CN114250955A - Ground device of caulking before waterproof construction of top building - Google Patents

Ground device of caulking before waterproof construction of top building Download PDF

Info

Publication number
CN114250955A
CN114250955A CN202111606371.0A CN202111606371A CN114250955A CN 114250955 A CN114250955 A CN 114250955A CN 202111606371 A CN202111606371 A CN 202111606371A CN 114250955 A CN114250955 A CN 114250955A
Authority
CN
China
Prior art keywords
frame
rod
spring
shaped
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202111606371.0A
Other languages
Chinese (zh)
Other versions
CN114250955B (en
Inventor
肖少娥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yuanxinshe Construction Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202111606371.0A priority Critical patent/CN114250955B/en
Publication of CN114250955A publication Critical patent/CN114250955A/en
Application granted granted Critical
Publication of CN114250955B publication Critical patent/CN114250955B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/165Implements for finishing work on buildings for finishing joints, e.g. implements for raking or filling joints, jointers

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Machines (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention relates to a gap filling device, in particular to a ground gap filling device before waterproof construction of a top building. Need design one kind and make things convenient for people to fill a seam to top floor ground, labour saving and time saving, work efficiency is high, and the device of filling a seam before the waterproof construction of top floor of clearing up in advance. The utility model provides a ground device of caulking before waterproof construction of top building, is including removing frame, removal gyro wheel and connection ring cover, removes the frame left and right sides and all front and back symmetry rotary type is equipped with the removal gyro wheel, removes the interior top left side rigid coupling of frame and has the connection ring cover. According to the invention, a proper amount of clear water is added for stirring and mixing, then the device is pushed to move through the moving roller, and meanwhile, the blanking frame is pulled to move downwards, so that the wedge-shaped block moves upwards to drive the first material baffle plate to move rightwards, and the mixed asphalt flows into a construction joint through the arc-shaped material guide rod for filling.

Description

Ground device of caulking before waterproof construction of top building
Technical Field
The invention relates to a gap filling device, in particular to a ground gap filling device before waterproof construction of a top building.
Background
In order to solve under the influence of temperature, temperature and material shrinkage, the top floor ground produces the problem of hunch bloated or shrink fracture easily, in order to avoid producing too big hot pressing stress, people all can set up corresponding shrinkage joint in order to adapt to its deformation, prevent to produce the crack, ground shrinkage joint will pour into pitch or sealed glue and seal, prevent that rainwater snow water from getting into inside, at present, most are the manual work and carry out the crack filling, waste time and energy, work efficiency is still low, and need the manual work to clear up the shrinkage joint earlier before filling, the work load of filling the crack has been increased, the efficiency of filling the crack has been reduced.
Therefore, the floor joint filling device before the top building waterproof construction, which is convenient for people to joint the top building ground, is time-saving, labor-saving, high in working efficiency and capable of being cleaned in advance, is needed to be designed so as to solve the problem of the prior art.
Disclosure of Invention
In order to overcome the manual work and joint filling, waste time and energy, work efficiency is still low, and need the manual work to clear up the contraction joint earlier before filling, has increased the work load of joint filling, has reduced the shortcoming of the efficiency of joint filling, and the technical problem is: the utility model provides a make things convenient for people to fill a seam to top floor ground, labour saving and time saving, work efficiency is high, and the device of filling a seam before the waterproof construction of top floor of clearing up in advance.
The technical scheme is as follows: a ground joint filling device before waterproof construction of a top building comprises a moving frame, moving rollers, a connecting ring sleeve, a material placing component and a joint filling component, wherein the moving rollers are symmetrically arranged on the left side and the right side of the moving frame in a front-back rotating mode, the connecting ring sleeve is fixedly connected to the left side of the top in the moving frame, the material placing component for storing materials is arranged on the moving frame, and the joint filling component for filling construction joints is arranged on the connecting ring sleeve; the joint filling assembly comprises a blanking frame, a second spring, an arc-shaped material guide rod, a wedge, a first baffle plate and a third spring, the inner sliding type of a connecting ring sleeve is provided with the blanking frame, the inner side of the blanking frame and the inner part of the connecting ring sleeve are symmetrically wound with the second spring, the lower sliding type of the lower part of the blanking frame is provided with the arc-shaped material guide rod for blanking, the middle part of the inner side surface of the arc-shaped material guide rod is fixedly connected with the wedge, the lower sliding type of the lower part of the blanking frame is provided with the first baffle plate, the first baffle plate is in sliding fit with the wedge, and the front and back symmetrical rigid couplings between the inner side surface of the first baffle plate and the inner part of the blanking frame are provided with the third spring.
Optionally, the discharging assembly comprises a discharging frame for storing materials, a supporting plate, a first spring and a discharging ring, the discharging frame is arranged on the sliding type of the left portion in the moving frame, the supporting plate is fixedly connected to the outer bottom of the discharging frame, the first spring is fixedly connected between the bottom of the supporting plate and the inner side face of the moving frame, the discharging ring is connected to the left middle side of the bottom of the discharging frame, and the discharging frame is sleeved on the discharging ring.
Optionally, still including the restriction subassembly that is used for restricting the unloading, the restriction subassembly is including second striker plate, the connecting block, torsion spring and stopper, unloading frame middle part rotary type is equipped with and is used for spacing second striker plate, arc guide pole rebound can drive second striker plate and rotate, both sides all the rigid coupling have the connecting block around the second striker plate, both sides are all around there being torsion spring around the second striker plate, torsion spring one end is connected with the connecting block, the torsion spring other end is connected with the unloading frame, the lower left part of both sides all the rigid coupling has the stopper around the unloading frame.
Optionally, the asphalt mixing machine further comprises a stirring assembly for conveniently stirring asphalt, the stirring assembly comprises a connecting rod, a first guide sleeve, a stirring rod, a first rotating shaft, a first transmission assembly, a bevel gear, a second transmission assembly and a second rotating shaft, the connecting rod is fixedly connected to the middle of the upper left side surface in the moving frame, the first guide sleeve is rotatably arranged at the right part of the connecting rod, the stirring rod for mixing and stirring is rotatably arranged in the middle of the discharging frame, the stirring rod penetrates through the first guide sleeve and is slidably connected with the first guide sleeve, the first rotating shaft is rotatably arranged at the right side of the rear part of the moving frame, the first transmission assembly is connected between the upper part of the first rotating shaft and the lower part of the first guide sleeve and consists of two belt pulleys and a belt, one belt pulley is arranged at the upper part of the first rotating shaft, the other belt pulley is arranged at the lower part of the first guide sleeve, the belt is wound between the two belts, and the second rotating shaft is rotatably arranged at the lower right side of the rear part of the moving frame, bevel gears are fixedly connected to the front portion of the second rotating shaft and the lower portion of the first rotating shaft, the two bevel gears are meshed, a second transmission assembly is connected between the front portion of the right rear moving roller and the rear portion of the second rotating shaft, the second transmission assembly is composed of two belt pulleys and a belt, one belt pulley is mounted on the front portion of the right rear moving roller, the other belt pulley is mounted on the rear portion of the second rotating shaft, and the belt is wound between the two belts.
Optionally, still including the subassembly of adding water that is used for conveniently adding the clear water, the subassembly of adding water is including water storage frame, square plate, first L shape connecting rod and fourth spring, and the upper side rigid coupling of removal frame right part has the water storage frame, and the middle slidingtype of water storage frame left part is equipped with the square plate that is used for the manger plate, and square plate middle part rigid coupling has first L shape connecting rod, and first L shape connecting rod cooperates with the blowing frame, is connected with the fourth spring between the middle of the square plate top and the water storage frame medial surface.
Optionally, the device further comprises a slotting component for cleaning the construction joint, the slotting component comprises a second guide sleeve, a slotting rod, a fifth spring, a first limiting rod, a cleaning rod and a sixth spring, the second guide sleeve is fixedly connected to the middle of the left portion of the movable frame, the slotting rod is arranged in the second guide sleeve in a sliding mode, the fifth spring is wound between the top of the second guide sleeve and the upper portion of the slotting rod, the first limiting rod penetrates through the left side of the lower portion of the slotting rod, the cleaning rod for cleaning is arranged on the lower portion of the slotting rod in a sliding mode, and the sixth spring is wound between the top of the cleaning rod and the upper portion of the inner portion of the slotting rod.
Optionally, the device also comprises a reset component for resetting, the reset component comprises a second limiting rod, a guide rail, a V-shaped block, a wedge block, a magnet, a U-shaped rod, a third limiting rod, a seventh spring, a second L-shaped connecting rod, a stop block, an eighth spring and a ninth spring, the bottom of the moving frame is slidably provided with the second limiting rod, the second limiting rod is matched with the first limiting rod, the front and the back of the bottom of the moving frame are symmetrically connected with the guide rail, the front and the back of the bottom of the support plate are symmetrically provided with the V-shaped block, the wedge block is matched with the V-shaped block, the front and the back of the left side of the second limiting rod are fixedly connected with the magnet, the magnet is matched with the wedge block, the right of the second limiting rod is fixedly connected with the U-shaped rod, the inner of the U-shaped rod is slidably provided with the third limiting rod, the seventh spring is symmetrically fixedly connected between the inner side of the third limiting rod and the U-shaped rod from front to back, the front and the right side of the bottom of the moving frame are symmetrically fixedly connected with the second L-shaped connecting rod, the upper portion of the second L-shaped connecting rod is slidably provided with a stop block used for limiting, the stop block is matched with the third limiting rod, an eighth spring is arranged between the inner side face of the stop block and the inner portion of the second L-shaped connecting rod, and a ninth spring is arranged between the inner side face of the second limiting rod and the inner side of the moving frame.
Alternatively, the rails are bolted
The invention has the beneficial effects that:
1. according to the invention, a proper amount of clear water is added for stirring and mixing, then the device is pushed to move through the moving roller, and meanwhile, the blanking frame is pulled to move downwards, so that the wedge-shaped block moves upwards to drive the first material baffle plate to move rightwards, and the mixed asphalt flows into a construction joint through the arc-shaped material guide rod for filling.
2. According to the invention, under the action of the stirring assembly, a proper amount of asphalt is poured into the blanking frame, so that the stirring rod rotates to stir the asphalt, and thus, the asphalt can be prevented from being solidified.
3. Under the action of the slotted component, the device is pushed to move by the movable roller, the material cleaning rod cleans the construction joint, and the sixth spring plays a role in buffering, so that sundries remained in the construction joint can be avoided.
Drawings
Fig. 1 is a schematic perspective view of a first embodiment of the present invention.
Fig. 2 is a schematic perspective view of a second embodiment of the present invention.
Fig. 3 is a schematic sectional perspective view of the present invention.
Fig. 4 is a schematic sectional perspective view of a discharging assembly according to the present invention.
FIG. 5 is a schematic view of a second sectional three-dimensional structure of the dispensing assembly of the present invention.
Fig. 6 is a schematic view of a first cross-sectional perspective view of the caulking assembly of the present invention.
Figure 7 is a schematic representation of a second cross-sectional perspective view of the caulking assembly of the present invention.
Fig. 8 is an enlarged perspective view of the present invention at a.
FIG. 9 is a schematic cross-sectional perspective view of a restraint assembly of the present invention.
FIG. 10 is an enlarged perspective view of the present invention at B.
FIG. 11 is a schematic sectional perspective view of the stirring assembly of the present invention.
Fig. 12 is a schematic sectional perspective view of the water feeding assembly of the present invention.
Fig. 13 is an enlarged perspective view of the present invention at C.
Fig. 14 is a schematic cross-sectional perspective view of the slotted assembly of the present invention.
Fig. 15 is a perspective view of the slotted assembly of the present invention.
Fig. 16 is a schematic view of a first cross-sectional perspective view of the reducing assembly of the present invention.
Fig. 17 is a schematic cross-sectional perspective view of a reduction assembly of the present invention.
Fig. 18 is an enlarged perspective view of the present invention at D.
Number designation in the figures: 1-a moving frame, 2-a moving roller, 3-a connecting ring sleeve, 4-a discharging component, 41-a discharging frame, 42-a supporting plate, 43-a first spring, 44-a discharging ring, 5-a caulking component, 51-a discharging frame, 52-a second spring, 53-an arc-shaped material guiding rod, 54-a wedge-shaped block, 55-a first material baffle, 56-a third spring, 6-a limiting component, 61-a second material baffle, 62-a connecting block, 63-a torsion spring, 64-a limiting block, 7-a stirring component, 71-a connecting rod, 72-a first guide sleeve, 73-a stirring rod, 74-a first rotating shaft, 75-a first transmission component, 76-a bevel gear, 77-a second transmission component, 78-a second rotating shaft, 8-water adding component, 81-water storage frame, 82-square plate, 83-first L-shaped connecting rod, 84-fourth spring, 9-slotted component, 91-second guide sleeve, 92-slotted rod, 93-fifth spring, 94-first limiting rod, 95-material cleaning rod, 96-sixth spring, 10-reset component, 101-second limiting rod, 102-guide rail, 103-V-shaped block, 104-inclined block, 105-magnet, 106-U-shaped rod, 107-third limiting rod, 108-seventh spring, 109-second L-shaped connecting rod, 110-stop block, 111-eighth spring and 112-ninth spring.
Detailed Description
It is to be noted that, in the case of the different described embodiments, identical components are provided with the same reference numerals or the same component names, wherein the disclosure contained in the entire description can be transferred to identical components having the same reference numerals or the same component names in a meaningful manner. The positional references selected in the description, such as upper, lower, lateral, etc., refer also to the directly described and illustrated figures and are to be read into the new position in the sense of a change in position.
Example 1
A ground gap filling device before waterproof construction of a top building is shown in figures 1-8 and comprises a moving frame 1, moving rollers 2, a connecting ring sleeve 3, a discharging component 4 and a gap filling component 5, wherein the moving rollers 2 are symmetrically and rotatably arranged on the left side and the right side of the moving frame 1 in a front-back symmetrical mode, the connecting ring sleeve 3 is fixedly connected to the left side of the inner top of the moving frame 1, the discharging component 4 is arranged on the moving frame 1, a proper amount of asphalt materials can be placed in the discharging component 4, the gap filling component 5 is arranged on the connecting ring sleeve 3, and the gap filling component 5 can be used for filling construction joints.
The discharging component 4 comprises a discharging frame 41, a supporting plate 42, a first spring 43 and a discharging ring 44, the discharging frame 41 is arranged in the movable frame 1 in a sliding mode at the left part, the supporting plate 42 is fixedly connected to the outer bottom of the discharging frame 41, the first spring 43 is fixedly connected between the bottom of the supporting plate 42 and the inner side face of the movable frame 1, and the discharging ring 44 is connected to the left middle side of the bottom of the discharging frame 41.
The gap filling assembly 5 comprises a blanking frame 51, a second spring 52, an arc-shaped guide rod 53, a wedge block 54, a first baffle plate 55 and a third spring 56, the blanking frame 51 is arranged in the connecting ring sleeve 3 in a sliding manner, the blanking frame 51 is sleeved on the blanking ring 44, the second spring 52 is wound between the inner side of the blanking frame 51 and the inner part of the connecting ring sleeve 3 in a bilateral symmetry manner, the arc-shaped guide rod 53 is arranged at the lower part of the blanking frame 51 in a sliding manner, the arc-shaped guide rod 53 can realize blanking, the wedge block 54 is fixedly connected to the middle part of the inner side surface of the arc-shaped guide rod 53, a first baffle plate 55 is arranged at the lower part of the blanking frame 51 in a sliding manner, the first baffle plate 55 is in sliding fit with the wedge block 54, and the third spring 56 is fixedly connected between the inner side surface of the first baffle plate 55 and the inner part of the blanking frame 51 in a front-back symmetry manner.
Firstly, pouring a proper amount of asphalt into the discharging frame 41, adding a proper amount of clear water, stirring and mixing, wherein the first spring 43 plays a role of supporting and buffering, the asphalt is discharged into the discharging frame 51 through the discharging ring 44, the first baffle plate 55 limits the asphalt, then the device is pushed to move through the moving roller 2, meanwhile, the discharging frame 51 is pulled to move downwards, the second spring 52 is compressed, the discharging frame 51 moves downwards to enable the arc-shaped guide rod 53 to be in contact with the ground, the ground enables the arc-shaped guide rod 53 to move upwards for a certain distance, the arc-shaped guide rod 53 moves upwards to drive the wedge-shaped block 54 to move upwards, the wedge-shaped block 54 moves upwards to be in contact with the first baffle plate 55, the wedge-shaped block 54 drives the first baffle plate 55 to move rightwards, the third spring 56 is compressed, so that the mixed asphalt flows into a construction joint through the arc-shaped guide rod 53 to be filled, and after all construction joint filling is completed, stop promoting this device and remove, loosen unloading frame 51, because of the effect of second spring 52, unloading frame 51 rebound resets, and arc guide rod 53 breaks away from with ground, because of the effect of gravity, arc guide rod 53 also rebound, because of the effect of third spring 56, first striker plate 55 moves left and resets and keeps off the material.
Example 2
On the basis of embodiment 1, as shown in fig. 1, fig. 2, fig. 3, fig. 9, fig. 10, fig. 11, fig. 12, fig. 13, fig. 14, fig. 15, fig. 16, fig. 17 and fig. 18, the present invention further includes a limiting assembly 6, the limiting assembly 6 includes a second material blocking plate 61, a connecting block 62, a torsion spring 63 and a limiting block 64, the second material blocking plate 61 is rotatably disposed in the middle of the material discharging frame 51, the second material blocking plate 61 can limit the flow of asphalt, the arc-shaped material guiding rod 53 moves upward to drive the second material blocking plate 61 to rotate, the connecting block 62 is fixedly connected to the front and rear sides of the second material blocking plate 61, the torsion spring 63 is wound around the front and rear sides of the second material blocking plate 61, one end of the torsion spring 63 is connected to the connecting block 62, the other end of the torsion spring 63 is connected to the material discharging frame 51, and the limiting blocks 64 are fixedly connected to the left lower portions of the front and rear sides outside the material discharging frame 51.
The asphalt and clear water mixing machine further comprises a stirring component 7, wherein the stirring component 7 comprises a connecting rod 71, a first guide sleeve 72, a stirring rod 73, a first rotating shaft 74, a first transmission component 75, a bevel gear 76, a second transmission component 77 and a second rotating shaft 78, the connecting rod 71 is fixedly connected to the middle of the upper portion of the left side face in the movable frame 1, the first guide sleeve 72 is rotatably arranged at the right portion of the connecting rod 71, the stirring rod 73 is rotatably arranged in the middle of the discharging frame 41, the stirring rod 73 can stir asphalt and clear water, the stirring rod 73 penetrates through the first guide sleeve 72, the stirring rod 73 is slidably connected with the first guide sleeve 72, the first rotating shaft 74 is rotatably arranged at the right portion of the rear portion of the movable frame 1, the first transmission component 75 is connected between the upper portion of the first rotating shaft 74 and the lower portion of the first guide sleeve 72, one belt pulley is arranged at the upper portion of the first rotating shaft 74, the other belt pulley is arranged at the lower portion of the first guide sleeve 72, the belt is wound between the two belts, a second rotating shaft 78 is rotatably arranged at the lower right side of the rear part of the moving frame 1, bevel gears 76 are fixedly connected to the front part of the second rotating shaft 78 and the lower part of the first rotating shaft 74, the two bevel gears 76 are meshed with each other, a second transmission component 77 is connected between the front part of the right rear moving roller 2 and the rear part of the second rotating shaft 78, the second transmission component 77 consists of two belt pulleys and a belt, one belt pulley is arranged at the front part of the right rear moving roller 2, the other belt pulley is arranged at the rear part of the second rotating shaft 78, and the belt is wound between the two belts.
Still including adding water subassembly 8, it is including water storage frame 81 to add water subassembly 8, square plate 82, first L shape connecting rod 83 and fourth spring 84, it has water storage frame 81 to remove 1 right part upside rigid coupling, the middle slidingtype of water storage frame 81 left part is equipped with square plate 82, in the water storage frame is added to an appropriate amount of clear water, square plate 82 can realize spacing, square plate 82 middle part rigid coupling has first L shape connecting rod 83, first L shape connecting rod 83 cooperates with blowing frame 41, be connected with fourth spring 84 between the middle of square plate 82 top and the water storage frame 81 medial surface.
The device is characterized by further comprising a slotting component 9, the slotting component 9 comprises a second guide sleeve 91, a slotting rod 92, a fifth spring 93, a first limiting rod 94, a material cleaning rod 95 and a sixth spring 96, the second guide sleeve 91 is fixedly connected to the middle of the left portion of the movable frame 1, the slotting rod 92 is arranged in the second guide sleeve 91 in a sliding mode, the fifth spring 93 is wound between the top of the second guide sleeve 91 and the upper portion of the slotting rod 92, the first limiting rod 94 penetrates through the left side of the lower portion of the slotting rod 92, the material cleaning rod 95 is arranged on the lower portion of the slotting rod 92 in a sliding mode, the material cleaning rod 95 can clean a construction seam, and the sixth spring 96 is wound between the top of the material cleaning rod 95 and the inner upper portion of the slotting rod 92.
The resetting component 10 comprises a second limiting rod 101, a guide rail 102, a V-shaped block 103, an inclined block 104, a magnet 105, a U-shaped rod 106, a third limiting rod 107, a seventh spring 108, a second L-shaped connecting rod 109, a stopper 110, an eighth spring 111 and a ninth spring 112, the second limiting rod 101 is arranged at the bottom of the moving frame 1 in a sliding manner, the second limiting rod 101 is matched with the first limiting rod 94, the bottom of the moving frame 1 is connected with the guide rail 102 in a front-back symmetrical manner through bolts, the V-shaped block 103 is arranged at the bottom of the supporting plate 42 in a front-back symmetrical manner, the inclined block 104 is arranged on the guide rail 102 in a sliding manner, the inclined block 104 is matched with the V-shaped block 103, the magnets 105 are fixedly connected at the front side and the rear side of the left part of the second limiting rod 101, the U-shaped rod 106 is fixedly connected at the right part of the second limiting rod 101, the third limiting rod 107 is arranged in a sliding manner in the U-shaped rod 106, the seventh spring 108 is fixedly connected between the inner side of the third limiting rod 107 and the U-shaped rod 106 in a front-back symmetrical manner, a second L-shaped connecting rod 109 is symmetrically fixedly connected to the right side of the bottom in the moving frame 1 in a front-back manner, a stop block 110 is arranged on the upper portion of the second L-shaped connecting rod 109 in a sliding manner, the stop block 110 is matched with the third limiting rod 107, an eighth spring 111 is arranged between the inner side face of the stop block 110 and the inside of the second L-shaped connecting rod 109, the third limiting rod 107 moves rightwards and slides over the stop block 110 under the action of the eighth spring 111, the stop block 110 can limit the third limiting rod 107, and a ninth spring 112 is arranged between the inner side face of the second limiting rod 101 and the inner side of the moving frame 1.
After the asphalt is stirred, the asphalt is discharged into the blanking frame 51 through the blanking ring 44, the second material blocking plate 61 limits the asphalt, when the arc-shaped material guiding rod 53 is in contact with the ground, the arc-shaped material guiding rod 53 moves upwards to be in contact with the second material blocking plate 61, the arc-shaped material guiding rod 53 enables the second material blocking plate 61 to rotate forwards, the second material blocking plate 61 rotates forwards to drive the connecting block 62 to rotate forwards, the torsion spring 63 is stretched, the second material blocking plate 61 stops limiting the asphalt in the forward direction, the asphalt also flows downwards, after all construction joints are filled, the arc-shaped material guiding rod 53 also moves downwards to reset and is separated from the second material blocking plate 61, the second material blocking plate 61 drives the connecting block 62 to rotate backwards to reset under the action of the torsion spring 63, the limiting block 64 limits the connecting block 62, and therefore, the outflow of excessive asphalt can be avoided.
Firstly, an operator pours a proper amount of asphalt into the blanking frame 51, then adds a proper amount of clear water, and then pushes the device to move through the movable roller 2, so that the right rear movable roller 2 rotates to drive the second transmission component 77 to rotate, the second transmission component 77 rotates to drive the second rotating shaft 78 to rotate, the second rotating shaft 78 drives the first rotating shaft 74 to rotate through the bevel gear 76, the first rotating shaft 74 rotates to drive the first transmission component 75 to rotate, the first transmission component 75 rotates to drive the stirring rod 73 to rotate, the stirring rod 73 rotates to stir the asphalt, after all construction joints are filled, the right rear movable roller 2 stops driving the second rotating shaft 78 to rotate through the second transmission component 77, and the stirring rod 73 stops rotating, so that the asphalt can be prevented from being solidified.
Firstly, an operator adds a proper amount of clean water into the water storage frame 81, the square plate 82 shields the clean water, the discharging frame 41 is added with a proper amount of asphalt, due to the action of gravity, the discharging frame 41 continuously drives the first L-shaped connecting rod 83 to move downwards, the first L-shaped connecting rod 83 moves downwards to drive the square plate 82 to move downwards, the fourth spring 84 is stretched, the square plate 82 moves downwards to stop limiting the clean water, the clean water also flows into the discharging frame 41, after all construction joints are filled, the asphalt in the discharging frame 41 is used up, the discharging frame 41 does not drive the first L-shaped connecting rod 83 to move downwards, due to the action of the fourth spring 84, the square plate 82 also drives the first L-shaped connecting rod 83 to move upwards to reset, and therefore, the manual clean water adding of people is not needed.
When people use this device, pulling crack rod 92 rebound for with the contact of crack rod 92 construction joint, fifth spring 93 is stretched, and then promote this device through removing gyro wheel 2 and remove, clear material pole 95 just also clears up in the construction joint, sixth spring 96 plays the cushioning effect, whole construction joint fills up the completion back, crack rod 92 breaks away from with the construction joint, because of fifth spring 93's effect, crack rod 92 rebound, so, can avoid remaining debris in the construction joint.
After all the construction joints are filled, the second limiting rod 101 is pulled to move rightwards, the ninth spring 112 is stretched, the second limiting rod 101 moves rightwards to drive the first limiting rod 94 to move upwards, the first limiting rod 94 moves upwards to drive the slotted rod 92 to move upwards, the second limiting rod 101 moves rightwards to contact with the blanking frame 51, the second limiting rod 101 also moves rightwards to drive the blanking frame 51 to move upwards to reset, meanwhile, the second limiting rod 101 moves rightwards to drive the magnet 105 to move rightwards, the magnet 105 moves rightwards to contact with the inclined block 104, the magnet 105 adsorbs and fixes the inclined block 104, the magnet 105 drives the inclined block 104 to move rightwards, the inclined block 104 moves rightwards to drive the V-shaped block 103 to move upwards, the V-shaped block 103 moves upwards to drive the support plate 42 to move upwards, the support plate 42 moves upwards to drive the blanking frame 41 to move upwards, and the second limiting rod 101 drives the U-shaped rod 106 to move rightwards, the U-shaped rod 106 moves rightwards to drive the third limiting rod 107 to move rightwards, the third limiting rod 107 moves rightwards to contact with the stop block 110, the third limiting rod 107 moves rightwards to slide over the stop block 110 under the action of the eighth spring 111, the stop block 110 limits the third limiting rod 107, after all construction joints are filled, the third limiting rod 107 is pressed to move downwards, the seventh spring 108 is compressed, the third limiting rod 107 moves downwards to be separated from the stop block 110, the second limiting rod 101 drives the inclined block 104 to move leftwards to be reset under the action of the ninth spring 112, the inclined block 104 moves leftwards to limit the maximum stroke of the guide rail 102, the third limiting rod 107 is loosened, the third limiting rod 107 moves upwards to be reset under the action of the eighth spring 111, and therefore multiple positions can be reset simultaneously.
The above embodiments are merely illustrative of the technical ideas and features of the present invention, and the purpose thereof is to enable those skilled in the art to understand the contents of the present invention and implement the present invention, and not to limit the protection scope of the present invention. All equivalent changes and modifications made according to the spirit of the present invention should be covered within the protection scope of the present invention.

Claims (8)

1. A ground joint filling device before waterproof construction of a top building is characterized by comprising a moving frame (1), moving rollers (2), a connecting ring sleeve (3), a material placing component (4) and a joint filling component (5), wherein the moving rollers (2) are symmetrically and rotatably arranged on the left side and the right side of the moving frame (1) in a front-back symmetrical mode, the connecting ring sleeve (3) is fixedly connected to the left side of the inner top of the moving frame (1), the material placing component (4) used for storing materials is arranged on the moving frame (1), and the joint filling component (5) used for filling construction joints is arranged on the connecting ring sleeve (3); the joint filling assembly (5) comprises a blanking frame (51), a second spring (52), an arc-shaped material guide rod (53), wedge-shaped blocks (54), a first material baffle plate (55) and a third spring (56), the blanking frame (51) is arranged in an inner sliding manner of a connecting ring sleeve (3), the second spring (52) is wound and connected in a bilateral symmetry manner between the inner side of the blanking frame (51) and the inner part of the connecting ring sleeve (3), the arc-shaped material guide rod (53) used for blanking is arranged in a sliding manner on the lower part of the blanking frame (51), the wedge-shaped blocks (54) are fixedly connected to the middle of the inner side of the arc-shaped material guide rod (53), the first material baffle plate (55) is arranged in a sliding manner on the lower part of the blanking frame (51), the first material baffle plate (55) is in sliding fit with the wedge-shaped blocks (54), and the third spring (56) is fixedly connected in a front-back symmetry manner between the inner side of the first material baffle plate (55) and the inner side of the blanking frame (51).
2. The ground gap filling device before waterproof construction of a top building according to claim 1, characterized in that the discharging component (4) comprises a discharging frame (41) for storing materials, a supporting plate (42), a first spring (43) and a discharging ring (44), the discharging frame (41) is arranged at the left part in the moving frame (1) in a sliding manner, the supporting plate (42) is fixedly connected to the outer bottom of the discharging frame (41), the first spring (43) is fixedly connected between the bottom of the supporting plate (42) and the inner side surface of the moving frame (1), the discharging ring (44) is connected to the left middle side of the bottom of the discharging frame (41), and the discharging frame (51) is sleeved on the discharging ring (44).
3. The ground gap filling device before waterproof construction of the top building according to claim 2, characterized by further comprising a limiting component (6) for limiting blanking, wherein the limiting component (6) comprises a second material baffle plate (61) and a connecting block (62), torsion spring (63) and stopper (64), unloading frame (51) middle part rotary type is equipped with and is used for spacing second flange (61), arc guide bar (53) rebound can drive second flange (61) and rotate, both sides all the rigid coupling has connecting block (62) around second flange (61), both sides are all around having torsion spring (63) around second flange (61), torsion spring (63) one end is connected with connecting block (62), torsion spring (63) other end is connected with unloading frame (51), unloading frame (51) outer front and back both sides left lower part all the rigid coupling have stopper (64).
4. The ground gap filling device before waterproof construction of the top building according to claim 3, characterized by further comprising a stirring component (7) for conveniently stirring asphalt, wherein the stirring component (7) comprises a connecting rod (71), a first guide sleeve (72), a stirring rod (73), a first rotating shaft (74), a first transmission component (75), a bevel gear (76), a second transmission component (77) and a second rotating shaft (78), the connecting rod (71) is fixedly connected to the middle of the left side surface in the moving frame (1), the first guide sleeve (72) is rotatably arranged at the right part of the connecting rod (71), the stirring rod (73) for mixing and stirring is rotatably arranged in the middle of the discharging frame (41), the stirring rod (73) penetrates through the first guide sleeve (72), the stirring rod (73) is slidably connected with the first guide sleeve (72), the first rotating shaft (74) is rotatably arranged at the right side of the rear part of the moving frame (1), a first transmission component (75) is connected between the upper part of the first rotating shaft (74) and the lower part of the first guide sleeve (72), the first transmission component (75) consists of two belt pulleys and a belt, one belt pulley is arranged on the upper part of the first rotating shaft (74), the other belt pulley is arranged on the lower part of the first guide sleeve (72), the belt is wound between the two belts, a second rotating shaft (78) is rotatably arranged on the lower right side of the rear part of the moving frame (1), bevel gears (76) are fixedly connected on the front part of the second rotating shaft (78) and the lower part of the first rotating shaft (74), the two bevel gears (76) are meshed with each other, a second transmission component (77) is connected between the front part of the right rear moving roller (2) and the rear part of the second rotating shaft (78), the second transmission component (77) consists of the two belt pulleys and the belt, one belt pulley is arranged on the front part of the right rear moving roller (2), the other belt pulley is arranged on the rear part of the second rotating shaft (78), the belt is wound between the two belts.
5. The ground gap filling device before waterproof construction of a top building as claimed in claim 4, characterized by further comprising a water adding assembly (8) for conveniently adding clear water, wherein the water adding assembly (8) comprises a water storage frame (81), a square plate (82), a first L-shaped connecting rod (83) and a fourth spring (84), the water storage frame (81) is fixedly connected to the upper side of the right part of the movable frame (1), the square plate (82) for retaining water is slidably arranged in the middle of the left part of the water storage frame (81), the first L-shaped connecting rod (83) is fixedly connected to the middle of the square plate (82), the first L-shaped connecting rod (83) is matched with the material placing frame (41), and the fourth spring (84) is connected between the middle of the top of the square plate (82) and the inner side face of the water storage frame (81).
6. The ground gap filling device before waterproof construction of the top building according to claim 5, characterized in that, the device further comprises a slotted component (9) for cleaning the construction gap, the slotted component (9) comprises a second guide sleeve (91), a slotted rod (92) and a fifth spring (93), first gag lever post (94), clear material pole (95) and sixth spring (96), the rigid coupling has second guide pin bushing (91) in the middle of removal frame (1) left part, second guide pin bushing (91) internal sliding formula is equipped with slotted pole (92), fifth spring (93) have been walked around between second guide pin bushing (91) top and slotted pole (92) upper portion, slotted pole (92) lower part left side has run through first gag lever post (94), slotted pole (92) lower part sliding type is equipped with clear material pole (95) that are used for the clearance, clear material pole (95) top and slotted pole (92) interior upper portion between have been walked around and have been had sixth spring (96).
7. The ground gap filling device before waterproof construction of the top building according to claim 6, characterized by further comprising a reset assembly (10) for resetting, wherein the reset assembly (10) comprises a second limiting rod (101), a guide rail (102), a V-shaped block (103), a wedge block (104), a magnet (105), a U-shaped rod (106), a third limiting rod (107), a seventh spring (108), a second L-shaped connecting rod (109), a stopper (110), an eighth spring (111) and a ninth spring (112), the second limiting rod (101) is slidably arranged at the bottom in the moving rack (1), the second limiting rod (101) is matched with the first limiting rod (94), the guide rail (102) is symmetrically connected at the front and back of the bottom in the moving rack (1), the V-shaped block (103) is symmetrically arranged at the front and back of the bottom of the support plate (42), the wedge block (104) is slidably arranged on the guide rail (102), and the wedge block (104) is matched with the V-shaped block (103), magnets (105) are fixedly connected to the front side and the rear side of the left portion of the second limiting rod (101), the magnets (105) are matched with the inclined blocks (104), a U-shaped rod (106) is fixedly connected to the right portion of the second limiting rod (101), a third limiting rod (107) is arranged in the U-shaped rod (106) in an inward sliding mode, seventh springs (108) are symmetrically and fixedly connected to the front and the rear of the inner side of the third limiting rod (107) and the inner portion of the U-shaped rod (106) in the front and the rear mode, a second L-shaped connecting rod (109) is symmetrically and fixedly connected to the front and the rear of the right side of the inner bottom of the moving frame (1), a stop block (110) used for limiting is arranged on the upper portion of the second L-shaped connecting rod (109) in a sliding mode, the stop block (110) is matched with the third limiting rod (107), an eighth spring (111) is arranged between the inner side of the stop block (110) and the inner side of the second L-shaped connecting rod (109), and a ninth spring (112) is arranged between the inner side of the second limiting rod (101) and the moving frame (1).
8. The floor caulking apparatus before waterproof construction of the top building as claimed in claim 7, wherein the guide rails (102) are connected by bolts.
CN202111606371.0A 2021-12-26 2021-12-26 Ground joint filling device before waterproof construction of top building Active CN114250955B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111606371.0A CN114250955B (en) 2021-12-26 2021-12-26 Ground joint filling device before waterproof construction of top building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111606371.0A CN114250955B (en) 2021-12-26 2021-12-26 Ground joint filling device before waterproof construction of top building

