CN114232883A CN202111617397.5A CN202111617397A CN114232883A CN 114232883 A CN114232883 A CN 114232883A CN 202111617397 A CN202111617397 A CN 202111617397A CN 114232883 A CN114232883 A CN 114232883A
Authority
CN
China
Prior art keywords
hot
angle steel
dip zinc
plate
rectangular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111617397.5A
Other languages
Chinese (zh)
Inventor
戚建权
习均龙
谢晓璐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Gold Kings Building Material Co ltd
Original Assignee
Guangzhou Gold Kings Building Material Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Gold Kings Building Material Co ltd filed Critical Guangzhou Gold Kings Building Material Co ltd
Priority to CN202111617397.5A priority Critical patent/CN114232883A/en
Publication of CN114232883A publication Critical patent/CN114232883A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/006Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation with means for hanging lighting fixtures or other appliances to the framework of the ceiling
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Non-Portable Lighting Devices Or Systems Thereof (AREA)

Abstract

The invention discloses a three-dimensional ceiling structure with a reflecting plate and an installation method thereof, and relates to the field of ceiling structures. This be used for inside angle steel, the L panel fixed code that sets up of furred ceiling structure of reflection and jib cooperation hot invasion zinc rectangular pipe are convenient for be connected roof, curb plate and bottom plate and vertical main bone, and form three-dimensional stereovision, and the projecting lamp of the inside setting of the cooperation this structure simultaneously is convenient for increase the vision of this reflecting plate structure and experiences the sense, and simple to operate can realize the three-dimensional shape effect of arris.

