CN114250955B - Ground joint filling device before waterproof construction of top building - Google Patents

Ground joint filling device before waterproof construction of top building Download PDF

Info

Publication number
CN114250955B
CN114250955B CN202111606371.0A CN202111606371A CN114250955B CN 114250955 B CN114250955 B CN 114250955B CN 202111606371 A CN202111606371 A CN 202111606371A CN 114250955 B CN114250955 B CN 114250955B
Authority
CN
China
Prior art keywords
frame
rod
spring
fixedly connected
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202111606371.0A
Other languages
Chinese (zh)
Other versions
CN114250955A (en
Inventor
肖少娥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yuanxinshe Construction Technology Co ltd
Original Assignee
Yuanxinshe Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yuanxinshe Construction Technology Co ltd filed Critical Yuanxinshe Construction Technology Co ltd
Priority to CN202111606371.0A priority Critical patent/CN114250955B/en
Publication of CN114250955A publication Critical patent/CN114250955A/en
Application granted granted Critical
Publication of CN114250955B publication Critical patent/CN114250955B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/165Implements for finishing work on buildings for finishing joints, e.g. implements for raking or filling joints, jointers

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Machines (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention relates to a joint filling device, in particular to a ground joint filling device before waterproof construction of a top building. The device is convenient for people to joint the ground of the top building, is time-saving and labor-saving, has high working efficiency, and is cleaned in advance before waterproof construction of the top building. The utility model provides a ground joint filling device before waterproof construction of attic, is equipped with the removal gyro wheel including removing the frame, removing gyro wheel and go-between cover, the symmetry rotation in both sides is equipped with the removal gyro wheel about removing the frame, and the top left side rigid coupling has the go-between cover in the removal frame. According to the invention, a proper amount of clear water is added for stirring and mixing, then the device is pushed to move by the moving roller, and meanwhile, the blanking frame is pulled to move downwards, so that the wedge block moves upwards to drive the first baffle plate to move rightwards, and the mixed asphalt flows into a construction joint to be filled by the arc-shaped material guide rod, so that people can conveniently joint the ground of an attic, time and labor are saved, and the working efficiency is high.

Description

Ground joint filling device before waterproof construction of top building
Technical Field
The invention relates to a joint filling device, in particular to a ground joint filling device before waterproof construction of a top building.
Background
In order to solve the problem that the ground of the top building is easy to generate arch expansion or shrinkage and cracking under the influence of temperature, temperature and material shrinkage, so as to avoid generating excessive hot pressing stress, people can set corresponding shrinkage joints to adapt to deformation of the ground shrinkage joints, so that the crack is prevented from being generated, asphalt or sealant is filled into the ground shrinkage joints to seal the ground shrinkage joints, rainwater and snow water are prevented from entering the ground, at present, most of the ground shrinkage joints are manually filled, time and labor are wasted, the working efficiency is low, the shrinkage joints are required to be cleaned before filling, the workload of filling the shrinkage joints is increased, and the efficiency of filling the joints is reduced.
Therefore, the device for filling the gaps on the ground before the waterproof construction of the top building, which is convenient for people to fill the gaps on the ground of the top building, is time-saving and labor-saving, has high working efficiency and is cleaned in advance, so that the problem of the prior art is solved.
Disclosure of Invention
In order to overcome the manual work and carry out the joint filling, waste time and energy, work efficiency is still low, and need the manual work to clear up the shrinkage joint earlier before filling, increased the work load of joint filling, reduced the shortcoming of the efficiency of joint filling, technical problem is: the device is convenient for people to joint the ground of the top building, saves time and labor, has high working efficiency, and is cleaned in advance before waterproof construction of the top building.
The technical proposal is as follows: the ground joint filling device before waterproof construction of the top building comprises a movable frame, movable rollers, a connecting ring sleeve, a discharging assembly and a joint filling assembly, wherein the movable rollers are symmetrically arranged on the left side and the right side of the movable frame in a front-back rotation mode, the connecting ring sleeve is fixedly connected to the left side of the inner top of the movable frame, the discharging assembly for storing materials is arranged on the movable frame, and the joint filling assembly for filling a construction joint is arranged on the connecting ring sleeve; the joint filling assembly comprises a blanking frame, a second spring, an arc-shaped guide rod, a wedge-shaped block, a first baffle plate and a third spring, wherein the blanking frame is arranged in the connecting ring sleeve in a sliding mode, the second spring is connected in a surrounding mode in a bilateral symmetry mode between the inner side of the blanking frame and the inner side of the connecting ring sleeve, the arc-shaped guide rod used for blanking is arranged on the lower portion of the blanking frame in a sliding mode, the wedge-shaped block is fixedly connected in the middle of the inner side face of the arc-shaped guide rod, the first baffle plate is arranged on the lower portion of the blanking frame in a sliding mode, and the third spring is fixedly connected between the inner side face of the first baffle plate and the inner side of the blanking frame in a front-back symmetry mode.
Optionally, the blowing subassembly is including being used for depositing the blowing frame, backup pad, first spring and the unloading ring of material, and the removal frame is interior left part slidingtype and is equipped with the blowing frame, and blowing frame outer bottom rigid coupling has the backup pad, and the backup pad bottom has first spring with the rigid coupling between the removal frame medial surface, and blowing frame bottom left side middle side is connected with the unloading ring, and the unloading frame overlaps on the unloading ring.
Optionally, still including the restriction subassembly that is used for restricting the unloading, restriction subassembly is including second striker plate, the connecting block, torsion spring and stopper, unloading frame middle part rotation is equipped with the second striker plate that is used for spacing, the arc guide bar upwards moves and can drive the rotation of second striker plate, both sides all have the connecting block around the second striker plate, both sides all around have torsion spring around the second striker plate, torsion spring one end is connected with the connecting block, the torsion spring other end is connected with the unloading frame, both sides left and right sides lower part all rigid coupling has the stopper around the unloading frame.
Optionally, still including being used for the stirring subassembly of convenient stirring pitch, the stirring subassembly is including the connecting rod, first guide pin bushing, the puddler, first pivot, first drive assembly, the bevel gear, second drive assembly and second pivot, the middle part rigid coupling has the connecting rod on the movable frame medial left surface, the connecting rod right part rotation is equipped with first guide pin bushing, the puddler that is used for mixing the stirring is equipped with in the middle of the blowing frame, the puddler passes first guide pin bushing, puddler and first guide pin bushing sliding connection, movable frame rear portion right side rotation is equipped with first pivot, be connected with first drive assembly between first pivot upper portion and the first guide pin bushing lower part, first drive assembly comprises two belt pulleys and belt, one belt pulley is installed in first pivot upper portion, another belt pulley is installed in first guide pin bushing lower part, the belt winds between two belts, movable frame rear portion right side lower side rotation is equipped with the second pivot, second pivot front portion and first pivot lower part all rigid coupling have the bevel gear, two bevel gears mesh mutually, right rear movable gyro wheel front portion and second drive assembly is connected with second belt pulley between second pivot rear portion, second belt pulley drive assembly is installed in two rear portion, two belt pulley drive assembly is installed in the rear portion, two belt drive assembly is around the rear portion.
Optionally, still including being used for conveniently adding the water subassembly that adds of clear water, add the water subassembly including water storage frame, square board, first L shape connecting rod and fourth spring, remove the upper side rigid coupling of frame right part and have the water storage frame, the slip is equipped with the square board that is used for the manger plate in the middle of the water storage frame left part, square board middle part rigid coupling has first L shape connecting rod, first L shape connecting rod cooperates with the blowing frame, is connected with the fourth spring between square board top middle and the water storage frame medial surface.
Optionally, still including the slotting component that is used for clearing up the construction joint, slotting component is including second guide pin bushing, slotting pole, fifth spring, first gag lever post, clear material pole and sixth spring, the rigid coupling has the second guide pin bushing in the middle of the movable frame left part, the sliding type is equipped with slotting pole in the second guide pin bushing, the fifth spring of round joint has between second guide pin bushing top and the slotting pole upper portion, slotting pole lower part left side runs through has first gag lever post, slotting pole lower part sliding type is equipped with the clear material pole that is used for the clearance, round joint has the sixth spring between clearing material pole top and the upper portion in the slotting pole.
Optionally, the reset assembly is further arranged, the reset assembly comprises a second limiting rod, a guide rail, a V-shaped block, an inclined block, a magnet, a U-shaped rod, a third limiting rod, a seventh spring, a second L-shaped connecting rod, a stop block, an eighth spring and a ninth spring, the second limiting rod is arranged at the bottom of the movable frame in a sliding mode, the second limiting rod is matched with the first limiting rod, the guide rail is symmetrically connected to the bottom of the movable frame in a front-back mode, the V-shaped block is symmetrically arranged at the bottom of the support plate in a front-back mode, the inclined block is slidably arranged on the guide rail, the V-shaped block is matched with the V-shaped block, the magnet is fixedly connected to the front side and the back side of the left part of the second limiting rod, the magnet is matched with the inclined block, the U-shaped rod is fixedly connected to the right part of the second limiting rod, the third limiting rod is fixedly connected to the inner side of the U-shaped rod, the third limiting rod is fixedly connected to the inner side of the third limiting rod, the second L-shaped connecting rod is symmetrically fixedly connected to the inner side of the U-shaped rod, the second limiting rod is fixedly connected to the second L-shaped connecting rod in a front-back mode, the stop block is slidably arranged at the upper part of the second L-shaped connecting rod is matched with the inner side of the third limiting rod, and the inner side of the third limiting rod is fixedly arranged between the third limiting rod and the eighth spring is fixedly arranged between the inner side of the third limiting rod.
Optionally, the guide rail is bolted
The beneficial effects of the invention are as follows:
1. according to the invention, a proper amount of clear water is added for stirring and mixing, then the device is pushed to move by the moving roller, and meanwhile, the blanking frame is pulled to move downwards, so that the wedge block moves upwards to drive the first baffle plate to move rightwards, and the mixed asphalt flows into a construction joint to be filled by the arc-shaped material guide rod, so that people can conveniently joint the ground of an attic, time and labor are saved, and the working efficiency is high.
2. According to the invention, a proper amount of asphalt is poured into the blanking frame under the action of the stirring assembly, so that the stirring rod rotates to stir the asphalt, and the asphalt can be prevented from being solidified.
3. According to the invention, under the action of the slotting component, the device is pushed to move by the moving roller, the cleaning rod also cleans the construction joint, and the sixth spring plays a role in buffering, so that the residual sundries in the construction joint can be avoided.
Drawings
Fig. 1 is a schematic perspective view of a first embodiment of the present invention.
Fig. 2 is a schematic perspective view of a second embodiment of the present invention.
Fig. 3 is a schematic cross-sectional perspective view of the present invention.
Fig. 4 is a schematic perspective view of a first cross-sectional view of the discharge assembly of the present invention.
Fig. 5 is a second cross-sectional perspective view of the discharge assembly of the present invention.
Fig. 6 is a first cross-sectional perspective view of the caulking assembly of the present invention.
Fig. 7 is a second cross-sectional perspective view of the caulking assembly of the present invention.
Fig. 8 is an enlarged perspective view of the present invention at a.
FIG. 9 is a schematic cross-sectional perspective view of a restraint assembly of the present invention.
Fig. 10 is an enlarged perspective view of the present invention at B.
FIG. 11 is a schematic cross-sectional perspective view of a stirring assembly of the present invention.
Fig. 12 is a schematic cross-sectional perspective view of a water addition assembly of the present invention.
Fig. 13 is an enlarged perspective view of the present invention at C.
FIG. 14 is a schematic cross-sectional perspective view of a slotted assembly of the present invention.
Fig. 15 is a schematic perspective view of a slit assembly according to the present invention.
Fig. 16 is a first cross-sectional perspective view of a reset assembly of the present invention.
Fig. 17 is a second cross-sectional perspective view of the reset assembly of the present invention.
Fig. 18 is an enlarged perspective view of the present invention at D.
Reference numerals in the figures: 1-moving frame, 2-moving roller, 3-connecting ring sleeve, 4-discharging component, 41-discharging frame, 42-supporting plate, 43-first spring, 44-discharging ring, 5-caulking component, 51-discharging frame, 52-second spring, 53-arc-shaped guide bar, 54-wedge block, 55-first baffle plate, 56-third spring, 6-limiting component, 61-second baffle plate, 62-connecting block, 63-torsion spring, 64-limiting block, 7-stirring component, 71-connecting rod, 72-first guide sleeve, 73-stirring rod, 74-first rotating shaft, 75-first transmission component, 76-bevel gear, 77-second transmission component, 78-second rotating shaft, 8-water adding component, 81-water storage frame, 82-square plate, 83-first L-shaped connecting rod, 84-fourth spring, 9-slotting component, 91-second guide sleeve, 92-slotting rod, 93-fifth spring, 94-first limit rod, 95-material clearing rod, 96-sixth spring, 10-reset component, 101-second limit rod, 102-guide rail, 103-V-shaped block, 104-inclined block, 105-magnet, 106-U-shaped rod, 107-third limit rod, 108-seventh spring, 109-second L-shaped connecting rod, 110-stop block, 111-eighth spring and 112-ninth spring.
Detailed Description
It should be noted that in the various embodiments described, identical components are provided with identical reference numerals or identical component names, wherein the disclosure contained throughout the description can be transferred in a meaning to identical components having identical reference numerals or identical component names. The position specification, the upper, lower, lateral, etc. selected in the description are also referred to directly in the description and the figures shown and are transferred in the sense of a new position when the position is changed.
Example 1
The utility model provides a ground joint filling device before waterproof construction of paring, as shown in fig. 1-8, including removing frame 1, remove gyro wheel 2, go-between cover 3, blowing subassembly 4 and joint filling subassembly 5, remove frame 1 left and right sides all around symmetry rotation be equipped with remove gyro wheel 2, remove frame 1 interior top left side rigid coupling has go-between cover 3, remove and be equipped with blowing subassembly 4 on the frame 1, blowing subassembly 4 can place the right amount pitch material, be equipped with joint filling subassembly 5 on the go-between cover 3, joint filling subassembly 5 can realize filling the construction joint.
The discharging assembly 4 comprises a discharging frame 41, a supporting plate 42, a first spring 43 and a discharging ring 44, the discharging frame 41 is slidably arranged at the left part in the movable frame 1, the supporting plate 42 is fixedly connected to the outer bottom of the discharging frame 41, the first spring 43 is fixedly connected between the bottom of the supporting plate 42 and the inner side surface of the movable frame 1, and the discharging ring 44 is connected to the left middle side of the bottom of the discharging frame 41.