Publications (2)

Publication Number Publication Date
CN114250955A true CN114250955A (en) 2022-03-29
CN114250955B CN114250955B (en) 2023-08-11

Family

ID=80795151

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111606371.0A Active CN114250955B (en) 2021-12-26 2021-12-26 Ground joint filling device before waterproof construction of top building

Country Status (1)

Country Link
CN (1) CN114250955B (en)

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107882309A (en) * 2017-11-02 2018-04-06 戚展鹏 A kind of house decoration tile tray joint filling device
CN108060770A (en) * 2017-11-23 2018-05-22 河南高盛企业管理咨询有限公司 A kind of caulking machine with seam cleaning function
CN108560385A (en) * 2018-05-04 2018-09-21 朱加春 A kind of cement floor expansion joint joint filling equipment
DE202018004187U1 (en) * 2018-09-11 2018-10-01 Ed. Züblin Aktiengesellschaft Fugenfüllvorrichtung
CN108868084A (en) * 2018-06-20 2018-11-23 叶永青 A kind of construction floor ceramic tile joint filling equipment
CN109403606A (en) * 2018-10-08 2019-03-01 刘光伟 A kind of ceramic tile gap gluer
CN111636402A (en) * 2020-05-27 2020-09-08 罗丽芳 Grass discharging and sand fixing integrated machine
CN112048980A (en) * 2020-09-11 2020-12-08 李宗志 Road and bridge crack repairing device capable of quantitatively filling repairing glue
JP6826263B1 (en) * 2019-12-19 2021-02-03 温州▲しゅう▼途電子科技有限公司 A device that automatically slices the road surface
CN112376377A (en) * 2020-11-06 2021-02-19 刘杰 Device capable of solving problems of easy position deviation and uneven glue discharge during pavement joint patching
CN112779847A (en) * 2021-01-12 2021-05-11 刘莉 Marking device is used in building site construction
CN213477561U (en) * 2020-09-14 2021-06-18 凌云 Floor tile joint filling equipment for building construction
CN213538634U (en) * 2020-08-11 2021-06-25 中交二航局第一工程有限公司 Municipal road is with device of caulking
CN214613513U (en) * 2021-03-10 2021-11-05 范方柱 Municipal administration road bridge construction is with device of caulking
CN114148394A (en) * 2021-11-12 2022-03-08 肖少娥 Cement mobile device for building
CN114232950A (en) * 2021-12-15 2022-03-25 钟朝见 Wall cement spraying device for wall construction
CN216865880U (en) * 2021-12-07 2022-07-01 山东卓高新材料有限公司 Building decoration joint agent filling device
CN217169137U (en) * 2022-04-03 2022-08-12 张谦硕 Civil engineering construction is with device of caulking fast

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107882309A (en) * 2017-11-02 2018-04-06 戚展鹏 A kind of house decoration tile tray joint filling device
CN108060770A (en) * 2017-11-23 2018-05-22 河南高盛企业管理咨询有限公司 A kind of caulking machine with seam cleaning function
CN108560385A (en) * 2018-05-04 2018-09-21 朱加春 A kind of cement floor expansion joint joint filling equipment
CN108868084A (en) * 2018-06-20 2018-11-23 叶永青 A kind of construction floor ceramic tile joint filling equipment
DE202018004187U1 (en) * 2018-09-11 2018-10-01 Ed. Züblin Aktiengesellschaft Fugenfüllvorrichtung
CN109403606A (en) * 2018-10-08 2019-03-01 刘光伟 A kind of ceramic tile gap gluer
JP6826263B1 (en) * 2019-12-19 2021-02-03 温州▲しゅう▼途電子科技有限公司 A device that automatically slices the road surface
CN111636402A (en) * 2020-05-27 2020-09-08 罗丽芳 Grass discharging and sand fixing integrated machine
CN213538634U (en) * 2020-08-11 2021-06-25 中交二航局第一工程有限公司 Municipal road is with device of caulking
CN112048980A (en) * 2020-09-11 2020-12-08 李宗志 Road and bridge crack repairing device capable of quantitatively filling repairing glue
CN213477561U (en) * 2020-09-14 2021-06-18 凌云 Floor tile joint filling equipment for building construction
CN112376377A (en) * 2020-11-06 2021-02-19 刘杰 Device capable of solving problems of easy position deviation and uneven glue discharge during pavement joint patching
CN112779847A (en) * 2021-01-12 2021-05-11 刘莉 Marking device is used in building site construction
CN214613513U (en) * 2021-03-10 2021-11-05 范方柱 Municipal administration road bridge construction is with device of caulking
CN114148394A (en) * 2021-11-12 2022-03-08 肖少娥 Cement mobile device for building
CN216865880U (en) * 2021-12-07 2022-07-01 山东卓高新材料有限公司 Building decoration joint agent filling device
CN114232950A (en) * 2021-12-15 2022-03-25 钟朝见 Wall cement spraying device for wall construction
CN217169137U (en) * 2022-04-03 2022-08-12 张谦硕 Civil engineering construction is with device of caulking fast

Also Published As

Publication number Publication date
CN114250955B (en) 2023-08-11

Similar Documents

Publication Publication Date Title
CN108673749B (en) A kind of stirring means of three-dimensional concrete
CN107790384B (en) Sand sieving mechanism is used in road construction
CN111805723B (en) Concrete pipe pile material making and filling system capable of improving quality of finished products
CN109469298B (en) Tile laying device
CN114250955A (en) Ground device of caulking before waterproof construction of top building
CN114505263A (en) Building decoration is with surplus mucilage binding of wall brick scraping device
CN213173250U (en) Remove convenient pitch laying device
CN213864239U (en) Quick cat litter board paving machine for pet shop
CN112726467B (en) Efficient energy-saving environment-friendly road garbage cleaning device
CN218319121U (en) Coal mine transportation transmission device
CN115430702B (en) Soil restoration agent pouring and scattering device for soil restoration and application method thereof
CN115837373A (en) Demulcent case is used in herbal pieces-processing
CN212890502U (en) Concrete transfer device with anti-shake spills structure
CN113235382B (en) Highway engineering is with melting marking off machine
CN211333971U (en) Concrete mixer for building
CN110142150B (en) Sesame sieving mechanism
CN112220408A (en) Automatic garbage collecting and dumping and floor cleaning equipment suitable for train
CN206512655U (en) A kind of sweeper
CN220008261U (en) Material mixing device for 3D concrete printer
CN114474496B (en) Equipment for crushing waste rubber before preparation of rubber powder
CN110758333A (en) Freight train carriage cleaning device
CN219235706U (en) Concrete placement device for construction engineering
CN216878973U (en) Asphalt concrete transportation tank
CN216304453U (en) Bridge crack repairing device
CN220521442U (en) Hydraulic ecological engineering dredging device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20230714

Address after: 215316 76-102 Yuhu Business Center, Kunshan City, Suzhou City, Jiangsu Province

Applicant after: Yuanxinshe Construction Technology Co.,Ltd.

Address before: 510630 room 1008, building 4, No. 3, Tianyun Road, Tianhe District, Guangzhou, Guangdong

Applicant before: Xiao Shaoe

GR01 Patent grant