CN114142599A - 机器人电源管理系统及方法 - Google Patents

机器人电源管理系统及方法 Download PDF

Info

Publication number
CN114142599A
CN114142599A CN202111454266.XA CN202111454266A CN114142599A CN 114142599 A CN114142599 A CN 114142599A CN 202111454266 A CN202111454266 A CN 202111454266A CN 114142599 A CN114142599 A CN 114142599A
Authority
CN
China
Prior art keywords
power
power supply
background
control system
supply system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111454266.XA
Other languages
English (en)
Inventor
张玉良
耿丽杰
常宗豪
伊丽丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong New Coordinate Intelligent Equipment Co ltd
Original Assignee
Shandong New Coordinate Intelligent Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong New Coordinate Intelligent Equipment Co ltd filed Critical Shandong New Coordinate Intelligent Equipment Co ltd
Priority to CN202111454266.XA priority Critical patent/CN114142599A/zh
Publication of CN114142599A publication Critical patent/CN114142599A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J9/00Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting
    • H02J9/04Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source
    • H02J9/06Circuit arrangements for emergency or stand-by power supply, e.g. for emergency lighting in which the distribution system is disconnected from the normal source and connected to a standby source with automatic change-over, e.g. UPS systems
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25JMANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES
    • B25J19/00Accessories fitted to manipulators, e.g. for monitoring, for viewing; Safety devices combined with or specially adapted for use in connection with manipulators
    • B25J19/005Accessories fitted to manipulators, e.g. for monitoring, for viewing; Safety devices combined with or specially adapted for use in connection with manipulators using batteries, e.g. as a back-up power source
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00022Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using wireless data transmission
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • H02J13/00006Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
    • H02J13/00022Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using wireless data transmission
    • H02J13/00026Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using wireless data transmission involving a local wireless network, e.g. Wi-Fi, ZigBee or Bluetooth
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/00032Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries characterised by data exchange
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/0047Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries with monitoring or indicating devices or circuits
    • H02J7/0048Detection of remaining charge capacity or state of charge [SOC]
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • H02J7/35Parallel operation in networks using both storage and other dc sources, e.g. providing buffering with light sensitive cells
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J2213/00Indexing scheme relating to details of circuit arrangements for providing remote indication of network conditions of for circuit arrangements for providing remote control of switching means in a power distribution network
    • H02J2213/10Indexing scheme relating to details of circuit arrangements for providing remote indication of network conditions of for circuit arrangements for providing remote control of switching means in a power distribution network using simultaneously two or more different transmission means
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/12Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/248UPS systems or standby or emergency generators

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Robotics (AREA)
  • Mechanical Engineering (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

本发明涉及机器人电池管理领域,具体涉及一种机器人电源管理系统及方法,包括机器人本体及为机器人本体供电的电源系统,机器人本体还包括控制系统,所述控制系统包括一体化集成的控制芯片、定位系统、WIFI定位模块、语音模块、4G通讯模块;所述控制芯片通过4G通讯模块与云平台连接;当所述电源系统工作异常时,后台电源系统提供辅助电压对所述控制系统进行供电。本发明可以在机器人失电的情况下,也能与后台保持联系,避免失联的情况。

Description

机器人电源管理系统及方法
技术领域
本发明涉及机器人电池管理领域,具体涉及一种机器人电源管理系统及方法。
背景技术
随着科学技术的不断发展,现代的割草机器人已经越来越成熟,但是也存在一些缺陷,例如割草机器人电源供给方面大多为单电源供电,当该电源失电时,不仅机器人无法开机行走,其各项控制均断电失灵,无法与云平台或控制者取得联系,导致机器人失联的情况。
发明内容
本发明提供了一种机器人电源管理系统及方法,可以在机器人失电的情况下,也能与后台保持联系,避免失联的情况。
在一些实施例中,所述系统包括机器人本体及为机器人本体供电的电源系统,机器人本体还包括控制系统,所述控制系统包括一体化集成的控制芯片、定位系统、WIFI定位模块、语音模块、4G通讯模块;所述控制芯片通过4G通讯模块与云平台连接;当所述电源系统工作异常时,后台电源系统提供辅助电压对所述控制系统进行供电。
进一步的,所述控制芯片用于数据处理及指令下发;
所述定位系统用于输出坐标信息;
所述WIFI定位模块用于设备无GPS信号区域时后台监控;
所述语音模块用于输出语音提示;
所述4G通讯模块用于控制器与云平台管理服务器建立数据通讯。
进一步的,还包括太阳能供电系统,太阳能供电系统给后台电源系统供电。
进一步的,后台电源系统包括电源管理电路,电源管理电路用于检测电源系统输入电压是否低于预设阈值;当电源系统的输入电压低于预设阈值时,切换后台电源系统仅对控制系统进行供电。
进一步的,还包括电池电量检测电路,用于定时检测所述后台电源系统的储存电量。
进一步的,后台电源系统根据预设的启动时间,给所述控制系统供电。
进一步的,后台电源系统包括RTC时钟,当后台电源系统的储存电量低于预设值时,关闭其余供电,仅保留RTC时钟供电。
所述方法包括以下步骤:
S1,后台电源系统定时检测电源系统存储电池电量,当电源系统存储电池电量低于预设值,后台电源系统向控制系统发送关断电源请求指令;
S2,控制系统接收到所述关断电源请求指令后,关断对主控单元、执行机构和工控机的供电,仅保留RTC时钟的供电;
S3,后台电源系统根据预设的开机时间开始向控制系统供电;
S4,控制系统向后台电源系统发送电量查询读取指令;
S5,后台电源系统接收到所述电量查询读取指令后,将实时更新剩余电量值返回到控制系统;
S6,控制系统通过定位系统查询自身位置;
S7,控制系统将接收到的所述实时更新剩余电量值及定位信息通过4G网络模块输出到云平台;
S8,重复步骤S1-S7;
进一步的,步骤S5包括,当后台电源系统的剩余电量值低于预设值时,延长预设的开机时间。
机器人电源管理系统及方法,可以实现以下技术效果:
本发明通过备用电源的模式,单独为控制系统供电,保障机器人在失电的情况下也不会失联,整个控制系统在启用备用电源后采取低功耗模式,仅保证时钟的运行,同时太阳能充电板时刻为电源供电,从理论上而言,本发明的控制系统可以永远处于有电的状态,不会出现失联的情况。
以上的总体描述和下文中的描述仅是示例性和解释性的,不用于限制本申请。
附图说明
图1是本发明系统示意图;
图2是本发明工作流程图;
具体实施方式
为了能够更加详尽地了解本公开实施例的特点与技术内容,下面结合附图对本公开实施例的实现进行详细阐述,所附附图仅供参考说明之用,并非用来限定本公开实施例。在以下的技术描述中,为方便解释起见,通过多个细节以提供对所披露实施例的充分理解。然而,在没有这些细节的情况下,一个或多个实施例仍然可以实施。在其它情况下,为简化附图,熟知的结构和装置可以简化展示。
本公开实施例的说明书和权利要求书及上述附图中的术语“第一”、“第二”等是用于区别类似的对象,而不必用于描述特定的顺序或先后次序。应该理解这样使用的数据在适当情况下可以互换,以便这里描述的本公开实施例的实施例。此外,术语“包括”和“具有”以及他们的任何变形,意图在于覆盖不排他的包含。
除非另有说明,术语“多个”表示两个或两个以上。
实施例1:
在本发明的实施例中,所述系统包括机器人本体及为机器人本体供电的电源系统,机器人本体还包括控制系统,所述控制系统包括一体化集成的控制芯片、定位系统、WIFI定位模块、语音模块、4G通讯模块;所述控制芯片通过4G通讯模块与云平台连接;当所述电源系统工作异常时,后台电源系统提供辅助电压对所述控制系统进行供电。
进一步的,所述控制芯片用于数据处理及指令下发;
所述定位系统用于输出坐标信息;
所述WIFI定位模块用于设备无GPS信号区域时后台监控;
所述语音模块用于输出语音提示;
所述4G通讯模块用于控制器与云平台管理服务器建立数据通讯。
进一步的,还包括太阳能供电系统,太阳能供电系统给后台电源系统供电。
进一步的,后台电源系统包括电源管理电路,电源管理电路用于检测电源系统输入电压是否低于预设阈值;当电源系统的输入电压低于预设阈值时,切换后台电源系统仅对控制系统进行供电。
进一步的,还包括电池电量检测电路,用于定时检测所述后台电源系统的储存电量。
进一步的,后台电源系统根据预设的启动时间,给所述控制系统供电。
进一步的,后台电源系统包括RTC时钟,当后台电源系统的储存电量低于预设值时,关闭其余供电,仅保留RTC时钟供电。
所述方法包括以下步骤:
S1,后台电源系统定时检测电源系统存储电池电量,当电源系统存储电池电量低于预设值,后台电源系统向控制系统发送关断电源请求指令;
S2,控制系统接收到所述关断电源请求指令后,关断对主控单元、执行机构和工控机的供电,仅保留RTC时钟的供电;
S3,后台电源系统根据预设的开机时间开始向控制系统供电;
S4,控制系统向后台电源系统发送电量查询读取指令;
S5,后台电源系统接收到所述电量查询读取指令后,将实时更新剩余电量值返回到控制系统;
S6,控制系统通过定位系统查询自身位置;
S7,控制系统将接收到的所述实时更新剩余电量值及定位信息通过4G网络模块输出到云平台;
S8,重复步骤S1-S7;
进一步的,步骤S5包括,当后台电源系统的剩余电量值低于预设值时,延长预设的开机时间。
本发明通过备用电源的模式,单独为控制系统供电,保障机器人在失电的情况下也不会失联,整个控制系统在启用备用电源后采取低功耗模式,仅保证时钟的运行,同时太阳能充电板时刻为电源供电,从理论上而言,本发明的控制系统可以永远处于有电的状态,不会出现失联的情况。
需要明确的是,本发明并不局限于上文所描述并在图中示出的特定配置和处理。为了简明起见,这里省略了对已知方法的详细描述。在上述实施例中,描述和示出了若干具体的步骤作为示例。但是,本发明的方法过程并不限于所描述和示出的具体步骤,本领域的技术人员可以在领会本发明的精神后,作出各种改变、修改和添加,或者改变步骤之间的顺序。
以上所述的结构框图中所示的功能块可以实现为硬件、软件、固件或者它们的组合。当以硬件方式实现时,其可以例如是电子电路、专用集成电路(ASIC)、适当的固件、插件、功能卡等等。当以软件方式实现时,本发明的元素是被用于执行所需任务的程序或者代码段。程序或者代码段可以存储在机器可读介质中,或者通过载波中携带的数据信号在传输介质或者通信链路上传送。“机器可读介质”可以包括能够存储或传输信息的任何介质。机器可读介质的例子包括电子电路、半导体存储器设备、ROM、闪存、可擦除ROM(EROM)、软盘、CD-ROM、光盘、硬盘、光纤介质、射频(RF)链路,等等。代码段可以经由诸如因特网、内联网等的计算机网络被下载。
还需要说明的是,本发明中提及的示例性实施例,基于一系列的步骤或者装置描述一些方法或系统。但是,本发明不局限于上述步骤的顺序,也就是说,可以按照实施例中提及的顺序执行步骤,也可以不同于实施例中的顺序,或者若干步骤同时执行。
以上所述,仅为本发明的具体实施方式,所属领域的技术人员可以清楚地了解到,为了描述的方便和简洁,上述描述的系统、模块和单元的具体工作过程,可以参考前述方法实施例中的对应过程,在此不再赘述。应理解,本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,可轻易想到各种等效的修改或替换,这些修改或替换都应涵盖在本发明的保护范围之内。

Claims (9)

1.一种机器人电源管理系统,包括机器人本体及为机器人本体供电的电源系统,机器人本体还包括控制系统,其特征在于,所述控制系统包括一体化集成的控制芯片、定位系统、WIFI定位模块、语音模块、4G通讯模块;所述控制芯片通过4G通讯模块与云平台连接;当所述电源系统工作异常时,后台电源系统提供辅助电压对所述控制系统进行供电。
2.根据权利要求1所述的一种机器人电源管理系统,其特征在于,所述控制芯片用于数据处理及指令下发;
所述定位系统用于输出坐标信息;
所述WIFI定位模块用于设备无GPS信号区域时后台监控;
所述语音模块用于输出语音提示;
所述4G通讯模块用于控制器与云平台管理服务器建立数据通讯。
3.根据权利要求1所述的一种机器人电源管理系统,其特征在于,
还包括太阳能供电系统,太阳能供电系统给后台电源系统供电。
4.根据权利要求1所述的一种机器人电源管理系统,其特征在于,
后台电源系统包括电源管理电路,电源管理电路用于检测电源系统输入电压是否低于预设阈值;当电源系统的输入电压低于预设阈值时,切换后台电源系统仅对控制系统进行供电。
5.根据权利要求1所述的一种机器人电源管理系统,其特征在于,
还包括电池电量检测电路,用于定时检测所述后台电源系统的储存电量。
6.根据权利要求1所述的一种自助驾驶机器人电源管理系统,其特征在于,
后台电源系统根据预设的启动时间,给所述控制系统供电。
7.根据权利要求1所述的一种机器人电源管理系统,其特征在于,后台电源系统包括RTC时钟,当后台电源系统的储存电量低于预设值时,关闭其余供电,仅保留RTC时钟供电。
8.根据权利要求1-7任一所述的一种机器人电源管理方法,其特征在于,
步骤包括:
S1,后台电源系统定时检测电源系统存储电池电量,当电源系统存储电池电量低于预设值,后台电源系统向控制系统发送关断电源请求指令;
S2,控制系统接收到所述关断电源请求指令后,关断对主控单元、执行机构和工控机的供电,仅保留RTC时钟的供电;
S3,后台电源系统根据预设的开机时间开始向控制系统供电;
S4,控制系统向后台电源系统发送电量查询读取指令;
S5,后台电源系统接收到所述电量查询读取指令后,将实时更新剩余电量值返回到控制系统;
S6,控制系统通过定位系统查询自身位置;
S7,控制系统将接收到的所述实时更新剩余电量值及定位信息通过4G网络模块输出到云平台;
S8,重复步骤S1-S7。
9.根据权利要求8所述的机器人电源管理方法,其特征在于,步骤S5包括,当后台电源系统的剩余电量值低于预设值时,延长预设的开机时间。
CN202111454266.XA 2021-12-01 2021-12-01 机器人电源管理系统及方法 Pending CN114142599A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111454266.XA CN114142599A (zh) 2021-12-01 2021-12-01 机器人电源管理系统及方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111454266.XA CN114142599A (zh) 2021-12-01 2021-12-01 机器人电源管理系统及方法

Publications (1)

Publication Number Publication Date
CN114142599A true CN114142599A (zh) 2022-03-04

Family

ID=80386709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111454266.XA Pending CN114142599A (zh) 2021-12-01 2021-12-01 机器人电源管理系统及方法

Country Status (1)

Country Link
CN (1) CN114142599A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114563626A (zh) * 2022-04-11 2022-05-31 国网江苏省电力有限公司镇江供电分公司 一种绝缘子检测机器人数据采集处理系统

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001339875A (ja) * 2000-03-24 2001-12-07 Denso Corp 移動ロボットの電力供給装置
CN101355261A (zh) * 2008-09-22 2009-01-28 北京科技大学 一种用于小型双足步行机器人的电源管理系统
CN105446203A (zh) * 2016-01-04 2016-03-30 杭州亚美利嘉科技有限公司 一种机器人电源控制方法及系统
CN108803397A (zh) * 2017-04-28 2018-11-13 深圳市朗驰欣创科技股份有限公司 一种机器人电源管理系统及控制方法
CN109741645A (zh) * 2019-03-15 2019-05-10 山东顺势教育科技有限公司 Ai机器人引导及互动对话教学系统
CN110535209A (zh) * 2019-09-12 2019-12-03 四川阿泰因机器人智能装备有限公司 一种夜巡机器人的电源管理电路及其控制方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001339875A (ja) * 2000-03-24 2001-12-07 Denso Corp 移動ロボットの電力供給装置
CN101355261A (zh) * 2008-09-22 2009-01-28 北京科技大学 一种用于小型双足步行机器人的电源管理系统
CN105446203A (zh) * 2016-01-04 2016-03-30 杭州亚美利嘉科技有限公司 一种机器人电源控制方法及系统
CN108803397A (zh) * 2017-04-28 2018-11-13 深圳市朗驰欣创科技股份有限公司 一种机器人电源管理系统及控制方法
CN109741645A (zh) * 2019-03-15 2019-05-10 山东顺势教育科技有限公司 Ai机器人引导及互动对话教学系统
CN110535209A (zh) * 2019-09-12 2019-12-03 四川阿泰因机器人智能装备有限公司 一种夜巡机器人的电源管理电路及其控制方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114563626A (zh) * 2022-04-11 2022-05-31 国网江苏省电力有限公司镇江供电分公司 一种绝缘子检测机器人数据采集处理系统

Similar Documents

Publication Publication Date Title
JP2822624B2 (ja) 非接触icカード
JP2000047728A (ja) 移動ロボットシステムの充電制御装置
EP2911909B1 (en) Control system
CN105242608B (zh) 整车控制器及其控制方法
CN114142599A (zh) 机器人电源管理系统及方法
CN112559003B (zh) 域控制器软件升级方法、装置及域控制器
JP2000090220A (ja) 非接触型icカードおよび非接触型icカードシステム
CN105676247A (zh) 一种工程机械定位系统以及定位方法
CN107765585A (zh) 数字电源的升级方法、装置及系统
JP5931694B2 (ja) 制御システム
CN115292133A (zh) 智能网卡的管理方法及相关装置
CN112367107A (zh) 一种星上自主处理卫星测控设备故障的方法及系统
CN101471678B (zh) 一种汽车网关及其控制方法
CN113353004B (zh) 支持车辆vcu后台远程升级的电源控制电路、方法和无人车
CN215904319U (zh) 无人驾驶供电系统及供电控制装置
CN114714979A (zh) 车辆控制方法、装置、介质、电子设备和自动驾驶车辆
JP2013207902A (ja) 電池制御装置
CN114435280A (zh) 一种远程控制系统
CN110281952B (zh) 控制系统及方法、装置、存储介质、电子装置
CN111245053B (zh) 电子装置及其低温下提高电池寿命的控制方法
CN113589737B (zh) 一种车载定位模块及其调控方法
CN109751184B (zh) 风力发电机组用控制方法、主控制器及变流控制器
US20130173080A1 (en) Programmable controller system
CN112416110B (zh) 一种星载存储设备长短期工作模块的控制方法
CN117744587B (zh) 一种主控芯片的优化方法及系统

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: Building 43, Zone A, Energy Conservation and Environmental Protection Innovation Park, No. 199, Hongwu Avenue, Tangqiao Town, Zhangjiagang City, Suzhou City, Jiangsu Province, 215600

Applicant after: Suzhou New Coordinates Intelligent Equipment Co.,Ltd.

Address before: 255086 4th floor, building 10, MEMS Industrial Park, No. 158, Zhongrun Avenue, Zibo City, Shandong Province

Applicant before: Shandong new coordinate Intelligent Equipment Co.,Ltd.