The joint filling assembly 5 comprises a blanking frame 51, a second spring 52, an arc-shaped material guide rod 53, a wedge block 54, a first baffle plate 55 and a third spring 56, wherein the blanking frame 51 is arranged in the connecting ring sleeve 3 in a sliding mode, the blanking frame 51 is sleeved on the blanking ring 44, the second spring 52 is symmetrically wound and connected between the inner side of the blanking frame 51 and the inner side of the connecting ring sleeve 3 in a bilateral symmetry mode, the arc-shaped material guide rod 53 is arranged at the lower portion of the blanking frame 51 in a sliding mode, blanking can be achieved through the arc-shaped material guide rod 53, the wedge block 54 is fixedly connected to the middle portion of the inner side face of the arc-shaped material guide rod 53, the first baffle plate 55 is arranged at the lower portion of the blanking frame 51 in a sliding mode, and the third spring 56 is fixedly connected between the inner side face of the first baffle plate 55 and the inner side of the blanking frame 51 in a longitudinal symmetry mode.
Firstly pouring a proper amount of asphalt into the discharging frame 41, adding a proper amount of clear water, stirring and mixing, supporting and buffering the first spring 43, discharging the asphalt into the discharging frame 51 through the discharging ring 44, limiting the asphalt by the first baffle plate 55, pushing the device to move through the moving roller 2, simultaneously pulling the discharging frame 51 to move downwards, compressing the second spring 52, enabling the discharging frame 51 to move downwards so that the arc-shaped material guide rod 53 is in contact with the ground, enabling the arc-shaped material guide rod 53 to move upwards for a certain distance, enabling the arc-shaped material guide rod 53 to move upwards to drive the wedge-shaped block 54 to move upwards, enabling the wedge-shaped block 54 to move upwards to be in contact with the first baffle plate 55, enabling the first baffle plate 55 to move rightwards, enabling the third spring 56 to be compressed, enabling the mixed asphalt to flow into a construction joint to be filled, stopping pushing the device to move after the whole construction joint is filled, loosening the discharging frame 51, enabling the discharging frame 51 to move upwards due to the effect of the second spring 52, enabling the arc-shaped material guide rod 53 to move upwards to be reset, enabling the arc-shaped material guide rod 53 to be separated from the ground, enabling the arc-shaped material guide rod 53 to move leftwards due to the effect of the gravity, and enabling the third baffle plate to move downwards due to the effect of the reset spring to the reset effect of the first baffle plate 55.
Example 2
On the basis of embodiment 1, as shown in fig. 1, fig. 2, fig. 3, fig. 9, fig. 10, fig. 11, fig. 12, fig. 13, fig. 14, fig. 15, fig. 16, fig. 17 and fig. 18, the device further comprises a limiting component 6, the limiting component 6 comprises a second striker plate 61, a connecting block 62, a torsion spring 63 and a limiting block 64, the second striker plate 61 is rotatably arranged in the middle of the blanking frame 51, the second striker plate 61 can limit the asphalt flow, the arc-shaped guide rod 53 can drive the second striker plate 61 to rotate by moving upwards, the connecting block 62 is fixedly connected to the front side and the rear side of the second striker plate 61, the torsion spring 63 is wound around the front side and the rear side of the second striker plate 61, one end of the torsion spring 63 is connected with the connecting block 62, and the other end of the torsion spring 63 is connected with the blanking frame 51, and the limiting block 64 is fixedly connected to the left lower part of the front side and the rear side of the blanking frame 51.
The stirring assembly 7 comprises a connecting rod 71, a first guide sleeve 72, a stirring rod 73, a first rotating shaft 74, a first transmission assembly 75, a bevel gear 76, a second transmission assembly 77 and a second rotating shaft 78, wherein the connecting rod 71 is fixedly connected to the upper middle part of the left side surface in the movable frame 1, the first guide sleeve 72 is rotatably arranged on the right part of the connecting rod 71, the stirring rod 73 is rotatably arranged in the middle of the discharging frame 41, the stirring rod 73 can stir asphalt and clear water, the stirring rod 73 passes through the first guide sleeve 72, the stirring rod 73 is in sliding connection with the first guide sleeve 72, the first rotating shaft 74 is rotatably arranged on the right side of the rear part of the movable frame 1, the first transmission assembly 75 is connected between the upper part of the first rotating shaft 74 and the lower part of the first guide sleeve 72, the first transmission assembly 75 is composed of two belt pulleys and a belt, one belt pulley is arranged on the upper portion of the first rotating shaft 74, the other belt pulley is arranged on the lower portion of the first guide sleeve 72, the belt is wound between the two belts, the second rotating shaft 78 is rotatably arranged on the right lower side of the rear portion of the movable frame 1, bevel gears 76 are fixedly connected to the front portion of the second rotating shaft 78 and the lower portion of the first rotating shaft 74, the two bevel gears 76 are meshed, a second transmission assembly 77 is connected between the front portion of the right rear movable roller 2 and the rear portion of the second rotating shaft 78, the second transmission assembly 77 is composed of two belt pulleys and a belt, one belt pulley is arranged on the front portion of the right rear movable roller 2, the other belt pulley is arranged on the rear portion of the second rotating shaft 78, and the belt is wound between the two belts.
Still including adding water subassembly 8, add water subassembly 8 including water storage frame 81, square board 82, first L shape connecting rod 83 and fourth spring 84, remove frame 1 right part upside rigid coupling and have water storage frame 81, the slip is equipped with square board 82 in the middle of the left portion of water storage frame 81, in the water storage frame is added to right amount clear water, square board 82 can realize spacing, square board 82 middle part rigid coupling has first L shape connecting rod 83, first L shape connecting rod 83 cooperates with blowing frame 41, be connected with fourth spring 84 between square board 82 top middle and the water storage frame 81 medial surface.
The novel construction joint cleaning device comprises a movable frame 1, and is characterized by further comprising a slotting component 9, wherein the slotting component 9 comprises a second guide sleeve 91, a slotting rod 92, a fifth spring 93, a first limiting rod 94, a cleaning rod 95 and a sixth spring 96, the second guide sleeve 91 is fixedly connected in the middle of the left part of the movable frame 1, the slotting rod 92 is arranged in the second guide sleeve 91 in a sliding mode, the fifth spring 93 is wound between the top of the second guide sleeve 91 and the upper part of the slotting rod 92, the first limiting rod 94 penetrates through the left side of the lower part of the slotting rod 92, the cleaning rod 95 is arranged in the lower part of the slotting rod 92 in a sliding mode, and the sixth spring 96 is wound between the top of the cleaning rod 95 and the upper part of the slotting rod 92.
The reset assembly 10 comprises a second limiting rod 101, a guide rail 102, a V-shaped block 103, an inclined block 104, a magnet 105, a U-shaped rod 106, a third limiting rod 107, a seventh spring 108, a second L-shaped connecting rod 109, a stop block 110, an eighth spring 111 and a ninth spring 112, wherein the second limiting rod 101 is slidably arranged at the bottom in the movable frame 1, the second limiting rod 101 is matched with the first limiting rod 94, the guide rail 102 is connected with the bottom in the movable frame 1 in a front-back symmetrical manner through bolts, the V-shaped block 103 is symmetrically arranged at the bottom of the support plate 42 in a front-back manner, the inclined block 104 is matched with the V-shaped block 103 in a sliding manner on the guide rail 102, the magnet 105 is fixedly connected at both sides of the left part of the second limiting rod 101 in a front-back manner, the magnet 105 is matched with the inclined block 104, the right part of the second limiting rod 101 is fixedly connected with a U-shaped rod 106, a third limiting rod 107 is arranged in the U-shaped rod 106 in a sliding mode, a seventh spring 108 is fixedly connected between the inner side of the third limiting rod 107 and the inner side of the U-shaped rod 106 in a front-back symmetrical mode, a second L-shaped connecting rod 109 is fixedly connected on the front-back symmetrical mode on the right side of the inner bottom of the movable frame 1, a stop block 110 is arranged on the upper part of the second L-shaped connecting rod 109 in a sliding mode, the stop block 110 is matched with the third limiting rod 107, an eighth spring 111 is arranged between the inner side surface of the stop block 110 and the inner side of the second L-shaped connecting rod 109, and due to the action of the eighth spring 111, the third limiting rod 107 slides rightwards from the stop block 110, limiting of the third limiting rod 107 can be achieved, and a ninth spring 112 is arranged between the inner side surface of the second limiting rod 101 and the inner side of the movable frame 1.
After the asphalt is stirred, the asphalt is discharged into the blanking frame 51 through the blanking ring 44, the second baffle plate 61 limits the asphalt, when the arc-shaped guide rod 53 contacts with the ground, the arc-shaped guide rod 53 moves upwards to contact with the second baffle plate 61, the arc-shaped guide rod 53 enables the second baffle plate 61 to rotate positively, the second baffle plate 61 drives the connecting block 62 to rotate positively, the torsion spring 63 is stretched, the second baffle plate 61 stops limiting the asphalt positively, the asphalt also flows downwards, after filling of all construction joints is completed, the arc-shaped guide rod 53 also moves downwards to reset to separate from the second baffle plate 61, and the second baffle plate 61 drives the connecting block 62 to reset reversely due to the action of the torsion spring 63, the limiting block 64 limits the connecting block 62, so that excessive asphalt can be prevented from flowing out.
Firstly, an operator pours a proper amount of asphalt into the blanking frame 51, then adds a proper amount of clear water, and then pushes the device to move through the moving roller 2, so that the right rear moving roller 2 rotates to drive the second transmission assembly 77 to rotate, the second transmission assembly 77 rotates to drive the second rotating shaft 78 to rotate, the second rotating shaft 78 drives the first rotating shaft 74 to rotate through the bevel gear 76, the first rotating shaft 74 rotates to drive the first transmission assembly 75 to rotate, the first transmission assembly 75 rotates to drive the stirring rod 73 to rotate, the stirring rod 73 rotates to stir the asphalt, after filling of all construction joints is completed, the right rear moving roller 2 stops driving the second rotating shaft 78 to rotate through the second transmission assembly 77, and the stirring rod 73 also stops rotating, so that asphalt solidification can be avoided.
Firstly, an operator adds a proper amount of clear water into the water storage frame 81, the square plate 82 shields the clear water, along with the addition of a proper amount of asphalt into the discharging frame 41, the discharging frame 41 continuously drives the first L-shaped connecting rod 83 to move downwards due to the action of gravity, the first L-shaped connecting rod 83 moves downwards to drive the square plate 82 to move downwards, the fourth spring 84 is stretched, the square plate 82 moves downwards to stop limiting clear water, the clear water also flows into the discharging frame 41, after filling of all construction joints is completed, the asphalt in the discharging frame 41 is used up, the discharging frame 41 does not drive the first L-shaped connecting rod 83 to move downwards any more, and the square plate 82 also drives the first L-shaped connecting rod 83 to move upwards to reset due to the action of the fourth spring 84, so that people do not need to manually add clear water.
When people use the device, the slotting rod 92 is pulled to move upwards, so that the slotting rod 92 is contacted with a construction joint, the fifth spring 93 is stretched, the device is pushed to move through the moving roller 2, the cleaning rod 95 also cleans the construction joint, the sixth spring 96 plays a role in buffering, after filling of all the construction joints is completed, the slotting rod 92 is separated from the construction joint, and the slotting rod 92 moves downwards to reset due to the action of the fifth spring 93, so that sundries remained in the construction joint can be avoided.
When the filling of all construction joints is completed, the second limiting rod 101 is pulled to move rightwards, the ninth spring 112 is stretched, the second limiting rod 101 moves rightwards to drive the first limiting rod 94 to move upwards, the first limiting rod 94 moves upwards to drive the slit rod 92 to move upwards, the second limiting rod 101 moves rightwards to be in contact with the blanking frame 51, the blanking frame 51 is driven to move upwards to reset by the rightwards movement of the second limiting rod 101, meanwhile, the magnet 105 is driven to move rightwards by the rightwards movement of the second limiting rod 101, the magnet 105 contacts with the diagonal block 104, the diagonal block 104 is adsorbed and fixed by the magnet 105, the diagonal block 104 is driven to move rightwards to drive the V-shaped block 103 to move upwards, the supporting plate 42 is driven to move upwards by the upward movement of the V-shaped block 103, the blanking frame 41 is driven to move upwards by the upward movement of the supporting plate 42, therefore, the second limiting rod 101 moves rightwards to drive the U-shaped rod 106 to move rightwards, the U-shaped rod 106 moves rightwards to drive the third limiting rod 107 to move rightwards, the third limiting rod 107 moves rightwards to be in contact with the stop block 110, the third limiting rod 107 slides rightwards to pass through the stop block 110 under the action of the eighth spring 111, the stop block 110 limits the third limiting rod 107, after filling all construction joints, the third limiting rod 107 is pressed to move downwards, the seventh spring 108 is compressed, the third limiting rod 107 moves downwards to be separated from the stop block 110, the second limiting rod 101 drives the oblique block 104 to move leftwards to reset under the action of the ninth spring 112, the oblique block 104 moves leftwards to limit the maximum stroke of the guide rail 102, the third limiting rod 107 is released, and the third limiting rod 107 moves upwards to reset under the action of the eighth spring 111, so that multiple positions can be reset simultaneously.
The above embodiments are provided to illustrate the technical concept and features of the present invention and are intended to enable those skilled in the art to understand the content of the present invention and implement the same, and are not intended to limit the scope of the present invention. All equivalent changes or modifications made in accordance with the spirit of the present invention should be construed to be included in the scope of the present invention.

Claims (5)

1. The ground joint filling device before waterproof construction of a top building is characterized by comprising a movable frame (1), movable rollers (2), a connecting ring sleeve (3), a discharging component (4) and a joint filling component (5), wherein the movable rollers (2) are symmetrically arranged on the left side and the right side of the movable frame (1) in a rotating mode, the connecting ring sleeve (3) is fixedly connected to the left side of the inner top of the movable frame (1), the discharging component (4) for storing materials is arranged on the movable frame (1), and the joint filling component (5) for filling construction joints is arranged on the connecting ring sleeve (3); the joint filling assembly (5) comprises a blanking frame (51), a second spring (52), an arc-shaped material guide rod (53), a wedge block (54), a first material baffle (55) and a third spring (56), wherein the blanking frame (51) is arranged in the connecting ring sleeve (3), the second spring (52) is symmetrically wound and connected between the inner side of the blanking frame (51) and the inner side of the connecting ring sleeve (3), the arc-shaped material guide rod (53) for blanking is arranged at the lower part of the blanking frame (51) in a sliding mode, the wedge block (54) is fixedly connected at the middle part of the inner side surface of the arc-shaped material guide rod (53), the first material baffle (55) is in sliding fit with the wedge block (54), and the third spring (56) is fixedly connected between the inner side surface of the first material baffle (55) and the inner side of the blanking frame (51) in a front-back symmetrical mode;
the discharging assembly (4) comprises a discharging frame (41) for storing materials, a supporting plate (42), a first spring (43) and a discharging ring (44), wherein the discharging frame (41) is arranged at the inner left part of the movable frame (1) in a sliding mode, the supporting plate (42) is fixedly connected to the outer bottom of the discharging frame (41), the first spring (43) is fixedly connected between the bottom of the supporting plate (42) and the inner side surface of the movable frame (1), the discharging ring (44) is connected to the left middle side of the bottom of the discharging frame (41), and the discharging frame (51) is sleeved on the discharging ring (44);
the blanking device comprises a blanking frame (51), and is characterized by further comprising a limiting assembly (6) for limiting blanking, wherein the limiting assembly (6) comprises a second striker plate (61), a connecting block (62), a torsion spring (63) and a limiting block (64), the second striker plate (61) for limiting the blanking frame is rotatably arranged in the middle of the blanking frame (51), an arc-shaped guide rod (53) moves upwards to drive the second striker plate (61) to rotate, the connecting block (62) is fixedly connected to the front side and the rear side of the second striker plate (61), the torsion spring (63) is wound around the front side and the rear side of the second striker plate (61), one end of the torsion spring (63) is connected with the connecting block (62), the other end of the torsion spring (63) is connected with the blanking frame (51), and the limiting block (64) is fixedly connected to the left lower part of the front side and the rear side outside the blanking frame (51);
still including slotting component (9) that are used for clearing up the construction seam, slotting component (9) are including second guide pin bushing (91), slotting pole (92), fifth spring (93), first gag lever post (94), clear material pole (95) and sixth spring (96), the rigid coupling has second guide pin bushing (91) in the middle of movable frame (1) left part, second guide pin bushing (91) sliding is equipped with slotting pole (92), the round joint has fifth spring (93) between second guide pin bushing (91) top and slotting pole (92) upper portion, slotting pole (92) lower part left side has run through first gag lever post (94), slotting pole (92) lower part slidingtype is equipped with clear material pole (95) that are used for the clearance, round joint has sixth spring (96) between clear material pole (95) top and slotting pole (92) interior upper portion.
2. The ground joint filling device before waterproof construction of a top building according to claim 1, further comprising a stirring assembly (7) for conveniently stirring asphalt, wherein the stirring assembly (7) comprises a connecting rod (71), a first guide sleeve (72), a stirring rod (73), a first rotating shaft (74), a first transmission assembly (75), a bevel gear (76), a second transmission assembly (77) and a second rotating shaft (78), the connecting rod (71) is fixedly connected to the middle part of the upper left side surface of the inner side of the movable frame (1), the right part of the connecting rod (71) is rotatably provided with the first guide sleeve (72), the middle of the discharging frame (41) is rotatably provided with the stirring rod (73) for mixing stirring, the stirring rod (73) penetrates through the first guide sleeve (72), the stirring rod (73) is in sliding connection with the first guide sleeve (72), the right side of the rear part of the movable frame (1) is rotatably provided with the first rotating shaft (74), the first transmission assembly (75) is connected between the upper part of the first rotating shaft (74) and the lower part of the first guide sleeve (72), the first transmission assembly (75) consists of two pulleys and a belt, one pulley is arranged on the upper part of the belt pulley (74) and the other pulley (78) is arranged between the lower part of the first rotating shaft (72), the front part of the second rotating shaft (78) is fixedly connected with bevel gears (76) on the lower part of the first rotating shaft (74), the two bevel gears (76) are meshed, a second transmission assembly (77) is connected between the front part of the right rear moving roller (2) and the rear part of the second rotating shaft (78), the second transmission assembly (77) consists of two belt pulleys and a belt, one belt pulley is arranged on the front part of the right rear moving roller (2), the other belt pulley is arranged on the rear part of the second rotating shaft (78), and the belt is wound between the two belts.
3. The ground joint filling device before waterproof construction of a top building according to claim 2, further comprising a water adding component (8) for adding clear water conveniently, wherein the water adding component (8) comprises a water storage frame (81), a square plate (82), a first L-shaped connecting rod (83) and a fourth spring (84), the water storage frame (81) is fixedly connected to the upper side of the right part of the movable frame (1), the square plate (82) for retaining water is slidably arranged in the middle of the left part of the water storage frame (81), the first L-shaped connecting rod (83) is fixedly connected to the middle of the square plate (82), the first L-shaped connecting rod (83) is matched with the discharging frame (41), and the fourth spring (84) is connected between the middle of the top of the square plate (82) and the inner side surface of the water storage frame (81).
4. The ground joint filling device before waterproof construction of a top building according to claim 3, which is characterized by further comprising a reset component (10) for resetting, wherein the reset component (10) comprises a second limit rod (101), a guide rail (102), a V-shaped block (103), an inclined block (104), a magnet (105), a U-shaped rod (106), a third limit rod (107), a seventh spring (108), a second L-shaped connecting rod (109), a stop block (110), an eighth spring (111) and a ninth spring (112), a second limit rod (101) is arranged at the bottom part in the movable frame (1) in a sliding manner, the second limit rod (101) is matched with the first limit rod (94), a guide rail (102) is symmetrically connected to the bottom part in the movable frame (1) in the front and the rear, a guide rail (102) is provided with an inclined block (104) in a sliding manner, the inclined block (104) is matched with the V-shaped block (103), the magnet (105) is fixedly connected to the front and the rear sides of the left part of the second limit rod (101), the magnet (105) is fixedly connected with the inclined block (104) and the second limit rod (106) is fixedly connected with the right limit rod (106), a seventh spring (108) is fixedly connected between the inner side of the third limiting rod (107) and the inner side of the U-shaped rod (106) in a front-back symmetrical mode, a second L-shaped connecting rod (109) is fixedly connected on the right side of the inner bottom of the movable frame (1) in a front-back symmetrical mode, a stop block (110) used for limiting is arranged on the upper portion of the second L-shaped connecting rod (109) in a sliding mode, the stop block (110) is matched with the third limiting rod (107), an eighth spring (111) is arranged between the inner side face of the stop block (110) and the inner side of the second L-shaped connecting rod (109), and a ninth spring (112) is arranged between the inner side face of the second limiting rod (101) and the inner side of the movable frame (1).
5. The ground caulking device before waterproof construction of a top floor according to claim 4, wherein the guide rail (102) is connected by a bolt.
CN202111606371.0A 2021-12-26 2021-12-26 Ground joint filling device before waterproof construction of top building Active CN114250955B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111606371.0A CN114250955B (en) 2021-12-26 2021-12-26 Ground joint filling device before waterproof construction of top building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111606371.0A CN114250955B (en) 2021-12-26 2021-12-26 Ground joint filling device before waterproof construction of top building

Publications (2)

Publication Number Publication Date
CN114250955A CN114250955A (en) 2022-03-29
CN114250955B true CN114250955B (en) 2023-08-11

Family

ID=80795151

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111606371.0A Active CN114250955B (en) 2021-12-26 2021-12-26 Ground joint filling device before waterproof construction of top building

Country Status (1)

Country Link
CN (1) CN114250955B (en)

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107882309A (en) * 2017-11-02 2018-04-06 戚展鹏 A kind of house decoration tile tray joint filling device
CN108060770A (en) * 2017-11-23 2018-05-22 河南高盛企业管理咨询有限公司 A kind of caulking machine with seam cleaning function
CN108560385A (en) * 2018-05-04 2018-09-21 朱加春 A kind of cement floor expansion joint joint filling equipment
DE202018004187U1 (en) * 2018-09-11 2018-10-01 Ed. Züblin Aktiengesellschaft Fugenfüllvorrichtung
CN108868084A (en) * 2018-06-20 2018-11-23 叶永青 A kind of construction floor ceramic tile joint filling equipment
CN109403606A (en) * 2018-10-08 2019-03-01 刘光伟 A kind of ceramic tile gap gluer
CN111636402A (en) * 2020-05-27 2020-09-08 罗丽芳 Grass discharging and sand fixing integrated machine
CN112048980A (en) * 2020-09-11 2020-12-08 李宗志 Road and bridge crack repairing device capable of quantitatively filling repairing glue
JP6826263B1 (en) * 2019-12-19 2021-02-03 温州▲しゅう▼途電子科技有限公司 A device that automatically slices the road surface
CN112376377A (en) * 2020-11-06 2021-02-19 刘杰 Device capable of solving problems of easy position deviation and uneven glue discharge during pavement joint patching
CN112779847A (en) * 2021-01-12 2021-05-11 刘莉 Marking device is used in building site construction
CN213477561U (en) * 2020-09-14 2021-06-18 凌云 Floor tile joint filling equipment for building construction
CN213538634U (en) * 2020-08-11 2021-06-25 中交二航局第一工程有限公司 Municipal road is with device of caulking
CN214613513U (en) * 2021-03-10 2021-11-05 范方柱 Municipal administration road bridge construction is with device of caulking
CN114148394A (en) * 2021-11-12 2022-03-08 肖少娥 Cement mobile device for building
CN114232950A (en) * 2021-12-15 2022-03-25 钟朝见 Wall cement spraying device for wall construction
CN216865880U (en) * 2021-12-07 2022-07-01 山东卓高新材料有限公司 Building decoration joint agent filling device
CN217169137U (en) * 2022-04-03 2022-08-12 张谦硕 Civil engineering construction is with device of caulking fast

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107882309A (en) * 2017-11-02 2018-04-06 戚展鹏 A kind of house decoration tile tray joint filling device
CN108060770A (en) * 2017-11-23 2018-05-22 河南高盛企业管理咨询有限公司 A kind of caulking machine with seam cleaning function
CN108560385A (en) * 2018-05-04 2018-09-21 朱加春 A kind of cement floor expansion joint joint filling equipment
CN108868084A (en) * 2018-06-20 2018-11-23 叶永青 A kind of construction floor ceramic tile joint filling equipment
DE202018004187U1 (en) * 2018-09-11 2018-10-01 Ed. Züblin Aktiengesellschaft Fugenfüllvorrichtung
CN109403606A (en) * 2018-10-08 2019-03-01 刘光伟 A kind of ceramic tile gap gluer
JP6826263B1 (en) * 2019-12-19 2021-02-03 温州▲しゅう▼途電子科技有限公司 A device that automatically slices the road surface
CN111636402A (en) * 2020-05-27 2020-09-08 罗丽芳 Grass discharging and sand fixing integrated machine
CN213538634U (en) * 2020-08-11 2021-06-25 中交二航局第一工程有限公司 Municipal road is with device of caulking
CN112048980A (en) * 2020-09-11 2020-12-08 李宗志 Road and bridge crack repairing device capable of quantitatively filling repairing glue
CN213477561U (en) * 2020-09-14 2021-06-18 凌云 Floor tile joint filling equipment for building construction
CN112376377A (en) * 2020-11-06 2021-02-19 刘杰 Device capable of solving problems of easy position deviation and uneven glue discharge during pavement joint patching
CN112779847A (en) * 2021-01-12 2021-05-11 刘莉 Marking device is used in building site construction
CN214613513U (en) * 2021-03-10 2021-11-05 范方柱 Municipal administration road bridge construction is with device of caulking
CN114148394A (en) * 2021-11-12 2022-03-08 肖少娥 Cement mobile device for building
CN216865880U (en) * 2021-12-07 2022-07-01 山东卓高新材料有限公司 Building decoration joint agent filling device
CN114232950A (en) * 2021-12-15 2022-03-25 钟朝见 Wall cement spraying device for wall construction
CN217169137U (en) * 2022-04-03 2022-08-12 张谦硕 Civil engineering construction is with device of caulking fast

Also Published As

Publication number Publication date
CN114250955A (en) 2022-03-29

Similar Documents

Publication Publication Date Title
CN110331643A (en) A kind of bituminous pavement fills out hole machine
CN113445750B (en) Be used for building engineering ration filler frame
CN109914207B (en) Pavement paving machine
CN113119278A (en) Aerated concrete block pouring device capable of achieving composite pouring
CN114717916B (en) Even pavement adding device for pavement construction concrete
CN114250955B (en) Ground joint filling device before waterproof construction of top building
CN114278052B (en) Fitment sealant filling device for building
CN112080999A (en) Portable core hole device for repairing road
CN114482465A (en) Building ceramic tile cement paints and scrapes all-in-one
CN213173250U (en) Remove convenient pitch laying device
CN112193683A (en) Town road drainage underground refuse case device
CN113005309A (en) High-efficient extraction element of industrial rare earth element
JP4748407B2 (en) Scouring equipment for sand settling and sludge
CN209601663U (en) A kind of husky equipment of dress for building
CN112726467B (en) Efficient energy-saving environment-friendly road garbage cleaning device
CN203658082U (en) Splitting machine
CN108438640A (en) A kind of municipal garbage bucket conveniently dumped rubbish
CN211333971U (en) Concrete mixer for building
CN111733678A (en) Automatic plastic course dismantling device
CN108722569B (en) Sand and stone separator with breaker
CN214764725U (en) Agitating unit with paint removes bubble
CN218150000U (en) Cement product groove filling device
CN111335113B (en) Street laying device
CN218323946U (en) Green construction cementer of assembled building
CN216640199U (en) Crack processing apparatus for highway engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20230714

Address after: 215316 76-102 Yuhu Business Center, Kunshan City, Suzhou City, Jiangsu Province

Applicant after: Yuanxinshe Construction Technology Co.,Ltd.

Address before: 510630 room 1008, building 4, No. 3, Tianyun Road, Tianhe District, Guangzhou, Guangdong

Applicant before: Xiao Shaoe

GR01 Patent grant