Description

Three-dimensional ceiling structure with reflecting plate and mounting method thereof
Technical Field
The invention relates to the field of suspended ceiling structures, in particular to a three-dimensional suspended ceiling structure with a reflecting plate and an installation method thereof.
Background
The reflecting plate has the characteristics of the material, is widely applied to various suspended ceiling industries, but the suspended ceiling structure used when the reflecting plate is used for suspended ceiling at present is usually that the reflecting plate is directly spliced outside a main framework of the suspended ceiling, the suspended ceiling is not well fixed, and the existing suspended ceiling device is plane setting and poor in decorative effect.
Aiming at the problem that the existing ceiling vision experience is poor when a reflecting plate is used for ceiling suspension at present, a three-dimensional ceiling structure with the reflecting plate and an installation method thereof are provided.
Disclosure of Invention
In order to achieve the purpose, the invention adopts the following technical scheme:
the utility model provides a take three-dimensional furred ceiling structure of reflecting plate, includes vertical main bone, the bottom of vertical main bone is provided with first hot zinc square tube of invading, the bottom that first hot zinc square tube of invading is provided with the roof, one side that first hot zinc square tube of invading is provided with the second angle steel, the second angle steel sets up with vertical main bone is perpendicular, one side of second angle steel is provided with the curb plate, just one side of curb plate is provided with the projecting lamp, the bottom of second angle steel is provided with the hot zinc square tube of invading of second, just the bottom that the hot zinc square tube of invading of second is provided with the bottom plate, and roof, curb plate and bottom plate form three-dimensional face position setting, just the projecting lamp shine in the roof surface with certain angle.
Preferably, the bilateral symmetry of vertical main bone is provided with the conversion fossil fragments, just the top of conversion fossil fragments is provided with the universal joint subassembly, the top of universal joint subassembly is provided with the adaptor.
Preferably, a third hot-dip zinc rectangular tube is uniformly arranged on one side of the longitudinal main bone and is distributed perpendicular to the longitudinal main bone.
Preferably, the top of first hot dipping zinc quarter bend evenly is provided with first jib, first jib is installed in proper order at the top of first hot dipping zinc quarter bend according to the difference of length, the top of first jib is provided with the clamp spare, just the clamp spare is connected with third hot dipping zinc quarter bend.
Preferably, the top of roof is provided with L panel fixed code, the roof is connected with first hot invasion zinc square tube through L panel fixed code, the both ends of roof, curb plate and bottom plate all are provided with pre-buried keyhole, just the inside of pre-buried keyhole all is provided with the bolt.
Preferably, one side of vertical main bone is provided with first angle steel, just the bottom of first angle steel runs through and is provided with first jib, the bottom of first jib is provided with the slide rail, the inside of slide rail is provided with overhauls the pulley, first jib is installed to the bottom of overhauing the pulley, it is connected with the second angle steel through first jib to overhaul the pulley, the curb plate is connected with the second angle steel through the bolt of its inside setting.
Preferably, the bottom of the first angle steel is provided with a second suspender, and the bottom of the second suspender is connected with the second hot-dip zinc rectangular pipe.
The mounting method of the three-dimensional suspended ceiling structure with the reflecting plate is characterized by comprising the following steps:
s1, taking out a proper amount of longitudinal main bones, connecting the longitudinal main bones in pairs through a conversion keel, connecting the bottom of a universal joint component with the conversion keel, connecting the top of the conversion keel with an adapter, and fixing the longitudinal main bones at proper positions through the adapter;
s2, taking out a proper amount of third hot-dip zinc rectangular pipes, vertically connecting the third hot-dip zinc rectangular pipes with the longitudinal main bones, and taking out the first hot-dip zinc rectangular pipes to be connected with the third hot-dip zinc rectangular pipes, so that the first hot-dip zinc rectangular pipes are fixed and are obliquely arranged;
s3, taking out the top plate, and connecting the top plate with the first hot-dip zinc rectangular tube;
s4, taking out the first angle steel, installing the first angle steel on the top of the longitudinal main rib, simultaneously taking out a group of first hanging rods and a sliding rail, and connecting the sliding rail with the first angle steel through the group of first hanging rods;
s5, mounting a second angle steel, meanwhile, enabling the second angle steel to be located on one side of the first hot-dip zinc rectangular tube, taking out the side plate, connecting the side plate with the second angle steel, taking out the projection lamp, and mounting the projection lamp on one side, close to the top plate, of the side plate;
s6, taking out a group of second hot-dip zinc rectangular tubes, installing the second hot-dip zinc rectangular tubes at the bottom of the longitudinal main ribs, taking out the bottom plate, and repeating the installation mode of the top plate to install the bottom plate;
after all the components are installed, the whole appearance is in a prismatic three-dimensional shape.
The invention has the beneficial effects that:
1. roof, curb plate and the bottom plate that this structure set up are convenient for form three-dimensional stereovision, just the projecting lamp shine in the roof surface with certain angle, cooperate the inside projecting lamp that sets up of this structure promptly to be convenient for increase the visual experience sense of this reflecting plate structure simultaneously.
2. The connecting piece, universal joint subassembly and the conversion fossil fragments that this structure set up are convenient for connect vertical main bone and fix it, and the inside angle steel that sets up of the device, the fixed sign indicating number of L panel and jib cooperation hot invasion zinc rectangular pipe are convenient for be connected roof, curb plate and bottom plate with vertical main bone simultaneously to it is fixed.
3. The installation method is convenient, practical and convenient to adjust, and the prismatic three-dimensional shape can be formed.
To sum up, the inside angle steel that sets up of the device, the fixed sign indicating number of L panel and jib cooperation hot invasion zinc quarter bend are convenient for be connected roof, curb plate and bottom plate and vertical main bone, and the inside projecting lamp cooperation roof, curb plate and the bottom plate that sets up of the device is convenient for increase the device's visual effect simultaneously.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
Fig. 2 is an enlarged schematic view of the structure at a in fig. 1 according to the present invention.
Fig. 3 is an enlarged schematic view of the invention at B in fig. 1.
Fig. 4 is an enlarged view of the structure of fig. 1 at C according to the present invention.
Fig. 5 is an overall effect diagram after the structure of the invention is installed.
Reference numbers in the figures: 1. a longitudinal main bone; 2. a first angle steel; 3. a slide rail; 4. a first hot dip zinc rectangular tube; 5. a top plate; 6. a side plate; 7. a projector; 8. a second hot dip zinc rectangular tube; 9. a base plate; 10. overhauling the pulley; 11. a first boom; 12. a second angle steel; 13. embedding a bolt hole; 14. a bolt; 15. an adapter; 16. a gimbal assembly; 17. converting keels; 18. a third hot dip zinc rectangular tube; 19. a hoop member; 20. a second boom; 21. and fixing the code by the L panel.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Referring to fig. 1-4, in the three-dimensional suspended ceiling structure with the reflecting plate, a first hot-dip zinc rectangular pipe 4 is arranged at the bottom of a longitudinal main rib 1, a top plate 5 is arranged at the bottom of the first hot-dip zinc rectangular pipe 4, a second angle steel 12 is arranged on one side of the first hot-dip zinc rectangular pipe 4, the second angle steel 12 is perpendicular to the longitudinal main rib 1, a side plate 6 is arranged on one side of the second angle steel 12, a projection lamp 7 is arranged on one side of the side plate 6, a second hot-dip zinc rectangular pipe 8 is arranged at the bottom of the second angle steel 12, and a bottom plate 9 is arranged at the bottom of the second hot-dip zinc rectangular pipe 8; the top plate 5, the side plates 6 and the bottom plate 9 form a three-dimensional surface position, so that the convenience for forming three-dimensional layering is increased.
The projection lamp 7 irradiates on the surface of the top plate at a certain angle, so that the visual effect of the device is increased.
As shown in fig. 3, conversion keels 17 are symmetrically arranged on two sides of the longitudinal main rib 1, a universal joint assembly 16 is arranged on the top of each conversion keel 17, and an adaptor 15 is arranged on the top of each universal joint assembly 16.
As shown in fig. 4, a third hot-dip zinc rectangular pipe 18 is uniformly arranged on one side of the longitudinal main bone 1, the third hot-dip zinc rectangular pipe 18 is vertically distributed with the longitudinal main bone 1, a first suspender 11 is uniformly arranged on the top of the first hot-dip zinc rectangular pipe 4, the first suspender 11 is sequentially arranged on the top of the first hot-dip zinc rectangular pipe 4 according to different lengths, a hoop member 19 is arranged on the top of the first suspender 11, and the hoop member 19 is connected with the third hot-dip zinc rectangular pipe 18.
As shown in fig. 2, an L-panel fixing weight 21 is arranged at the top of the top plate 5, the top plate 5 is connected with a first hot-dip zinc rectangular pipe 4 through the L-panel fixing weight 21, pre-buried bolt holes 13 are arranged at both ends of the top plate 5, the side plates 6 and the bottom plate 9, bolts 14 are arranged inside the pre-buried bolt holes 13, a first angle steel 2 is arranged at one side of the longitudinal main frame 1, a first hanger rod 11 is arranged at the bottom of the first angle steel 2 in a penetrating manner, a slide rail 3 is arranged at the bottom of the first hanger rod 11, an overhaul pulley 10 is arranged inside the slide rail 3, a first hanger rod 11 is arranged at the bottom of the overhaul pulley 10, the overhaul pulley 10 is connected with a second angle steel 12 through the first hanger rod 11, the side plate 6 is connected with the second angle steel 12 through the bolts 14 arranged inside the side plate, and a second hanger rod 20 is arranged at the bottom of the first angle steel 2, and the bottom of the second hanger rod 20 is connected with a second hot-dip zinc rectangular pipe 8.
When the universal joint is used, firstly, a proper amount of longitudinal main bones 1 are taken out and arranged at intervals, then a proper amount of conversion keels 17 are taken out, the longitudinal main bones 1 are connected in pairs through the conversion keels 17, then the universal joint component 16 and the adaptor 15 are taken out, the bottom of the universal joint component 16 is connected with the conversion keels 17, the top of the conversion keels 17 is connected with the adaptor 15, and finally the longitudinal main bones 1 are fixed at proper positions through the adaptor 15;
at the moment, taking out a proper amount of third hot-dip zinc rectangular pipes 18, vertically connecting the third hot-dip zinc rectangular pipes with the longitudinal main bone 1, taking out a proper amount of second suspension rods 20 with different lengths when taking out the first hot-dip zinc rectangular pipes 4, sequentially installing the proper amount of second suspension rods 20 at the tops of the first hot-dip zinc rectangular pipes 4 according to the lengths, and connecting hoop members 19 arranged on the other sides of the second suspension rods 20 with the third hot-dip zinc rectangular pipes 18, so that the first hot-dip zinc rectangular pipes 4 are fixed and are obliquely arranged;
taking out the top plate 5, placing the top plate at the bottom of the first hot-dip zinc rectangular tube 4, and connecting the top plate 5 with the first hot-dip zinc rectangular tube 4 through the L-shaped panel fixing code 21 and the bolts 14 arranged on the side wall of the L-shaped panel fixing code;
taking out the first angle steel 2, installing the first angle steel 2 at the top of the longitudinal main frame 1, simultaneously taking out a group of first suspension rods 11 and the sliding rail 3, and connecting the sliding rail 3 with the first angle steel 2 through the group of first suspension rods 11;
taking out a group of first hanger rods 11 and an overhaul pulley 10, connecting the overhaul pulley 10 with a slide rail 3, connecting the first hanger rods 11 with the overhaul pulley 10, simultaneously installing second angle steel 12 at the bottom of the first hanger rods 11, simultaneously enabling the second angle steel 12 to be positioned at one side of a first hot-dip zinc rectangular tube 4, taking out a side plate 6 at the moment, connecting the side plate 6 with the second angle steel 12 through pre-embedded bolt holes 13 arranged inside the side plate 6 and bolts 14 arranged inside the pre-embedded bolt holes 13, taking out a projection lamp 7, and installing the projection lamp 7 at one side of the side plate 6 close to a top plate 5;
and taking out a group of second hot-dip zinc rectangular pipes 8 and a proper amount of second hanging rods 20 with equal length, installing the second hot-dip zinc rectangular pipes 8 at the bottom of the longitudinal main framework 1 through the second hanging rods 20, connecting the bottoms of the second hot-dip zinc rectangular pipes 8 with second angle steel 12, taking out the bottom plate 9, and repeating the installation mode of the top plate 5 to install the bottom plate 9.
The mounting method of the three-dimensional suspended ceiling structure with the reflecting plate is characterized by comprising the following steps:
s1, taking out a proper amount of longitudinal main bones, connecting the longitudinal main bones in pairs through a conversion keel, connecting the bottom of a universal joint component with the conversion keel, connecting the top of the conversion keel with an adapter, and fixing the longitudinal main bones at proper positions through the adapter;
s2, taking out a proper amount of third hot-dip zinc rectangular pipes, vertically connecting the third hot-dip zinc rectangular pipes with the longitudinal main bones, and taking out the first hot-dip zinc rectangular pipes to be connected with the third hot-dip zinc rectangular pipes, so that the first hot-dip zinc rectangular pipes are fixed and are obliquely arranged;
s3, taking out the top plate, and connecting the top plate with the first hot-dip zinc rectangular tube;
s4, taking out the first angle steel, installing the first angle steel on the top of the longitudinal main rib, simultaneously taking out a group of first hanging rods and a sliding rail, and connecting the sliding rail with the first angle steel through the group of first hanging rods;
s5, mounting a second angle steel, meanwhile, enabling the second angle steel to be located on one side of the first hot-dip zinc rectangular tube, taking out the side plate, connecting the side plate with the second angle steel, taking out the projection lamp, and mounting the projection lamp on one side, close to the top plate, of the side plate;
s6, taking out a group of second hot-dip zinc rectangular tubes, installing the second hot-dip zinc rectangular tubes at the bottom of the longitudinal main ribs, taking out the bottom plate, and repeating the installation mode of the top plate to install the bottom plate;
after all the components are installed, the whole appearance is in a prismatic three-dimensional shape. The middle part is provided with a protruding symmetry axis, the two sides are folded outwards and inclined, the upper part is a top plate combination part, the lower part is a bottom plate closing part, the joint between the two plates is bounded by a side plate and the projection lamp, and the whole effect is as shown in figure 5.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (9)

1. A three-dimensional suspended ceiling structure with a reflecting plate comprises a longitudinal main framework (1) and is characterized in that, a first hot-dip zinc rectangular pipe (4) is arranged at the bottom of the longitudinal main rib (1), a top plate (5) is arranged at the bottom of the first hot-dip zinc rectangular pipe (4), a second angle steel (12) is arranged on one side of the first hot-dip zinc rectangular pipe (4), the second angle steel (12) is perpendicular to the longitudinal main rib (1), a side plate (6) is arranged on one side of the second angle steel (12), a projection lamp (7) is arranged on one side of the side plate (6), a second heat-invasion zinc rectangular tube (8) is arranged at the bottom of the second angle steel (12), and the bottom of the second hot-dip zinc rectangular pipe (8) is provided with a bottom plate (9), and the top plate (5), the side plates (6) and the bottom plate (9) form a three-dimensional surface, and the projection lamp (7) irradiates the surface of the top plate (5) at a certain angle.
2. The three-dimensional suspended ceiling structure with the reflecting plate according to claim 1, wherein the two sides of the longitudinal main rib (1) are symmetrically provided with conversion keels (17), the top of each conversion keel (17) is provided with a universal joint component (16), and the top of each universal joint component (16) is provided with an adaptor (15).
3. The three-dimensional suspended ceiling structure with the reflecting plate according to claim 1, wherein a third heat-immersed zinc rectangular pipe (18) is uniformly arranged on one side of the longitudinal main rib (1), and the third heat-immersed zinc rectangular pipe (18) is distributed perpendicular to the longitudinal main rib (1).
4. The three-dimensional suspended ceiling structure with the reflecting plate according to claim 1, wherein a first hanger rod (11) is uniformly arranged at the top of the first hot-dip zinc rectangular tube (4), the first hanger rod (11) is sequentially arranged at the top of the first hot-dip zinc rectangular tube (4) according to different lengths, a hoop member (19) is arranged at the top of the first hanger rod (11), and the hoop member (19) is connected with a third hot-dip zinc rectangular tube (18).
5. The three-dimensional suspended ceiling structure with the reflecting plate according to claim 1, wherein an L-shaped panel fixing code (21) is arranged at the top of the top plate (5), the top plate (5) is connected with the first hot-dip zinc rectangular pipe (4) through the L-shaped panel fixing code (21), pre-embedded bolt holes (13) are formed in two ends of the top plate (5), the side plates (6) and the bottom plate (9), and bolts (14) are arranged inside the pre-embedded bolt holes (13).
6. The three-dimensional suspended ceiling structure with the reflecting plate according to claim 1, wherein a first angle steel (2) is arranged on one side of the longitudinal main frame (1), a first suspension rod (11) penetrates through the bottom of the first angle steel (2), a sliding rail (3) is arranged at the bottom of the first suspension rod (11), an overhaul pulley (10) is arranged inside the sliding rail (3), the first suspension rod (11) is installed at the bottom of the overhaul pulley (10), the overhaul pulley (10) is connected with a second angle steel (12) through the first suspension rod (11), and the side plate (6) is connected with the second angle steel (12) through a bolt (14) arranged inside the side plate.
7. The three-dimensional suspended ceiling structure with the reflecting plate according to claim 6, wherein a second hanger bar (20) is arranged at the bottom of the first angle steel (2), and the bottom of the second hanger bar (20) is connected with a second hot-dip zinc rectangular pipe (8).
8. A method for installing a three-dimensional suspended ceiling structure with reflecting plates according to any one of claims 1 to 7, which comprises the following steps:
s1, taking out a proper amount of longitudinal main bones, connecting the longitudinal main bones in pairs through a conversion keel, connecting the bottom of a universal joint component with the conversion keel, connecting the top of the conversion keel with an adapter, and fixing the longitudinal main bones at proper positions through the adapter;
s2, taking out a proper amount of third hot-dip zinc rectangular pipes, vertically connecting the third hot-dip zinc rectangular pipes with the longitudinal main bones, and taking out the first hot-dip zinc rectangular pipes to be connected with the third hot-dip zinc rectangular pipes, so that the first hot-dip zinc rectangular pipes are fixed and are obliquely arranged;
s3, taking out the top plate, and connecting the top plate with the first hot-dip zinc rectangular tube;
s4, taking out the first angle steel, installing the first angle steel on the top of the longitudinal main rib, simultaneously taking out a group of first hanging rods and a sliding rail, and connecting the sliding rail with the first angle steel through the group of first hanging rods;
s5, mounting a second angle steel, meanwhile, enabling the second angle steel to be located on one side of the first hot-dip zinc rectangular tube, taking out the side plate, connecting the side plate with the second angle steel, taking out the projection lamp, and mounting the projection lamp on one side, close to the top plate, of the side plate;
and S6, taking out a group of second hot-dip zinc rectangular tubes, installing the second hot-dip zinc rectangular tubes at the bottom of the longitudinal main ribs, taking out the bottom plate, and repeating the installation mode of the top plate to install the bottom plate.
9. The method for installing a three-dimensional suspended ceiling structure with reflecting plates according to claim 8, wherein the overall appearance is prismatic after installation.
CN202111617397.5A 2021-12-27 2021-12-27 Three-dimensional ceiling structure with reflecting plate and mounting method thereof Pending CN114232883A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111617397.5A CN114232883A (en) 2021-12-27 2021-12-27 Three-dimensional ceiling structure with reflecting plate and mounting method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111617397.5A CN114232883A (en) 2021-12-27 2021-12-27 Three-dimensional ceiling structure with reflecting plate and mounting method thereof

Publications (1)

Publication Number Publication Date
CN114232883A true CN114232883A (en) 2022-03-25

Family

ID=80763666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111617397.5A Pending CN114232883A (en) 2021-12-27 2021-12-27 Three-dimensional ceiling structure with reflecting plate and mounting method thereof

Country Status (1)

Country Link
CN (1) CN114232883A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040213003A1 (en) * 2003-04-23 2004-10-28 Bruce Lauderdale Suspended ceiling lighting system incorporating T-bar component
CN203684483U (en) * 2013-12-03 2014-07-02 广州金霸建材有限公司 Novel smallpox suspended ceiling structure
CN109235740A (en) * 2018-11-01 2019-01-18 苏州金螳螂建筑装饰股份有限公司 A kind of spherical net brace universal structure part
CN209129235U (en) * 2018-10-29 2019-07-19 中建八局装饰工程有限公司 Ceiling structure and hanger system for ceiling structure
CN111021621A (en) * 2019-12-26 2020-04-17 北京建磊国际装饰工程股份有限公司 Architectural decoration ceiling and installation method thereof
CN210685127U (en) * 2019-09-10 2020-06-05 山东天元装饰工程有限公司 Special-shaped honeycomb aluminum plate ceiling system
CN211597339U (en) * 2019-12-31 2020-09-29 北京扶桑建筑装饰有限公司 Modeling gypsum board suspended ceiling structure
CN113107134A (en) * 2021-04-02 2021-07-13 苏州美瑞德建筑装饰有限公司 Mounting design structure and mounting method of oversized special-shaped curved surface ceiling
CN113700205A (en) * 2021-09-18 2021-11-26 苏州金螳螂建筑装饰股份有限公司 Installation design structure of super-large hyperboloid modeling felt plate embedded with light-transmitting soft film

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040213003A1 (en) * 2003-04-23 2004-10-28 Bruce Lauderdale Suspended ceiling lighting system incorporating T-bar component
CN203684483U (en) * 2013-12-03 2014-07-02 广州金霸建材有限公司 Novel smallpox suspended ceiling structure
CN209129235U (en) * 2018-10-29 2019-07-19 中建八局装饰工程有限公司 Ceiling structure and hanger system for ceiling structure
CN109235740A (en) * 2018-11-01 2019-01-18 苏州金螳螂建筑装饰股份有限公司 A kind of spherical net brace universal structure part
CN210685127U (en) * 2019-09-10 2020-06-05 山东天元装饰工程有限公司 Special-shaped honeycomb aluminum plate ceiling system
CN111021621A (en) * 2019-12-26 2020-04-17 北京建磊国际装饰工程股份有限公司 Architectural decoration ceiling and installation method thereof
CN211597339U (en) * 2019-12-31 2020-09-29 北京扶桑建筑装饰有限公司 Modeling gypsum board suspended ceiling structure
CN113107134A (en) * 2021-04-02 2021-07-13 苏州美瑞德建筑装饰有限公司 Mounting design structure and mounting method of oversized special-shaped curved surface ceiling
CN113700205A (en) * 2021-09-18 2021-11-26 苏州金螳螂建筑装饰股份有限公司 Installation design structure of super-large hyperboloid modeling felt plate embedded with light-transmitting soft film

Similar Documents

Publication Publication Date Title
CN105178479B (en) The construction method of the intelligent glass curtain wall of Super High element type
CN110512790B (en) High and large space multi-curvature suspended ceiling structure and construction method thereof
CN211622182U (en) Single-layer large-span frame curtain wall assembled hanging system
CN204728554U (en) The integral structure of channel and double-deck operation platform
CN114232883A (en) Three-dimensional ceiling structure with reflecting plate and mounting method thereof
CN212078415U (en) Deformable card formula keel and curved surface furred ceiling mounting structure
CN216690019U (en) Suspended ceiling structure for reflecting plate
CN208899928U (en) Stage building structure
CN216973984U (en) Pull rod supporting and decorating system for sun-shading truss of station house
CN115434515B (en) Construction method of hyperboloid cornice keel for station building engineering
CN113622581B (en) Special-shaped ceiling formed by combining triangular grating splicing units and installation method
CN103572879B (en) For the sky well construction of Integral ceiling
CN216920972U (en) Connection structure of furred ceiling board and wallboard of whole bathroom
CN113152658B (en) Large-span corridor with comprehensive curtain wall at bottom and construction method
CN213868520U (en) Light steel keel frame with stable structure for indoor suspended ceiling
CN204475534U (en) A kind of syndeton of column node
CN203487680U (en) Courtyard structure for integrated suspended ceiling
CN218508875U (en) Adjustable precast concrete molding hanging plate system
CN217461142U (en) Hanging bracket structure system of building suspended ceiling
CN220080476U (en) Light galvanized keel bracket
CN217420145U (en) Slightly-inclined trapezoidal plate curtain wall
CN214785234U (en) Splicing design mounting structure of assembled suspended ceiling
CN215594565U (en) Assembled keel-free ceiling structure
CN220848280U (en) Suspended ceiling mounting rack of lead-free radiation-proof plate
CN214833851U (en) Aluminum plate anti-wind post constructional system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination