Disclosure of Invention
The invention aims to overcome the defects in the prior art and provide a floor tile gap filling device for building construction, which can adjust the distance between supporting plates through an adjusting mechanism, thereby realizing gap filling of ceramic tile gaps with different sizes, mashing concrete ash in the ceramic tile gaps, discharging dust through an ash removing mechanism, and finally inputting a gap filling agent into the ceramic tile gaps under the action of the gap filling mechanism, thereby realizing the purpose of gap filling of the ceramic tile gaps, reducing the working strength and the production cost, greatly improving the efficiency of gap filling of the ceramic tiles and ensuring the quality of gap filling of the ceramic tiles.
In order to achieve the purpose, the invention adopts the technical scheme that:
the utility model provides a floor tile device of caulking for construction, includes the support, the bottom of support is installed and is removed the wheel, installs first connecting piece on the support, install the alignment jig on the first connecting piece, install adjustment mechanism and second connecting piece on the alignment jig, adjustment mechanism installs the middle part at the alignment jig, the one end at the alignment jig is installed to the second connecting piece, installs the support frame on the second connecting piece, the one end at the alignment jig is installed to the support frame, and the support frame cooperatees with adjustment mechanism, install pounding mechanism, ash removal mechanism and the mechanism of caulking on the support frame, the front end at the support frame is installed to pounding mechanism, ash removal mechanism installs the one side of pounding mechanism on the support frame, the rear end at the support frame is installed to the mechanism of caulking.
Preferably, the support comprises a frame formed by end-to-end square plates, a support plate is mounted at the bottom of the frame, and the support is used for supporting the device, so that the stability of the device is guaranteed.
Preferably, first connecting piece is installed in the backup pad on the frame, first connecting piece is including set casing, axis of rotation, twist grip, the set casing is installed in the backup pad, has worm wheel, worm at the internally mounted of set casing, the one end of axis of rotation runs through the set casing and installs in the backup pad, and the other end extends to the top of set casing and cooperatees with the alignment jig, the worm wheel is installed in the axis of rotation, the worm is established in one side of worm wheel and is meshed with the worm wheel, all installs the connecting axle at the both ends of worm, and the connecting axle rotates and installs on the frame, and one of them connecting axle runs through the outside that the frame extends to the frame, twist grip installs the one end at the connecting axle that extends to the frame outside, and twist grip, dwang, worm wheel, worm mutually support, can realize the adjustment to the alignment jig to guarantee to pound the mechanism, The ash removing mechanism and the joint filling mechanism correspond to gaps of the ceramic tiles, the effect of filling the gaps of the ceramic tiles is achieved, the rotating handle is rotated to drive the connecting shaft to rotate, the connecting shaft rotates to drive the worm to rotate, the worm rotates to drive the rotating shaft to rotate, and the rotating shaft rotates to drive the adjusting frame to rotate, so that the adjusting effect on the adjusting frame is achieved.
Preferably, the alignment jig includes the connecting plate and installs the curb plate at the connecting plate both ends, and it has the adjustment tank to open on the connecting plate, the support frame is equipped with two, and two support frame symmetries are installed in the both sides of alignment jig, smash mechanism, ash removal mechanism, mechanism and support frame one-to-one of caulking, the alignment jig can realize the angle between alignment jig and the support in the effect of first connecting piece on the one hand, can adjust alignment jig and support on the coplanar when the transportation, conveniently carry, on the other hand is under adjustment mechanism's effect, adjusts the purpose of realizing caulking to not unidimensional ceramic tile to the support frame.
Preferably, adjustment mechanism includes driving motor, threaded rod, protective housing, the protective housing is installed on the connecting plate, is equipped with first bevel gear, second bevel gear in the protective housing, the one end of threaded rod is installed on one of them curb plate, and the other end runs through the protective housing and installs on another curb plate, first bevel gear is installed on the threaded rod, driving motor installs on the protective housing, second bevel gear installs on driving motor's output shaft and meshes with first bevel gear mutually, and adjustment mechanism can adjust the distance between the support frame at both ends to the realization is smashed the distance between the mechanism, the mechanism of removing dust and the mechanism of caulking on adjusting both ends support frame, thereby realizes the purpose of caulking to the ceramic tile gap of not unidimensional.
Preferably, second connecting piece and support frame one-to-one, second connecting piece include last rotating disk, lower rotating disk and connecting block, the connecting block is established in the adjustment tank and is installed in the bottom of last rotating disk, and connecting block and threaded rod threaded connection, lower rotating disk install in the below of last rotating disk and with last rotating disk interference fit, the screw thread of two connecting blocks at threaded rod both ends is turned to on the contrary, goes up rotating disk and lower rotating disk and mutually supports, is convenient for adjust the contained angle between support frame and the ceramic tile gap to guarantee to pound mechanism, ash removal mechanism and the mechanism of caulking and can work the ceramic tile gap, improved work efficiency greatly, guaranteed operating mass with rated load.
Preferably, smash the mechanism to pieces and include mount, motor, mounting panel, crank, first band pulley, second band pulley, connecting rod and smash the pole, the mount adopts the cross-section to be L type structure, the mounting panel is installed at the both ends of mount, the articulate both ends are installed on the mounting panel, first band pulley is installed on the crank, the motor is installed at the opposite side of mount, the second band pulley is installed on the output shaft of motor, and the second band pulley passes through the belt with first band pulley and is connected, the one end of connecting rod is installed on the crank, and the other end is installed on smash the pole, smash the bottom of pole and run through the mount and extend to the below of mount, wherein the connecting rod and smash the pole and all be equipped with a plurality ofly, and a plurality of pole length of smashing to pieces are different, smash the pole to pieces to concrete in the gap to pieces, make things convenient for follow-up ash removal mechanism to remove ash, guarantee the quality of caulking, the motor drives the second band pulley and rotates, and the second band pulley passes through the belt and drives first band pulley rotation, and first band pulley rotation drives the crank rotation, and the crank rotation drives the connecting rod rotation, and the connecting rod rotates and drives smashes pole reciprocating motion from top to bottom to the realization is to the smashing to pieces of concrete in the ceramic tile gap, and the concrete discharge that makes things convenient for the ash removal mechanism will smash to pieces has improved the quality of caulking.
Preferably, the dust removing mechanism comprises a fixed plate, a motor, a rotating ring, a dust removing plate, a mounting seat, springs, a fixed shaft, a sliding block and elastic scraping plates, one end of the fixed plate is fixedly mounted at the bottom of the supporting frame, the motor is mounted on one side of the fixed plate, an output shaft of the motor penetrates through the other side of the fixed plate and extends to the other side of the fixed plate, the rotating ring is mounted on the output shaft of the motor, the dust removing plate is mounted at the edge of the rotating ring, the mounting seat is mounted above the rotating disc on the fixed plate, two ends of the fixed shaft are respectively mounted on the mounting seat, the sliding block is mounted on the fixed shaft, the elastic scraping plates are mounted at the bottom of the sliding block and matched with the dust removing plate, the springs are sleeved on the fixed shaft, the springs are two, the two springs are arranged on two sides of the sliding block, and the dust removing plate can take out mashed concrete from gaps of tiles, thereby realize the purpose in clearance ceramic tile gap, the elasticity scraper blade can be scraped the residue that remains on the dusting board, guarantees subsequent dusting quality, has guaranteed the quality of caulking in later stage, has improved the efficiency of caulking.
Preferably, the dust removing plates are arranged in a plurality of numbers, the dust removing plates are evenly distributed on the rotating ring, the cross sections of the dust removing plates are of V-shaped structures, and the V-shaped structures can discharge dust brought out from the gaps to two sides, so that the gaps are guaranteed to be clean, and the gap filling quality is greatly improved.
Preferably, the gap filling mechanism comprises a mounting rack, a connecting pipe, a limiting ring, a pressure spring and a hose, wherein the limiting plate is arranged in the middle of the mounting rack, one end of the connecting pipe penetrates through the limiting plate and extends to the top of the limiting plate, the other end of the connecting pipe penetrates through a bottom plate of the mounting rack and extends to the bottom of the mounting rack, the limiting ring is fixed on one side, close to the bottom plate of the mounting rack, of the connecting pipe, the pressure spring is sleeved on the connecting pipe, one end of the pressure spring is arranged at the bottom of the limiting plate, the other end of the pressure spring is arranged at the top of the limiting ring, a discharge pipe is arranged on the connecting pipe and close to the bottom end of the connecting pipe, a pressure plate is arranged on one side of the discharge pipe, one end of the hose is arranged at the top of the connecting pipe, the other end of the hose penetrates through the support frame and extends to the top of the support frame, the gap filling agent can be filled in gaps of the ceramic tiles, the purpose of gap filling of the ceramic tiles is achieved, and the pressure spring has a certain buffering effect, the connecting pipe has the advantages that the connecting pipe is prevented from being damaged due to uneven ground in the gap, the service life of the connecting pipe is prolonged, the production cost is reduced, the connecting pipe is used for connecting the hose to guarantee normal supply of the joint mixture, on the other hand, the ash in the gap can be cleaned again, and the joint filling effect is guaranteed.
The invention has the beneficial effects that:
1) this device can adjust the distance between the backup pad through adjustment mechanism to the realization is caulking the not unidimensional ceramic tile gap, can pound the concrete ash in the brick gap to pieces, then discharge the dust through dust removal mechanism, at last with in the gap filler inputs the ceramic tile gap under the effect of mechanism of caulking, realize the purpose of caulking the ceramic tile gap, working strength and manufacturing cost have been reduced, the efficiency of ceramic tile caulking has been improved greatly, the quality of ceramic tile caulking has been guaranteed.
2) The support of the device comprises a frame consisting of end-to-end square plates, a support plate is arranged at the bottom of the frame, and the support is used for supporting the device, so that the stability of the device is ensured.
3) This device twist grip, dwang, worm wheel, mutually supporting of worm can realize the adjustment to the alignment jig to guarantee to smash the mechanism, the ash removal mechanism, mechanism and the ceramic tile gap of caulking corresponding, realize the effect of caulking the ceramic tile, rotate twist grip and drive the connecting axle and rotate, the connecting axle rotates and drives the worm and rotate, the worm rotates and drives the axis of rotation and rotate, the axis of rotation rotates and drives the alignment jig and rotate, thereby the realization is to the regulatory action of alignment jig.
4) This device alignment jig on the one hand can realize the angle between alignment jig and the support in the effect of first connecting piece, can adjust alignment jig and support when the transportation on the coplanar, conveniently carries, and on the other hand is under adjustment mechanism's effect, adjusts the purpose that realizes caulking to not unidimensional ceramic tile to the support frame.
5) This device adjustment mechanism can adjust the distance between the support frame at both ends to the realization is adjusted and is smashed the distance between mechanism, ash removal mechanism and the mechanism of caulking on the support frame of both ends, thereby realizes the purpose of caulking to the ceramic tile gap of equidimension not.
6) Rotating disk and lower rotating disk mutually support on this device, are convenient for adjust the contained angle between support frame and the ceramic tile gap to guarantee to smash to pieces mechanism, ash removal mechanism and the mechanism of caulking and can carry out work to the ceramic tile gap, improved work efficiency greatly, guaranteed work quality.
7) This device smashes the pole and can smash the concrete in the gap to pieces, make things convenient for follow-up dusting mechanism to carry out the ash removal, guarantee the quality of caulking, the motor drives the second band pulley and rotates, the second band pulley passes through the belt and drives first band pulley rotation, first band pulley rotation drives the crank rotation, the crank rotation drives the connecting rod rotation, the connecting rod rotates and drives smashes pole reciprocating motion from top to bottom, thereby realize smashing to pieces of concrete in the ceramic tile gap, the concrete discharge that conveniently the ash removal mechanism will smash to pieces, the quality of caulking has been improved.
8) This device dust board can take out the concrete of smashing to pieces from the ceramic tile gap, thereby realize the purpose in clearance ceramic tile gap, the elasticity scraper blade can be scraped the residue of remaining on the dust board, guarantee subsequent ash handling quality, the quality of caulking of later stage has been guaranteed, the efficiency of caulking has been improved, the dust board is equipped with a plurality ofly, a plurality of dust board evenly distributed are on rotating the ring, the dust board adopts the cross-section to be V type structure, V type structure can be with the ash of taking out in the gap to both sides discharge, thereby guarantee the clean of gap department, the quality of caulking has been improved greatly.
9) This device mechanism of caulking can fill in the ceramic tile gap with the gap filler, the realization is to the purpose that the ceramic tile was caulked, the pressure spring has certain cushioning effect, prevent that the ground in the gap is uneven to cause the damage to the connecting pipe, the life of connecting pipe has been improved, manufacturing cost is reduced, the connecting pipe is used for connecting the normal supply that the hose guaranteed the gap filler on the one hand, on the other hand can clear up the ash in the gap once more, the effect of caulking has been guaranteed.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to fig. 1 to 11, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "longitudinal", "lateral", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on those shown in the drawings, are merely for convenience of description of the present invention, and do not indicate or imply that the referenced devices or elements must have a particular orientation, be constructed and operated in a particular orientation, and thus, are not to be construed as limiting the present invention.
A floor tile gap filling device for building construction comprises a bracket 1, wherein the bottom of the bracket 1 is provided with a movable wheel 6, a first connecting piece 5 is arranged on the bracket 1, an adjusting bracket 3 is arranged on the first connecting piece 5, the adjusting frame 3 is provided with an adjusting mechanism 4 and a second connecting piece 10, the adjusting mechanism 4 is arranged in the middle of the adjusting frame 3, the second connecting piece 10 is arranged at one end of the adjusting frame 3, a supporting frame 2 is arranged on the second connecting piece 10, the supporting frame 2 is arranged at one end of an adjusting frame 3, the supporting frame 2 is matched with an adjusting mechanism 4, the support frame 2 is provided with a mashing mechanism 7, an ash removing mechanism 8 and a caulking mechanism 9, the mashing mechanism 7 is arranged at the front end of the support frame 2, the ash removing mechanism 8 is arranged on one side of the mashing mechanism 7 on the support frame 2, and the caulking mechanism 9 is arranged at the rear end of the support frame 2.
The support 1 comprises a frame formed by end-to-end square plates, a supporting plate is mounted at the bottom of the frame, and the support 1 is used for supporting the device, so that the stability of the device is guaranteed.
The first connecting piece 5 is arranged on a supporting plate on a frame, the first connecting piece 5 comprises a fixed shell 501, a rotating shaft 504 and a rotating handle 503, the fixed shell 501 is arranged on the supporting plate, a worm wheel 506 and a worm 505 are arranged in the fixed shell 501, one end of the rotating shaft 504 penetrates through the fixed shell 501 and is arranged on the supporting plate, the other end of the rotating shaft extends to the upper part of the fixed shell 501 to be matched with the adjusting frame 3, the worm wheel 506 is arranged on the rotating shaft 504, the worm 505 is arranged on one side of the worm wheel 506 and is meshed with the worm wheel 506, connecting shafts 502 are arranged at two ends of the worm 505, the connecting shafts 502 are rotatably arranged on the frame, one connecting shaft 502 penetrates through the frame and extends to the outer side of the frame, the rotating handle 503 is arranged at one end of the connecting shaft 502 extending to the outer side of the frame, and the rotating handle 503, the rotating rod, the worm wheel 506 and the worm 505 are matched with each other, can realize the adjustment to alignment jig 3 to guarantee to smash mechanism 7, ash removal mechanism 8, mechanism 9 and the ceramic tile gap of filling joints corresponding, realize the effect of filling joints to the ceramic tile, rotate twist grip 503 and drive connecting axle 502 and rotate, connecting axle 502 rotates and drives worm 505 and rotate, and worm 505 rotates and drives axis of rotation 504 and rotate, and axis of rotation 504 rotates and drives alignment jig 3 and rotate, thereby realizes the regulating action to alignment jig 3.
The adjusting bracket 3 comprises a connecting plate and side plates arranged at two ends of the connecting plate, adjusting grooves are formed in the connecting plate, the two supporting frames 2 are arranged, the two supporting frames 2 are symmetrically arranged on two sides of the adjusting bracket 3, the mashing mechanism 7, the ash removing mechanism 8 and the joint filling mechanism 9 correspond to the supporting frames 2 one to one, the adjusting bracket 3 can realize the angle between the adjusting bracket 3 and the support 1 under the action of the first connecting piece 5, the adjusting bracket 3 and the support 1 can be adjusted on the same plane during transportation, the carrying is convenient, and the aim of joint filling of ceramic tiles with different sizes is achieved by adjusting the supporting frames 2 under the action of the adjusting mechanism 4.
The adjusting mechanism 4 comprises a driving motor 403, a threaded rod 402 and a protective shell 401, the protective shell 401 is installed on a connecting plate, a first bevel gear 405 and a second bevel gear 404 are arranged in the protective shell 401, one end of the threaded rod 402 is installed on one side plate, the other end of the threaded rod 402 penetrates through the protective shell 401 and is installed on the other side plate, the first bevel gear 405 is installed on the threaded rod 402, the driving motor 403 is installed on the protective shell 401, the second bevel gear 404 is installed on an output shaft of the driving motor 403 and is meshed with the first bevel gear 405, the adjusting mechanism 4 can adjust the distance between the support frames 2 at two ends, so that the distance among the mashing mechanism 7, the ash removing mechanism 8 and the gap filling mechanism 9 on the support frames 2 at two ends can be adjusted, and the purpose of gap filling of ceramic tiles with different sizes is achieved.
Second connecting piece 10 and 2 one-to-one of support frame, second connecting piece 10 include last carousel 1002, lower carousel 1001 and connecting block 1003, connecting block 1003 is established in the adjustment tank and is installed in the bottom of last carousel 1002, and connecting block 1003 and threaded rod 402 threaded connection, lower carousel 1001 install in the below of going up carousel 1002 and with go up carousel 1002 interference fit, the screw thread of two connecting blocks 1003 at threaded rod 402 both ends is turned to on the contrary, goes up carousel 1002 and lower carousel 1001 and mutually supports, is convenient for adjust the contained angle between support frame 2 and the ceramic tile gap to guarantee to pound to pieces mechanism 7, remove grey mechanism 8 and joint filling mechanism 9 and can work the ceramic tile gap, improved work efficiency greatly, guaranteed work quality.
The mashing mechanism 7 comprises a fixing frame 703, a motor 707, a mounting plate 702, a crank 704, a first belt wheel 706, a second belt wheel 708, a connecting rod 705 and a mashing rod 701, the fixing frame 703 adopts an L-shaped structure, the mounting plate 702 is mounted at two ends of the fixing frame 703, two ends of the crank 704 are mounted on the mounting plate 702, the first belt wheel 706 is mounted on the crank 704, the motor 707 is mounted at the other side of the fixing frame 703, the second belt wheel 708 is mounted on an output shaft of the motor 707, the second belt wheel 708 is connected with the first belt wheel 706 through a belt, one end of the connecting rod 705 is mounted on the crank 704, the other end of the connecting rod 705 is mounted on the mashing rod 701, the bottom of the mashing rod 701 penetrates through the fixing frame and extends to the lower part of the fixing frame 703, wherein the connecting rod 703 and the mashing rod 701 are provided with a plurality of mashing rods 705, and the lengths of the mashing rods 701 are different, smash pole 701 and can smash the concrete in the gap to pieces, make things convenient for follow-up ash removal mechanism 8 to carry out the ash removal, guarantee the quality of caulking, motor 707 drives second band pulley 708 and rotates, second band pulley 708 drives first band pulley 706 through the belt and rotates, first band pulley 706 rotates and drives crank 704 and rotate, crank 704 rotates and drives connecting rod 705 and rotates, connecting rod 705 rotates and drives smash pole 701 up-and-down motion, thereby realize smashing to pieces to concrete in the ceramic tile gap, make things convenient for ash removal mechanism 8 to discharge the concrete of smashing to pieces, the quality of caulking has been improved.
The dust removing mechanism 8 comprises a fixing plate 801, a motor 803, a rotating ring 804, a dust removing plate 805, a mounting seat 808, a spring 903, a fixing shaft 802, a sliding block 807 and an elastic scraper blade 806, wherein one end of the fixing plate 801 is fixedly arranged at the bottom of the support frame 2, the motor 803 is arranged at one side of the fixing plate 801, an output shaft of the motor 803 extends to the other side of the fixing plate 801 through the fixing plate 801, the rotating ring 804 is arranged on the output shaft of the motor 803, the dust removing plate 805 is arranged at the edge of the rotating ring 804, the mounting seat 808 is arranged above the rotating disc 1002 on the fixing plate 801, two ends of the fixing shaft 802 are respectively arranged on the mounting seat 808, the sliding block 807 is arranged on the fixing shaft 802, the elastic scraper blade 806 is arranged at the bottom of the sliding block 807 and is matched with the dust removing plate 805, the spring 903 is sleeved on the fixing shaft 802, and two springs 903 are arranged, two springs 903 are arranged on two sides of the sliding block 807, and the ash removing plate 805 can take out the mashed concrete from the ceramic tile gap, so that the purpose of cleaning the ceramic tile gap is realized, the residue remained on the ash removing plate 805 can be scraped by the elastic scraping plate 806, the subsequent ash removing quality is ensured, the seam filling quality in the later stage is ensured, and the seam filling efficiency is improved.
When the dust removing plate 805 moves to the top of the rotating ring 804, the dust removing plate 805 will drive the elastic scraper 806 to move along the fixed shaft 802, and when the dust removing plate 805 moves to the right end of the connecting shaft 502, the dust removing plate 805 will separate from the elastic scraper 806, and during the separation process, sliding friction is generated between the dust removing plate 805 and the elastic scraper 806, so as to remove the residue on the dust removing plate 805.
The plurality of ash removing plates 805 are uniformly distributed on the rotating ring 804, the section of each ash removing plate 805 is of a V-shaped structure, and ash brought out from a gap can be discharged to two sides by the aid of the V-shaped structures, so that the gap is clean, and gap filling quality is greatly improved.
The gap filling mechanism 9 comprises a mounting rack 901, a connecting pipe 905, a limiting ring 904, a pressure spring and a hose 908, wherein the limiting plate 902 is installed in the middle of the mounting rack 901, one end of the connecting pipe 905 penetrates through the limiting plate 902 and extends to the top of the limiting plate 902, the other end penetrates through the bottom plate of the mounting rack 901 and extends to the bottom of the mounting rack 901, the limiting ring 904 is fixed on the connecting pipe 905 close to one side of the bottom plate of the mounting rack 901, the pressure spring is sleeved on the connecting pipe 905, one end of the pressure spring is installed at the bottom of the limiting plate 902, the other end of the pressure spring is installed at the top of the limiting ring 904, a discharge pipe 906 is installed on the connecting pipe 905 close to the bottom end of the connecting pipe 905, a pressure plate 907 is installed on one side of the discharge pipe 906, one end of the hose 908 is installed at the top of the connecting pipe 905, the other end of the hose penetrates through the supporting rack 2 and extends to the top of the supporting rack 2, and the gap filling agent can be filled in a ceramic tile gap, the realization is to the purpose that the ceramic tile was caulked, and the pressure spring has certain cushioning effect, prevents that the ground in the gap is uneven to cause the damage to connecting pipe 905, has improved connecting pipe 905's life, has reduced manufacturing cost, and connecting pipe 905 is used for coupling hose 908 to guarantee the normal supply of gap filler on the one hand, and on the other hand can clear up the ash in the gap once more, has guaranteed the effect of caulking.
The hose 908 is used for connecting a device for storing the gap filler, so that the gap filler is conveniently conveyed into the discharge pipe from the connecting pipe 905, and the gap filler is discharged from the discharge pipe, thereby achieving the purpose of gap filling.
The foregoing is merely exemplary and illustrative of the present invention and various modifications, additions and substitutions may be made by those skilled in the art to the specific embodiments described without departing from the scope of the present invention as defined in the accompanying claims.