CN212174336U CN202020669397.4U CN202020669397U CN212174336U CN 212174336 U CN212174336 U CN 212174336U CN 202020669397 U CN202020669397 U CN 202020669397U CN 212174336 U CN212174336 U CN 212174336U
Authority
CN
China
Prior art keywords
backup pad
baffle
auxiliary air
air duct
tuber pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020669397.4U
Other languages
Chinese (zh)
Inventor
苗剑平
王超
郭昆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Tianyuan Construction Engineering Co ltd
Original Assignee
Beijing Tianyuan Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Tianyuan Construction Engineering Co ltd filed Critical Beijing Tianyuan Construction Engineering Co ltd
Priority to CN202020669397.4U priority Critical patent/CN212174336U/en
Application granted granted Critical
Publication of CN212174336U publication Critical patent/CN212174336U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to an installation equipment is assisted to tuber pipe relates to the technical field of tuber pipe installation, including being located a plurality of scalable bracing pieces between ground and the roof, locating the backup pad between two adjacent scalable bracing pieces and installing on every scalable bracing piece and be used for with hoisting mechanism that the backup pad was hoisted still is including setting up positioner in the backup pad, positioner is including seting up spout and sliding connection in the backup pad are in baffle in the spout. The utility model has the advantages that can restrict the relative position of tuber pipe in the backup pad, can not reduce the probability that drops off from the backup pad and injure the staff by a crashing object because of two backup pads slopes, increased the installation guarantee.

Description

Auxiliary air pipe installation equipment
Technical Field
The utility model belongs to the technical field of the technique of tuber pipe installation and specifically relates to an auxiliary erection equipment of tuber pipe is related to.
Background
The air duct is a duct system for conveying and distributing air. The air duct is mainly installed inside a building, and in the air duct installation process, a plurality of sections of air ducts need to be installed on a ceiling or other higher positions for multiple times. Each time the air duct is installed, it is necessary to butt-joint the air duct to be installed to the installed air duct. The general construction mode is that a plurality of persons lift the air pipes in a combined force mode, and then the air pipes are moved by hands to be butted.
Chinese utility model patent with publication number CN205820777U discloses an tuber pipe hoist device, it is main including locating a plurality of scalable bracing pieces between upper and lower floor's floor, locating hoisting machine on the scalable bracing piece constructs, locates hoisting machine below the backup pad to and both ends are connected two respectively scalable bracing piece's horizontal support rod.
When the device is used, the air pipe to be installed is placed on the supporting plate, then the supporting plate is lifted by the lifting mechanism until the supporting plate is lifted to a proper height, and then the lifted air pipe and the installed branch pipes are butted and installed together. But all be provided with hoisting machine on every scalable bracing piece and construct, so need four hoisting machine of synchronous operation when using construct, otherwise will make two backup pads that are used for supporting the tuber pipe both ends produce the slope for the tuber pipe landing from the backup pad, thereby injure the staff by a crashing object.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims at providing an installation equipment is assisted to tuber pipe, it can restrict the relative position of tuber pipe in the backup pad, can not because of two backup pads slopes and the landing, reduces to drop from the backup pad and gets off the probability of injures the staff by a crashing object, has increased the installation guarantee.
The above object of the present invention can be achieved by the following technical solutions: the utility model provides an installation equipment is assisted to tuber pipe, is including being located a plurality of scalable bracing pieces between ground and the roof, locating the backup pad between two adjacent scalable bracing pieces and installing on every scalable bracing piece and be used for with hoisting machine that the backup pad was hung is constructed, still including setting up positioner in the backup pad, positioner is including seting up spout and sliding connection in the backup pad are in baffle in the spout.
Through adopting above-mentioned technical scheme, during the use, place the tuber pipe both ends respectively in two backup pads to the tuber pipe both ends are the butt respectively in the baffle department in every backup pad, then through hoisting machine construct with the backup pad hoist can. When two backup pads took place the slope, the baffle will play the effect that blocks to the tuber pipe, restricts the relative position of tuber pipe in the backup pad, can not because of two backup pads slopes and the landing, reduces to drop from the backup pad and gets off the probability of injures staff by a crashing object, has increased the installation guarantee.
The utility model discloses can further set up to in a preferred example: and a spring is fixedly connected between the bottom of the sliding groove and the baffle.
Through adopting above-mentioned technical scheme, under the normality, thereby the baffle stretches out the spout and restricts to the relative position of tuber pipe in the backup pad under the spring action, when upwards lifting up the tuber pipe, the tuber pipe that has installed will with baffle upper end butt to make in the baffle withdrawal spout, and backup pad upper surface also with the tuber pipe lower surface butt of installing, the tuber pipe that is located in the backup pad is also lifted to the height the same with the tuber pipe of installing, is suitable for the direct mount.
The utility model discloses can further set up to in a preferred example: the equal rigid coupling in baffle both ends has the stopper, the stopper is located the baffle is close to the one end of spring, set up the confession on the baffle the gliding spacing groove of stopper, the spacing groove with the spout intercommunication.
Through adopting above-mentioned technical scheme, when the baffle slided in the spout, the stopper also slided in the spacing groove, can restrict the sliding range of baffle, avoids baffle roll-off from the spout under the spring action.
The utility model discloses can further set up to in a preferred example: the supporting plate is provided with a slot, limiting plates are inserted in the slot, the number of the limiting plates is two, and the air pipe is located between the two limiting plates.
Through adopting above-mentioned technical scheme, can restrict the position of tuber pipe in the backup pad through the limiting plate, avoid being used for hoisting the hoisting machine who lifts same backup pad both ends not synchronous for the tuber pipe takes place to incline, increases and accomplishes the butt joint degree of difficulty of tuber pipe with having installed.
The utility model discloses can further set up to in a preferred example: the slot is opened along backup pad length direction has a plurality ofly.
Through adopting above-mentioned technical scheme, the position in the backup pad can be placed to the staff more the tuber pipe, selects to cooperate limiting plate and suitable slot.
The utility model discloses can further set up to in a preferred example: the telescopic supporting rod comprises a screw rod placed on the ground and a supporting rod in threaded connection with the screw rod.
Through adopting above-mentioned technical scheme, just can adjust the height of scalable bracing piece through the relative position of rotatory screw rod and branch for scalable bracing piece between ground and roof butt is more firm.
The utility model discloses can further set up to in a preferred example: one end of the screw rod, which is far away from the supporting rod, is rotatably connected with a lower mounting plate.
By adopting the technical scheme, the lower support can increase the supporting area between the telescopic supporting rod and the ground, and meanwhile, the screw rod can be conveniently screwed by workers.
The utility model discloses can further set up to in a preferred example: the screw rod orientation the one end rigid coupling of lower mounting panel has the swivel, the mounting panel orientation down the grooving that supplies the swivel embedding has been seted up to one side of screw rod.
Through adopting above-mentioned technical scheme, can realize through the cooperation of change and rotary trough that the screw rod is connected with the rotation of lower mounting panel, when rotating the height that the telescopic support pole was adjusted to the screw rod, the change also rotated in the rotary trough.
The utility model discloses can further set up to in a preferred example: and a rotating handle is fixedly connected to the screw rod.
Through adopting above-mentioned technical scheme, thereby the staff just can rotate the screw rod through rotating the turning handle and adjust the height of scalable bracing piece.
To sum up, the utility model discloses a beneficial technological effect does:
1. the arrangement of the baffle can limit the relative position of the air pipe on the supporting plate, the air pipe cannot slide off due to the inclination of the two supporting plates, the probability that workers are injured by falling off from the supporting plates is reduced, and the installation guarantee is increased;
2. the arrangement of the limiting block can limit the sliding distance of the baffle in the sliding groove, so that the baffle is prevented from sliding out of the sliding groove under the action of the spring;
