CN113962669A - Construction project cost auditing method and system - Google Patents

Construction project cost auditing method and system Download PDF

Info

Publication number
CN113962669A
CN113962669A CN202111327662.6A CN202111327662A CN113962669A CN 113962669 A CN113962669 A CN 113962669A CN 202111327662 A CN202111327662 A CN 202111327662A CN 113962669 A CN113962669 A CN 113962669A
Authority
CN
China
Prior art keywords
project
cost
unit price
cost list
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111327662.6A
Other languages
Chinese (zh)
Inventor
李继涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202111327662.6A priority Critical patent/CN113962669A/en
Publication of CN113962669A publication Critical patent/CN113962669A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

The application relates to the technical field of construction cost, and discloses a construction project cost auditing method and system, which comprise: acquiring a cost list to be checked, wherein the cost list comprises project names; if the project name of the cost list belongs to an externally disclosed project, acquiring the auditing grade of the cost list; if the checking level of the cost list belongs to a common level, acquiring the unit price of the project and the quantity of the project, and checking the unit price of the project and the quantity of the project in sequence according to the project name; and if the checking grade of the cost list belongs to the important grade, checking the unit price of the project and the quantity of the project for multiple times in sequence according to the project name. The method and the device have the effect of saving manpower when the project cost list is checked.

Description

Construction project cost auditing method and system
Technical Field
The invention relates to the field of construction cost, in particular to a construction project cost auditing method and system.
Background
Project Costs (PC) refer to the construction Costs expected or actually paid out during the construction period of a component Project. The work process of predicting, planning, controlling, accounting, analyzing and evaluating the construction Cost by comprehensively using knowledge and skills in Management, economics, engineering technology and the like is called construction Cost Management (PCM). According to procedures, methods and bases prescribed by laws, regulations, standards and the like, prediction or determination of Construction costs and their constituent contents is called Project Pricing (CPE), and the Project Pricing Bases (BEPC) include Project metering Pricing standards, Project Pricing quotations, Project Cost information and the like related to Pricing contents, Pricing methods and Pricing standards.
In the process of some construction projects, the expenses required by the construction projects are listed as a construction cost list, so that project buyers can conveniently plan purchase items according to the construction cost list, and after the construction cost list is listed, corresponding staff can be arranged to check the contents of the construction cost list, and some lost contents or wrong items are avoided.
For the related technologies, the inventor thinks that when the project cost list is checked at present, a manual checking mode is usually adopted, and large human resources are occupied.
Disclosure of Invention
In order to save manpower when checking a project cost list, the application provides a construction project cost checking method and a construction project cost checking system.
In a first aspect, the construction project cost auditing method provided by the application adopts the following technical scheme:
a construction project cost auditing method comprises the following steps:
acquiring a cost list to be checked, wherein the cost list comprises project names;
if the project name of the cost list belongs to an externally disclosed project, acquiring the auditing grade of the cost list;
if the checking level of the cost list belongs to a common level, acquiring the unit price of the project and the quantity of the project, and checking the unit price of the project and the quantity of the project in sequence according to the project name;
and if the checking grade of the cost list belongs to the important grade, checking the unit price of the project and the quantity of the project for multiple times in sequence according to the project name.
By adopting the technical scheme, when the cost list is checked, the cost list is firstly obtained, then whether the cost list belongs to the externally disclosed engineering project or not is judged, the concealed engineering cost list cannot be directly checked, the construction project which belongs to the externally disclosed engineering project needs to obtain the checking grade of the cost list, for the cost lists of some common grades, only one time of checking is needed for improving the checking efficiency, and for the cost lists of some important grades, the checking needs to be repeated for ensuring the accuracy rate; by automatically judging the type and the importance level of the cost list and then automatically checking the cost list, a large amount of labor can be saved.
Optionally, the step of synchronously performing with the project name of the cost list belonging to the externally disclosed engineering project includes:
if the project name of the cost list does not belong to the externally disclosed engineering project, sending a research instruction to a notification module to notify related personnel of obtaining a research result within preset time;
and acquiring the project unit price and the project quantity of the project which is not disclosed to the outside based on the investigation result, and sequentially checking the project unit price and the project quantity of the project which is not disclosed to the outside according to the project name.
By adopting the technical scheme, for some concealed engineering projects which are not disclosed to the outside, private investigation needs to be carried out to obtain the unit price and the quantity of the projects which are not disclosed to the outside, and then auditing is carried out based on investigation results, so that corresponding auditing can be carried out on cost lists under different conditions, corresponding measures are also taken for some engineering project lists which are not disclosed to the outside, and the privacy of the cost lists which are not disclosed to the outside can be protected.
Optionally, the step of obtaining the unit price of the item includes:
acquiring the unit price of the project corresponding to the project name based on the cost list;
judging whether the unit price of the item belongs to a floating price or not based on the unit price of the item;
and if the item unit price belongs to the floating price, marking the item unit price.
By adopting the technical scheme, when the cost staff makes the cost list, the purchase price of some items is floated, and in order to consider the total cost of the cost, the lowest purchase price needs to be selected, so that when the purchase price of the item belongs to the floated price, the mark is carried out, the purchase staff is reminded to draw attention, and the total purchase cost is saved to a certain extent.
Optionally, obtaining a purchasing time corresponding to each item name in the cost list;
respectively acquiring the minimum value of the project unit price corresponding to each project name in the time period away from the purchasing time;
and modifying the purchasing time corresponding to the project name based on the minimum value of the project unit price.
Through adopting above-mentioned technical scheme, because purchasing personnel generally belong to unified purchase when purchasing the goods and materials, but often the minimum price of a lot of goods and materials does not belong to the purchase time of unified purchase and goes to accomplish the purchase, consequently finding the minimum price that appears of corresponding goods and materials wherein, can select to go to purchase according to the time of minimum price alone, can save the goods and materials cost when examining and examining the cost manifest.
Optionally, if the review level of the cost list belongs to an importance level, the step of performing multiple reviews on the unit price of the project and the quantity of the project in sequence according to the project name includes:
acquiring a project construction drawing related to the cost list;
if the project name in the project construction drawing does not correspond to the project name in the cost list to be checked, marking;
and sending a rechecking instruction based on the marked content, and checking the cost list to be checked again.
By adopting the technical scheme, the cost list of the important grade needs to be checked through the project construction drawing, and the project construction drawing comprises the real project name and the number of the distributed projects, so that the cost list needs to be checked by referring to the construction drawing, and the accuracy of checking the cost list is improved.
Optionally, the step of sequentially checking the unit price of the project and the quantity of the project according to the project name includes:
acquiring the times of checking the cost list in the historical data;
and if the number of times of checking the cost list exceeds a threshold value of the number of times, sending a selective inspection instruction to a selective inspection module, and controlling the selective inspection module to carry out selective inspection on all checked cost lists.
By adopting the technical scheme, errors may occur when the system audits the cost list, in order to ensure the accuracy of the auditing system, the system needs to be periodically checked, and whether the auditing is inaccurate is judged according to the result of the checking, so that the accuracy rate of auditing the cost list is improved.
In a second aspect, the construction project cost auditing system provided by the application adopts the following technical scheme:
a construction project cost auditing system comprises a cost list acquiring module, an auditing grade acquiring module, an auditing module, a judging module and a control module;
the cost list acquisition module is used for acquiring a cost list to be checked;
the audit level acquisition module is used for acquiring the audit level of the cost list;
the auditing module is used for sequentially auditing the unit price and the quantity of the projects according to the project names;
the judging module is used for judging whether the project name of the cost list belongs to an externally disclosed engineering project and judging whether the auditing grade of the cost list belongs to a common grade;
the project information acquisition module is used for acquiring project unit price and project quantity;
the control module is used for controlling the auditing grade acquisition module to acquire the auditing grade of the cost list when the project name of the cost list belongs to an externally disclosed engineering project;
the project information acquisition module is also used for controlling the project information acquisition module to acquire the project unit price and the project quantity;
and when the audit level of the cost list belongs to a common level, controlling the audit module to audit the unit price of the project and the quantity of the project in sequence according to the project name;
and when the audit level of the cost list belongs to the important level, controlling the audit module to sequentially audit the unit price of the project and the quantity of the project for multiple times according to the project name.
By adopting the technical scheme, when the cost list is checked, the cost list is firstly obtained, then whether the cost list belongs to the externally disclosed engineering project or not is judged, the concealed engineering cost list cannot be directly checked, the construction project which belongs to the externally disclosed engineering project needs to obtain the checking grade of the cost list, for the cost lists of some common grades, only one time of checking is needed for improving the checking efficiency, and for the cost lists of some important grades, the checking needs to be repeated for ensuring the accuracy rate; by automatically judging the type and the importance level of the cost list and then automatically checking the cost list, a large amount of labor can be saved.
Optionally, the system further comprises a notification module;
the control module is also used for sending a research instruction to the notification module when the project name of the cost list does not belong to an externally disclosed project;
the notification module is used for responding to the investigation instruction and notifying related personnel to acquire the investigation result within preset time;
the project information acquisition module is further used for acquiring project unit prices and project quantities of project projects which are not disclosed to the outside based on the investigation result.
By adopting the technical scheme, for some concealed engineering projects which are not disclosed to the outside, private investigation needs to be carried out to obtain the unit price and the quantity of the projects which are not disclosed to the outside, and then auditing is carried out based on investigation results, so that corresponding auditing can be carried out on cost lists under different conditions, corresponding measures are also taken for some engineering project lists which are not disclosed to the outside, and the privacy of the cost lists which are not disclosed to the outside can be protected.
Optionally, the system further includes a project unit price acquisition module and a marking module;
the project unit price acquisition module is used for acquiring project unit prices corresponding to the project names based on the cost list;
the judging module is also used for judging whether the unit price of the project belongs to a floating price;
the marking module is used for marking the project name when the project unit price belongs to the floating price.
By adopting the technical scheme, when the cost staff makes the cost list, the purchase price of some items is floated, and in order to consider the total cost of the cost, the lowest purchase price needs to be selected, so that when the purchase price of the item belongs to the floated price, the mark is carried out, the purchase staff is reminded to draw attention, and the total purchase cost is saved to a certain extent.
Optionally, the system further comprises a procurement time acquisition module;
the purchasing time acquisition module is used for acquiring the purchasing time of the cost list;
the project unit price acquisition module is further used for acquiring the minimum value of the project unit price corresponding to the project name in the time period away from the purchasing time;
and the purchasing time modifying module is used for modifying the purchasing time corresponding to the project name based on the minimum value of the project unit price.
Through adopting above-mentioned technical scheme, because purchasing personnel generally belong to unified purchase when purchasing the goods and materials, but often the minimum price of a lot of goods and materials does not belong to the purchase time of unified purchase and goes to accomplish the purchase, consequently finding the minimum price that appears of the goods and materials that wherein have corresponds, can select to go to purchase according to the time of minimum price alone, can save the goods and materials cost when examining and examining the cost manifest to improve the beneficial effect of examining and examining.
In summary, the present application includes at least one of the following beneficial technical effects:
1. when the cost list is checked, the cost list is firstly obtained, the checking grade of the cost list needs to be obtained for the engineering projects which are externally disclosed and belong to the common grade, for the cost lists of some common grades, only one time of checking is needed for improving the checking efficiency, and for the cost lists of some important grades, for ensuring the accuracy rate, the checking needs to be repeated for many times; the type and the importance level of the cost list are automatically judged, and then the cost list is automatically checked, so that a large amount of labor can be saved;
2. for some concealed engineering projects which are not disclosed to the outside, private investigation is needed to obtain unit prices and quantity of the projects which are not disclosed to the outside, and then auditing is carried out based on investigation results, so that corresponding auditing can be carried out for cost lists under different conditions, corresponding measures can be taken for the lists of some engineering projects which are not disclosed to the outside, and the privacy of the cost lists which are not disclosed to the outside can be protected.
Drawings
Fig. 1 is a schematic diagram of a hardware architecture of a construction project cost auditing system according to an embodiment of the present application.
Fig. 2 is a flowchart of a construction project cost auditing method according to an embodiment of the present application.
Detailed Description
The present application is described in further detail below with reference to figures 1-2.
Referring to fig. 1, an embodiment of the present application discloses a construction project cost auditing system, which includes a cost list obtaining module, an auditing grade obtaining module, an auditing module, a judging module, a notification module, a project information obtaining module, a project unit price obtaining module, a marking module, a purchasing time obtaining module, a sampling inspection module, and a control module. The manufacturing cost list acquisition module, the auditing grade acquisition module, the auditing module, the judgment module, the notification module, the project information acquisition module, the project unit price acquisition module, the marking module, the purchasing time acquisition module and the sampling inspection module are all in communication connection with the control module.
The cost list acquisition module is used for acquiring a cost list to be checked; the cost list can include a list of some engineering construction projects, including material cost, labor cost and the like, and the cost list to be checked is called from the database.
The audit grade acquisition module is used for acquiring the audit grade of the cost list; before the examination, the examination grades of the cost list are classified, for example, the cost list of the common grade and the cost list of the important grade, and the classification mode is classified according to the item type of the cost list and the price of the item from high to low.
The auditing module is used for sequentially auditing the unit price and the quantity of the projects according to the project names; the auditing mode can be that auditing is carried out according to a pre-established auditing standard, or the unit price of the project and the quantity of the project required by equivalent projects of a historical data center are compared.
The judging module is used for judging whether the project name of the cost list belongs to an externally disclosed engineering project or not and judging whether the auditing grade of the cost list belongs to a common grade or not; and the unit price of the item is judged whether to belong to the floating price.
And the project information acquisition module is used for acquiring the unit price and the quantity of projects.
The control module can be a central processing unit, a chip and the like of a prestored program. And the auditing grade acquisition module is used for controlling to acquire the auditing grade of the cost list when the project name of the cost list belongs to an externally disclosed project.
And the system is also used for controlling the item information acquisition module to acquire the unit price and the quantity of the items.
The system is also used for controlling the auditing module to sequentially audit the unit price and the quantity of the items according to the item names when the auditing grade of the cost list belongs to the common grade; and when the auditing grade of the cost list belongs to the important grade, controlling an auditing module to sequentially audit the unit price and the quantity of the project for multiple times according to the project name.
And the system is also used for sending a research instruction to the notification module when the project name of the cost list does not belong to an externally disclosed engineering project.
And the system is also used for sending a selective examination instruction to the selective examination module and controlling the selective examination module to carry out selective examination on all the examined cost lists.
The notification module is used for responding to the investigation instruction and notifying related personnel to acquire the investigation result within the preset time; related technicians are notified through the investigation instruction, and the notification mode can be short message, telephone, mail and the like.
And the project information acquisition module is also used for acquiring project unit price and project quantity of the project which is not disclosed to the outside based on the investigation result.
The project unit price acquisition module is used for acquiring project unit prices corresponding to project names based on the cost list; and the method is also used for acquiring the minimum value of the unit price of the project corresponding to the project name in the time period from the purchase time.
And the marking module is used for marking the item name when the unit price of the item belongs to the floating price, and the marking mode can be a red marking mode, a bold marking mode, an underline marking mode and the like.
And the purchasing time acquisition module is used for acquiring the purchasing time of the cost list.
And the purchasing time modifying module is used for modifying the purchasing time corresponding to the project name based on the minimum value of the project unit price.
And the selective examination module is used for responding to a selective examination instruction and performing selective examination on all the examined cost lists.
The implementation principle of the construction project cost auditing system in the embodiment of the application is as follows: when the cost list is checked, the cost list is firstly obtained, then whether the cost list belongs to an externally disclosed engineering project or not is judged, the concealed engineering cost list cannot be checked directly, the checking grade of the cost list needs to be obtained for the engineering project belonging to the externally disclosed engineering project, for the cost lists of some common grades, in order to improve the checking efficiency, only one time of checking is needed, and for the cost lists of some important grades, in order to ensure the accuracy rate, the checking needs to be repeated for many times.
Based on the hardware structure, referring to fig. 2, the embodiment of the application further discloses a construction project cost auditing method, which includes steps S100-S400:
step S100: and acquiring a cost list to be checked, wherein the cost list comprises project names.
The project names can be suspended ceiling, decorative lamp, emulsion paint and the like.
Step S200: and if the project name of the cost list belongs to an externally disclosed project, acquiring the auditing grade of the cost list.
Therefore, the review level needs to be judged again, and different review modes are adopted for different levels of prices in the project, for example, a cost list of a common level and a cost list of an important level belong to the important list for the cost list with the price exceeding 10 ten thousand yuan, and belong to the common list for the cost list with the price not exceeding 10 ten thousand yuan.
The step performed in synchronization with step S200 includes:
S2A 1: and if the project name of the cost list does not belong to the externally disclosed engineering project, sending a research instruction to a notification module, and notifying related personnel to acquire a research result within preset time.
S2A 2: and acquiring the project unit price and the project quantity of the project which is not disclosed to the outside based on the investigation result, and sequentially checking the project unit price and the project quantity of the project which is not disclosed to the outside according to the project name.
The unit price and the number of items that are not disclosed to the outside are acquired by investigating the results by a field investigation or the like, or by asking the relevant person.
Step S300: and if the checking grade of the cost list belongs to the common grade, acquiring the unit price of the project and the quantity of the project, and checking the unit price of the project and the quantity of the project in sequence according to the project name.
A cost list of a common level may also refer to a cost list of a general level of complexity, for example, less than 20 items.
The step of acquiring unit prices of the items in the step S300 includes steps S310 to S330:
step S310: and acquiring the unit price of the project corresponding to the project name based on the cost list.
And analyzing the unit price of each item name on the cost list according to the cost list, such as 2000 yuan of suspended ceiling, 500 yuan of decorative lamp and the like.
Step S320: and judging whether the unit price of the item belongs to a floating price or not based on the unit price of the item.
By inquiring about various purchase channels, if the unit price of the item can be shifted up to 20%, for example, 100 yuan latex paint, the highest price can reach 120 yuan, and the lowest price can be as low as 80 yuan.
Step S330: and if the item unit price belongs to the floating price, marking the item unit price.
And acquiring the purchasing time corresponding to each project name in the cost list.
And respectively acquiring the minimum value of the unit price of the project corresponding to each project name in the time period away from the purchasing time.
And modifying the purchasing time corresponding to the project name based on the minimum value of the project unit price.
For example, when purchasing through a cost list, a purchasing person generally selects to purchase on the same day, and separately purchases materials by acquiring preferential time and purchasing channels of the lowest price of each project in advance, so that a large amount of total cost can be saved.
After the item unit price and the item quantity are checked in sequence according to the item name, the method comprises the following steps:
and obtaining the times of checking the cost list in the historical data.
And if the number of times of checking the cost list exceeds a threshold value of the number of times, sending a selective inspection instruction to a selective inspection module, and controlling the selective inspection module to carry out selective inspection on all checked cost lists.
In order to verify the operation accuracy of the auditing system, the auditing system needs to be subjected to periodic spot check, for example, every time 50 cost lists are audited, one cost list needs to be subjected to random rolling spot check, namely, the audit is performed in a manual auditing mode, and an electronic-version spot check result form is generated.
Step S3a 0: and if the checking grade of the cost list belongs to the important grade, checking the unit price of the project and the quantity of the project for multiple times in sequence according to the project name.
For some price list of important level, for example, if the number of items exceeds 20, the price list is defined as the price list of important level, and at least two audits are needed, so as to reduce the error of the audits.
The step S3A0 includes steps S3A 1-S3A 3:
step S3a 1: and acquiring a project construction drawing related to the cost list.
Step S3a 2: and if the project name in the project construction drawing does not correspond to the project name in the cost list to be checked, marking.
Step S3a 3: and sending a rechecking instruction based on the marked content, and checking the cost list to be checked again.
For the cost list of the important level, the cost list needs to correspond to the project construction drawing, the project name needed to be used in the project construction drawing corresponds to the project name in the cost list, when the project name which does not correspond needs to be marked, the re-examination is carried out based on the marked place, and therefore the examination error of the cost list of the important level is reduced.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (10)

1. A construction project cost auditing method is characterized in that: the method comprises the following steps:
acquiring a cost list to be checked, wherein the cost list comprises project names;
if the project name of the cost list belongs to an externally disclosed project, acquiring the auditing grade of the cost list;
if the checking level of the cost list belongs to a common level, acquiring the unit price of the project and the quantity of the project, and checking the unit price of the project and the quantity of the project in sequence according to the project name;
and if the checking grade of the cost list belongs to the important grade, checking the unit price of the project and the quantity of the project for multiple times in sequence according to the project name.
2. The construction project cost auditing method according to claim 1, characterized in that: and if the project name of the cost list belongs to an externally disclosed engineering project, synchronously performing the steps of:
if the project name of the cost list does not belong to the externally disclosed engineering project, sending a research instruction to a notification module to notify related personnel of obtaining a research result within preset time;
and acquiring the project unit price and the project quantity of the project which is not disclosed to the outside based on the investigation result, and sequentially checking the project unit price and the project quantity of the project which is not disclosed to the outside according to the project name.
3. The construction project cost auditing method according to claim 1, characterized in that: the step of acquiring the unit price of the project comprises the following steps:
acquiring the unit price of the project corresponding to the project name based on the cost list;
judging whether the unit price of the item belongs to a floating price or not based on the unit price of the item;
and if the item unit price belongs to the floating price, marking the item unit price.
4. A construction project cost review method according to claim 3, characterized in that: if the unit price of the item belongs to the floating price, the step of marking the unit price of the item further comprises the following steps:
acquiring the purchasing time corresponding to each project name in the cost list;
respectively acquiring the minimum value of the project unit price corresponding to each project name in the time period away from the purchasing time;
and modifying the purchasing time corresponding to the project name based on the minimum value of the project unit price.
5. The construction project cost auditing method according to claim 1, characterized in that: if the checking level of the cost list belongs to the important level, the step of checking the unit price of the project and the quantity of the project for multiple times according to the project name comprises the following steps:
acquiring a project construction drawing related to the cost list;
if the project name in the project construction drawing does not correspond to the project name in the cost list to be checked, marking;
and sending a rechecking instruction based on the marked content, and checking the cost list to be checked again.
6. The construction project cost auditing method according to claim 1, characterized in that: the step of sequentially auditing the unit price of the project and the quantity of the project according to the project name comprises the following steps:
acquiring the times of checking the cost list in the historical data;
and if the number of times of checking the cost list exceeds a threshold value of the number of times, sending a selective inspection instruction to a selective inspection module, and controlling the selective inspection module to carry out selective inspection on all checked cost lists.
7. A construction project cost auditing system is characterized in that: the system comprises a cost list acquisition module, an audit level acquisition module, an audit module, a judgment module and a control module;
the cost list acquisition module is used for acquiring a cost list to be checked;
the audit level acquisition module is used for acquiring the audit level of the cost list;
the auditing module is used for sequentially auditing the unit price and the quantity of the projects according to the project names;
the judging module is used for judging whether the project name of the cost list belongs to an externally disclosed engineering project and judging whether the auditing grade of the cost list belongs to a common grade;
the project information acquisition module is used for acquiring project unit price and project quantity;
the control module is used for controlling the auditing grade acquisition module to acquire the auditing grade of the cost list when the project name of the cost list belongs to an externally disclosed engineering project;
the project information acquisition module is also used for controlling the project information acquisition module to acquire the project unit price and the project quantity;
and when the audit level of the cost list belongs to a common level, controlling the audit module to audit the unit price of the project and the quantity of the project in sequence according to the project name;
and when the audit level of the cost list belongs to the important level, controlling the audit module to sequentially audit the unit price of the project and the quantity of the project for multiple times according to the project name.
8. The construction project cost audit system according to claim 7 wherein: the system also comprises a notification module and a project information acquisition module;
the control module is also used for sending a research instruction to the notification module when the project name of the cost list does not belong to an externally disclosed project;
the notification module is used for responding to the investigation instruction and notifying related personnel to acquire the investigation result within preset time;
the project information acquisition module is further used for acquiring project unit prices and project quantities of project projects which are not disclosed to the outside based on the investigation result.
9. The construction project cost audit system according to claim 7 wherein: the system also comprises a project unit price acquisition module and a marking module;
the project unit price acquisition module is used for acquiring project unit prices corresponding to the project names based on the cost list;
the judging module is also used for judging whether the unit price of the project belongs to a floating price;
the marking module is used for marking the project name when the project unit price belongs to the floating price.
10. The construction project cost audit system according to claim 7 wherein: the system also comprises a purchasing time acquisition module and a purchasing time modification module;
the purchasing time acquisition module is used for acquiring the purchasing time of the cost list;
the project unit price acquisition module is further used for acquiring the minimum value of the project unit price corresponding to the project name in the time period away from the purchasing time;
and the purchasing time modifying module is used for modifying the purchasing time corresponding to the project name based on the minimum value of the project unit price.
CN202111327662.6A 2021-11-10 2021-11-10 Construction project cost auditing method and system Pending CN113962669A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111327662.6A CN113962669A (en) 2021-11-10 2021-11-10 Construction project cost auditing method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111327662.6A CN113962669A (en) 2021-11-10 2021-11-10 Construction project cost auditing method and system

Publications (1)

Publication Number Publication Date
CN113962669A true CN113962669A (en) 2022-01-21

Family

ID=79469996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111327662.6A Pending CN113962669A (en) 2021-11-10 2021-11-10 Construction project cost auditing method and system

Country Status (1)

Country Link
CN (1) CN113962669A (en)

Similar Documents

Publication Publication Date Title
CN108074032B (en) Engineering quality acceptance device and method
Milanzi The impact of barriers on export behavior of a developing country firms: evidence from Tanzania
CN109783566B (en) Product inspection data acquisition device
EP0803098A1 (en) Computer-aided methods and apparatus for assessing an organizational process or system
CN106651653B (en) Intelligent power distribution network engineering auxiliary management system
CN107844875A (en) Green product management system and method
CN109684322B (en) Data processing system and method for automatic maritime affair auditing
CN112669019A (en) Engineering data automatic filing method based on engineering quantity list and quality inspection data correlation interaction
Sunazuka et al. Software quality assessment technology
CN112348530A (en) Automatic server production inspection and repair method
CN112396302A (en) Engineering quality acceptance management system and method based on field positioning
CN114936801A (en) Distribution network dispatching operation management method based on big data
CN109324978A (en) A kind of software testing management system of multi-person synergy
CN112926840A (en) Hydropower engineering civil engineering test data statistical analysis method and system
TWI780580B (en) Image reinspection method, computer device, and storage medium
CN113689098A (en) Performance assessment method, system, equipment and storage medium
CN113962669A (en) Construction project cost auditing method and system
CN111523805A (en) Method and device for inspecting incoming goods
CN116050928A (en) Method for evaluating service specification application effect of comprehensive service area on water
CN109345112A (en) A kind of maintenance technician's ranking method, system and electronic equipment and storage medium
CN115222276A (en) Bidding analysis and evaluation method and device
CN115423489A (en) Product traceability system based on SPC
Park A manager's checklist for validating software cost and schedule estimates
Cook et al. Documentation is important
CN112801521B (en) Educational quality assessment system based on big data

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination