げ部が、前記デッキプレートの上面側においてコンクリート内に埋設され、
前記線状体及びその下端に一体的に設けられた折り返し部が前記デッキプレートの下面側に配され、
ダクトを包持させた吊りバンドの両端の穴に前記折り返し部が挿通されて前記吊りバンドの両端が前記折り返し部に保持されたことを特徴とするダクト吊り下げ構造。
The fitting is fitted into the hole made in the deck plate,
A detachment prevention bent portion integrally provided at an upper end of the linear body penetrating the fitting body is buried in concrete on the upper surface side of the deck plate,
A folded portion provided integrally with the linear body and its lower end is arranged on the lower surface side of the deck plate,
A duct hanging structure, wherein the folded portion is inserted into holes at both ends of a hanging band holding a duct, and both ends of the hanging band are held by the folded portion.
前記嵌合体が、下側が小径となった柱状である請求項5記載のダクト吊り下げ構造。The duct hanging structure according to claim 5, wherein the fitting has a columnar shape with a small diameter on a lower side. 前記嵌合体が弾性材からなる請求項5記載のダクト吊り下げ構造。The duct hanging structure according to claim 5, wherein the fitting body is made of an elastic material. 前記吊りバンドの少なくとも一端側に前記折り返し部を選択的に挿通するための吊りバンド長手方向の複数の穴が設けられた請求項5記載のダクト吊り下げ構造。The duct hanging structure according to claim 5, wherein a plurality of holes in a longitudinal direction of the hanging band are provided at at least one end side of the hanging band for selectively inserting the folded portion. デッキプレートを敷設する工程と、
前記デッキプレートにダクトの敷設方向に沿って複数の穴をあける工程と、
直線部の上端に抜け防止曲げ部が設けられ、前記直線部の下端に折り返し部が設けられた前記直線部に前記抜け防止曲げ部の下方に嵌合体が装着された吊り下げ支持具を用いて、前記デッキプレートの前記穴に上面側から前記折り返し部及び前記直線部を前記デッキプレートの下方へと挿通させて前記嵌合体を前記穴にはめ込む工程と、
前記デッキプレートの上面側にコンクリートを打設して、前記抜け防止曲げ部を埋設する工程と、
前記デッキプレートの下方においてダクトを敷設し、吊りバンドを前記ダクトに巻囲し、前記折り返し部を前記吊りバンドの両端の穴に挿通させて前記折り返し部に前記吊りバンドを保持させる工程とを備えたダクト吊り下げ方法。
Laying a deck plate,
Drilling a plurality of holes in the deck plate along the duct laying direction,
A drop-off preventing bent portion is provided at the upper end of the straight portion, and a hanging support having a fitting below the slip-preventing bent portion is attached to the straight portion provided with a folded portion at the lower end of the straight portion. Inserting the fitting body into the hole by inserting the folded portion and the straight portion from below into the hole of the deck plate from below and down the deck plate;
Casting concrete on the upper surface side of the deck plate, and embedding the falling prevention bent portion,
Laying a duct below the deck plate, surrounding a suspension band around the duct, inserting the folded portion through holes at both ends of the suspension band, and holding the suspension band at the folded portion. Duct hanging method.
前記嵌合体が、下側が小径となった柱状である請求項9記載のダクト吊り下げ方法。The method for suspending a duct according to claim 9, wherein the fitting body has a column shape having a small diameter on a lower side. 前記嵌合体が弾性材からなる請求項9記載のダクト吊り下げ方法。The method for suspending a duct according to claim 9, wherein the fitting body is made of an elastic material. 前記吊りバンドの少なくとも一端側に前記折り返し部を選択的に挿通するための吊りバンド長手方向の複数の穴が設けられた請求項9記載のダクト吊り下げ方法。The duct hanging method according to claim 9, wherein a plurality of holes in a longitudinal direction of the hanging band are provided on at least one end side of the hanging band for selectively inserting the folded portion.
JP2003009538A 2003-01-17 2003-01-17 Suspension support, duct suspension structure, and duct suspension method Expired - Fee Related JP4365590B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003009538A JP4365590B2 (en) 2003-01-17 2003-01-17 Suspension support, duct suspension structure, and duct suspension method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003009538A JP4365590B2 (en) 2003-01-17 2003-01-17 Suspension support, duct suspension structure, and duct suspension method

Publications (2)

Publication Number Publication Date
JP2004218800A true JP2004218800A (en) 2004-08-05
JP4365590B2 JP4365590B2 (en) 2009-11-18

Family

ID=32899005

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003009538A Expired - Fee Related JP4365590B2 (en) 2003-01-17 2003-01-17 Suspension support, duct suspension structure, and duct suspension method

Country Status (1)

Country Link
JP (1) JP4365590B2 (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009085371A (en) * 2007-10-01 2009-04-23 Burest Kogyo Kenkyusho Co Ltd Suspension support tool
JP2013036544A (en) * 2011-08-08 2013-02-21 Shimizu Corp Wiring/piping material hanging implement and band fastening implement for wiring/piping material hanging implement
CN103742719A (en) * 2013-12-31 2014-04-23 成都市工业设备安装公司 Thermal insulation lifting head used for connecting with suspender type air pipe and assembling method of thermal insulation lifting head
WO2014087662A1 (en) * 2012-12-07 2014-06-12 ダイキン工業株式会社 Hanger band for air conditioning device
NL2012269C2 (en) * 2014-02-14 2015-08-17 Nijburg Ind B V Clamping device and method for hanging an air duct.
CN113863367A (en) * 2021-09-16 2021-12-31 中电建铁路建设投资集团有限公司 In-situ protection suspension method for existing underground pipeline
CN114353302A (en) * 2021-11-30 2022-04-15 湖北省地源洁能工程有限公司 Roof air pipe mounting structure
WO2023186989A1 (en) * 2022-03-30 2023-10-05 Lumi-Plugin Limited A plenum device and a plenum system

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009085371A (en) * 2007-10-01 2009-04-23 Burest Kogyo Kenkyusho Co Ltd Suspension support tool
JP4486988B2 (en) * 2007-10-01 2010-06-23 株式会社ブレスト工業研究所 Hanging support
JP2013036544A (en) * 2011-08-08 2013-02-21 Shimizu Corp Wiring/piping material hanging implement and band fastening implement for wiring/piping material hanging implement
WO2014087662A1 (en) * 2012-12-07 2014-06-12 ダイキン工業株式会社 Hanger band for air conditioning device
CN103742719A (en) * 2013-12-31 2014-04-23 成都市工业设备安装公司 Thermal insulation lifting head used for connecting with suspender type air pipe and assembling method of thermal insulation lifting head
NL2012269C2 (en) * 2014-02-14 2015-08-17 Nijburg Ind B V Clamping device and method for hanging an air duct.
CN113863367A (en) * 2021-09-16 2021-12-31 中电建铁路建设投资集团有限公司 In-situ protection suspension method for existing underground pipeline
CN114353302A (en) * 2021-11-30 2022-04-15 湖北省地源洁能工程有限公司 Roof air pipe mounting structure
CN114353302B (en) * 2021-11-30 2023-01-24 湖北省地源洁能工程有限公司 Roof air pipe mounting structure
WO2023186989A1 (en) * 2022-03-30 2023-10-05 Lumi-Plugin Limited A plenum device and a plenum system

Also Published As

Publication number Publication date
JP4365590B2 (en) 2009-11-18

Similar Documents

Publication Publication Date Title
US5217191A (en) Pipe hangers or the like
US6017005A (en) Pipe hanging and rooftop load supporting system
US7540452B2 (en) Air duct support
US7661240B2 (en) Rooftop structure supporting stand
US5146720A (en) Pipe stabilizer
JP2004218800A (en) Suspension support device, duct hanging structure, and duct hanging method
JP4351227B2 (en) Support structure for equipment
US6543731B1 (en) Conduit bracket system
JP4460874B2 (en) Ceiling equipment
US20180051827A1 (en) Magnetic loop hanger
JP3149454U (en) Temporary column for handrail
JP4002665B2 (en) Vertical bolt support
JPH08144382A (en) In-ceiling hoisted material supporting device for three-dimensional slab
JP2589566Y2 (en) Air conditioner outdoor unit ceiling mount
JP3103968B2 (en) Piping equipment
JPH1194134A (en) Suspension band fitting for refrigerant piping of air conditioner
US20050211851A1 (en) Duct holder
JP2733467B2 (en) Ceiling equipment pre-installation method
AU750894B2 (en) A pipe clip
JP3035439U (en) Hanging tools
KR100728573B1 (en) Conduit hanger
KR200243474Y1 (en) hanger for ceiling support
KR100595007B1 (en) A structure for construction of a duct on a ceiling
JP3073135U (en) Anti-vibration hanger
JP3613655B2 (en) Support member and support device for refrigerant pipe for air conditioner

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20041112

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080529

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080610

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080806

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090303

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090424

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090811

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090821

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120828

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4365590

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120828

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150828

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees