CN113931200A - Construction device for construction site groove and using method - Google Patents

Construction device for construction site groove and using method Download PDF

Info

Publication number
CN113931200A
CN113931200A CN202111259363.3A CN202111259363A CN113931200A CN 113931200 A CN113931200 A CN 113931200A CN 202111259363 A CN202111259363 A CN 202111259363A CN 113931200 A CN113931200 A CN 113931200A
Authority
CN
China
Prior art keywords
inserting plate
limiting
construction
picture peg
spacing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111259363.3A
Other languages
Chinese (zh)
Inventor
张弘强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN202111259363.3A priority Critical patent/CN113931200A/en
Publication of CN113931200A publication Critical patent/CN113931200A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/08Bordering or stiffening the sides of ditches trenches or narrow shafts for foundations
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F3/00Sewer pipe-line systems
    • E03F3/06Methods of, or installations for, laying sewer pipes

Abstract

The invention discloses a construction device for a groove in a construction site and a using method thereof, belonging to the technical field of construction equipment. The invention comprises a rectangular plate-shaped limiting front inserting plate and a limiting rear inserting plate which are the same in size, wherein flat pedals are vertically arranged at the tops of the limiting front inserting plate and the limiting rear inserting plate, a plurality of lifting holes are formed in the pedals, two circular tube-shaped threaded pipes are vertically arranged at the upper part of the inner wall of the limiting rear inserting plate, two bearings are correspondingly embedded at the upper part of the inner wall of the limiting front inserting plate, and two threaded rods are respectively fixed on the inner rings of the two bearings. The invention can be used as a frame limit for construction of the groove in a construction site, ensures that the construction can be carried out by using an excavator, ensures the flatness of the bottom surface and the side surface of the groove and improves the working efficiency.

Description

Construction device for construction site groove and using method
Technical Field
The invention relates to the technical field of building equipment, in particular to a construction device for a groove in a building site and a using method of the construction device.
Background
Need excavate a large amount of slots at the job site of building site for diversion, drainage etc. the cross section of slot roughly is isosceles trapezoid and flaring up, all needs the casting concrete on slot bottom surface and side, avoids the dregs of soil to be washed away, otherwise is difficult to satisfy the blowdown demand, and leads to building site underground earth to run off easily. Along with the construction of the construction site building, the groove needs to be changed and excavated again. But the construction of present slot all is manual going on, can't use the construction of small-size excavator, because the roughness of slot bottom surface and side is difficult to guarantee, leads to the construction to waste time and energy, and efficiency is also lower.
Disclosure of Invention
The invention aims to provide a construction device and a use method for a groove of a construction site, which can be used for limiting a frame for groove construction of the construction site, ensure that construction can be carried out by using an excavator, ensure the flatness of the bottom surface and the side surface of the groove and improve the working efficiency.
In order to achieve the purpose, the invention provides the following technical scheme:
the utility model provides a building site slot construction equipment, picture peg and spacing back picture peg before including the rectangular plate-like spacing of size the same, picture peg and spacing back picture peg top all are equipped with flat footboard perpendicularly before spacing, all open a plurality of lewis holes on the footboard, the inner wall upper portion of spacing back picture peg is equipped with two tubular screwed pipes perpendicularly, picture peg inner wall upper portion corresponds to inlay before spacing has two bearings, the inner circle of two bearings is fixed with two threaded rods respectively, two threaded rods respectively with the mutual screw-thread fit of two screwed pipes, the screwed pipe that corresponds, the threaded rod, the bearing is all coaxial.
Preferably, the limiting front inserting plate, the limiting rear inserting plate and the pedal are all made of stainless steel, and the limiting front inserting plate and the limiting rear inserting plate are connected with the pedal through welding.
Preferably, the hanging holes are through holes with concave threads.
Preferably, the threaded pipe and the threaded rod are both made of stainless steel, and the threaded pipe is connected with the limiting rear inserting plate through welding.
Preferably, the bearing is a ball roller bearing, the outer ring of the bearing is connected with the limiting front inserting plate through welding, and the inner ring of the bearing is connected with the threaded rod through welding.
The invention provides another technical scheme:
a method of using a trench construction device for a construction site, comprising the steps of:
s1: rotating the threaded rods in the bearing, screwing the two threaded rods into the threaded pipes to a proper depth, and adjusting the distance between the limiting front inserting plate and the limiting rear inserting plate to be equal to the width of the groove;
s2: then, the pedal is hammered, the limiting front inserting plate and the limiting rear inserting plate are respectively inserted into the ground to a proper depth to form a frame of the groove, and the groove can be dug out between the limiting front inserting plate and the limiting rear inserting plate by using an excavator.
Compared with the prior art, the invention has the beneficial effects that:
the construction device and the use method for the construction site groove can be used as a frame limit for construction of the construction site groove, ensure that construction can be carried out by using an excavator, ensure the flatness of the bottom surface and the side surface of the groove and improve the working efficiency.
Drawings
FIG. 1 is a front view of the present invention;
FIG. 2 is a left side view of the present invention;
fig. 3 is a top view of the present invention.
In the figure: 1. a front plug board is limited; 2. limiting a rear flashboard; 3. a threaded pipe; 4. a threaded rod; 5. a bearing; 6. a pedal; 7. and (4) hoisting holes.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-3, embodiments of the present invention provide: the utility model provides a building site slot construction equipment, picture peg 1 and spacing back picture peg 2 before including the rectangular plate-like spacing of size the same, picture peg 1 all is equipped with flat footboard 6 with spacing back picture peg 2 top perpendicularly before spacing, all open a plurality of lewis holes 7 on the footboard 6, the inner wall upper portion of spacing back picture peg 2 is equipped with two tubular screwed pipe 3 perpendicularly, picture peg 1 inner wall upper portion corresponds to inlay before spacing has two bearings 5, the inner circle of two bearings 5 is fixed with two threaded rods 4 respectively, two threaded rods 4 respectively with the mutual screw-thread fit of two screwed pipe 3, the screwed pipe 3 that corresponds, threaded rod 4, bearing 5 is all coaxial.
Spacing preceding picture peg 1, spacing back picture peg 2, footboard 6 are made by stainless steel, and sturdy and durable, and corrosion resisting property is good, and spacing preceding picture peg 1 and spacing back picture peg 2 all are connected with footboard 6 through the welding. The lifting holes 7 are through holes with concave threads, and the lifting holes 7 can be screwed into a lifting threaded rod or directly penetrate through lifting ropes, so that the limiting front inserting plate 1 and the limiting rear inserting plate 2 can be conveniently lifted. Screwed pipe 3 and threaded rod 4 are made by stainless steel, and are sturdy and durable, and corrosion resisting property is good, and screwed pipe 3 all is connected with spacing back picture peg 2 through the welding. Bearing 5 is ball roller bearing, and bearing 5's outer lane all connects through welding and spacing preceding picture peg 1, and bearing 5's inner circle all is connected with threaded rod 4 through welding, so can ensure before spacing picture peg 1 and bearing 5's the motionless condition of outer lane under, let bearing 5's inner circle and threaded rod 4 can the free rotation to picture peg 1 and spacing back picture peg 2's distance before the adjustment is good.
This building site slot construction equipment can be at the inside rotatory threaded rod 4 of bearing 5 when using, with the suitable degree of depth in the 4 screw in threaded pipe 3 of two threaded rods, picture peg 1 before adjusting spacingly equals with spacing back picture peg 2 distance and slot width, then hammering footboard 6, picture peg 1 inserts the suitable degree of depth in underground respectively with spacing preceding picture peg 1 with spacing back picture peg 2, form the frame of slot, alright use excavator picture peg 1 before spacing and spacing back picture peg 2 in the middle of excavate the slot, construction efficiency is improved, and the roughness of guarantee slot bottom surface and side. This building site slot construction device can be spacing as the frame of building site slot construction, ensures to use the excavator to be under construction, ensures the roughness of trench bottom surface and side, improves work efficiency.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be able to cover the technical solutions and the inventive concepts of the present invention within the technical scope of the present invention.

Claims (6)

1. The utility model provides a building site slot construction equipment, a serial communication port, building site slot construction equipment includes that the same rectangular plate of size is spacing before picture peg (1) and spacing back picture peg (2), picture peg (1) and spacing back picture peg (2) top all are equipped with flat footboard (6) perpendicularly before spacing, all opened a plurality of lewis holes (7) on footboard (6), the inner wall upper portion of spacing back picture peg (2) is equipped with two tubular screwed pipe (3) perpendicularly, picture peg (1) inner wall upper portion corresponds before spacing inlays and has two bearings (5), the inner circle of two bearings (5) is fixed with two threaded rods (4) respectively, two threaded rods (4) respectively with two screwed pipe (3) each other screw-thread fit, screwed pipe (3) that correspond, threaded rod (4), bearing (5) are all coaxial.
2. A construction site trench construction device as set forth in claim 1, wherein: the limiting front inserting plate (1), the limiting rear inserting plate (2) and the pedal (6) are all made of stainless steel, and the limiting front inserting plate (1) and the limiting rear inserting plate (2) are connected with the pedal (6) through welding.
3. A construction site trench construction device as set forth in claim 1, wherein: the lifting holes (7) are through holes with concave threads.
4. A construction site trench construction device as set forth in claim 1, wherein: the threaded pipe (3) and the threaded rod (4) are both made of stainless steel, and the threaded pipe (3) is connected with the limiting rear inserting plate (2) through welding.
5. A construction site trench construction device as set forth in claim 1, wherein: the bearing (5) is a ball roller bearing, the outer ring of the bearing (5) is connected with the limiting front inserting plate (1) through welding, and the inner ring of the bearing (5) is connected with the threaded rod (4) through welding.
6. A method of using a construction site trench working device as claimed in claim 1, comprising the steps of:
s1: rotating the threaded rods (4) in the bearings (5), screwing the two threaded rods (4) into the threaded pipes (3) to a proper depth, and adjusting the distance between the limiting front inserting plate (1) and the limiting rear inserting plate (2) to be equal to the width of the groove;
s2: then hammering the pedal (6), inserting the limiting front inserting plate (1) and the limiting rear inserting plate (2) into the ground to a proper depth respectively to form a frame of a groove, and digging out the groove between the limiting front inserting plate (1) and the limiting rear inserting plate (2) by using an excavator.
CN202111259363.3A 2021-10-28 2021-10-28 Construction device for construction site groove and using method Pending CN113931200A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111259363.3A CN113931200A (en) 2021-10-28 2021-10-28 Construction device for construction site groove and using method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111259363.3A CN113931200A (en) 2021-10-28 2021-10-28 Construction device for construction site groove and using method

Publications (1)

Publication Number Publication Date
CN113931200A true CN113931200A (en) 2022-01-14

Family

ID=79284580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111259363.3A Pending CN113931200A (en) 2021-10-28 2021-10-28 Construction device for construction site groove and using method

Country Status (1)

Country Link
CN (1) CN113931200A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH351234A (en) * 1956-05-11 1960-12-31 Heidbreder Gustav Method and device for bracing construction pits, in particular sewer trenches
US5720580A (en) * 1995-12-22 1998-02-24 Kvh Verbautechnik Gmbh Apparatus for and method of shoring a trench
EP2261424A2 (en) * 2009-06-10 2010-12-15 SBH TIEFBAUTECHNIK GmbH Shoring box for shoring trenches
CN206667268U (en) * 2017-03-31 2017-11-24 中交第二航务工程局有限公司 A kind of device for channel excavation supporting
CN210658381U (en) * 2019-09-02 2020-06-02 侯书兰 Detachable temporary support for constructional engineering construction
CN211200406U (en) * 2019-11-11 2020-08-07 中铁建苏州设计研究院有限公司 Pipeline slot supporting device
CN112411562A (en) * 2020-11-04 2021-02-26 河南五建建设集团有限公司 Detachable foundation pit supporting structure and using method thereof
CN113136876A (en) * 2021-03-19 2021-07-20 中国建筑第八工程局有限公司 Construction method of pipe trench
CN214328893U (en) * 2021-01-15 2021-10-01 李永光 Deep foundation pit supporting structure
CN113463649A (en) * 2021-06-24 2021-10-01 湖南新禹规划设计有限公司 Groove excavation foundation pit supporting device and construction method
CN214363522U (en) * 2020-11-16 2021-10-08 唐德尧 Corrugated steel sheet pile for anti-collapse support in municipal pipeline groove excavation

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH351234A (en) * 1956-05-11 1960-12-31 Heidbreder Gustav Method and device for bracing construction pits, in particular sewer trenches
US5720580A (en) * 1995-12-22 1998-02-24 Kvh Verbautechnik Gmbh Apparatus for and method of shoring a trench
EP2261424A2 (en) * 2009-06-10 2010-12-15 SBH TIEFBAUTECHNIK GmbH Shoring box for shoring trenches
CN206667268U (en) * 2017-03-31 2017-11-24 中交第二航务工程局有限公司 A kind of device for channel excavation supporting
CN210658381U (en) * 2019-09-02 2020-06-02 侯书兰 Detachable temporary support for constructional engineering construction
CN211200406U (en) * 2019-11-11 2020-08-07 中铁建苏州设计研究院有限公司 Pipeline slot supporting device
CN112411562A (en) * 2020-11-04 2021-02-26 河南五建建设集团有限公司 Detachable foundation pit supporting structure and using method thereof
CN214363522U (en) * 2020-11-16 2021-10-08 唐德尧 Corrugated steel sheet pile for anti-collapse support in municipal pipeline groove excavation
CN214328893U (en) * 2021-01-15 2021-10-01 李永光 Deep foundation pit supporting structure
CN113136876A (en) * 2021-03-19 2021-07-20 中国建筑第八工程局有限公司 Construction method of pipe trench
CN113463649A (en) * 2021-06-24 2021-10-01 湖南新禹规划设计有限公司 Groove excavation foundation pit supporting device and construction method

Similar Documents

Publication Publication Date Title
CN104480974B (en) Reverse seepage drain system suitable for upstream type tailings pond and upstream type tailings pond
CN103924602B (en) Deep Thick Soft Ground foundation ditch construction method
CN107938683A (en) One kind tilts pile pit supporting construction and its construction method
CN103290848A (en) Large diameter arc-shaped steel sheet pile combined foundation pit retaining structure and construction method thereof
CN108661073A (en) A kind of barrier wall structure and its construction method
CN206204972U (en) A kind of prefabricated tubular pile as well-points dewatering
CN105625420A (en) Extension type manual hole digging pile support structure and construction method thereof
CN208934002U (en) A kind of barrier wall structure
CN206706774U (en) Larsen steel plate matches somebody with somebody i shaped steel foundation ditch sealing support system
CN205688454U (en) Power transmission tower resistance to plucking well foundation
CN113931200A (en) Construction device for construction site groove and using method
CN214194751U (en) Intercepting drain structure suitable for steep rock slope
CN207775898U (en) A kind of inclination pile pit supporting construction
CN211395652U (en) Steel-pipe pile foundation reinforced structure
CN203795437U (en) Reinforced steel plate pile foundation pit
CN206941573U (en) Artificial digging pile
CN207700198U (en) A kind of advanced support supporting construction
CN1053246C (en) Construction method and device using large open caisson lowering water level in high-storied buiding and under ground engineering
CN206438524U (en) A kind of geomembrane steel framework cofferdam structure
CN204875665U (en) A power station tailrace barricade that is used for medium thickness sand gravel basis
CN206396744U (en) A kind of cast-in-place concrete pile stake core
CN110130398A (en) A kind of piping lane system and its construction method that multistage support is combined with main structure
CN215948243U (en) Deep foundation pit drainage structure
CN215629984U (en) Desert area photovoltaic pile foundation construction equipment
CN212534122U (en) Foundation ditch concrete supporting construction for water conservancy construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20220114