3. the relative position of tuber pipe in the backup pad can be fixed in the setting of limiting plate, avoids tuber pipe one end to take place to slide in the backup pad and makes whole tuber pipe take place to incline to hardly dock with the tuber pipe of having installed the completion.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a partially cut-away view of the connecting structure of the baffle plate and the supporting plate;
fig. 3 is a partially enlarged schematic view of a portion a in fig. 2.
In the figure, 1, the ground; 2. a roof; 3. a telescopic support rod; 31. a screw; 311. rotating the ring; 312. a handle is rotated; 32. a strut; 321. a force receiving portion; 33. a lower mounting plate; 331. rotating the groove; 34. an upper mounting plate; 4. a support plate; 5. a positioning device; 51. a chute; 52. a baffle plate; 53. a spring; 54. a limiting block; 55. a limiting groove; 56. a slot; 57. a limiting plate; 6. a hoisting mechanism; 61. a gourd body; 62. a chain; 63. a hook; 64. a zipper; 65. an ear plate; 66. a lifting ring.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
Referring to fig. 1, for the utility model discloses an installation equipment is assisted to tuber pipe, including being located four scalable bracing pieces 3 between ground 1 and the roof 2, four scalable bracing pieces 3 form a rectangle in the space, and two are a set of both ends that are located the tuber pipe respectively, all be provided with the backup pad 4 that is used for lifting up the tuber pipe between two scalable bracing pieces 3 of every group, all be provided with the positioner 5 of fixed tuber pipe relative position in backup pad 4 in every backup pad 4, all be provided with the hoist mechanism 6 that is used for hoisting backup pad 4 simultaneously on every scalable bracing piece 3.
Referring to fig. 2 and 3, the positioning device 5 includes a sliding groove 51 formed on the upper surface of each support plate 4, a baffle plate 52 slidably connected in the sliding groove 51, and a spring 53 fixedly connected between the closed end of the sliding groove 51 and the baffle plate 52, wherein two ends of each baffle plate 52 are further fixedly connected with a limiting block 54, a limiting groove 55 for the limiting block 54 to slide is formed in the support plate 4, and the limiting groove 55 is communicated with the sliding groove 51. Under normal conditions, the baffle plate 52 extends out of the sliding groove 51 under the action of the spring 53, and the limiting block 54 is abutted against the upper end of the limiting groove 55, so that the baffle plate 52 is prevented from sliding out of the sliding groove 51 under the action of the spring 53. The staff can directly place the tuber pipe on the backup pad 4 between two sets of scalable bracing piece 3 to make the tuber pipe both ends butt on the baffle 52 of every backup pad 4. When the hoisting mechanism 6 drives the support plate 4 to ascend, the baffle plate 52 is also abutted to the installed air pipe and retracts into the sliding groove 51 under the extrusion of the installed air pipe, and meanwhile, the limit block 54 also slides to the lower end of the limit groove 55 in the limit groove 55. Until the supporting plate 4 abuts against the installed air pipe, the air pipe placed on the supporting plate 4 is located on the same horizontal plane with the installed air pipe, air pipe lifting work is completed, and the air pipe lifted to the designated height and the installed air pipe can be directly butted for installation.
Referring to fig. 1, the positioning device 5 further includes slots 56 formed in each support plate 4, the slots 56 are spaced apart along the length direction of each support plate 4 and are located on opposite sides of two baffles 52 on two support plates 4, limiting plates 57 are inserted into two of the slots 56 in each support plate 4, and a cavity for embedding the air duct is formed between the two limiting plates 57 on the same support plate 4. During the use, directly place the tuber pipe on backup pad 4, and make the tuber pipe both ends and baffle 52 butt, then insert limiting plate 57 in the slot 56 of suitable position to fix the relative position of tuber pipe on backup pad 4.
Referring to fig. 1, the telescopic supporting rod 3 includes a screw 31 placed on the ground 1 and a supporting rod 32 in threaded connection with the screw 31, a lower mounting plate 33 is rotatably connected to one end of the screw 31 far away from the supporting rod 32, an upper mounting plate 34 is fixedly connected to one end of the supporting rod 32 far away from the screw 31, the contact area between the screw 31 and the ground 1 and between the supporting rod 32 and the roof 2 can be increased through the upper mounting plate 34 and the lower mounting plate 33, the telescopic supporting rod 3 can be clamped between the ground 1 and the roof 2, and the installation is firmer.
Referring to fig. 2, a swivel 311 having an inverted T-shaped cross section is fixed to an end of the screw 31 facing the lower mounting plate 33, and a swivel 331 for rotating the swivel 311 is formed at an end of the lower mounting plate 33 facing the rod 32. The rotating fit of the screw 31 and the lower mounting plate 33 can be realized through the matching of the rotating ring 311 and the rotating groove 331, so that the rotating of the screw 31 is more labor-saving.
Meanwhile, in order to facilitate the rotation of the screw 31 by a worker, the screw 31 is further fixedly connected with a rotating handle 312, the supporting rod 32 is fixedly connected with a stress part 321, the stress part 321 is located at one end, facing the screw 31, of the supporting rod 32, when the telescopic supporting rod 3 is used, the worker can directly rotate the rotating handle 312 to adjust the height of the telescopic supporting rod 3, and at the moment, the rotating ring 311 rotates in the rotating groove 331, so that the operation is more labor-saving. Meanwhile, the other hand can fix the force-bearing part 321 to prevent the support rod 32 from rotating along with the screw 31.
Referring to fig. 2, the hoisting mechanism 6 comprises a manual hoist, and the manual hoist comprises a hoist body 61, a chain 62 rotatably connected inside the hoist body 61, a hook 63 fixedly connected to one end of the chain 62 far away from the hoist body 61, and a zipper 64 for pulling the chain 62 back inside the hoist body 61. An ear plate 65 for mounting the hoist body 61 is fixedly connected to each support rod 32, two hanging rings 66 are fixedly connected to each support plate 4, and the two hanging rings 66 are respectively positioned at two ends of each support plate 4. When the chain type lifting device is used, the hoist body 61 is directly fixedly connected to the lug plate 65, the lifting hook 63 is hooked on the lifting ring 66, then the chain 62 can be driven to retract into the hoist body 61 by pulling the zipper 64, and therefore the supporting plate 4 is lifted through the lifting hook 63. After the air duct is installed, the chains 62 inside the hoist body 61 can be released by pulling the zipper 64 in the reverse direction, so that the support plate 4 is released.
In summary, when the telescopic supporting rod 3 is used, a worker can place the telescopic supporting rod 3 at a proper position on the ground 1 according to the position of the air duct to be installed, and then turn the rotating handle 312 with one hand and fix the force-receiving portion 321 with the other hand, so as to adjust the relative position of the screw 31 and the supporting rod 32 until the upper installation plate 34 abuts against the roof 2, thereby fixing the relative position of the telescopic supporting rod 3. Then, the hoist body 61 is fixed to the ear plate 65 and the hook 63 is hooked to the hanging ring 66. Then the staff can directly place the tuber pipe that needs the installation on backup pad 4 and make the tuber pipe both ends butt on baffle 52, insert limiting plate 57 in the slot 56 of tuber pipe both sides suitable position at last. Then, the worker directly and manually pulls the zipper 64 to wind the chain 62 around the hoist body 61, thereby lifting the support plate 4. Because the relative position of tuber pipe on backup pad 4 can be restricted to baffle 52 and limiting plate 57 for the tuber pipe can not be because of two backup pad 4 slopes and the landing, reduces to drop from backup pad 4 and injure staff's probability by a crashing object, has increased the installation guarantee.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (9)

1. The utility model provides an installation equipment is assisted to tuber pipe, includes a plurality of scalable bracing pieces (3) that are located between ground (1) and roof (2), locates backup pad (4) between two adjacent scalable bracing pieces (3) and install on every scalable bracing piece (3) and be used for with hoisting machine structure (6) that backup pad (4) hung, its characterized in that: the device is characterized by further comprising a positioning device (5) arranged on the supporting plate (4), wherein the positioning device (5) comprises a sliding groove (51) formed in the supporting plate (4) and a baffle (52) connected in the sliding groove (51) in a sliding mode.
2. An auxiliary air duct installation apparatus as claimed in claim 1, wherein: and a spring (53) is fixedly connected between the bottom of the sliding groove (51) and the baffle (52).
3. An auxiliary air duct installation apparatus as claimed in claim 2, wherein: the equal rigid coupling in baffle (52) both ends has stopper (54), stopper (54) are located baffle (52) are close to the one end of spring (53), seted up the confession on baffle (52) the gliding spacing groove (55) of stopper (54), spacing groove (55) with spout (51) intercommunication.
4. An auxiliary air duct installation apparatus as claimed in claim 1, wherein: the supporting plate (4) is provided with a slot (56), the slot (56) is connected with two limiting plates (57) in an inserting mode, and the air pipes are located between the two limiting plates (57).
5. An auxiliary air duct installation apparatus as claimed in claim 4, wherein: the slots (56) are formed in a plurality along the length direction of the support plate (4).
6. An auxiliary air duct installation apparatus as claimed in claim 1, wherein: the telescopic supporting rod (3) comprises a screw rod (31) placed on the ground (1) and a supporting rod (32) in threaded connection with the screw rod (31).
7. An auxiliary air duct installation apparatus as claimed in claim 6, wherein: one end of the screw rod (31) far away from the support rod (32) is rotatably connected with a lower mounting plate (33).
8. An auxiliary air duct installation apparatus as claimed in claim 7, wherein: screw rod (31) orientation the one end rigid coupling of lower mounting panel (33) has swivel (311), lower mounting panel (33) orientation the confession has been seted up to one side of screw rod (31) swivel (331) that swivel (311) was embedded into.
9. An auxiliary air duct installation apparatus as claimed in claim 8, wherein: a rotating handle (312) is fixedly connected to the screw rod (31).
CN202020669397.4U 2020-04-27 2020-04-27 Auxiliary air pipe installation equipment Active CN212174336U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020669397.4U CN212174336U (en) 2020-04-27 2020-04-27 Auxiliary air pipe installation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020669397.4U CN212174336U (en) 2020-04-27 2020-04-27 Auxiliary air pipe installation equipment

Publications (1)

Publication Number Publication Date
CN212174336U true CN212174336U (en) 2020-12-18

Family

ID=73764781

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020669397.4U Active CN212174336U (en) 2020-04-27 2020-04-27 Auxiliary air pipe installation equipment

Country Status (1)

Country Link
CN (1) CN212174336U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114353302A (en) * 2021-11-30 2022-04-15 湖北省地源洁能工程有限公司 Roof air pipe mounting structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114353302A (en) * 2021-11-30 2022-04-15 湖北省地源洁能工程有限公司 Roof air pipe mounting structure
CN114353302B (en) * 2021-11-30 2023-01-24 湖北省地源洁能工程有限公司 Roof air pipe mounting structure

Similar Documents

Publication Publication Date Title
CN212174336U (en) Auxiliary air pipe installation equipment
CN114893623B (en) Air duct installation structure in narrow vertical shaft and construction method thereof
CN218346745U (en) Civil engineering is with adjustable bearing stores pylon
CN113708295B (en) Cable maintenance framework among electric power system
CN209922712U (en) Transformer fan replacing tool
CN115807532A (en) Device for attaching suspension bracket and construction method
CN213537073U (en) Channel is hoist device for lining board
CN212406155U (en) Vertical correction of hoist and mount prefabricated assembled reinforced concrete structure is to telescopic link of counterpointing
GB2469633A (en) Lifting System
CN108263972A (en) A kind of air conditioner water standpipe fixed frame hanging apparatus
CN112563975A (en) Clamping device is transferred to shaft cable and wire rope
CN216603859U (en) Safety belt hanging device for disassembling and assembling oil drilling derrick
CN216976006U (en) Air pipe suspension mounting structure
CN220877503U (en) Pipeline supporting system for NICU
CN219557121U (en) Curtain washs with adjustable string inserted bar that hangs
CN217547778U (en) Simple water dispenser for construction site
CN218371526U (en) Air pipe installation mechanism
CN220908869U (en) Aluminum square tube unit connecting mechanism
CN219304388U (en) Suspension type cable clamping device
CN217759890U (en) Adjustable scaffold for commercial scene installation
CN217076779U (en) Can have enough to meet need construction elevator attachment device suitable for board position falls
CN219507554U (en) Pipeline installation device
CN215240621U (en) Ceiling bolt fastening device
CN117550470B (en) Lifting device for door and window construction installation
CN220190412U (en) Electrical circuit installation fixing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant