CN209129235U - Ceiling structure and hanger system for ceiling structure - Google Patents
Ceiling structure and hanger system for ceiling structure Download PDFInfo
- Publication number
- CN209129235U CN209129235U CN201821758861.6U CN201821758861U CN209129235U CN 209129235 U CN209129235 U CN 209129235U CN 201821758861 U CN201821758861 U CN 201821758861U CN 209129235 U CN209129235 U CN 209129235U
- Authority
- CN
- China
- Prior art keywords
- sunpender
- reinforced pipe
- tightening piece
- roof structure
- ceiling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005452 bending Methods 0.000 abstract description 4
- 229910000831 Steel Inorganic materials 0.000 description 7
- 238000009434 installation Methods 0.000 description 7
- 239000010959 steel Substances 0.000 description 7
- 239000000725 suspension Substances 0.000 description 4
- 238000000034 method Methods 0.000 description 3
- 210000000988 bone and bone Anatomy 0.000 description 2
- 238000006073 displacement reaction Methods 0.000 description 2
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- 239000004411 aluminium Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model relates to a kind of ceiling structure and hanger system, which includes: the sunpender for being vertically located in roof structure and being placed under the roof structure, and one end far from the roof structure is formed with connection end on the sunpender;The reinforced pipe being sheathed on the sunpender;The tightening piece being movably attached on the sunpender, the tightening piece are located at the both ends of the reinforced pipe, by the mobile position for adjusting the tightening piece so that the tightening piece for being located at the reinforced pipe both ends clamps the reinforced pipe;It is connected to the keel framework of the connection end, the bottom of the keel framework is formed with smooth mounting surface;And it is installed on the ceiling board on the mounting surface.The rigidity for increasing sunpender using reinforced pipe, increases the ability of resistance to deformation, when negative wind pressure applies active force to ceiling board indoors, can avoid the bending deformation of sunpender, can be reasonably resistant to the active force of negative wind pressure, improve the structural stability of ceiling board.
Description
Technical field
The utility model relates to building roof constructing structure fields, refer in particular to a kind of ceiling structure and hanging for ceiling structure
Frame system.
Background technique
In ceiling suspended ceiling construction, one end of angle steel is fixed on by existing angle steel or the channel steel of generalling use as drawknot bar
On roof, the other end is connect with ceiling board, such ceiling structure when in use, since indoor negative wind pressure can generate ceiling board
Upward displacement, so that drawknot bar (angle steel or channel steel) is easy to produce certain bending, after negative wind pressure disappears, ceiling board is by weight
Power influences to restore to the original state again, makes the flatness of ceiling board be affected even in cycles in this way and deforms.
Utility model content
The purpose of the utility model is to overcome the defect of the prior art, a kind of ceiling structure is provided and for ceiling structure
Hanger system, solve existing to make the flatness susceptible of ceiling board as drawknot bar using angle steel or channel steel and generate
The problem of deformation.
Realizing the technical solution of above-mentioned purpose is:
The utility model provides a kind of ceiling structure, comprising:
It is vertically located in the sunpender that roof structure is placed under the roof structure, the separate roofing on the sunpender
One end of structure is formed with connection end;
The reinforced pipe being sheathed on the sunpender;
The tightening piece being movably attached on the sunpender, the tightening piece are located at the both ends of the reinforced pipe, pass through
The mobile position for adjusting the tightening piece is so that the tightening piece for being located at the reinforced pipe both ends clamps the reinforced pipe;
It is connected to the keel framework of the connection end, the bottom of the keel framework is formed with smooth mounting surface;With
And
The ceiling board being installed on the mounting surface.
The utility model is using sunpender and is set in the reinforced pipe of sunpender as hanger system, and reinforced pipe is arranged by both ends
Tightening piece clamp and be in tensioned state, using reinforced pipe increase sunpender rigidity, increase the ability of resistance to deformation, indoors
When negative wind pressure applies active force to ceiling board, enhances the resistance of sunpender by reinforced pipe, avoid the bending deformation of sunpender, thus
It can be reasonably resistant to the active force of negative wind pressure, avoid its influence to furred ceiling plate flatness, the structure for improving ceiling board is steady
It is qualitative.And the structural strength of sunpender and reinforced pipe is higher, self stability is stronger, and strong reversed branch can be provided for ceiling board
Support.
The utility model ceiling structure further improvement lies in that, the both ends of the sunpender are equipped with threaded connection section;
The tightening piece includes the gasket for being sheathed on the sunpender and the locknut for being screwed together in the threaded connection section, is led to
It crosses to screw togather and adjusts the locknut and make the locknut push the gasket and stand tightly against corresponding in the reinforced pipe
End.
The utility model ceiling structure further improvement lies in that, the connection end is fastenedly connected with connector, described
Connector is sheathed on the keel in the keel framework.
The utility model ceiling structure further improvement lies in that, the top of the connector is equipped with connecting plate, described to hang
The end of bar pass through the connecting plate and by screw togather one attaching nut and be fastenedly connected with the connecting plate.
The utility model ceiling structure further improvement lies in that, be located on the reinforced pipe far from the roof structure one
The tightening piece at end is placed on the connector, and the tightening piece on the reinforced pipe close to described roof structure one end is attached at
The bottom surface of the roof structure, so that the reinforced pipe is supported between the roof structure and the connector.
The utility model additionally provides a kind of hanger system for ceiling structure, comprising:
It is vertically located in the sunpender that roof structure is placed under the roof structure, the separate roofing on the sunpender
One end of structure is formed with the connection end for installing ceiling structure;
The reinforced pipe being sheathed on the sunpender;And
The tightening piece being movably attached on the sunpender, the tightening piece are located at the both ends of the reinforced pipe, pass through
The mobile position for adjusting the tightening piece is so that the tightening piece for being located at the reinforced pipe both ends clamps the reinforced pipe.
The utility model for ceiling structure hanger system further improvement lies in that, the both ends of the sunpender are equipped with
Threaded connection section;
The tightening piece includes the gasket for being sheathed on the sunpender and the locknut for being screwed together in the threaded connection section, is led to
It crosses to screw togather and adjusts the locknut and make the locknut push the gasket and stand tightly against corresponding in the reinforced pipe
End.
The utility model for ceiling structure hanger system further improvement lies in that, the connection end is fastenedly connected
There is connector, the ceiling structure is connected by the connector.
The utility model for ceiling structure hanger system further improvement lies in that, the top of the connector is equipped with
Connecting plate, the end of the sunpender pass through the connecting plate and by screw togather one attaching nut and fasten and connect with the connecting plate
It connects.
The utility model for ceiling structure hanger system further improvement lies in that, be located at the reinforced pipe on it is separate
The tightening piece of described roof structure one end is placed on the connector, is located on the reinforced pipe close to described roof structure one end
Tightening piece be attached at the bottom surface of the roof structure so that the reinforced pipe is supported in the roof structure and the company
Between fitting.
Detailed description of the invention
Fig. 1 is the utility model for the hanger system of ceiling structure and the schematic perspective view of ceiling structure.
Fig. 2 is the top view of the utility model ceiling structure.
Fig. 3 is the side sectional view of the utility model ceiling structure.
Specific embodiment
The utility model is described in further detail in the following with reference to the drawings and specific embodiments.
Refering to fig. 1, the utility model provides a kind of ceiling structure and the ceiling suspension system for ceiling structure, for preventing
The problem of ceiling board forms dome, furred ceiling is caused to destroy in air pressure change due to bearing upward wind pressure and being deformed.This is practical
The novel structural strength and rigidity that hanger system is improved using sunpender and the reinforced pipe that is set on sunpender, can prevent vibration with
And the deformation that wind pressure generates, improve the overall stability and architecture quality of ceiling structure.With reference to the accompanying drawing to the utility model
Ceiling structure and ceiling suspension system for ceiling structure are illustrated.
Refering to fig. 1, it is shown that the utility model shows for the hanger system of ceiling structure and the stereochemical structure of ceiling structure
It is intended to.Refering to Fig. 3, it is shown that the side sectional view of the utility model ceiling structure.It is practical new to this below with reference to Fig. 1 and Fig. 3
Type ceiling structure is illustrated.
As shown in figures 1 and 3, the ceiling structure of the utility model includes sunpender 21, reinforced pipe 22, tightening piece 23, keel
Skeleton 31 and ceiling board 32;Sunpender 21 therein is vertically located in roof structure 11 and is placed under the roof structure 11, hangs
One end on bar 21 far from roof structure 11 is formed with connection end 211, which is located under roof structure 11
Side;Reinforced pipe 22 is sheathed on sunpender 21, and reinforced pipe 22 is used to enhance the rigidity of sunpender 21, utilizes reinforced pipe 22 and sunpender 21 1
Resistance to deformation is played, there is stronger structural stability;Tightening piece 23 is movably attached on sunpender 21, and tightening piece 23, which is located at, to be added
The both ends of pipe 22 by force, by the mobile position for adjusting tightening piece 23 so that the tightening piece 23 for being located at 22 both ends of reinforced pipe clamps and adds
Strong pipe 22;Reinforced pipe 22 is clamped by two tightening piece 23 being connected on sunpender 21, is being hung so that reinforced pipe 22 covers securely
On bar 21, it can be improved vertically with horizontally anti-weight bearing power, avoid the stress deformation of sunpender 21;Keel framework 31 is connected to
Keel framework 31 is lifted on the lower section of roof structure 11 by sunpender 21 by the connection end 211 of sunpender 21, keel framework 31
Bottom is formed with smooth mounting surface;Ceiling board 32 is installed on mounting surface.
Since reinforced pipe 22 and sunpender 21 form stable hanger system, and the rigidity of reinforced pipe 22 and sunpender 21 is strong,
Resistance capacity to deformation is strong.When negative wind pressure applies active force to ceiling board indoors, enhances the resistance of sunpender by reinforced pipe, keep away
Exempt from the bending deformation of sunpender, so as to be reasonably resistant to the active force of negative wind pressure, avoid its influence to furred ceiling plate flatness,
Improve the structural stability of ceiling board.
As a better embodiment of the utility model, the both ends of sunpender 21 are equipped with threaded connection section;Tightening piece 23
Including being sheathed on the gasket 231 of sunpender 21 and being screwed together in the locknut 232 of the threaded connection section, by screwing togather adjusting clamp screw
Mother 232 to press closer nut 232 and pushes gasket 231 and stand tightly against in the corresponding end of reinforced pipe 22, be achieved that two it is tight
Determine part 23 and clamps reinforced pipe 22.
Specifically, a tightening piece 23 is first installed on sunpender 21, then suit is by 22 on sunpender 21, then at sunpender 21
Another tightening piece 23 is installed in connection end, and the gasket 231 in tightening piece 23 is set to end and the locknut of reinforced pipe 22
Between 232, may make locknut 232 to move up and down along threaded connection section by screwing togather locknut 232, i.e., towards
Close or end far from reinforced pipe 22 is mobile, can be achieved using the adjusting that screws togather of the locknut 232 at 22 both ends of reinforced pipe
Clamp reinforced pipe 22.
As another better embodiment of the utility model, connects end 211 and be fastenedly connected with connector 24, the connection
Part 24 is set on the keel in keel framework 31, by connector 24 by the connection end 211 of keel framework 31 and sunpender 21
It is connected and fixed.
Preferably, connector 24 include box and with the integrally formed L-type plate of box, the L-type plate include a wing plate and hang down
The direct-connected connecting plate for connecing the wing plate, wing plate therein is vertical at the top surface of box and side corresponding with box flush is set
It sets, connecting plate is located at the top of the top surface of box and setting parallel with the top surface of box.Connector 24 is set in by box
On the keel of keel framework 31, it is fastenedly connected by connecting plate and sunpender 21.
Again goodly, as depicted in figs. 1 and 2, keel framework 31 includes multiple keel that transverse and longitudinal is cross-linked, by connector 24
Setting is spaced on keel, correspondingly, sunpender 21 and reinforced pipe 22 are correspondingly arranged with connector 24 namely sunpender 21 and reinforced pipe
22 also lay along keel interval.
As the another better embodiment of the utility model, connecting plate 241, sunpender 21 are equipped at the top of connector 24
End pass through connecting plate 241 and by screw togather one attaching nut 25 and be fastenedly connected with connecting plate 241.
Preferably, connector 24 is formed with the box to link into an integrated entity with connecting plate 241 in the lower section of connecting plate 241, it should
Box is set on the keel of keel framework 31, is installed with gap between connecting plate 241 and box, and the gap is empty as operation
Between, attaching nut 25 can be screwed on the end of sunpender 21 by gap, and screw the attaching nut 25 using gap, so that
Attaching nut 25 is resisted against the bottom surface of connecting plate 241.
Further, as shown in connection with fig. 3, the tightening piece 23 of one end on reinforced pipe 22 far from roof structure 11 is placed in
On connector 24, the tightening piece 23 on reinforced pipe 22 close to one end of roof structure 11 is attached at the bottom of roof structure 11
Face, so that 22 are supported between roof structure 11 and connector 24.
Specifically, one end of sunpender 21 is fixed on roof structure 11 by expansion bolt, and it is soft to be arranged one on sunpender 21
Property pad, enables the flexible pad be attached at the bottom surface of roof structure 11;Tightening piece 23, reinforced pipe 22 and another tightening are then installed again
Part 23 adjusts the tightening piece 23 on reinforced pipe 22 close to 11 one end of roof structure, so that the tightening piece close to roof structure 11
23 locknut 232 is attached in flexible pad, then upward ejection reinforced pipe 22, is enabled the end of reinforced pipe 22 stand tightly against and is leaned on
The gasket 231 and locknut 232 of nearly roof structure 11, then screw togather the locknut 232 far from roof structure 11, enable this remote
Locknut 232 and gasket 231 from roof structure 11 are tightly attached to corresponding end on reinforced pipe 22.Then in sunpender 21
Connection end 211 at installation connecting element 24, on the connection end 211 of sunpender 21 simultaneously by 241 sets of connecting plate of connector 24
It enables connecting plate 241 be attached at and presses closer nut 232 far from roof structure 11, be then screwed together at connection end 211 nut
25, enable attaching nut 25 abut the bottom surface of connecting plate 241, so that the fastening of attaching nut 25 is so that reinforced pipe 22 is supported in connection
Between plate 241 and roof structure 11, in this way when ceiling board 32 and keel framework 31 are upwarded pressure, reinforced pipe 22 passes through
It is supported on roof structure 11 and is capable of providing strong support, avoid shifting up for ceiling board 32 and keel framework 31,
Prevent the generation of metaboly.
Preferably, the length selection of reinforced pipe 22 adapts to the hoisting height of ceiling board 32, it is spaced in keel framework 31
Equipped with multiple sunpenders 21 and reinforced pipe 22, without enable all reinforced pipes 22 be supported in connecting plate 241 and roof structure 11 it
Between, can compartment of terrain enable reinforced pipe 22 be supported between connecting plate 241 and roof structure 11.
Two tightening piece 23 connected on sunpender 21 are that sunpender 21 provides the function of adjusting hoisting height, i.e. tightening piece
23 can realize the length for adjusting sunpender 21 part of the sunpender 21 between roof structure 11 and connecting plate 241, so as to incite somebody to action
Keel framework 31 levels, and provides smooth mounting surface for ceiling board 32.
The installation process of the ceiling structure of the utility model is illustrated below.
Surveying setting-out first: site clearing, repetition measurement axis, elevation line control line deepen drawing according to ceiling plane, in room
Snap the line positions in the structure of face, determines suspension centre spacing.Then it punches: being punched according to positioning using electric drill, by Kong Zhongchen ash after punching
It cleans out.Sunpender is then installed: after the good ceiling board elevation level of bullet and the keel framework position line, determining downrod lower end head
Absolute altitude with impact drill perforating, sunpender is installed, determines length of boom by ceiling board absolute altitude according to the good hoisting point position of bullet, Gu
Determine sunpender.Spacing is preferably 900-1200mm, and suspension centre distribution will uniformly, and installation has to securely.The tightening piece on top is then installed.
Reinforced pipe is then installed: the zinc-plated round tube of φ 16 is set on the outside of sunpender.The tightening piece of lower part is installed.Fastening reinforced pipe: will add
The locknut of strong pipe upper and lower ends is screwed tight using spanner fastening, and reinforced pipe and sunpender is made to keep relative static conditions.Installation dragon
Bone skeleton: in strict accordance with elevation line and setting-out drawing, and it is according to position shown in finishing handbook that material is different, the practice is different
Region is installed separately keel, will assemble the keel of connector, installs by stepping line position.Leveling keel is entire aluminium sheet furred ceiling
A more troublesome procedure in engineering, whether keel level and the key of furred ceiling quality control.Therefore only keel level
Just facing can be made to reach ideal decorative effect, otherwise awave ceiling surface, macroscopic view seems just undesirable.For
This important procedure should take effective measures to control the flatness of keel, draw elevation line in length and breadth, since one end, on one side
Installation, adjusts on one side, finally also wants accurate adjustment one time, especially more need efforts in two flowing water section intersections, so that absolute altitude is consistent,
Without faulting of slab ends, fissure of displacement phenomenon.Ceiling board installation: it is installing and keel framework by inspection is in the following, by the specification of ceiling board, draw seam
Gap carries out piecemeal snap the line, first fills a line ceiling board along elongated secondary joist direction from the centre of ceiling areas, as benchmark, so
Backward two sides extension branch installs.Plasterboard can be used in ceiling board therein.
The hanger system provided by the utility model for ceiling structure is illustrated below.
Hanger system 20 for ceiling structure includes sunpender 21, reinforced pipe 22 and tightening piece 23, sunpender 21 therein
It is vertically located in roof structure 11 to be placed under the roof structure 11, one end on sunpender 21 far from roof structure 11 is formed with
End 211 is connected, which is located at the lower section of roof structure 11;Reinforced pipe 22 is sheathed on sunpender 21, reinforced pipe 22
For enhancing the rigidity of sunpender 21, using reinforced pipe 22 and the resistance to deformation together of sunpender 21, there is stronger structural stability;Tightly
Determine part 23 to be movably attached on sunpender 21, tightening piece 23 is located at the both ends of reinforced pipe 22, adjusts tightening piece 23 by mobile
Position so that be located at 22 both ends of reinforced pipe tightening piece 23 clamp reinforced pipe 22;It is tight by two be connected on sunpender 21
Determine part 23 and clamp reinforced pipe 22, so that reinforced pipe 22 is covered securely on sunpender 21, can be improved vertical and horizontally anti-lotus
Loading capability avoids the stress deformation of sunpender 21.
Then keel framework 31 and ceiling board 32 can be installed in the bottom of hanger system 20, to complete applying for ceiling structure
Work.The hanger system of the utility model can provide strong support for ceiling board, can avoid the deformation of ceiling board, guarantee furred ceiling
The installation quality and structural stability of plate.
As a better embodiment of the utility model, the both ends of sunpender 21 are equipped with threaded connection section;Tightening piece 23
Including being sheathed on the gasket 231 of sunpender 21 and being screwed together in the locknut 232 of the threaded connection section, by screwing togather adjusting clamp screw
Mother 232 to press closer nut 232 and pushes gasket 231 and stand tightly against in the corresponding end of reinforced pipe 22, be achieved that two it is tight
Determine part 23 and clamps reinforced pipe 22.
Specifically, a tightening piece 23 is first installed on sunpender 21, then suit is by 22 on sunpender 21, then at sunpender 21
Another tightening piece 23 is installed in connection end, and the gasket 231 in tightening piece 23 is set to end and the locknut of reinforced pipe 22
Between 232, may make locknut 232 to move up and down along threaded connection section by screwing togather locknut 232, i.e., towards
Close or end far from reinforced pipe 22 is mobile, can be achieved using the adjusting that screws togather of the locknut 232 at 22 both ends of reinforced pipe
Clamp reinforced pipe 22.
As another better embodiment of the utility model, connects end 211 and be fastenedly connected with connector 24, pass through company
The keel of the connection ceiling structure of fitting 24.Connector 24 can be set on the keel in keel framework 31, thus by keel bone
Frame 31 and the connection end 211 of sunpender 21 are connected and fixed.
Preferably, connector 24 include box and with the integrally formed L-type plate of box, the L-type plate include a wing plate and hang down
The direct-connected connecting plate for connecing the wing plate, wing plate therein is vertical at the top surface of box and side corresponding with box flush is set
It sets, connecting plate is located at the top of the top surface of box and setting parallel with the top surface of box.Connector 24 is set in by box
On the keel of keel framework 31, it is fastenedly connected by connecting plate and sunpender 21.
As the another better embodiment of the utility model, connecting plate 241, sunpender 21 are equipped at the top of connector 24
End pass through connecting plate 241 and by screw togather one attaching nut 25 and be fastenedly connected with connecting plate 241.
Preferably, connector 24 is formed with the box to link into an integrated entity with connecting plate 241 in the lower section of connecting plate 241, it should
Box is set on the keel of keel framework 31, is installed with gap between connecting plate 241 and box, and the gap is empty as operation
Between, attaching nut 25 can be screwed on the end of sunpender 21 by gap, and screw the attaching nut 25 using gap, so that
Attaching nut 25 is resisted against the bottom surface of connecting plate 241.
Further, as shown in connection with fig. 3, the tightening piece 23 of one end on reinforced pipe 22 far from roof structure 11 is placed in
On connector 24, the tightening piece 23 on reinforced pipe 22 close to one end of roof structure 11 is attached at the bottom of roof structure 11
Face, so that 22 are supported between roof structure 11 and connector 24.
Specifically, one end of sunpender 21 is fixed on roof structure 11 by expansion bolt, and it is soft to be arranged one on sunpender 21
Property pad, enables the flexible pad be attached at the bottom surface of roof structure 11;Tightening piece 23, reinforced pipe 22 and another tightening are then installed again
Part 23 adjusts the tightening piece 23 on reinforced pipe 22 close to 11 one end of roof structure, so that the tightening piece close to roof structure 11
23 locknut 232 is attached in flexible pad, then upward ejection reinforced pipe 22, is enabled the end of reinforced pipe 22 stand tightly against and is leaned on
The gasket 231 and locknut 232 of nearly roof structure 11, then screw togather the locknut 232 far from roof structure 11, enable this remote
Locknut 232 and gasket 231 from roof structure 11 are tightly attached to corresponding end on reinforced pipe 22.Then in sunpender 21
Connection end 211 at installation connecting element 24, on the connection end 211 of sunpender 21 simultaneously by 241 sets of connecting plate of connector 24
It enables connecting plate 241 be attached at and presses closer nut 232 far from roof structure 11, be then screwed together at connection end 211 nut
25, enable attaching nut 25 abut the bottom surface of connecting plate 241, so that the fastening of attaching nut 25 is so that reinforced pipe 22 is supported in connection
Between plate 241 and roof structure 11, in this way when ceiling board 32 and keel framework 31 are upwarded pressure, reinforced pipe 22 passes through
It is supported on roof structure 11 and is capable of providing strong support, avoid shifting up for ceiling board 32 and keel framework 31,
Prevent the generation of metaboly.
Preferably, the length selection of reinforced pipe 22 adapts to the hoisting height of ceiling board 32, it is spaced in keel framework 31
Equipped with multiple sunpenders 21 and reinforced pipe 22, without enable all reinforced pipes 22 be supported in connecting plate 241 and roof structure 11 it
Between, can compartment of terrain enable reinforced pipe 22 be supported between connecting plate 241 and roof structure 11.
Two tightening piece 23 connected on sunpender 21 are that sunpender 21 provides the function of adjusting hoisting height, i.e. tightening piece
23 can realize the length for adjusting sunpender 21 part of the sunpender 21 between roof structure 11 and connecting plate 241, so as to incite somebody to action
Keel framework 31 levels, and provides smooth mounting surface for ceiling board 32.
Combine figure embodiment that the utility model is described in detail above, those skilled in the art can root
Many variations example is made to the utility model according to above description.Thus, certain details in embodiment should not constitute practical to this
Novel restriction, the utility model will be using the ranges that the appended claims define as the protection scope of the utility model.
Claims (10)
1. a kind of ceiling structure characterized by comprising
It is vertically located in the sunpender that roof structure is placed under the roof structure, the separate roof structure on the sunpender
One end be formed with connection end;
The reinforced pipe being sheathed on the sunpender;
The tightening piece being movably attached on the sunpender, the tightening piece are located at the both ends of the reinforced pipe, pass through movement
The position of the tightening piece is adjusted so that the tightening piece for being located at the reinforced pipe both ends clamps the reinforced pipe;
It is connected to the keel framework of the connection end, the bottom of the keel framework is formed with smooth mounting surface;And
The ceiling board being installed on the mounting surface.
2. ceiling structure as described in claim 1, which is characterized in that the both ends of the sunpender are equipped with threaded connection section;
The tightening piece includes the gasket for being sheathed on the sunpender and the locknut for being screwed together in the threaded connection section, passes through spiral shell
The adjusting locknut is closed to make the locknut push the gasket and stand tightly against end corresponding in the reinforced pipe
Portion.
3. ceiling structure as described in claim 1, which is characterized in that the connection end is fastenedly connected with connector, described
Connector is sheathed on the keel in the keel framework.
4. ceiling structure as claimed in claim 3, which is characterized in that the top of the connector is equipped with connecting plate, described to hang
The end of bar pass through the connecting plate and by screw togather one attaching nut and be fastenedly connected with the connecting plate.
5. ceiling structure as claimed in claim 3, which is characterized in that be located on the reinforced pipe far from the roof structure one
The tightening piece at end is placed on the connector, and the tightening piece on the reinforced pipe close to described roof structure one end is attached at
The bottom surface of the roof structure, so that the reinforced pipe is supported between the roof structure and the connector.
6. a kind of hanger system for ceiling structure characterized by comprising
It is vertically located in the sunpender that roof structure is placed under the roof structure, the separate roof structure on the sunpender
One end be formed with for install ceiling structure connection end;
The reinforced pipe being sheathed on the sunpender;And
The tightening piece being movably attached on the sunpender, the tightening piece are located at the both ends of the reinforced pipe, pass through movement
The position of the tightening piece is adjusted so that the tightening piece for being located at the reinforced pipe both ends clamps the reinforced pipe.
7. being used for the hanger system of ceiling structure as claimed in claim 6, which is characterized in that the both ends of the sunpender are equipped with
Threaded connection section;
The tightening piece includes the gasket for being sheathed on the sunpender and the locknut for being screwed together in the threaded connection section, passes through spiral shell
The adjusting locknut is closed to make the locknut push the gasket and stand tightly against end corresponding in the reinforced pipe
Portion.
8. being used for the hanger system of ceiling structure as claimed in claim 6, which is characterized in that the connection end is fastenedly connected
There is connector, the ceiling board of ceiling structure is connected by the connector.
9. being used for the hanger system of ceiling structure as claimed in claim 8, which is characterized in that the top of the connector is equipped with
Connecting plate, the end of the sunpender pass through the connecting plate and by screw togather one attaching nut and fasten and connect with the connecting plate
It connects.
10. being used for the hanger system of ceiling structure as claimed in claim 8, which is characterized in that be located at remote on the reinforced pipe
Tightening piece from described roof structure one end is placed on the connector, is located on the reinforced pipe close to the roof structure one
The tightening piece at end is attached at the bottom surface of the roof structure, so that the reinforced pipe is supported in the roof structure and described
Between connector.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821758861.6U CN209129235U (en) | 2018-10-29 | 2018-10-29 | Ceiling structure and hanger system for ceiling structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821758861.6U CN209129235U (en) | 2018-10-29 | 2018-10-29 | Ceiling structure and hanger system for ceiling structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209129235U true CN209129235U (en) | 2019-07-19 |
Family
ID=67233150
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821758861.6U Expired - Fee Related CN209129235U (en) | 2018-10-29 | 2018-10-29 | Ceiling structure and hanger system for ceiling structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209129235U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114232883A (en) * | 2021-12-27 | 2022-03-25 | 广州金霸建材股份有限公司 | Three-dimensional ceiling structure with reflecting plate and mounting method thereof |
-
2018
- 2018-10-29 CN CN201821758861.6U patent/CN209129235U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114232883A (en) * | 2021-12-27 | 2022-03-25 | 广州金霸建材股份有限公司 | Three-dimensional ceiling structure with reflecting plate and mounting method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9080786B2 (en) | Drop-front drain pan | |
CN201635218U (en) | Aluminum hanging board curtain wall equipment | |
CN209129235U (en) | Ceiling structure and hanger system for ceiling structure | |
JP2004124665A (en) | Non-hole retaining trestle for solar panel and its installation method | |
CN102864926B (en) | A kind of steel work conversion layer ceiling construction method | |
CN201635297U (en) | Hung ceiling system with good sound insulation effect | |
KR20090010031U (en) | structure of celing | |
CN203605170U (en) | Lamp installing suspension cable hooking clamp | |
CN206971499U (en) | A kind of copper plate curtain wall system for being mounted in parallel plate | |
CN213064867U (en) | Side-mounted base of support hanger | |
CN215054445U (en) | A anti-strutting arrangement for furred ceiling | |
US20130192587A1 (en) | Ballasted solar hot water racking system for flat plate collectors | |
CN210536242U (en) | Support arm for cable bridge | |
CN218205286U (en) | Siphon drainage device | |
CN206581398U (en) | A kind of attachment structure of 3D building modules Z-type keel wall and beam | |
JP3588214B2 (en) | Roof mounting fixtures | |
CN111691596B (en) | Adjustable suspender and installation method thereof | |
CN219654049U (en) | Hoisting device for ceiling access opening at narrow part | |
CN205369742U (en) | A roofing system of falling into water for steel construction | |
CN205777137U (en) | Roof board support switching device | |
CN210167752U (en) | Bridge grounding flat steel fixing clamp | |
CN211286244U (en) | Regulation and control fixing device for square tube installation | |
CN216196850U (en) | Building structure design roof beam reinforced structure | |
JP6693719B2 (en) | Gutter support structure, building, gutter installation method | |
CN204059749U (en) | A kind of tubing rod member of space structures framework |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190719 |