CN108868084A - A kind of construction floor ceramic tile joint filling equipment - Google Patents

A kind of construction floor ceramic tile joint filling equipment Download PDF

Info

Publication number
CN108868084A
CN108868084A CN201810637541.3A CN201810637541A CN108868084A CN 108868084 A CN108868084 A CN 108868084A CN 201810637541 A CN201810637541 A CN 201810637541A CN 108868084 A CN108868084 A CN 108868084A
Authority
CN
China
Prior art keywords
movable block
nut
ceramic tile
block
link
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810637541.3A
Other languages
Chinese (zh)
Other versions
CN108868084B (en
Inventor
叶永青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi longchen Construction Engineering Co., Ltd
Original Assignee
叶永青
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 叶永青 filed Critical 叶永青
Priority to CN201810637541.3A priority Critical patent/CN108868084B/en
Publication of CN108868084A publication Critical patent/CN108868084A/en
Application granted granted Critical
Publication of CN108868084B publication Critical patent/CN108868084B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/165Implements for finishing work on buildings for finishing joints, e.g. implements for raking or filling joints, jointers
    • E04F21/1652Implements for finishing work on buildings for finishing joints, e.g. implements for raking or filling joints, jointers for smoothing and shaping joint compound to a desired contour

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Floor Finish (AREA)

Abstract

The present invention relates to a kind of construction joint filling equipment more particularly to a kind of construction floor ceramic tile joint filling equipment.Technical problem of the invention is:It is a kind of time saving and energy saving to provide, and can guarantee the construction floor ceramic tile joint filling equipment of construction stability and ground tidiness.Implementer's case of the invention is:A kind of construction floor ceramic tile joint filling equipment, includes movable block, wheel, screw rod, L-type connecting rod, annulus, first nut etc.;The bottom left of left movable block and the bottom right of right movable block are equipped with wheel, and right part is symmetrical above and below on front side of the movable block of left is equipped with screw rod, and screw rod right part is located in front of the movable block of right.The present invention pushes the movable block of two sides of left and right by user backward, to make piston move down, thus achieve the effect that fill up gap filler to sew in ceramic tile, push plate moves backward and can will fill up the gap filler sewed in ceramic tile and be bulldozed, user's positive direction, which rotates the first bolt, moves down cushion block, so that cushion block be made to play a supportive role equipment.

Description

A kind of construction floor ceramic tile joint filling equipment
Technical field
The present invention relates to a kind of construction joint filling equipment more particularly to a kind of construction to be set with floor ceramic tile joint filling It is standby.
Background technique
Ceramic tile, also known as ceramic tile, are metal oxide and half-metal oxide with fire resisting, via grinding, mixing, compacting, The process of glazing, sintering, and a kind of porcelain of the acid and alkali-resistance formed or stone matter etc., building or ornament materials, referred to as ceramic tile.Its Raw material are mostly mixed by clay, quartz sand etc..
People can be laid with ground with ceramic tile when house decoration, and common ceramic tile gap can all occur when being laid with, and stitch Gap can accumulate dust, so that will increase people clears up the difficulty on ground, so just need to be filled up ceramic tile seam with tile grout, But if it is ceramic tile seam is manually filled up, that just requires a great deal of time and labour, and manually fills up and cannot be guaranteed The tidiness of construction stability and ground.
Summary of the invention
In order to overcome manually fill up ceramic tile seam can be time-consuming and laborious, and manually fill up it cannot be guaranteed that construction stability and ground Tidiness the shortcomings that, technical problem of the invention is:It is a kind of time saving and energy saving to provide, and can guarantee that construction stability and ground are whole The construction of cleanliness floor ceramic tile joint filling equipment.
Implementer's case of the invention is:A kind of construction floor ceramic tile joint filling equipment includes movable block, wheel Son, screw rod, L-type connecting rod, annulus, the first nut, hollow pipe, piston, elevating lever, pressing plate, link, reel, bracing wire and extension Hook, the bottom left of left movable block and the bottom right of right movable block are equipped with wheel, on front side of the movable block of left on right part Under be symmetrically arranged with screw rod, screw rod right part is located in front of the movable block of right, and the left part L-type symmetrical above and below that is equipped with connects on front side of the movable block of right Extension bar, L-type connecting rod lower end are equipped with annulus, are threadably set in the middle part of screw rod there are two the first nut, annulus passes through screw rod, circle Ring is located between two the first nuts in left and right, and left movable block top left side and right movable block top right side are provided with through-hole, It is equipped with hollow pipe on the left of the movable block of left and on the right side of the movable block of right, lower slide formula is equipped with piston, piston top in hollow pipe Portion is equipped with elevating lever, is equipped with pressing plate at the top of elevating lever, and left pressing plate bottom right and right pressing plate bottom left are equipped with link, Reel is equipped on the right side of the left side of left wheel and right wheel, reel is located at the lower section of through-hole, is wound on reel Bracing wire is drawstring through through-hole, and the bracing wire other end is connected with hook, hangs on link.
Further, further include having the first link block, the second nut, spring, push plate, the first guide rod and wing bolt, Left movable block left lower and right movable block lower right side are equipped with the first link block, the first link block of left left side and the right side The second nut is equipped on the right side of the first link block of side, the second nut is located in front of hollow pipe, right at left and right sides of the second nut bottom Claim to be equipped with spring, lower spring end is connected with push plate, and push plate top center is equipped with the first guide rod, and the first guide rod is located at two sides' of left and right Between spring, the first guide rod top is located in the second nut, and wing bolt, wing bolt are threadably equipped in the second nut Bottom end and the first guide rod tip contact.
Further, further including having guide sleeve, the second link block, the second guide rod, the first bolt and cushion block, left movable block Left upper portion and right movable block right upper portion are equipped with guide sleeve, are equipped with the second company on the right side of left pressing plate left side and right pressing plate Block is connect, left the second link block bottom left and right the second link block bottom right are equipped with the second guide rod, and the second guide rod is worn Cross guide sleeve, left movable block bottom right and right movable block bottom left are provided with threaded hole, in threaded hole threadably Equipped with the first bolt, the first bolt bottom end is equipped with cushion block.
When user will use the equipment to ceramic tile joint filling, user puts it on the ground equipment, then makes two sides' of left and right Hollow pipe bottom end is directed at ceramic tile seam, when the distance between the hollow pipe bottom end of two sides of left and right is wider than the distance between two ceramic tile seams When, user's positive direction rotates the first nut of left, and after the first nut of left moves to the appropriate position, user stops operating a left side First nut of side, then user is moved to the left the movable block of right, and the movable block of right, which is moved to the left, drives the hollow of right Pipe is moved to the left, while the movable block of right is moved to the left and will drive L-type connecting rod and be moved to the left, and L-type connecting rod is moved to the left Annulus is driven to be moved to the left, when annulus is contacted with the first nut of left, user stops the movable block for being moved to the left right, then User's positive direction rotates the first nut of right, and the first nut of right is moved to the left when contacting with annulus, and user stops operating the right side The first nut of side, when the distance between less than two ceramic tile seams in the distance between two side's hollow pipe bottom ends of left and right, user negative side To the first nut of rotation right, the first nut of right moves right to suitable position, and user stops operating right first Nut, then user moves right right movable block, and right movable block, which moves right, drives right hollow pipe to move right, simultaneously Right movable block, which moves right, drives L-type connecting rod to move right, and L-type connecting rod, which moves right, drives annulus to move right, when When annulus and the first nut of right contact, user stops the right movable block that moves right, and then user's opposite direction rotates left First nut, when the first nut of left is moved right as annulus contact, user stops operating the first nut of left, two sides of left and right The first nut annulus is fixed, thus by left and right two sides movable block fix, user will left and right two sides hollow pipe bottom end After being directed at ceramic tile seam, user will link up with and remove from link, and then user is lifted up pressing plate, so that elevating lever and piston be taken Out in hollow pipe, subsequent user pours into tile grout in hollow pipe, is finished down rear user and again puts back to elevating lever and piston In hollow pipe, hook is hung again hang back on ring later, after hanging up properly, user pushes the movable block of two sides of left and right backward, mobile Block, which moves backward, drives wheel to roll backward on the ground, and wheel rolls backward drives reel rotation, and reel rotation will be drawn Line is packed up, to make bracing wire that hook be pulled to move down, hook, which moves down, drives link to move down, and link moves down band Dynamic pressure plate moves down, and pressing plate, which moves down, drives elevating lever to move down, and elevating lever moves down band piston and moves down, To which the tile grout in hollow pipe is squeezed out hollow pipe, thus ceramic tile will be stitched and be filled up by tile grout, work as user When not needing to fill up ceramic tile seam, user stops the movable block for pushing two sides of left and right backward.
When user will lower the height of push plate, user's positive direction rotates wing bolt, and wing bolt moves down promotion First guide rod moves down, and the first guide rod, which moves down, drives push plate to move down, and push plate, which moves down, makes spring be stretched, when After push plate is moved downward to suitable distance, user stops operating wing bolt, and when user will raise the height of push plate, user is anti- Direction rotates wing bolt, and when wing bolt is moved upward to suitable distance, user stops operating wing bolt, spring contraction band Dynamic push plate moves up, and push plate, which moves up, drives the first guide rod to move up, when push plate is adjusted to proper height, Yong Huxiang The movable block for pushing two sides of left and right afterwards, during movable block is mobile, push plate can will fill up the ceramic tile sewed in ceramic tile and fill out Seam agent is bulldozed.
When bracing wire pulls pressing plate to move down, pressing plate, which moves down, drives the second link block to move down, the second connection Block, which moves down, drives the second guide rod to move down, and guide sleeve and the second guide rod play balanced action to pressing plate, to make piston and liter Drop bar can be moved down smoothly, and when user does not need to fill up ceramic tile seam, user's positive direction rotates the first bolt, the first spiral shell Bolt move down drive cushion block move down, when cushion block when being contacted with ground, user stop positive direction rotate the first bolt, left and right The cushion block of two sides plays a supportive role to equipment, so that wheel be made not use with ground face contact when user will start to fill up ceramic tile seam Family opposite direction rotate the first bolt, the first bolt move up drive cushion block move up, when cushion block be moved upward to properly away from From rear, user stops operating the first bolt.
Beneficial effects of the present invention are:The present invention pushes the movable block of two sides of left and right by user backward, to make piston It moves down, thus achievees the effect that fill up gap filler and be sewed in ceramic tile, push plate is moved backward to fill up and be stitched in ceramic tile On gap filler be bulldozed, user's positive direction rotate the first bolt move down cushion block, thus make cushion block to equipment rise support make With.
Detailed description of the invention
Fig. 1 is the first schematic view of the front view of the invention.
Fig. 2 is second of schematic view of the front view of the invention.
Fig. 3 is the third schematic view of the front view of the invention.
Fig. 4 is the 4th kind of schematic view of the front view of the invention.
In the figures above:1:Movable block, 2:Wheel, 3:Screw rod, 4:L-type connecting rod, 5:Annulus, 6:First nut, 7:It is logical Hole, 8:Hollow pipe, 9:Piston, 10:Elevating lever, 11:Pressing plate, 12:Link, 13:Reel, 14:Bracing wire, 15:Hook, 16:The One link block, 17:Second nut, 18:Spring, 19:Push plate, 20:First guide rod, 21:Wing bolt, 22:Guide sleeve, 23:Second Link block, 24:Second guide rod, 25:Threaded hole, 26:First bolt, 27:Cushion block.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Embodiment 1
A kind of construction floor ceramic tile joint filling equipment includes as shown in Figs 1-4 movable block 1, wheel 2, screw rod 3, L-type Connecting rod 4, annulus 5, the first nut 6, hollow pipe 8, piston 9, elevating lever 10, pressing plate 11, link 12, reel 13, bracing wire 14 With hook 15, the bottom left of left movable block 1 and the bottom right of right movable block 1 are equipped with wheel 2, left movable block 1 Front side right part is symmetrical above and below to be equipped with screw rod 3, and 3 right part of screw rod is located in front of right movable block 1, on 1 front side left part of right movable block Under be symmetrically arranged with L-type connecting rod 4,4 lower end of L-type connecting rod is equipped with annulus 5, and 3 middle part of screw rod threadably sets that there are two first Nut 6, annulus 5 pass through screw rod 3, and annulus 5 is located between two the first nuts 6 in left and right, 1 top left side of left movable block and right 1 top right side of movable block is provided with through-hole 7, is equipped with hollow pipe 8 on the right side of 1 left side of left movable block and right movable block 1, hollow Lower slide formula is equipped with piston 9 in pipe 8, and elevating lever 10 is equipped at the top of piston 9, and pressing plate 11, left pressure are equipped at the top of elevating lever 10 11 bottom right of plate and 11 bottom left of right pressing plate are equipped with link 12, the left side of left wheel 2 and the right side of right wheel 2 It is equipped with reel 13, reel 13 is located at the lower section of through-hole 7, and bracing wire 14 is wound on reel 13, and bracing wire 14 passes through through-hole 7, 14 other end of bracing wire is connected with hook 15, and hook 15 is hung on link 12.
Embodiment 2
A kind of construction floor ceramic tile joint filling equipment includes as shown in Figs 1-4 movable block 1, wheel 2, screw rod 3, L-type Connecting rod 4, annulus 5, the first nut 6, hollow pipe 8, piston 9, elevating lever 10, pressing plate 11, link 12, reel 13, bracing wire 14 With hook 15, the bottom left of left movable block 1 and the bottom right of right movable block 1 are equipped with wheel 2, left movable block 1 Front side right part is symmetrical above and below to be equipped with screw rod 3, and 3 right part of screw rod is located in front of right movable block 1, on 1 front side left part of right movable block Under be symmetrically arranged with L-type connecting rod 4,4 lower end of L-type connecting rod is equipped with annulus 5, and 3 middle part of screw rod threadably sets that there are two first Nut 6, annulus 5 pass through screw rod 3, and annulus 5 is located between two the first nuts 6 in left and right, 1 top left side of left movable block and right 1 top right side of movable block is provided with through-hole 7, is equipped with hollow pipe 8 on the right side of 1 left side of left movable block and right movable block 1, hollow Lower slide formula is equipped with piston 9 in pipe 8, and elevating lever 10 is equipped at the top of piston 9, and pressing plate 11, left pressure are equipped at the top of elevating lever 10 11 bottom right of plate and 11 bottom left of right pressing plate are equipped with link 12, the left side of left wheel 2 and the right side of right wheel 2 It is equipped with reel 13, reel 13 is located at the lower section of through-hole 7, and bracing wire 14 is wound on reel 13, and bracing wire 14 passes through through-hole 7, 14 other end of bracing wire is connected with hook 15, and hook 15 is hung on link 12.
It further include having the first link block 16, the second nut 17, spring 18, push plate 19, the first guide rod 20 and wing bolt 21, 1 left lower of left movable block and 1 lower right side of right movable block are equipped with the first link block 16, and the first link block of left 16 is left The second nut 17 is equipped on the right side of side and the first link block of right 16, the second nut 17 is located at 8 front of hollow pipe, the second nut 17 Spring 18 is symmetrically arranged at left and right sides of bottom, 18 lower end of spring is connected with push plate 19, and 19 top center of push plate is equipped with the first guide rod 20, the first guide rod 20 is located between the spring 18 of two sides of left and right, and 20 top of the first guide rod is located in the second nut 17, the second nut Wing bolt 21,21 bottom end of wing bolt and 20 tip contact of the first guide rod are threadably equipped in 17.
Embodiment 3
A kind of construction floor ceramic tile joint filling equipment includes as shown in Figs 1-4 movable block 1, wheel 2, screw rod 3, L-type Connecting rod 4, annulus 5, the first nut 6, hollow pipe 8, piston 9, elevating lever 10, pressing plate 11, link 12, reel 13, bracing wire 14 With hook 15, the bottom left of left movable block 1 and the bottom right of right movable block 1 are equipped with wheel 2, left movable block 1 Front side right part is symmetrical above and below to be equipped with screw rod 3, and 3 right part of screw rod is located in front of right movable block 1, on 1 front side left part of right movable block Under be symmetrically arranged with L-type connecting rod 4,4 lower end of L-type connecting rod is equipped with annulus 5, and 3 middle part of screw rod threadably sets that there are two first Nut 6, annulus 5 pass through screw rod 3, and annulus 5 is located between two the first nuts 6 in left and right, 1 top left side of left movable block and right 1 top right side of movable block is provided with through-hole 7, is equipped with hollow pipe 8 on the right side of 1 left side of left movable block and right movable block 1, hollow Lower slide formula is equipped with piston 9 in pipe 8, and elevating lever 10 is equipped at the top of piston 9, and pressing plate 11, left pressure are equipped at the top of elevating lever 10 11 bottom right of plate and 11 bottom left of right pressing plate are equipped with link 12, the left side of left wheel 2 and the right side of right wheel 2 It is equipped with reel 13, reel 13 is located at the lower section of through-hole 7, and bracing wire 14 is wound on reel 13, and bracing wire 14 passes through through-hole 7, 14 other end of bracing wire is connected with hook 15, and hook 15 is hung on link 12.
It further include having the first link block 16, the second nut 17, spring 18, push plate 19, the first guide rod 20 and wing bolt 21, 1 left lower of left movable block and 1 lower right side of right movable block are equipped with the first link block 16, and the first link block of left 16 is left The second nut 17 is equipped on the right side of side and the first link block of right 16, the second nut 17 is located at 8 front of hollow pipe, the second nut 17 Spring 18 is symmetrically arranged at left and right sides of bottom, 18 lower end of spring is connected with push plate 19, and 19 top center of push plate is equipped with the first guide rod 20, the first guide rod 20 is located between the spring 18 of two sides of left and right, and 20 top of the first guide rod is located in the second nut 17, the second nut Wing bolt 21,21 bottom end of wing bolt and 20 tip contact of the first guide rod are threadably equipped in 17.
It further include having guide sleeve 22, the second link block 23, the second guide rod 24, the first bolt 26 and cushion block 27, left movable block 1 Left upper portion and 1 right upper portion of right movable block are equipped with guide sleeve 22, are all provided on the right side of 11 left side of left pressing plate and right pressing plate 11 There is the second link block 23,23 bottom left of the second link block of left and 23 bottom right of the second link block of right are equipped with second and lead Bar 24, the second guide rod 24 pass through guide sleeve 22, and 1 bottom right of left movable block and 1 bottom left of right movable block are provided with screw thread Hole 25, the first bolt 26 is threadably equipped in threaded hole 25, and 26 bottom end of the first bolt is equipped with cushion block 27.
When user will use the equipment to ceramic tile joint filling, user puts it on the ground equipment, then makes two sides' of left and right 8 bottom end of hollow pipe is directed at ceramic tile seam, when the distance between 8 bottom end of hollow pipe of two sides of left and right be wider than between two ceramic tiles seam away from From when, user's positive direction rotate left the first nut 6, after the first nut 6 of left moves to the appropriate position, user stop turn First nut 6 of dynamic left, then user is moved to the left the movable block 1 of right, and the movable block 1 of right, which is moved to the left, drives right Hollow pipe 8 be moved to the left, while the movable block 1 of right is moved to the left and will drive L-type connecting rod 4 and be moved to the left, L-type connecting rod 4, which are moved to the left drive annulus 5, is moved to the left, and when annulus 5 is contacted with the first nut of left 6, user stops being moved to the left right Movable block 1, then user's positive direction rotate the first nut of right 6, the first nut of right 6 is moved to the left to be contacted with annulus 5 When, user stops operating the first nut of right 6, and when the distance between left and right two side's hollow pipes, 8 bottom end, less than two ceramic tiles stitch it Between apart from when, user's opposite direction rotates the first nut 6 of right, and the first nut 6 of right moves right to suitable position, User stops operating the first nut of right 6, and then user moves right right movable block 1, and right movable block 1 moves right drive Right hollow pipe 8 moves right, while right movable block 1 moves right and L-type connecting rod 4 is driven to move right, L-type connecting rod 4 It moves right and annulus 5 is driven to move right, when annulus 5 is contacted with the first nut of right 6, user stops the right shifting that moves right Motion block 1, then user's opposite direction rotates the first nut 6 of left, when the first nut of left 6 is moved right as the contact of annulus 5, User stops operating the first nut of left 6, and the first nut 6 of two sides of left and right fixes annulus 5, thus will two sides of left and right shifting Motion block 1 is fixed, and after user stitches 8 bottom end of the hollow pipe alignment ceramic tile of two sides of left and right, user will link up with 15 and remove from link 12, Then user is lifted up pressing plate 11, so that elevating lever 10 and piston 9 be taken out in hollow pipe 8, subsequent user is by ceramic tile joint filling Agent is poured into hollow pipe 8, is finished down rear user and is again put back to elevating lever 10 and piston 9 in hollow pipe 8, later again hangs hook 15 It hangs back on ring 12, after hook 15 is hung up properly, user pushes the movable block 1 of two sides of left and right backward, and movable block 1 moves backward drive wheel 2 roll backward on the ground, and wheel 2 rolls backward drives reel 13 to rotate, and bracing wire 14 is packed up in the rotation of reel 13, thus Make bracing wire 14 that hook 15 be pulled to move down, hook 15, which moves down, drives link 12 to move down, and link 12 moves down band Dynamic pressure plate 11 moves down, and pressing plate 11, which moves down, drives elevating lever 10 to move down, and elevating lever 10 moves down band piston 9 It moves down, so that the tile grout in hollow pipe 8 is squeezed out hollow pipe 8, thus ceramic tile will be stitched and be filled out by tile grout It mends, when user does not need to fill up ceramic tile seam, user stops the movable block 1 for pushing two sides of left and right backward.
When user will lower the height of push plate 19, user's positive direction rotates wing bolt 21, and wing bolt 21 is to moving down Dynamic that the first guide rod 20 is pushed to move down, the first guide rod 20, which moves down, drives push plate 19 to move down, and push plate 19 moves down So that spring 18 is stretched, after push plate 19 is moved downward to suitable distance, user stops operating wing bolt 21, when user will on When adjusting the height of push plate 19, user's opposite direction rotates wing bolt 21, when wing bolt 21 is moved upward to suitable distance, user Stop operating wing bolt 21, and spring 18, which is shunk, drives push plate 19 to move up, and push plate 19, which moves up, drives the first guide rod 20 It moves up, when push plate 19 is adjusted to proper height, user pushes the movable block 1 of two sides of left and right backward, mobile in movable block 1 During, push plate 19 can will fill up the tile grout sewed in ceramic tile and be bulldozed.
When bracing wire 14 pulls pressing plate 11 to move down, pressing plate 11, which moves down, drives the second link block 23 to move down, Second link block 23, which moves down, drives the second guide rod 24 to move down, and guide sleeve 22 and the second guide rod 24 play balance to pressing plate 11 and make With so that piston 9 and elevating lever 10 be enable smoothly to move down, when user does not need to fill up ceramic tile seam, user is square To rotation the first bolt 26, the first bolt 26 move down drive cushion block 27 move down, when cushion block 27 when being contacted with ground, use Family stop positive direction rotate the first bolt 26, left and right two sides cushion block 27 play a supportive role to equipment, thus make wheel 2 not with ground Face contact, when user will start to fill up ceramic tile seam, user's opposite direction rotates the first bolt 26, and the first bolt 26 moves up band Dynamic cushion block 27 moves up, and after cushion block 27 is moved upward to suitable distance, user stops operating the first bolt 26.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention rather than protects to the present invention The limitation of range is protected, although the invention is described in detail with reference to the preferred embodiments, those skilled in the art should Understand, it can be with modification or equivalent replacement of the technical solution of the present invention are made, without departing from the essence of technical solution of the present invention And range.

Claims (3)

1. a kind of construction floor ceramic tile joint filling equipment, feature are being:It include movable block, wheel, screw rod, L-type company Extension bar, annulus, the first nut, hollow pipe, piston, elevating lever, pressing plate, link, reel, bracing wire and hook, left movable block Bottom left and the bottom right of right movable block be equipped with wheel, right part is symmetrical above and below on front side of the movable block of left is equipped with spiral shell Bar, screw rod right part are located in front of the movable block of right, and left part is symmetrical above and below on front side of the movable block of right is equipped with L-type connecting rod, L-type connection Bar lower end is equipped with annulus, is threadably set in the middle part of screw rod there are two the first nut, and annulus passes through screw rod, and annulus is located at left and right two Between a first nut, left movable block top left side and right movable block top right side are provided with through-hole, and left movable block is left It is equipped with hollow pipe on the right side of side and right movable block, lower slide formula is equipped with piston in hollow pipe, and top land is equipped with elevating lever, Pressing plate is equipped at the top of elevating lever, left pressing plate bottom right and right pressing plate bottom left are equipped with link, a left side for left wheel Reel is equipped on the right side of side and right wheel, reel is located at the lower section of through-hole, is wound with bracing wire on reel, is drawstring through Through-hole, the bracing wire other end are connected with hook, hang on link.
2. a kind of construction described in accordance with the claim 1 floor ceramic tile joint filling equipment, feature are being:It further include having One link block, the second nut, spring, push plate, the first guide rod and wing bolt, left movable block left lower and right movable block Lower right side is equipped with the first link block, is equipped with the second spiral shell on the right side of the first link block of left left side and the first link block of right Mother, the second nut are located in front of hollow pipe, are symmetrically arranged with spring at left and right sides of the second nut bottom, lower spring end, which is connected with, to be pushed away Plate, push plate top center are equipped with the first guide rod, and the first guide rod is located between the spring of two sides of left and right, and the first guide rod top is located at the In two nuts, wing bolt, wing bolt bottom end and the first guide rod tip contact are threadably equipped in the second nut.
3. a kind of construction floor ceramic tile joint filling equipment, feature are being according to claim 2:It further include leading Set, the second link block, the second guide rod, the first bolt and cushion block, left movable block left upper portion and right movable block right upper portion It is equipped with guide sleeve, is equipped with the second link block, left the second link block bottom left on the right side of left pressing plate left side and right pressing plate Be equipped with the second guide rod with right the second link block bottom right, the second guide rod passes through guide sleeve, left movable block bottom right and Right movable block bottom left is provided with threaded hole, is threadably equipped with the first bolt in threaded hole, the first bolt bottom end is set There is cushion block.
CN201810637541.3A 2018-06-20 2018-06-20 Floor tile joint filling equipment for building construction Active CN108868084B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810637541.3A CN108868084B (en) 2018-06-20 2018-06-20 Floor tile joint filling equipment for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810637541.3A CN108868084B (en) 2018-06-20 2018-06-20 Floor tile joint filling equipment for building construction

Publications (2)

Publication Number Publication Date
CN108868084A true CN108868084A (en) 2018-11-23
CN108868084B CN108868084B (en) 2020-02-11

Family

ID=64340755

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810637541.3A Active CN108868084B (en) 2018-06-20 2018-06-20 Floor tile joint filling equipment for building construction

Country Status (1)

Country Link
CN (1) CN108868084B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113585677A (en) * 2021-06-18 2021-11-02 国网山东省电力公司建设公司 Floor tile joint filling device for building construction
CN114250955A (en) * 2021-12-26 2022-03-29 肖少娥 Ground device of caulking before waterproof construction of top building

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005108282A1 (en) * 2004-04-16 2005-11-17 Jorgenson Dean H Air operated grout tool
US7614813B1 (en) * 2006-12-15 2009-11-10 Yande Chandrakant R Grout dispenser
CN101914989A (en) * 2010-08-26 2010-12-15 王晓文 Wall pointer for buildings
CN105507567A (en) * 2016-01-17 2016-04-20 罗洋洋 Wall jointing device suitable for mortar
CN107882309A (en) * 2017-11-02 2018-04-06 戚展鹏 A kind of house decoration tile tray joint filling device
CN207405962U (en) * 2017-11-16 2018-05-25 崔建 A kind of adjustable two-tube glue rifle manually

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005108282A1 (en) * 2004-04-16 2005-11-17 Jorgenson Dean H Air operated grout tool
US7614813B1 (en) * 2006-12-15 2009-11-10 Yande Chandrakant R Grout dispenser
CN101914989A (en) * 2010-08-26 2010-12-15 王晓文 Wall pointer for buildings
CN105507567A (en) * 2016-01-17 2016-04-20 罗洋洋 Wall jointing device suitable for mortar
CN107882309A (en) * 2017-11-02 2018-04-06 戚展鹏 A kind of house decoration tile tray joint filling device
CN207405962U (en) * 2017-11-16 2018-05-25 崔建 A kind of adjustable two-tube glue rifle manually

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113585677A (en) * 2021-06-18 2021-11-02 国网山东省电力公司建设公司 Floor tile joint filling device for building construction
CN114250955A (en) * 2021-12-26 2022-03-29 肖少娥 Ground device of caulking before waterproof construction of top building
CN114250955B (en) * 2021-12-26 2023-08-11 源心舍建筑科技有限公司 Ground joint filling device before waterproof construction of top building

Also Published As

Publication number Publication date
CN108868084B (en) 2020-02-11

Similar Documents

Publication Publication Date Title
CN105003067A (en) Tile laying device
CN204983576U (en) Ceramic tile laying device
CN108868084A (en) A kind of construction floor ceramic tile joint filling equipment
CN110512848B (en) A ceramic tile laying device for united villa construction
CN205400002U (en) Auxiliary device is pasted to ceramic tile
CN206273565U (en) A kind of partition structure of building tile cutting device
CN203796283U (en) Flexible form bag for concrete pouring
CN206109997U (en) Two -sided sliding chute device
CN206408866U (en) Anti-coming off glazed tile
CN108457378A (en) A kind of Liftable type single story building
CN207892208U (en) A kind of slidingtype floor tile leveling unit
CN207959983U (en) A kind of paving slurry tool of control building wall gray seam thickness
CN212533767U (en) Bridge erecting device for civil engineering
CN206844606U (en) A kind of building materials lay aid
CN110206326B (en) Floor brick tiling is with handling device
CN207794572U (en) A kind of floor tile sand-lime Slicking apparatus
CN208618415U (en) A kind of pervious concrete well casing mounting device for base pit dewatering
CN205917819U (en) Novel retaining structure
CN207079927U (en) A kind of lifting hopper for building
CN206521928U (en) A kind of multi-functional accessory of mating formation
CN207738315U (en) A kind of self-locking for engineering prefabricated components self solves suspender
CN207289798U (en) A kind of novel polishing line entrance ceramic tile is automatically into brick device
CN205399422U (en) Construct recoverable stock
CN206070944U (en) A kind of new insert-type wooden decorative wallboard
CN210421020U (en) River channel gate for hydraulic engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200102

Address after: 532200 F-16, group F, Huashan Road (Jiayuan community), Chongzuo City, Guangxi Zhuang Autonomous Region

Applicant after: Guangxi longchen Construction Engineering Co., Ltd

Address before: 210022 Meng Shang construction engineering company, 118 Hongguang Road, Qinhuai District, Nanjing, Jiangsu

Applicant before: Ye Yongqing

GR01 Patent grant
GR01 Patent grant