CN209601663U - Sand loading equipment for building - Google Patents

Sand loading equipment for building Download PDF

Info

Publication number
CN209601663U
CN209601663U CN201920009230.2U CN201920009230U CN209601663U CN 209601663 U CN209601663 U CN 209601663U CN 201920009230 U CN201920009230 U CN 201920009230U CN 209601663 U CN209601663 U CN 209601663U
Authority
CN
China
Prior art keywords
motor
shaped frame
sand
screw rod
sprocket wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920009230.2U
Other languages
Chinese (zh)
Inventor
黎莹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201920009230.2U priority Critical patent/CN209601663U/en
Application granted granted Critical
Publication of CN209601663U publication Critical patent/CN209601663U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Chain Conveyers (AREA)

Abstract

The utility model relates to a dress husky equipment especially relates to a dress husky equipment for building. The utility model aims at providing a can once only can pour a large amount of sands into the trolley in, and then improved work efficiency, people's hand can not ache, dress husky equipment for building tired out either. A sand loading device for buildings comprises a u-shaped frame, wheels, a pushing handle, a fixed block, a vertical rod, a sliding sleeve, a connecting block, a rotating shaft, a collecting hopper and the like; wheels are arranged on the left and right sides of the outer front side face and the left and right sides of the rear side face of the u-shaped frame, a pushing handle is arranged on the left side of the u-shaped frame, and fixing blocks are symmetrically arranged on the front and rear sides of the outer right side face of the u-shaped frame. The utility model discloses an effect of second motor and first motor can be transported in pouring the sand in collecting the fill into the trolley, and then need not the people and shovel the sand into the trolley through the shovel, and the sand shoveling device can push the sand in collecting the fill, will collect and fill up in the fill and pour into the trolley, has improved work efficiency.

Description

A kind of husky equipment of dress for building
Technical field
The utility model relates to a kind of husky equipment of dress, more particularly to a kind of husky equipment of dress for building.
Background technique
Building is the general name of building and structures, is people to meet social life needs, utilizes grasped object Matter technological means, and the artificial environment created with certain scientific law, geomantic omen theory and aesthetic principle.
In the construction of building, sand is to do essential a kind of material in concrete, and sand is typically all to need to pass through Trolley is transported to the position of needs, is all manually at present to be shoveled sand in trolley with scoop, but trolley is relatively high, when long Between shovel sand be easy to cause the hand soreness of people, it is also very tired out.
Utility model content
It is all manually at present to be shoveled sand in trolley with scoop, but trolley is relatively high to overcome, prolonged shovel is husky It is easy to cause the hand soreness of people, also disadvantage very tired out, the purpose of the utility model is to provide one kind being capable of a performance A large amount of sand is poured into trolley, and then is improved work efficiency, the hand of people will not ache, dress for building tired out is husky Equipment.
A kind of husky equipment of dress for building includes u-shaped frame, wheel, pushing hands, fixed block, vertical bar, sliding sleeve, link block, turns Axis, collection bucket, the first sprocket wheel, chain belt, mounting plate, first motor, the second sprocket wheel, bearing block, nut, screw rod, top plate, the second electricity Machine and brace, the outer leading flank left and right sides of u-shaped frame are fitted with wheel with the trailing flank left and right sides, are equipped with and push away on the left of u-shaped frame Hand, in face of u-shaped frame external right side after bilateral type fixed block is installed, fixed block top right side is equipped with vertical bar, on vertical bar Equipped with sliding sleeve, link block is installed, rotary type is equipped with shaft, front and rear sides shaft in the middle part of link block in the middle part of sliding sleeve left side Collection bucket is installed between inner end, front side shaft front end is equipped with the first sprocket wheel, and front side link block left side is equipped with mounting plate, First motor is installed on the left of mounting plate leading flank, the output shaft of first motor is connected with the second sprocket wheel by shaft coupling, and second It is connected with chain belt between sprocket wheel and the first sprocket wheel, top plate is installed between the vertical bar top of front and rear sides, top plate front and rear sides face is left It is fitted with brace between side and the outer front and rear sides left side of face of u-shaped frame, top plate bottom right is vertically-mounted the second motor, front side Fixed block right side top is equipped with bearing block, and screw rod is equipped in bearing block, and screw rod is equipped with nut, nut left side and cunning Right flank middle part connection is covered, the output shaft of the second motor is connect by shaft coupling with screw mandrel top.
As a further preferred solution, further include having the husky device of shovel, shovel husky device include handle, transverse slat, cutting ferrule, Mounting rack, axle sleeve, scoop and motion bar, top left side Middle face are equipped with transverse slat, and transverse slat top left side is equipped with cutting ferrule, top plate Top right side is equipped with mounting rack, and axle sleeve is equipped on mounting rack, is equipped with motion bar in axle sleeve, motion bar left part is located at cutting ferrule Interior, motion bar left end is equipped with handle, and motion bar right end is equipped with scoop.
It as a further preferred solution, further include having inner thread sleeve, screw rod and circular block, on the right side of u-shaped top of the trellis Front and back two is fitted with inner thread sleeve, is equipped with screw rod in inner thread sleeve, screw tip is equipped with circular block.
The personnel of being operated first hold pushing hands and push the present apparatus to the movement of sand direction by wheel, and then sand is located at and is received In collection bucket, after having suitable sand in collection bucket, trolley can be pushed to be located in u-shaped frame, the second motor of starting rotates forward, and second Motor, which rotates forward, drives screw rod to rotate forward, and screw rod, which rotates forward, drives nut to move up, and nut, which moves up, drives sliding sleeve to move up, sliding Set, which moves up, drives link block to move up, and link block moves upwardly through shaft and collection bucket is driven to move up, and then works as When collection bucket is moved up positioned at trolley upper right side, the second motor, starting first motor reversion, first motor reversion can be closed The second sprocket wheel is driven to invert, the reversion of the second sprocket wheel drives the reversion of the first sprocket wheel by chain belt, and the reversion of the first sprocket wheel drives shaft anti- Turn, shaft reversion drives collection bucket reversion, and collection bucket reversion pours into sand in trolley, closes the second motor.Similarly, work as collection When sand in bucket is all poured into trolley, the rotating forward of the second motor can be started, and then shaft rotates forward and drives collection bucket rotating forward extensive Multiple to original position, the second motor of closing starts first motor and inverts, and nut, which moves down, drives sliding sleeve to move down, and then drives Collection bucket moves down recovery to original position, closes first motor, operator can push trolley to transport sand.
Because further including having the husky device of shovel, shovel husky device include handle, transverse slat, cutting ferrule, mounting rack, axle sleeve, scoop and Motion bar, top left side Middle face are equipped with transverse slat, and transverse slat top left side is equipped with cutting ferrule, and top plate top right side is equipped with installation Frame is equipped with axle sleeve on mounting rack, is equipped with motion bar in axle sleeve, motion bar left part is located in cutting ferrule, and motion bar left end is equipped with Handle, motion bar right end is equipped with scoop, and when being underfilled with sand in collection bucket, operator can hold handle pulling activity Bar is rotated up, and motion bar is rotated up to be detached from in cutting ferrule, and then drives scoop to rotate down by axle sleeve, when motion bar is in When vertical state, can stop operating motion bar, and motion bar is pushed to move down, and motion bar, which moves down, drives scoop to moving down Dynamic, scoop moves down in insertion sand, motion bar top can be pushed to swing to the right, and then motion bar lower part swings band to the left Dynamic scoop is swung to the left, and scoop is swung to the left is pushed into sand in collection bucket, repeatedly, sand can be pushed into collection bucket It is interior.After filling sand in collection bucket, motion bar can be pulled to move up by handle, motion bar moves up drive scoop Move up, after scoop is moved upward to suitable position, can pull motion bar rotate down restore in cutting ferrule to It is in situ.In this way, can make to fill sand in collection bucket, working efficiency is improved.
Because further including having inner thread sleeve, screw rod and circular block, front and back two is fitted with interior spiral shell on the right side of u-shaped top of the trellis Line sleeve, inner thread sleeve is interior to be equipped with screw rod, and screw tip is equipped with circular block, when trolley is located in u-shaped frame, operator It can be rotated screw rod reversion, screw rod reversion is moved up by inner thread sleeve, and screw rod, which moves up, drives circular block to moving up Dynamic, circular block is moved up to contact with trolley and be supported, and stop operating screw rod, can start to carry out dress sand.Work as sand After all pouring into trolley, i.e., rotatably screw rod rotates forward drive circular block and moves down recovery to original position.In this way, sand can be prevented When pouring into trolley, sand is poured out in trolley overturning.
Compared with prior art, the utility model has the advantage that the utility model passes through the second motor and the first electricity Sand in collection bucket can be poured into trolley and be transported by the effect of machine, and then be shoveled sand into bucket by spades without people Car, shoveling husky device can be pushed into sand in collection bucket, and sand will be filled in collection bucket and is poured into trolley, improve work effect Rate, reached can a performance a large amount of sand is poured into trolley, and then improve work efficiency, the hand of people will not Ache, effect tired out.
Detailed description of the invention
Fig. 1 is the first schematic view of the front view of the utility model.
Fig. 2 is the overlooking structure diagram of the utility model u-shaped frame.
Fig. 3 is the schematic view of the front view that the utility model shovels that husky device is packed up.
Fig. 4 is the schematic view of the front view that the utility model shovels that husky device is put down.
Fig. 5 is second of schematic view of the front view of the utility model.
In the figure, it is marked as 1:u type frame, 2: wheel, 3: pushing hands, 4: trolley, 5: fixed block, 6: vertical bar, 7: sliding sleeve, 8: connection Block, 9: shaft, 10: collection bucket, 11: the first sprocket wheels, 12: chain belt, 13: mounting plate, 14: first motor, 15: the second sprocket wheels, 16: Bearing block, 17: nut, 18: screw rod, 19: top plate, 20: the second motors, 21: brace, 22: the husky device of shovel, 221: handle, 222: Transverse slat, 223: cutting ferrule, 224: mounting rack, 225: axle sleeve, 226: scoop, 227: motion bar, 23: inner thread sleeve, 24: screw rod, 25: circular block.
Specific embodiment
The utility model is specifically described with reference to the accompanying drawing.
Embodiment 1
The husky equipment of one kind dress for building includes as shown in Figs. 1-5 u-shaped frame 1, wheel 2, pushing hands 3, fixed block 5, vertical bar 6, sliding sleeve 7, link block 8, shaft 9, collection bucket 10, the first sprocket wheel 11, chain belt 12, mounting plate 13, first motor 14, the second sprocket wheel 15, bearing block 16, nut 17, screw rod 18, top plate 19, the second motor 20 and brace 21, at left and right sides of u-shaped frame 1 outer leading flank with It is fitted with wheel 2 at left and right sides of trailing flank, pushing hands 3 is installed, 1 external right side face front and rear sides of u-shaped frame are symmetrical on the left of u-shaped frame 1 Formula is equipped with fixed block 5, and 5 top right side of fixed block is equipped with vertical bar 6, and vertical bar 6 is equipped with sliding sleeve 7,7 left side of sliding sleeve middle part Link block 8 is installed, 8 middle part rotary type of link block is equipped with shaft 9, and front and rear sides shaft is equipped with collection between 9 inner end Bucket 10,9 front end of front side shaft are equipped with the first sprocket wheel 11, and link block 8 left side in front side is equipped with mounting plate 13, before mounting plate 13 First motor 14 is installed on the left of side, the output shaft of first motor 14 is connected with the second sprocket wheel 15, the second chain by shaft coupling It is connected with chain belt 12 between wheel 15 and the first sprocket wheel 11, top plate 19,19 front and back of top plate are installed between 6 top of front and rear sides vertical bar It is fitted with brace 21 between the outer front and rear sides left side of face of u-shaped frame 1 on the left of two sides, 19 bottom right of top plate is vertically-mounted to be had Second motor 20,5 right side top of front side fixed block are equipped with bearing block 16, screw rod 18, screw rod 18 are equipped in bearing block 16 Be equipped with nut 17,17 left side of nut connect with 7 right flank middle part of sliding sleeve, the output shaft of the second motor 20 pass through shaft coupling and The connection of 18 top of screw rod.
Embodiment 2
The husky equipment of one kind dress for building includes as shown in Figs. 1-5 u-shaped frame 1, wheel 2, pushing hands 3, fixed block 5, vertical bar 6, sliding sleeve 7, link block 8, shaft 9, collection bucket 10, the first sprocket wheel 11, chain belt 12, mounting plate 13, first motor 14, the second sprocket wheel 15, bearing block 16, nut 17, screw rod 18, top plate 19, the second motor 20 and brace 21, at left and right sides of u-shaped frame 1 outer leading flank with It is fitted with wheel 2 at left and right sides of trailing flank, pushing hands 3 is installed, 1 external right side face front and rear sides of u-shaped frame are symmetrical on the left of u-shaped frame 1 Formula is equipped with fixed block 5, and 5 top right side of fixed block is equipped with vertical bar 6, and vertical bar 6 is equipped with sliding sleeve 7,7 left side of sliding sleeve middle part Link block 8 is installed, 8 middle part rotary type of link block is equipped with shaft 9, and front and rear sides shaft is equipped with collection between 9 inner end Bucket 10,9 front end of front side shaft are equipped with the first sprocket wheel 11, and link block 8 left side in front side is equipped with mounting plate 13, before mounting plate 13 First motor 14 is installed on the left of side, the output shaft of first motor 14 is connected with the second sprocket wheel 15, the second chain by shaft coupling It is connected with chain belt 12 between wheel 15 and the first sprocket wheel 11, top plate 19,19 front and back of top plate are installed between 6 top of front and rear sides vertical bar It is fitted with brace 21 between the outer front and rear sides left side of face of u-shaped frame 1 on the left of two sides, 19 bottom right of top plate is vertically-mounted to be had Second motor 20,5 right side top of front side fixed block are equipped with bearing block 16, screw rod 18, screw rod 18 are equipped in bearing block 16 Be equipped with nut 17,17 left side of nut connect with 7 right flank middle part of sliding sleeve, the output shaft of the second motor 20 pass through shaft coupling and The connection of 18 top of screw rod.
Further include having the husky device 22 of shovel, shovel husky device 22 include handle 221, transverse slat 222, cutting ferrule 223, mounting rack 224, Axle sleeve 225, scoop 226 and motion bar 227, top left side Middle face are equipped with transverse slat 222, and 222 top left side of transverse slat is equipped with Cutting ferrule 223,19 top right side of top plate are equipped with mounting rack 224, and axle sleeve 225 is equipped on mounting rack 224, is equipped in axle sleeve 225 Motion bar 227,227 left part of motion bar are located in cutting ferrule 223, and 227 left end of motion bar is equipped with handle 221,227 right end of motion bar Scoop 226 is installed.
Embodiment 3
The husky equipment of one kind dress for building includes as shown in Figs. 1-5 u-shaped frame 1, wheel 2, pushing hands 3, fixed block 5, vertical bar 6, sliding sleeve 7, link block 8, shaft 9, collection bucket 10, the first sprocket wheel 11, chain belt 12, mounting plate 13, first motor 14, the second sprocket wheel 15, bearing block 16, nut 17, screw rod 18, top plate 19, the second motor 20 and brace 21, at left and right sides of u-shaped frame 1 outer leading flank with It is fitted with wheel 2 at left and right sides of trailing flank, pushing hands 3 is installed, 1 external right side face front and rear sides of u-shaped frame are symmetrical on the left of u-shaped frame 1 Formula is equipped with fixed block 5, and 5 top right side of fixed block is equipped with vertical bar 6, and vertical bar 6 is equipped with sliding sleeve 7,7 left side of sliding sleeve middle part Link block 8 is installed, 8 middle part rotary type of link block is equipped with shaft 9, and front and rear sides shaft is equipped with collection between 9 inner end Bucket 10,9 front end of front side shaft are equipped with the first sprocket wheel 11, and link block 8 left side in front side is equipped with mounting plate 13, before mounting plate 13 First motor 14 is installed on the left of side, the output shaft of first motor 14 is connected with the second sprocket wheel 15, the second chain by shaft coupling It is connected with chain belt 12 between wheel 15 and the first sprocket wheel 11, top plate 19,19 front and back of top plate are installed between 6 top of front and rear sides vertical bar It is fitted with brace 21 between the outer front and rear sides left side of face of u-shaped frame 1 on the left of two sides, 19 bottom right of top plate is vertically-mounted to be had Second motor 20,5 right side top of front side fixed block are equipped with bearing block 16, screw rod 18, screw rod 18 are equipped in bearing block 16 Be equipped with nut 17,17 left side of nut connect with 7 right flank middle part of sliding sleeve, the output shaft of the second motor 20 pass through shaft coupling and The connection of 18 top of screw rod.
Further include having the husky device 22 of shovel, shovel husky device 22 include handle 221, transverse slat 222, cutting ferrule 223, mounting rack 224, Axle sleeve 225, scoop 226 and motion bar 227, top left side Middle face are equipped with transverse slat 222, and 222 top left side of transverse slat is equipped with Cutting ferrule 223,19 top right side of top plate are equipped with mounting rack 224, and axle sleeve 225 is equipped on mounting rack 224, is equipped in axle sleeve 225 Motion bar 227,227 left part of motion bar are located in cutting ferrule 223, and 227 left end of motion bar is equipped with handle 221,227 right end of motion bar Scoop 226 is installed.
It further include having inner thread sleeve 23, screw rod 24 and circular block 25, two are fitted with before and after 1 top right side of u-shaped frame Inner thread sleeve 23, inner thread sleeve 23 is interior to be equipped with screw rod 24, and 24 top of screw rod is equipped with circular block 25.
The personnel of being operated first hold pushing hands 3 and push the present apparatus to the movement of sand direction by wheel 2, and then sand is located at In collection bucket 10, after having suitable sand in collection bucket 10, trolley 4 can be pushed to be located in u-shaped frame 1, start the second motor 20 rotate forward, and the second motor 20, which rotates forward, drives screw rod 18 to rotate forward, and screw rod 18, which rotates forward, drives nut 17 to move up, and nut 17 is to moving up Dynamic that sliding sleeve 7 is driven to move up, sliding sleeve 7, which moves up, drives link block 8 to move up, and link block 8 moves upwardly through shaft 9 It drives collection bucket 10 to move up, and then when collection bucket 10 is moved up positioned at 4 upper right side of trolley, the second motor can be closed 20, starting first motor 14 inverts, and the reversion of first motor 14 drives the reversion of the second sprocket wheel 15, and the reversion of the second sprocket wheel 15 passes through chain belt 12 drive the reversion of the first sprocket wheel 11, and the reversion of the first sprocket wheel 11 drives shaft 9 to invert, and the reversion of shaft 9 drives collection bucket 10 to invert, and receive 10 reversion of collection bucket pours into sand in trolley 4, closes the second motor 20.Similarly, when the sand in collection bucket 10 all pours into bucket When in vehicle 4, the rotating forward of the second motor 20 can be started, and then shaft 9 rotates forward and drives collection bucket 10 to rotate forward to restore to original position, close the Two motors 20, starting first motor 14 invert, and nut 17, which moves down, drives sliding sleeve 7 to move down, and then drives collection bucket 10 Recovery is moved down to original position, closes first motor 14, operator can push trolley 4 to transport sand.
Because further including having the husky device 22 of shovel, shoveling husky device 22 includes handle 221, transverse slat 222, cutting ferrule 223, mounting rack 224, axle sleeve 225, scoop 226 and motion bar 227, top left side Middle face are equipped with transverse slat 222,222 top left side of transverse slat peace Equipped with cutting ferrule 223,19 top right side of top plate is equipped with mounting rack 224, is equipped with axle sleeve 225 on mounting rack 224, in axle sleeve 225 Equipped with motion bar 227,227 left part of motion bar is located in cutting ferrule 223, and 227 left end of motion bar is equipped with handle 221, motion bar 227 Right end is equipped with scoop 226, and when being underfilled with sand in collection bucket 10, operator can hold handle 221 and pull motion bar 227 are rotated up, and motion bar 227 is rotated up to be detached from in cutting ferrule 223, and then drive scoop 226 to turn downwards by axle sleeve 225 Dynamic, when 227 state in a vertical shape of motion bar, can stop operating motion bar 227, push motion bar 227 to move down, motion bar 227, which move down drive scoop 226, moves down, and scoop 226 moves down in insertion sand, can push on motion bar 227 Portion is swung to the right, and then 227 lower part of motion bar swings scoop 226 is driven to swing to the left to the left, and scoop 226 is swung to the left by sand It is pushed into collection bucket 10, repeatedly, sand can be pushed into collection bucket 10.After filling sand in collection bucket 10 Motion bar 227 is pulled to move up by handle 221, motion bar 227, which moves up, drives scoop 226 to move up, and works as scoop After 226 are moved upward to suitable position, motion bar 227 can be pulled to rotate down and restored in cutting ferrule 223 to original position.Such as This, can make to fill sand in collection bucket 10, improve working efficiency.
Because further including having inner thread sleeve 23, screw rod 24 and circular block 25, all pacify for two before and after 1 top right side of u-shaped frame Equipped with inner thread sleeve 23, it is equipped with screw rod 24 in inner thread sleeve 23,24 top of screw rod is equipped with circular block 25, when 4, trolley When in u-shaped frame 1, operator can be rotated screw rod 24 and invert, and the reversion of screw rod 24 is moved up by inner thread sleeve 23, spiral shell Bar 24, which moves up, drives circular block 25 to move up, and circular block 25 is moved up to contact with trolley 4 and be supported, and is stopped Screw rod 24 is rotated, can start to carry out dress sand.After sand all pours into trolley 4, i.e., rotatably screw rod 24 rotates forward and drives circle Shape block 25 moves down recovery to original position.In this way, sand is poured out in the overturning of trolley 4 when can prevent sand from pouring into trolley 4.
The embodiments of the present invention is explained in detail above in conjunction with attached drawing, but the utility model is not limited to Above embodiment can also not depart from the utility model aims within the knowledge of those skilled in the art Under the premise of make a variety of changes.

Claims (3)

1. a kind of husky equipment of dress for building includes u-shaped frame, wheel, pushing hands, fixed block, vertical bar and sliding sleeve, the outer front side of u-shaped frame At left and right sides of face with wheel is fitted at left and right sides of trailing flank, pushing hands is installed on the left of u-shaped frame, in face of u-shaped frame external right side after Bilateral type is equipped with fixed block, and fixed block top right side is equipped with vertical bar, and vertical bar is equipped with sliding sleeve, it is characterised in that: It further include having link block, shaft, collection bucket, the first sprocket wheel, chain belt, mounting plate, first motor, the second sprocket wheel, bearing block, spiral shell Mother, screw rod, top plate, the second motor and brace, sliding sleeve left side middle part are equipped with link block, the installation of rotary type in the middle part of link block There is shaft, collection bucket is installed between the shaft inner end of front and rear sides, front side shaft front end is equipped with the first sprocket wheel, front side link block Left side is equipped with mounting plate, is equipped with first motor on the left of mounting plate leading flank, the output shaft of first motor passes through shaft coupling It is connected with the second sprocket wheel, chain belt is connected between the second sprocket wheel and the first sprocket wheel, front and rear sides are equipped with top between vertical bar top It is fitted with brace between the outer front and rear sides left side of face of plate, top plate front and rear sides left side of face and u-shaped frame, top plate bottom right is vertical Second motor is installed, front side fixed block right side top is equipped with bearing block, screw rod is equipped in bearing block, screw rod is equipped with Nut, nut left side are connect with sliding sleeve right flank middle part, and the output shaft of the second motor is connect by shaft coupling with screw mandrel top.
2. the husky equipment of one kind dress for building described in accordance with the claim 1, it is characterised in that: further include having the husky device of shovel, shovel is husky Device includes handle, transverse slat, cutting ferrule, mounting rack, axle sleeve, scoop and motion bar, and top left side Middle face is equipped with transverse slat, horizontal Plate top left side is equipped with cutting ferrule, and top plate top right side is equipped with mounting rack, and axle sleeve is equipped on mounting rack, is equipped with and lives in axle sleeve Lever, motion bar left part are located in cutting ferrule, and motion bar left end is equipped with handle, and motion bar right end is equipped with scoop.
3. the husky equipment of a kind of dress for building according to claim 2, it is characterised in that: further include having inner thread sleeve, spiral shell Bar and circular block, u-shaped top of the trellis right side front and back two are fitted with inner thread sleeve, are equipped with screw rod, screw rod in inner thread sleeve Top is equipped with circular block.
CN201920009230.2U 2019-01-04 2019-01-04 Sand loading equipment for building Expired - Fee Related CN209601663U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920009230.2U CN209601663U (en) 2019-01-04 2019-01-04 Sand loading equipment for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920009230.2U CN209601663U (en) 2019-01-04 2019-01-04 Sand loading equipment for building

Publications (1)

Publication Number Publication Date
CN209601663U true CN209601663U (en) 2019-11-08

Family

ID=68399805

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920009230.2U Expired - Fee Related CN209601663U (en) 2019-01-04 2019-01-04 Sand loading equipment for building

Country Status (1)

Country Link
CN (1) CN209601663U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111942906A (en) * 2020-07-14 2020-11-17 肖春莲 Sand and soil collection device for building
CN112660226A (en) * 2021-01-06 2021-04-16 李述芳 Food production is with shallow is collected to dried-up shrimp of base shrimp

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111942906A (en) * 2020-07-14 2020-11-17 肖春莲 Sand and soil collection device for building
CN111942906B (en) * 2020-07-14 2022-07-22 湖北梨木建筑工程有限公司 Sand and soil collection device for building
CN112660226A (en) * 2021-01-06 2021-04-16 李述芳 Food production is with shallow is collected to dried-up shrimp of base shrimp

Similar Documents

Publication Publication Date Title
CN207013022U (en) A kind of mining industry high-efficiency breaker
CN206654080U (en) It is a kind of can automatic discharging building trolley
CN209601663U (en) Sand loading equipment for building
CN206304803U (en) A kind of preliminary breaker of waste water clod for building
CN204620367U (en) Self-propelled full automatic sand sieving machine
CN207973454U (en) A kind of cart for building
CN108867297A (en) A kind of construction is banketed equipment
CN109094885A (en) A kind of grains of sand automatic packer
CN219560488U (en) Screening plant of merchant's concrete production
CN114408317B (en) Cement bag breaking device convenient for discharging for building construction
CN110027918A (en) A kind of loose sand barrel filler
CN201883464U (en) Rescue vehicle
CN108438355A (en) A kind of sand sack-filling device
CN214739961U (en) Small-size automatic sand bucket loader that looses
CN212248183U (en) Ground tamping device for building engineering
CN210593510U (en) Environment-friendly hopper of keeping in of concrete production usefulness
CN201127995Y (en) Double-tilting mechanism ladle
CN204110956U (en) Bulk cargo collecting device and bulk cargo carloader
CN209383283U (en) Subway segment steel reinforcement cage tipper
CN208788866U (en) A kind of blow moulding machine convenient for feeding
CN102671760B (en) Vertical-type dry-concentration placer ore taking and magnetic concentration system and method
CN206368344U (en) A kind of oscillatory type pavement ice breaker
CN207025780U (en) A kind of mining industry high-efficiency coal separator
CN219506181U (en) Concrete transportation device
CN221295228U (en) Building material feeding unit for building engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191108

Termination date: 20210104

CF01 Termination of patent right due to non-payment of annual fee