CN1138902C - Guide rail synchronous raise scaffold and its using method - Google Patents

Guide rail synchronous raise scaffold and its using method Download PDF

Info

Publication number
CN1138902C
CN1138902C CNB971088136A CN97108813A CN1138902C CN 1138902 C CN1138902 C CN 1138902C CN B971088136 A CNB971088136 A CN B971088136A CN 97108813 A CN97108813 A CN 97108813A CN 1138902 C CN1138902 C CN 1138902C
Authority
CN
China
Prior art keywords
guide
rail
piece
fixed
fixed guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNB971088136A
Other languages
Chinese (zh)
Other versions
CN1188173A (en
Inventor
沈海晏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Techen Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNB971088136A priority Critical patent/CN1138902C/en
Publication of CN1188173A publication Critical patent/CN1188173A/en
Application granted granted Critical
Publication of CN1138902C publication Critical patent/CN1138902C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The present invention relates to a synchronous raise scaffold of a guide rail, which comprises a frame body 2, a guide rail frame 1 fixedly connected with the frame body 2, a fixed guide component 4 connected with the sliding bush of the guide rail frame 1, and a fastening piece 3 for fixing the guide component 4 to a building. The synchronous raise scaffold of a guide rail has the following advantages of strong versatility: the present invention can be suitable for building periphery such as a beam slab or a shear wall or other structures, the raise stroke at every time is changed according to the different story heights of the building, and the numbers and the heights of function layers are flexibly arranged according to construction needs, high stability, stable raise process, simple raise and fixation process of the scaffold, convenient operation, low cost, simple processing, small steel consumption, convenient transportation, good stiffness, small deformation and large load bearing.

Description

Guide rail synchronous raise scaffold and using method thereof
Technical field
The present invention relates to building engineering equipment, more particularly, relate to a kind of raise scaffold and using method thereof that is used for high-building construction.
Background technology
In high-building construction,, therefore be widely adopted at present because the more traditional fixed outrigger of raise scaffold has multiple advantages such as the lot of materials of saving.A kind of raise scaffold is disclosed in the Chinese patent CN2119459U document, one side double as rail guide piece of its support body load frame, this member can move in the guiding device of band open slot to realize the lifting of this device, because its longitudinal size is subjected to the restriction of production technology, a lifting of this scaffold can only be the height between two springboards; The side of load frame slides in gathering sill, and this gathering sill is an opening, and then the anti-power of tumbling of framework is relatively poor, and stability is also bad.In addition, its lifting program complexity, cost is higher, and versatility is relatively poor.
Summary of the invention
The object of the present invention is to provide a kind of guide rail synchronous raise scaffold, this guide rail synchronous raise scaffold can overcome the above-mentioned shortcoming of prior art, characteristics such as have versatility and good stability is simple to operate, and cost is lower.
Another object of the present invention is to provide a kind of using method of guide rail synchronous raise scaffold, utilize this method, the advantage of above-mentioned guide rail synchronous raise scaffold be can fully effectively utilize, its good versatility and good stability, simple to operate, characteristics such as cost is lower realized.
The object of the present invention is achieved like this, construct a kind of guide rail synchronous raise scaffold, comprise the support body, the rail guide piece of fixedlying connected formed by various material, and the fixed guide of rail guide piece flexible connection and fixed guide is fixed on securing member on the building with support body, described rail guide piece can be along its axial elongation, and axially can connect the described support body of multilayer along it, two members that are connected to of described rail guide piece and fixed guide are slidingly connected along the semi-enclosed of axial rhampotheca of rail guide piece.Between rail guide piece and fixed guide, be provided with the temporary fixing piece that when guide rail is static, the vertical load of guide rail is delivered to fixed guide.
Guide rail synchronous raise scaffold of the present invention, its feature are that also described rail guide piece and fixed guide can be such, and the cross section of rail guide piece is the T type, and two edges of a wing of its T type are inserted in the fairlead of fixed guide.
Guide rail synchronous raise scaffold of the present invention, its feature are that also described rail guide piece and fixed guide can be such, and the cross section of rail guide piece is the rectangular aperture cover, and the guide pad on the fixed guide is enclosed in the opening sleeve.
The present invention uses the method for described guide rail synchronous raise scaffold, and its installation and lifting may further comprise the steps:
With securing member several fixed guide are installed on the building;
Make and be connected with the fixed guide sliding sleeve with the fixedly connected rail guide piece of support body and temporary fixed by pipe collar fastener or latch temporary fixing piece;
On the building fixed guide is being installed again above existing several fixed guide, with the fixed guide at this top or the suspender member on the building of other position, installed again as sling point;
Carry support body with lifting means and remove temporary fixing piece between rail guide piece or support body and the fixed guide, start lifting means support body is risen;
Rail guide piece and support body just can rise along fixed guide, rise to certain altitude and the rail guide piece top is connected with the fixed guide sliding sleeve of the top;
Continuation rises to the height that needs with support body together with rail guide piece;
Again use described temporary fixing piece that rail guide piece or support body and fixed guide is together temporary fixed;
Move or remove lifting means.
The present invention uses the method for described guide rail synchronous raise scaffold, and its decline process may further comprise the steps:
, carry support body with lifting means and remove pipe collar fastener or latch temporary fixing piece between rail guide piece or support body and the fixed guide as sling point with fixed guide or the suspender member on the building of other position, installed, start lifting means support body is descended;
Rail guide piece and support body descend along fixed guide, drop to certain altitude and a fixed guide is installed on the building below the shelf again, constantly descend and rail guide piece bottom is connected with fixed guide sliding sleeve;
Continuation drops to the height that needs with support body together with rail guide piece;
Again use described temporary fixing piece that rail guide piece or support body and fixed guide is together temporary fixed;
Move or remove lifting means.
Implement guide rail synchronous raise scaffold of the present invention, have following advantage: the one, highly versatile no matter architecture enclosing is structures such as beam slab or shearing are strong, all can use; And each lifting travel is the amount doesn't matter, can satisfy the variation of the different floor heights of building, and the work layer number of plies and floor height can be provided with flexibly according to the construction needs; The 2nd, good stability, shelf are in lifting process, and because of inside and outside or tilt and be subjected to only allowing the restriction of micro-displacement, so lifting is steadily stable; The 3rd, the lifting of shelf and fixation procedure are simple and easy to operate; The 4th, cost is lower, and the processing of workpieces such as guide rail and fixed guide is simple, and steel quantity consumption is little, and is convenient to transportation, and all the other most of materials are working versatile material; The 5th, stiffness is good, is out of shape for a short time, and carrying is big, and because of guide rail is connected with support body and forms space truss structure, the stiffness of guide rail and support body is all bigger, so the sidesway of shelf etc. is out of shape for a short time, and supporting capacity is big.
In conjunction with the accompanying drawings and embodiments, further specify characteristics of the present invention.
Description of drawings
Fig. 1 is the structure side schematic view of guide rail synchronous raise scaffold of the present invention.
Fig. 2 is the structural representation behind the support body rising first floor of guide rail synchronous raise scaffold of the present invention.
Fig. 3 is guide rail and the fixed guide joint construction schematic diagram of guide rail synchronous raise scaffold embodiment of the present invention.
Fig. 4 be along A-A among Fig. 3 to sectional view.
Fig. 5 is the guide rail of guide rail synchronous raise scaffold second embodiment of the present invention and the schematic diagram of fixed guide joint construction.
Fig. 6 be along B-B among Fig. 5 to sectional view.
Fig. 7-the 8th, guide rail synchronous raise scaffold the 3rd embodiment middle guide of the present invention and fixed guide joint construction schematic diagram.
Fig. 9-the 10th, guide rail synchronous raise scaffold the 4th embodiment middle guide of the present invention and fixed guide joint construction schematic diagram.
Figure 11-the 12nd, guide rail synchronous raise scaffold the 5th embodiment middle guide of the present invention and fixed guide joint construction schematic diagram.
Figure 13-the 14th, guide rail synchronous raise scaffold the 6th embodiment middle guide of the present invention and fixed guide joint construction schematic diagram.
The specific embodiment
In the guide rail synchronous raise scaffold of the present invention shown in Fig. 1 and Fig. 2, rail guide piece 1 and be fixed together by the support body 2 that multiple material connects to form, with securing member 3 fixed guide 4 is fixed on the building, for sliding sleeve is connected, and sliding sleeve connects and can have multiple joint construction and (sees for details hereinafter to reach and see Fig. 3-Figure 12) between guide rail 1 and the fixed guide 4.
Fig. 3-Fig. 4 shows first embodiment of the invention middle guide and fixed guide joint construction situation.As shown in Figure 3 and Figure 4, the cross section of rail guide piece 1 is the T type, and two edges of a wing 5 of its T type are inserted in the opening sleeve 6 of fixed guide spare 1, thereby realizes that sliding sleeve connects.
Fig. 5-Fig. 6 shows second embodiment of the invention middle guide and fixed guide joint construction situation.As shown in Figure 5 and Figure 6, the cross section of rail guide piece 1 is a rectangular aperture cover 7, and the guide pad 8 on the fixed guide 4 is enclosed in the opening sleeve 7 of rail guide piece 1, can realize that equally sliding sleeve connects.
Fig. 7-8 shows third embodiment of the invention middle guide and fixed guide joint construction schematic diagram.Wherein, Fig. 7 is a vertical view, Fig. 8 is a lateral view, as seen from the figure, described rail guide piece 1 is to be provided with like this with fixed guide 4, described rail guide piece 1 is for to be provided with two steel pipes that are parallel to each other 11, but described fixed guide 4 is provided with the guide pad 12 of chuck between two steel pipes that are parallel to each other 11, thereby realizes that sliding sleeve connects.
Fig. 9-10 shows fourth embodiment of the invention middle guide and fixed guide joint construction schematic diagram.Wherein, Fig. 9 is a vertical view, and Figure 10 is a lateral view.As seen in Fig., described rail guide piece 1 is to be provided with like this with fixed guide 4, the cross section of described rail guide piece is the shaped steel spare 13 of Contraband shape, and described fixed guide 4 is provided with can insert described rail guide piece 1 Contraband tee section shaped steel spare 13
Figure C9710881300103
Shape gathering sill 14.
Figure 11-12 shows fifth embodiment of the invention middle guide and fixed guide joint construction schematic diagram.Wherein, Figure 11 is a vertical view, Figure 12 is a lateral view, as seen from the figure, described rail guide piece 1 is to be provided with like this with fixed guide 4, described rail guide piece 1 is provided with the steel pipe fitting 15 of forming T type two edges of a wing, and described fixed guide 4 is provided with the fairlead 17 of the steel pipe fitting 15 on T type two edges of a wing of inserting described rail guide piece 1 that surrounded by runner 16.
Figure 13-the 14th illustrates the schematic diagram of securing member in the guide rail synchronous raise scaffold of the present invention.Wherein, Figure 13 is a vertical view, and Figure 14 is a lateral view, and as shown in the figure, securing member 3 can be the tie spare 18 that is connected with fixed guide 4.Securing member 3 can also be a bolt and nut component.
Use is such: during construction, the needs with the exterior decoration engineering of increasing along with building, support body 2 can rise or descend together with rail guide piece 1 along fixed guide 4, after stopping when rising or descending, available pipe collar fastener or latch temporary fixing piece are together temporary fixed with fixed guide 4 with rail guide piece 1 and support body 2, like this, support body 2 just has been fixed on the building.Lifting process is such: a fixed guide 4 is installed again, with the fixed guide 4 at this top or on other local building suspender member is installed again, as sling point on building above former mounted several fixed guide 4; Promote support body 2 with lifting means 10 (as manual or electric block), and the temporary fixing piece between dismounting rail guide piece 1 and the fixed guide 4, rail guide piece 1 and support body 2 just can rise along fixed guide 4, rise to certain altitude and rail guide piece 1 top is connected with fixed guide 4 sliding sleeves of the top, after continuation rises to the height that needs with support body 2 together with rail guide piece 1, again with temporary fixing piece that rail guide piece 1 and fixed guide 4 is together temporary fixed, at this moment, the lifting means 10 of dismantling, just finished the once lifting of scaffold, like this, whole scaffold has just entered the new duty than higher level before promoting.Repeat said process, scaffold just can progressively rise, and after building binds, above process is reversed, and scaffold is descended, and is used to carry out the construction of building exterior decoration engineering, gets back to initial infield until scaffold.
The decline process of this scaffold may further comprise the steps: with fixed guide 4 or the suspender member on the building of other position, installed as sling point, put forward pipe collar fastener or the latch temporary fixing piece that support body 2 is removed between rail guide piece 1 or support body 2 and the fixed guide 4 with lifting means 10, start lifting means support body 2 is descended; Rail guide piece 1 and support body 2 just can descend along fixed guide 4, drop to certain altitude and a fixed guide 4 is installed on the building below the shelf again, constantly descend and rail guide piece 1 bottom is connected with fixed guide 4 sliding sleeves of below, continuation drops to the height that needs with support body 2 together with rail guide piece 1, and is with temporary fixing piece that rail guide piece 1 or support body 2 is together temporary fixed with fixed guide 4 again; Move or remove lifting means 10.

Claims (10)

1, a kind of guide rail synchronous raise scaffold, comprise the support body (2), the rail guide piece (1) of fixedlying connected formed by various material, and the fixed guide (4) of rail guide piece (1) flexible connection, fixed guide (4) be fixed on securing member (3) on the building with support body (2), it is characterized in that: described rail guide piece (1) can be along its axial elongation, and axially can connect the described support body of multilayer (2) along it, described rail guide piece (1) and fixed guide (4) be connected to two members along rail guide piece (1) axially mutually the semi-enclosed of rhampotheca be slidingly connected; Between rail guide piece 1 and fixed guide (4), be provided with the temporary fixing piece that when guide rail is static, the vertical load of guide rail (1) is delivered to fixed guide (4).
2, guide rail synchronous raise scaffold as claimed in claim 1, it is characterized in that: described rail guide piece (1) is to be provided with like this with being slidingly connected of fixed guide (4), the cross section of rail guide piece (1) is a T shape, and fixed guide (4) is provided with can be for being inserted in the fairlead (6) on rail guide piece (1) T shape two edges of a wing, cross section (5).
3, guide rail synchronous raise scaffold as claimed in claim 1, it is characterized in that: described rail guide piece (1) is to be provided with like this with being slidingly connected of fixed guide (4), the cross section of rail guide piece (1) is rectangular aperture cover (7), and fixed guide (4) is provided with can be for the guide pad (8) in the opening sleeve (7) that is inserted in rail guide piece (1).
4, guide rail synchronous raise scaffold as claimed in claim 1, it is characterized in that: described rail guide piece (1) is to be provided with like this with being slidingly connected of fixed guide (4), for to be provided with two steel pipes that are parallel to each other (11), fixed guide (4) is provided with can be by the guide pad (12) of chuck between (1) two steel pipe that is parallel to each other of rail guide piece (11) for rail guide piece (1).
5, guide rail synchronous raise scaffold as claimed in claim 1, it is characterized in that: described rail guide piece (1) is to be provided with like this with being slidingly connected of fixed guide (4), the cross section of rail guide piece (1) is the shaped steel spare (13) of Contraband shape, and it can be the shaped steel spare (13) of Contraband shape for the cross section of being inserted in rail guide piece (1) that fixed guide (4) is provided with
Figure C9710881300033
Shape gathering sill (14).
6, guide rail synchronous raise scaffold as claimed in claim 1, it is characterized in that: described rail guide piece (1) is to be provided with like this with being slidingly connected of fixed guide (4), rail guide piece (1) is provided with the steel pipe fitting (15) of forming its T section two edges of a wing, and fixed guide (4) is provided with the fairlead (17) for the steel pipe fitting (15) on T shape two edges of a wing of being inserted in rail guide piece (1) that is surrounded by runner (16).
7, guide rail synchronous raise scaffold as claimed in claim 1 is characterized in that: described securing member (3) is a bolt and nut component.
8, guide rail synchronous raise scaffold as claimed in claim 1 is characterized in that: described securing member (3) is the tie spare (18) that is connected with fixed guide (4).
9, a kind of method of using according to the described guide rail synchronous raise scaffold of one of claim 1-8 item is characterized in that its installation and lifting may further comprise the steps:
With securing member (3) several fixed guide (4) are installed on the building;
Make and be connected with fixed guide (4) sliding sleeve with the fixedly connected rail guide piece (1) of support body (2) and temporary fixed by pipe collar fastener or latch temporary fixing piece;
On the top building of existing several fixed guide (4), a fixed guide (4) is installed again, with the fixed guide (4) at this top or the suspender member on the building of other position, installed again as sling point;
Carry support body (2) with lifting means (10) and remove temporary fixing piece between rail guide piece (1) or support body (2) and the fixed guide (4), start lifting means and make support body (2) rising;
Rail guide piece (1) and support body (2) just can rise along fixed guide (4), rise to certain altitude and rail guide piece 1 top is connected with fixed guide (4) sliding sleeve of the top;
Continuation rises to the height that needs with support body (2) together with rail guide piece (1);
Again use described temporary fixing piece that rail guide piece (1) or support body (2) is together temporary fixed with fixed guide (4);
Move or remove lifting means (10).
10, a kind of method of using according to the described guide rail synchronous raise scaffold of one of claim 1-8 item is characterized in that its decline process may further comprise the steps:
With fixed guide (4) or the suspender member on the building of other position, installed as sling point, carry support body (2) with lifting means (10) and remove pipe collar fastener or latch temporary fixing piece between rail guide piece (1) or support body (2) and the fixed guide (4), start lifting means and make support body (2) decline;
Rail guide piece (1) and support body (2) descend along fixed guide (4), drop to certain altitude and a fixed guide (4) is installed on the building below the shelf again, constantly descend and rail guide piece (1) bottom is connected with fixed guide (4) sliding sleeve;
Continuation drops to the height that needs with support body (2) together with rail guide piece (1);
Again use described temporary fixing piece that rail guide piece (1) or support body (2) is together temporary fixed with fixed guide (4);
Move or remove lifting means (10).
CNB971088136A 1997-01-17 1997-01-17 Guide rail synchronous raise scaffold and its using method Expired - Lifetime CN1138902C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB971088136A CN1138902C (en) 1997-01-17 1997-01-17 Guide rail synchronous raise scaffold and its using method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB971088136A CN1138902C (en) 1997-01-17 1997-01-17 Guide rail synchronous raise scaffold and its using method

Publications (2)

Publication Number Publication Date
CN1188173A CN1188173A (en) 1998-07-22
CN1138902C true CN1138902C (en) 2004-02-18

Family

ID=5170660

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB971088136A Expired - Lifetime CN1138902C (en) 1997-01-17 1997-01-17 Guide rail synchronous raise scaffold and its using method

Country Status (1)

Country Link
CN (1) CN1138902C (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103321400A (en) * 2012-03-23 2013-09-25 肖玉光 Lift type scaffold with manual winch and slide
CN103452303B (en) * 2013-09-22 2015-09-23 江苏申锡建筑机械有限公司 The adjustable unloading fastener of a kind of attached lift scaffold
CN103526920B (en) * 2013-11-04 2017-02-15 江苏申锡建筑机械有限公司 Closeable and openable guide base of attached lifting scaffold

Also Published As

Publication number Publication date
CN1188173A (en) 1998-07-22

Similar Documents

Publication Publication Date Title
CN1736848A (en) Large-scale structure integral hositing device and method
CN1138902C (en) Guide rail synchronous raise scaffold and its using method
CN1641126A (en) Cross-connection method for steel pipe and H-shape steel
CN113073839B (en) Heavy-load self-climbing construction device and climbing method thereof
CN106193567A (en) Variable-section integrated lifting operation platform adduction construction method for ultrahigh building
CN2603827Y (en) Self-supproting form member
CN2782835Y (en) Foldable scaffold
EP2316780B1 (en) Mast for a stacker crane
CN201121427Y (en) Simple lifting type parking equipment
CN209538759U (en) Applied to the jack up high-building construction workshop on climbing frame
CN2268748Y (en) Guide railing synchronously lifting scaffold
CN209493853U (en) A kind of support frame structure of high-speed railway attaching scaffold
DE69913173T2 (en) LIFT DEVICE
CN2219286Y (en) Mast structural member for tower crane
CN220762636U (en) Loading and unloading robot for steel structure machining
CN215407355U (en) Temporary diagonal draw bar of attached lifting scaffold
CN215160215U (en) Early warning type hoisting mechanism applied to shore bridge hoisting equipment
CN219652590U (en) Ceiling hoisting device
CN212671053U (en) Steel construction stair
CN214828494U (en) Truss bridge type crane
CN217947286U (en) Construction elevator attached combined structure fixed on floor
CN220311627U (en) T beam reinforcement cage forming device
CN212027232U (en) Multifunctional assembled stair device easy to install and detach
CN220079783U (en) Suspended casting hanging basket walking propelling device
CN215160445U (en) Auxiliary lifting machine of scissor jack

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: SHENZHEN CITY TECHENG TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: SHEN HAIYAN

Effective date: 20090410

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20090410

Address after: 5F, East music building, 2019 Shennan East Road, Guangdong, Shenzhen

Patentee after: Shenzhen Techen Technology Co., Ltd.

Address before: Guangdong Province, Shenzhen City, Futian District Fuhua Road, Fuhua Residential District 1 building 702 room

Patentee before: Shen Haiyan

C56 Change in the name or address of the patentee

Owner name: SHENZHEN TECHEN SCIENCE AND TECHNOLOGY CO., LTD.

Free format text: FORMER NAME: SHENZHEN TECHEN TECHNOLOGY CO., LTD.

CP03 Change of name, title or address

Address after: Luohu District Shenzhen Shennan Road 518002 Guangdong province No. 2019 Dong le on the eighth floor of A

Patentee after: Shenzhen Techen Science and Technology Co., Ltd.

Address before: 518002 5F, Dong Yue Building, 2019 Shennan East Road, Guangdong, Shenzhen

Patentee before: Shenzhen Techen Technology Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20040218

EXPY Termination of patent right or utility model