CN114322689A - Ore draw shaft bottom blockage treatment method - Google Patents
Ore draw shaft bottom blockage treatment method Download PDFInfo
- Publication number
- CN114322689A CN114322689A CN202011035495.3A CN202011035495A CN114322689A CN 114322689 A CN114322689 A CN 114322689A CN 202011035495 A CN202011035495 A CN 202011035495A CN 114322689 A CN114322689 A CN 114322689A
- Authority
- CN
- China
- Prior art keywords
- shaft
- ore
- blockage
- explosive
- treatment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P10/00—Technologies related to metal processing
- Y02P10/20—Recycling
Abstract
The invention relates to a method for treating bottom blockage of an ore pass, which comprises the following steps: the method comprises the steps of arranging a vertical ladder, arranging an operation platform, arranging a blasting window, observing the blocking condition, determining a treatment scheme, treating explosive package arrangement, treating explosive package in place, blocking treatment and the like. The ore chute bottom blockage treatment method provided by the invention realizes that when a mine using chute ore drawing is blocked at the bottom of the chute, the blasting explosive charge safely and effectively approaches to a blockage point at the bottom of the chute through a specially-arranged system path, and the blasting shock wave generated after detonation loosens the ore at the blockage position, and falls to dredge. The construction of the invention is simple, newly-built and under-built mines can be constructed and matched according to the design of the invention when the orepass is constructed and installed, and the mines in production can be used after being constructed and repaired according to the design of the invention.
Description
Technical Field
The invention relates to a method for treating bottom blockage of an ore pass, and belongs to the technical field of metal deposit mining.
Background
The metal deposit mining adopts both open-pit mining and underground mining modes, and involves the use of drop shafts, particularly underground mining, and a large number of drop shafts are used. The ore in the chute is put on a mine car with horizontal transportation through a vibration ore drawing device arranged at the bottom. The ore in the ore pass moves downwards by means of gravity and is influenced by factors such as the granularity, the grain size, the mud content, the water content of the ore entering the ore pass, the dynamic change of the ore position in the ore pass and the like, the phenomenon of blockage frequently occurs in the ore drawing process of the ore pass, and the blockage mainly occurs at the bottom of the ore pass. The existing treatment method comprises the steps of entering the ore drawing hole at the bottom of the orepass and treating a blocking point by using high-pressure water or placing an explosive package, wherein the treatment method is effective when the blocking point is low, the treatment method is extremely poor in treatment effect when the blocking point is high and the treatment method is difficult to access by flushing or placing the explosive package, and meanwhile, the safety risk of personnel entering the operation from the ore drawing hole at the bottom is extremely high.
Disclosure of Invention
The invention aims to solve the technical problems that: the method overcomes the defects of the technology and provides the ore draw shaft bottom blockage processing method which adopts a safe and effective channel or path to realize that the explosive charge and the detonating device thereof are conveyed to or close to the blockage part at the bottom of the draw shaft, and then the ore at the blockage part is detonated and vibrated to be loosened and fall until the blockage part is dredged.
In order to solve the technical problems, the technical scheme provided by the invention is as follows: a method for treating bottom blockage of an ore pass comprises the following steps:
step 1: arranging a straight ladder; arranging a nearly vertical steel ladder outside a vibration ore drawing machine in the ore drawing chamber;
step 2: setting a working platform; a blockage treatment operation platform is arranged above the ore drawing opening of the vibration ore drawing machine;
and step 3: setting a blasting window; opening an upward oblique window on a retaining wall above a ore drawing opening of the vibration ore drawing machine and lining the window with a steel plate;
and 4, step 4: observing the blocking condition; an operator climbs the straight ladder in the ore drawing chamber, climbs the operation platform, and observes the blocking condition in the shaft of the draw shaft through the blasting window;
and 5: determining a processing scheme; determining a treatment scheme according to the blocking condition in the shaft of the draw shaft;
step 6: treating the medicine bag for finishing; after receiving required explosives and blasting equipment, an operator manufactures benefit management explosive bags on a ground in the ore drawing chamber;
and 7: treating the medicine package in place; the working platform is reached through the straight ladder again; conveying the processing explosive package and the explosive package conveying telescopic rod to the operation platform; the two persons cooperate to send the treatment explosive to the lower end face blocked in the shaft of the draw shaft through the blasting window by means of the explosive feeding telescopic rod, the explosive feeding telescopic rod is fixed, and the detonating line of the treatment explosive is led out to the initiation point;
and 8: carrying out blocking treatment; and (6) carrying out point blasting.
The scheme is further improved in that: and after the step 8, if the blockage in the shaft of the drop shaft cannot be solved, repeating the steps 4 to 8 until the blockage in the shaft of the drop shaft is solved.
The ore chute bottom blockage treatment method provided by the invention realizes that when a mine using chute ore drawing is blocked at the bottom of the chute, the blasting explosive charge safely and effectively approaches to a blockage point at the bottom of the chute through a specially-arranged system path, and the blasting shock wave generated after detonation loosens the ore at the blockage position, and falls to dredge. The construction of the invention is simple, newly-built and under-built mines can be constructed and matched according to the design of the invention when the orepass is constructed and installed, and the mines in production can be used after being constructed and repaired according to the design of the invention.
Drawings
Fig. 1 is a schematic structural diagram of a preferred embodiment of the present invention.
Fig. 2 is a side view of fig. 1.
Detailed Description
Examples
The method for treating the bottom blockage of the ore pass of the embodiment, as shown in figures 1 and 2, comprises the following steps:
step 1: arranging a straight ladder 10; arranging a nearly vertical steel ladder outside a vibration ore drawing machine in the ore drawing chamber; the vertical ladder 10 is welded and fixed with the chamber wall by adopting a grouting anchor rod, and the installation angle of the vertical ladder 10 is arranged at 70-90 degrees relative to the horizontal plane on site;
step 2: setting a working platform 11; installing an operation platform 11 which is prefabricated by a platform pedal net and has the width of 60-80 cm at a position 20-30 cm above the ore drawing port 12 of the vibration ore drawing machine, and welding and fixing two ends of the operation platform with a chamber wall by adopting grouting anchor rods;
and step 3: setting a blasting window 7; excavating an explosion window 7 with the width of 40cm, the height of 60cm and the inclined upward angle of 55-60 degrees on a retaining wall 8 which is 60cm above the ore drawing opening 12 of the vibration ore drawing machine and in the middle line direction of a shaft of the drop shaft, and lining a prefabricated steel plate frame; newly building and building a mine, and placing a prefabricated steel plate frame when a mine opening retaining wall 8 is poured to form a blasting window 7;
and 4, step 4: observing the blocking condition; 4. an operator climbs a straight ladder 10 from a floor 13 of the ore drawing chamber, climbs an operation platform 11, and observes the blocking condition in the shaft of the chute through a blasting window 7;
and 5: determining a processing scheme; determining a treatment scheme according to the blocking condition in the shaft of the draw shaft;
step 6: treating the medicine bag for finishing; after receiving required explosives and blasting equipment, operators manufacture beneficial treatment cartridges 5 on a floor 13 in the ore drawing chamber;
and 7: treating the medicine package in place; the working platform 11 is reached through the straight ladder 10 again; conveying the processing explosive bag 5 and the explosive bag conveying telescopic rod 4 to an operation platform 11; the two persons cooperate to send the treatment explosive package 5 to the blocked lower end face 3 in the shaft of the draw shaft through the blasting window 7 by means of the explosive package feeding telescopic rod 4, the explosive package feeding telescopic rod 4 is fixed, and the detonating line 6 of the treatment explosive package is led out to the detonating point;
and 8: carrying out blocking treatment; and (6) carrying out point blasting.
And 8, after the step 8, if the blockage in the shaft of the drop shaft cannot be solved, repeating the steps 4 to 8 until the blockage in the shaft of the drop shaft is solved.
The present invention is not limited to the above-described embodiments. All technical solutions formed by equivalent substitutions fall within the protection scope of the claims of the present invention.
Claims (2)
1. The method for treating the blockage at the bottom of the ore pass is characterized by comprising the following steps of:
step 1: arranging a straight ladder; arranging a nearly vertical steel ladder outside a vibration ore drawing machine in the ore drawing chamber;
step 2: setting a working platform; a blockage treatment operation platform is arranged above the ore drawing opening of the vibration ore drawing machine;
and step 3: setting a blasting window; opening an upward oblique window on a retaining wall above a ore drawing opening of the vibration ore drawing machine and lining the window with a steel plate;
and 4, step 4: observing the blocking condition; an operator climbs the straight ladder in the ore drawing chamber, climbs the operation platform, and observes the blocking condition in the shaft of the draw shaft through the blasting window;
and 5: determining a processing scheme; determining a treatment scheme according to the blocking condition in the shaft of the draw shaft;
step 6: treating the medicine bag for finishing; after receiving required explosives and blasting equipment, an operator manufactures benefit management explosive bags on a ground in the ore drawing chamber;
and 7: treating the medicine package in place; the working platform is reached through the straight ladder again; conveying the processing explosive package and the explosive package conveying telescopic rod to the operation platform; the two persons cooperate to send the treatment explosive to the lower end face blocked in the shaft of the draw shaft through the blasting window by means of the explosive feeding telescopic rod, the explosive feeding telescopic rod is fixed, and the detonating line of the treatment explosive is led out to the initiation point;
and 8: carrying out blocking treatment; and (6) carrying out point blasting.
2. The ore pass bottom plug treatment method of claim 1, characterized by: and after the step 8, if the blockage in the shaft of the drop shaft cannot be solved, repeating the steps 4 to 8 until the blockage in the shaft of the drop shaft is solved.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011035495.3A CN114322689B (en) | 2020-09-27 | 2020-09-27 | Ore drop shaft bottom blockage treatment method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011035495.3A CN114322689B (en) | 2020-09-27 | 2020-09-27 | Ore drop shaft bottom blockage treatment method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN114322689A true CN114322689A (en) | 2022-04-12 |
CN114322689B CN114322689B (en) | 2023-07-14 |
Family
ID=81010702
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011035495.3A Active CN114322689B (en) | 2020-09-27 | 2020-09-27 | Ore drop shaft bottom blockage treatment method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114322689B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116222330A (en) * | 2023-03-14 | 2023-06-06 | 新疆八钢矿业资源有限公司 | Processing apparatus that mining blasting of pit was used |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2232975C1 (en) * | 2002-10-14 | 2004-07-20 | Институт горного дела СО РАН (статус государственного учреждения) | Method for charging of blind pass entry with explosive |
CN102927864A (en) * | 2012-11-08 | 2013-02-13 | 攀钢集团矿业有限公司 | Device and method for performing blasting processing for ore-pass high position blockage by balloon suspended explosive powders |
CN102997764A (en) * | 2012-12-13 | 2013-03-27 | 玉溪大红山矿业有限公司 | Method for effectively removing ore-pass blockage and blockage removal device |
CN203296813U (en) * | 2013-06-19 | 2013-11-20 | 玉溪大红山矿业有限公司 | Winze device with automatic ore drawing and blockage preventing functions |
CN103884246A (en) * | 2014-01-28 | 2014-06-25 | 甘肃酒钢集团宏兴钢铁股份有限公司 | High-deep chute shaft blockage blasting cartridge and fixed-point cartridge delivery method |
CN204041104U (en) * | 2014-07-25 | 2014-12-24 | 南京梅山冶金发展有限公司 | A kind of underground mine drop shaft blockage-clearing device |
CN106907963A (en) * | 2017-05-08 | 2017-06-30 | 中南大学 | A kind of drop shaft suspension demolition set and its Pass blocks dredging method of application |
-
2020
- 2020-09-27 CN CN202011035495.3A patent/CN114322689B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2232975C1 (en) * | 2002-10-14 | 2004-07-20 | Институт горного дела СО РАН (статус государственного учреждения) | Method for charging of blind pass entry with explosive |
CN102927864A (en) * | 2012-11-08 | 2013-02-13 | 攀钢集团矿业有限公司 | Device and method for performing blasting processing for ore-pass high position blockage by balloon suspended explosive powders |
CN102997764A (en) * | 2012-12-13 | 2013-03-27 | 玉溪大红山矿业有限公司 | Method for effectively removing ore-pass blockage and blockage removal device |
CN203296813U (en) * | 2013-06-19 | 2013-11-20 | 玉溪大红山矿业有限公司 | Winze device with automatic ore drawing and blockage preventing functions |
CN103884246A (en) * | 2014-01-28 | 2014-06-25 | 甘肃酒钢集团宏兴钢铁股份有限公司 | High-deep chute shaft blockage blasting cartridge and fixed-point cartridge delivery method |
CN204041104U (en) * | 2014-07-25 | 2014-12-24 | 南京梅山冶金发展有限公司 | A kind of underground mine drop shaft blockage-clearing device |
CN106907963A (en) * | 2017-05-08 | 2017-06-30 | 中南大学 | A kind of drop shaft suspension demolition set and its Pass blocks dredging method of application |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116222330A (en) * | 2023-03-14 | 2023-06-06 | 新疆八钢矿业资源有限公司 | Processing apparatus that mining blasting of pit was used |
Also Published As
Publication number | Publication date |
---|---|
CN114322689B (en) | 2023-07-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104847356B (en) | Mining method of thin and small ore body | |
CN102966333B (en) | Anti-blockage method for bottom hole of mine stope and roadway driving working face | |
CN104532818A (en) | Treatment method for strip mine goaf | |
WO2011103620A1 (en) | A method of reducing subsidence or windblast impacts from longwall mining | |
CN110118084B (en) | Ultra-deep shaft construction method | |
CN110595308B (en) | Method for treating goaf by ultra-deep hole blasting of strip mine | |
US20230228193A1 (en) | Raise caving method for mining an ore from an ore body, and a mining infrastructure, monitoring system, machinery, control system and data medium therefor | |
CN110219650B (en) | Deep hole subsequent filling mining method in environment reconstruction stage | |
CN114322689A (en) | Ore draw shaft bottom blockage treatment method | |
JP6971170B2 (en) | How to build an underground structure | |
CN113530558B (en) | Double-drop shaft-inclined drift combined layered construction method for high-large chamber | |
CN110080774A (en) | Mine Dry-placed fill mining is fallen based on the vertical medium-length hole retrusive of high-dipping ore block | |
CN103233739A (en) | Mining method for thick and large ore pillar under filling body package | |
KR20160076885A (en) | Blasting Method for Excavation of Bedrock Using Dozer | |
CN112324439A (en) | Mining method for inducing caving roadway roof | |
CN110671984A (en) | Boulder blasting construction method | |
CN110397439A (en) | Mine Dry-placed fill mining is fallen based on the vertical medium-length hole retrusive of high-dipping ore block | |
CN213021276U (en) | Explosive loading funnel for blasting | |
CN114165282A (en) | Method for safely treating underground suspension arch large block | |
CN111706386B (en) | Underground roadway rock burst active protection method and underground roadway tunneling method | |
CN113865452A (en) | Controllable, safe and efficient dredging method for high-position clamping bucket of draw shaft | |
CN209295800U (en) | A kind of damped blasting of tunnels structure | |
CN113622916A (en) | Stope point column support reinforcing and recycling method | |
RU2488693C1 (en) | Method for in-line production of work at non-benching version of extraction of chambers along strike on chamber-and-pillar system | |
CN201575754U (en) | Blast hole loading device and blast hole mesh screen used in gob area |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |