CN215629984U - Desert area photovoltaic pile foundation construction equipment - Google Patents

Desert area photovoltaic pile foundation construction equipment Download PDF

Info

Publication number
CN215629984U
CN215629984U CN202121970227.0U CN202121970227U CN215629984U CN 215629984 U CN215629984 U CN 215629984U CN 202121970227 U CN202121970227 U CN 202121970227U CN 215629984 U CN215629984 U CN 215629984U
Authority
CN
China
Prior art keywords
water injection
pile foundation
water
pipe
foundation construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121970227.0U
Other languages
Chinese (zh)
Inventor
温世博
彭江
陶龙志
周顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Tofly New Energy Technology Co ltd
Original Assignee
Suzhou Tofly New Energy Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Tofly New Energy Technology Co ltd filed Critical Suzhou Tofly New Energy Technology Co ltd
Priority to CN202121970227.0U priority Critical patent/CN215629984U/en
Application granted granted Critical
Publication of CN215629984U publication Critical patent/CN215629984U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model relates to the technical field of pile foundation construction devices, in particular to a photovoltaic pile foundation construction device in a desert area. According to the utility model, through the matching of the water storage tank, the water guide pipe, the movable valve, the connecting pipe, the water injection pipe and the water injection hole, a water source is conveniently injected into the rotating column when the device is used for drilling in a construction process, so that the device can be ensured to be injected and dug at the same time, the collapse of sand is avoided, the practicability of the device is effectively increased, and the use effect of the device is increased.

Description

Desert area photovoltaic pile foundation construction equipment
Technical Field
The utility model relates to the technical field of pile foundation construction devices, in particular to a photovoltaic pile foundation construction device in a desert area.
Background
The land of desert area constitutes for sand or quicksand basically, and the degree of difficulty is great when the photovoltaic power plant foundation construction, and takes place easily that the settlement leads to the fact photovoltaic support to warp, subassembly skew and then influence the generated energy, causes economic loss.
And the operation degree of difficulty is great when pouring the stake to desert area in the past and executing the frock, adopt the watering to fix sand and swim soon to dig the mode that combines together and carry out the pore-forming, take dado and pipeline mode behind the pore-forming and pour, but inconvenient to the rotatory hole digging of device and water injection combine, device result of use is not good, and adopt the pile foundation to pour and adopt the pipeline method, during the result of use of guarantee device, need pour the pipe and take out on one side, this just needs the staff to move about the pipe, staff working strength is great, inconvenient utilization device is poured the work, device result of use is comparatively limited, consequently need to design a desert area photovoltaic pile foundation construction equipment and solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a photovoltaic pile foundation construction device in a desert area, and aims to solve the problems that when the device provided by the background technology is used, the device is inconvenient to carry out mutual combination of rotary pit digging and water injection, the device is inconvenient to play a role in helping pouring work, and the using effect of the device is poor.
In order to achieve the purpose, the utility model provides the following technical scheme:
the utility model provides a desert area photovoltaic pile foundation construction equipment, includes:
the device comprises a frame body, wherein the frame body comprises a hoisting device, the surface of the hoisting device is movably connected with a movable arm, the surface of the movable arm is connected with a water injection chamber, the top end of the water injection chamber is connected with a motor, and the output end of the motor is movably connected with a rotating column;
the water injection mechanism comprises a water storage tank, a water guide pipe, a movable valve, a connecting pipe, a water injection pipe and a water injection hole, the surface of the hoisting device is connected with the water injection mechanism, and the surface of the hoisting device is connected with the water storage tank;
moving mechanism, moving mechanism includes first pivot, upper junction plate, the stake of punching, second pivot, lower connecting plate and rotary rod, the surperficial swing joint of column spinner has moving mechanism, the surface of column spinner is connected with first pivot, the surface of first pivot is connected with the upper junction plate, the column spinner is inserted and is established and be connected with the stake of punching.
Preferably, the surface of the water storage tank is connected with a water guide pipe, the surface of the water guide pipe is connected with a movable valve, the surface of the movable valve is connected with a connecting pipe, the connecting pipe is sleeved with a water injection pipe, and the surface of the rotary column is provided with a water injection hole.
Preferably, the inner side of the water injection chamber is fixedly connected with a water injection pipe, and the rotating column is connected with the water injection pipe in a penetrating manner.
Preferably, the rotating column is connected with a water injection chamber in a penetrating manner, and the water injection holes are uniformly distributed on the surface of the rotating column.
Preferably, the surface of the punching pile is connected with a second rotating shaft, the surface of the second rotating shaft is connected with a lower connecting plate, a fixing groove is formed in the inner side of the lower connecting plate, a rotating groove is formed in the surface of the upper connecting plate, a rotating rod is movably connected to the inner side of the rotating groove, a first rotating tooth block is connected to the surface of the lower connecting plate, and a second rotating tooth block is connected to the surface of the rotating column.
Preferably, the upper connecting plate is inserted into and connected to the inner side of the fixing groove, and the rotating rod is connected with the fixing groove in a penetrating manner.
Compared with the prior art, the utility model has the beneficial effects that:
1. through the cooperation of storage water tank, aqueduct, movable valve, connecting pipe, water injection pipe and water injection hole, be convenient for to the device when being under construction drilling to the rotation column inboard injection water source to the guarantee device can pour into hole on one side, thereby avoids subside of sand ground, effectively increases the practicality of device, increases the result of use of device.
2. Through first pivot, the upper junction plate, the stake punches, the second pivot, the lower junction plate, the fixed slot, the swivelling chute, the rotary rod, the cooperation of first rotatory tooth piece and the rotatory tooth piece of second, the movable rotary rod of being convenient for, thereby be convenient for separate the connection of the stake of punching and rotatory post, thereby be convenient for the staff with the bottom connection of rotatory post need draw the pipe, thereby effectively reduce staff working strength, effectively increase the convenience of device, increase the application range of device.
Drawings
FIG. 1 is a schematic front view, partially in section, of the present invention;
FIG. 2 is an enlarged schematic view of FIG. 1 at A according to the present invention;
FIG. 3 is a schematic sectional front view of the upper connecting plate of FIG. 1 according to the present invention;
fig. 4 is a schematic top view of the lower connecting plate of fig. 3 according to the present invention.
In the figure: 1. a frame body; 11. a hoisting device; 12. a movable arm; 13. a water injection chamber; 14. a motor; 15. a spin column; 2. a water injection mechanism; 21. a water storage tank; 22. a water conduit; 23. a movable valve; 24. a connecting pipe; 25. a water injection pipe; 26. a water injection hole; 3. a movable mechanism; 31. a first rotating shaft; 32. an upper connecting plate; 33. punching piles; 34. a second rotating shaft; 35. a lower connecting plate; 36. fixing grooves; 37. a rotating tank; 38. rotating the rod; 39. a first rotating block; 310. a second rotating block.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, an embodiment of the present invention is shown:
the utility model provides a desert area photovoltaic pile foundation construction equipment, includes:
the frame comprises a frame body 1, wherein the frame body 1 comprises a hoisting device 11, the surface of the hoisting device 11 is movably connected with a movable arm 12, the surface of the movable arm 12 is connected with a water injection chamber 13, the top end of the water injection chamber 13 is connected with a motor 14, and the output end of the motor 14 is movably connected with a rotating column 15;
the water injection mechanism 2, the water injection mechanism 2 includes the water storage tank 21, the aqueduct 22, the movable valve 23, the joint pipe 24, the water injection pipe 25 and the water injection hole 26, the surface of the hoisting device 11 connects with the water injection mechanism 2, the surface of the hoisting device 11 connects with the water storage tank 21;
moving mechanism 3, moving mechanism 3 includes first pivot 31, upper junction plate 32, the stake 33 punches, second pivot 34, lower connecting plate 35 and rotary rod 38, the surperficial swing joint of column spinner 15 has moving mechanism 3, the surface of column spinner 15 is connected with first pivot 31, the surface of first pivot 31 is connected with upper junction plate 32, column spinner 15 inserts and establishes and is connected with the stake 33 that punches, there is second pivot 34 through the surface connection of the stake 33 that punches, thereby the guarantee punches and can not drive the rotation of connecting plate 35 down when stake 33 is rotatory.
Further, the surface of the water storage tank 21 is connected with a water guide pipe 22, the surface of the water guide pipe 22 is connected with a movable valve 23, the surface of the movable valve 23 is connected with a connecting pipe 24, the connecting pipe 24 is sleeved with a water injection pipe 25, a water injection hole 26 is formed in the surface of the rotary column 15, and the movable valve 23 is moved, so that water conveyed by the water guide pipe 22 can be conveniently controlled to enter the inner side of the connecting pipe 24.
Further, the inboard fixedly connected with water injection pipe 25 of water injection room 13, column spinner 15 through connection have water injection pipe 25, seal a festival length of column spinner 15 through water injection pipe 25 to be convenient for to the inboard injected water of column spinner 15.
Further, the column spinner 15 through connection has the hydroecium 13, and water injection hole 26 evenly distributed is on the surface of column spinner 15, and through to the inboard injected water of water injection pipe 25, water passes through the water injection hole 26 that the column spinner 15 surface was seted up, can enter into the column spinner 15 inboardly to enter into the inboard of the stake 33 that punches, what the bottom surface of the stake 33 that punches was seted up has the through-hole, thereby makes its rivers go out.
Further, the surface of the punching pile 33 is connected with a second rotating shaft 34, the surface of the second rotating shaft 34 is connected with a lower connecting plate 35, a fixing groove 36 is formed in the inner side of the lower connecting plate 35, a rotating groove 37 is formed in the surface of the upper connecting plate 32, a rotating rod 38 is movably connected to the inner side of the rotating groove 37, a first rotating tooth block 39 is connected to the surface of the lower connecting plate 35, the surface of the rotating column 15 is connected with a second rotating tooth block 310, the rotating groove 37 formed in the inner side of the upper connecting plate 32 is movably connected through the rotating rod 38 in a rotating mode, and therefore the upper connecting plate 32 and the lower connecting plate 35 can be connected.
The working principle is as follows: when the device is used, thereby the activity of the water injection room 13 is driven in the start through the digging arm 12, through the start of motor 14, thereby drive the rotation of column spinner 15, store the construction through storage water tank 21, pass through aqueduct 22, through activity valve 23, thereby control construction water passes through the inboard that connecting pipe 24 enters into the water injection pipe 25 of column spinner 15, thereby enter into the inboard of column spinner 15 through water injection hole 26, thereby enter into the inboard of the stake 33 that punches, the through-hole has been seted up on the surface of the stake 33 bottom of punching, thereby carry out the water injection simultaneously when the stake 33 that punches drills to ground, thereby effectively ensure the practicality of device, effectively increase the result of use of device.
Through the rotation of column spinner 15, thereby make the first rotatory tooth piece 39 of second rotatory tooth piece 310 meshing, thereby it rotates to drive the stake 33 that punches, thereby punch to ground, through rotatory rotary rod 38, thereby make rotary rod 38 no longer run through upper junction plate 32 and fixed slot 36, rotary rod 38 and swivelling chute 37 separate, thereby make the connection of upper junction plate 32 and lower connecting plate 35 no longer fixed, through pulling down lower junction plate 35, thereby make stake 33 and column spinner 15 separate, at this moment, the staff of being convenient for is through connecting the bottom of column spinner 15 to the pipe with ground watering through instruments such as guy rope, through the activity of control activity arm 12, thereby stretch the pipe, thereby effectively reduce staff's working strength, increase the application range of device, the convenience of device has been improved.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a desert area photovoltaic pile foundation construction equipment which characterized in that includes:
the frame comprises a frame body (1), wherein the frame body (1) comprises a hoisting device (11), the surface of the hoisting device (11) is movably connected with a movable arm (12), the surface of the movable arm (12) is connected with a water injection chamber (13), the top end of the water injection chamber (13) is connected with a motor (14), and the output end of the motor (14) is movably connected with a rotating column (15);
the water injection mechanism (2), the water injection mechanism (2) comprises a water storage tank (21), a water guide pipe (22), a movable valve (23), a connecting pipe (24), a water injection pipe (25) and a water injection hole (26), the water injection mechanism (2) is connected to the surface of the hoisting device (11), and the water storage tank (21) is connected to the surface of the hoisting device (11);
moving mechanism (3), moving mechanism (3) include first pivot (31), upper junction plate (32), the stake (33) that punches, second pivot (34), lower connecting plate (35) and rotary rod (38), the surperficial swing joint of column spinner (15) has moving mechanism (3), the surface of column spinner (15) is connected with first pivot (31), the surface of first pivot (31) is connected with upper junction plate (32), column spinner (15) are inserted and are established and are connected with the stake (33) that punches.
2. The desert area photovoltaic pile foundation construction device of claim 1, characterized in that: the surface of storage water tank (21) is connected with aqueduct (22), the surface of aqueduct (22) is connected with movable valve (23), the surface of movable valve (23) is connected with connecting pipe (24), water injection pipe (25) have been cup jointed in connecting pipe (24), water injection hole (26) have been seted up on the surface of column spinner (15).
3. The desert area photovoltaic pile foundation construction device of claim 1, characterized in that: the inner side of the water injection chamber (13) is fixedly connected with a water injection pipe (25), and the rotating column (15) is connected with the water injection pipe (25) in a penetrating manner.
4. The desert area photovoltaic pile foundation construction device of claim 1, characterized in that: the rotating column (15) is connected with a water injection chamber (13) in a penetrating mode, and the water injection holes (26) are evenly distributed on the surface of the rotating column (15).
5. The desert area photovoltaic pile foundation construction device of claim 1, characterized in that: the surface of stake (33) of punching is connected with second pivot (34), the surface of second pivot (34) is connected with down connecting plate (35), fixed slot (36) have been seted up to the inboard of connecting plate (35) down, swivelling chute (37) have been seted up on the surface of upper junction plate (32), the inboard swing joint of swivelling chute (37) has rotary rod (38), the surface of connecting plate (35) is connected with first rotatory tooth piece (39) down, the surface of column spinner (15) is connected with second rotatory tooth piece (310).
6. The desert area photovoltaic pile foundation construction device of claim 1, characterized in that: the upper connecting plate (32) is inserted and connected to the inner side of the fixing groove (36), and the rotating rod (38) is connected with the fixing groove (36) in a penetrating mode.
CN202121970227.0U 2021-08-20 2021-08-20 Desert area photovoltaic pile foundation construction equipment Active CN215629984U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121970227.0U CN215629984U (en) 2021-08-20 2021-08-20 Desert area photovoltaic pile foundation construction equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121970227.0U CN215629984U (en) 2021-08-20 2021-08-20 Desert area photovoltaic pile foundation construction equipment

Publications (1)

Publication Number Publication Date
CN215629984U true CN215629984U (en) 2022-01-25

Family

ID=79900309

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121970227.0U Active CN215629984U (en) 2021-08-20 2021-08-20 Desert area photovoltaic pile foundation construction equipment

Country Status (1)

Country Link
CN (1) CN215629984U (en)

Similar Documents

Publication Publication Date Title
CN203801236U (en) Digging machine for planting, rotatably digging and injecting water in desert
CN203840727U (en) Double-steering rotary excavating and water injecting integrated drill bit for desert tree planting
CN205975756U (en) Multi -functional novel ditching pipelayer
CN107172922A (en) A kind of self-balancing planting tree digging apparatus
CN105442589B (en) The compound piling machinery of one-shot forming strength core
CN209498106U (en) A kind of afforestation project planting of plants device
CN215629984U (en) Desert area photovoltaic pile foundation construction equipment
CN202998806U (en) V-shaped tree pit digging machine drilling head
CN217470714U (en) Digging and backfilling integrated desert tree planting device
CN213508317U (en) Hydraulic engineering construction supports protector
CN108184621A (en) It is a kind of based on the soapberry of lifting technology deep layer irrigation rig
CN201495988U (en) pit boring machine hung on wheeled tractor
CN219803030U (en) Auxiliary pit digging device for seedling cultivation
CN101629471B (en) Pot hole drilling and digging machine carried on wheel type tractor
CN211948272U (en) Hydraulic engineering construction supports protector
CN215601840U (en) Digging device for landscaping
CN218550623U (en) Multi-adaptability riverbank vegetation restoration planting device
CN216689357U (en) Embedding device for horizontal drainage channel in soft soil underground space construction
CN220888621U (en) Eleven-shaft cement soil impervious wall pile machine
CN211090534U (en) Planting device for tree planting
CN204225177U (en) One leads wall chase automatic excavator continuously
CN214657335U (en) Irrigation canals and ditches excavating gear is used in hydraulic and hydroelectric engineering construction
CN213205053U (en) Water conservancy and hydropower engineering construction expropriation outside migration people centralized arrangement house
CN217364389U (en) Multi-functional hydraulic engineering irrigation equipment that uses
CN216892340U (en) Hydraulic engineering foundation detection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant