CN113841542A - Construction device and method capable of building forest on water in water environment - Google Patents

Construction device and method capable of building forest on water in water environment Download PDF

Info

Publication number
CN113841542A
CN113841542A CN202111295544.1A CN202111295544A CN113841542A CN 113841542 A CN113841542 A CN 113841542A CN 202111295544 A CN202111295544 A CN 202111295544A CN 113841542 A CN113841542 A CN 113841542A
Authority
CN
China
Prior art keywords
planting
fixing
soil
water
arbor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111295544.1A
Other languages
Chinese (zh)
Inventor
饶显龙
何田恬
沈波
陈一锋
孙欢
徐施锜
钱思思
刘百升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Shuren University
Original Assignee
Zhejiang Shuren University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Shuren University filed Critical Zhejiang Shuren University
Priority to CN202111295544.1A priority Critical patent/CN113841542A/en
Publication of CN113841542A publication Critical patent/CN113841542A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G17/00Cultivation of hops, vines, fruit trees, or like trees
    • A01G17/04Supports for hops, vines, or trees
    • A01G17/14Props; Stays

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Botany (AREA)
  • Cultivation Of Plants (AREA)

Abstract

The invention belongs to the field of construction of trees planted in water, and particularly relates to a construction device and a construction method capable of building an overwater forest in a water environment. The water system bottom sets up the waterproof layer and can lead to the arbor root system and the original soil of planting to produce to keep apart mainly to the river system, causes the root system to prick not unstable to former soil layer, influences the problem of survival rate and later stage growth vigor. The following scheme is proposed, and planting rings which deal with contradictions between the original soil and the waterproof layer are arranged. The invention also provides a construction method for building the forest on water in the water environment, which comprises the following steps: selecting the type of a planting circle; leveling the field; laying a planting circle; laying a waterproof layer; plant backfilling; planting arbors; fixing the arbor; beautifying the device; and (5) dismantling the fixing frame. The invention not only can make the plant in the planting circle prick the root system into the original soil layer, but also can fix the planted arbor, in addition, the invention can also be applied to the shallow water environment, and solves the influence of water logging on the growth of the tree.

Description

Construction device and method capable of building forest on water in water environment
Technical Field
The invention relates to the field of construction and planting technology of trees in water (building forest on water), in particular to a construction device and a construction method capable of building forest on water in water environment.
Background
As an important measure for wonderful wetland and improvement of water ecological environment, the overwater forest ecological system is well popularized and applied in wetland protection and landscape construction, and arbor is a basic skeleton in landscape and plays a leading role in ecological benefit, function and landscape artistic treatment, so that arbor plants are mainly planted in the construction of the wetland ecological system (the construction of the overwater forest).
However, many landscape lakes, especially those where water bodies just excavated are prone to leakage, often need to adopt anti-seepage measures in order to maintain a normal water level to achieve ecological benefits and landscape effects, and most of the conventional methods need to arrange waterproof layers, especially artificial water systems (waterscape) are abundant. And the waterproof layer way is mostly several high-molecular coiled materials, can lead to the arbor root system and the native soil of planting into water to produce and keep apart to make the root system can not prick former soil layer. On the one hand, trees cannot contact a wider soil space in future and are difficult to grow up; on the other hand, the trees are difficult to stabilize and easy to fall down in the initial planting stage, and landscape effects such as unstable tree bodies, influence on survival rate and later growth vigor and the like are generated. Therefore, a construction device and a method for building the forest on water in the water environment are provided.
Disclosure of Invention
The invention aims to solve the problems that the root system of an arbor planted in water is isolated from original soil due to the fact that a waterproof layer is laid at the bottom of a lake in the existing engineering, so that the root system cannot be pricked into the original soil layer, and on the one hand, the arbor cannot be in contact with a wider soil space in future and cannot grow up easily; on the other hand, the trees are difficult to stabilize and easy to fall down in the initial planting stage, and landscape effects such as unstable tree bodies, influence on survival rate and later growth vigor and the like are generated. And provides a construction device and a method for building the forest on water in the water environment. In addition, the method can also be applied to arbor construction in water bodies which need to be directly in shallow water environment (within 0.3-1.5 m) and are not paved with waterproof measures, and although some arbors are relatively resistant to water humidity, the arbors are not suitable to be soaked in a full water environment for a long time in the initial planting stage, and the direct influence of the flooding condition on the growth of the arbors can be solved.
In order to achieve the purpose, the invention adopts the following technical scheme:
a construction device capable of building an aquatic forest in a water environment comprises base soil and a planting ring, wherein four fixing holes are formed in the top of the planting ring, fixing pieces are arranged in the fixing holes and comprise inserting rods, the inserting rods are fixed in the fixing holes through bolts, the top of the inserted link is fixedly connected with a connecting block, the top of the connecting block is provided with an insertion hole, a fixed link is fixedly connected in the insertion hole, one side of the top of the fixed link is fixedly connected with a connecting buckle, a fixed frame is fixedly connected between the connecting buckles, two fixing mechanisms are symmetrically arranged on two sides of the fixed frame, the fixing mechanism comprises a fixing block and a clamping plate, the fixing block is fixedly connected with one side of the fixing frame, two threaded rods are inserted into one side of the fixing block, two fixing seats are fixedly connected with one side of the clamping plate, and the other end of the threaded rod is rotatably connected with the fixed seat, and one side of the threaded rod, which is close to the clamping plate, is connected with a fastening nut in a threaded manner.
Furthermore, a plurality of threaded holes are formed in the outer wall of the circumference of the planting ring, fixing bolts are connected to the threaded holes in a threaded mode, hooks are fixedly connected to the other ends of the fixing bolts, and steel wires are wound between the hooks.
On the basis of the scheme, one side of the clamping plate is fixedly connected with a rubber pad.
As a further scheme of the invention, one side of the rubber pad is provided with a plurality of anti-skid grains.
Furthermore, the upper surface of basic unit soil is equipped with the waterproof layer, and plants the circle and pass the waterproof layer and fix mutually with basic unit soil.
On the basis of the scheme, a backfill soil layer is arranged on one side, away from the base soil, of the waterproof layer.
The invention also provides a construction method for building the forest on water in the water environment, which comprises the following steps:
s1: selecting a proper planting circle model according to the type, the breast/ground diameter and the water depth of the arbor, and conveying the arbor to a construction site;
s2: leveling the surrounding field according to the positioning of the construction drawing;
s3: hoisting the selected planting ring to a pit dug in a construction ground, backfilling soil to fix the planting ring at the outer wall of the planting ring, wherein the height of the backfilled external soil is 8-15cm lower than the top of the planting ring so as to lay a waterproof layer and fix the backfilled soil, and then filling soil into the planting ring;
s4: paving a waterproof layer above the base soil, paving the waterproof layer to the top of the outer wall of the planting circle, and enabling the actual finished surface to be flush with the normal water level of the water body;
s5: backfilling planting soil into the planting circle, and reversely pushing the reserved depth of the backfilled soil according to the thickness of the tree soil ball;
s6: planting trees in the planting soil in the planting circle, backfilling the improved planting soil around soil balls of the trees, and winding and fixing steel wires for the soil balls of the trees between the hooks;
s7: fixing a fixing rod on the fixing piece, then building the fixing frame, fixing the arbor through the fixing mechanism, then adding root fixing water into the planting circle, tamping the planting soil after the root fixing water is dried, and daily maintaining water again for several times until the tree body is stable;
s8: planting aquatic herbaceous plants around the arbor tree pit according to construction drawings to beautify the planting device, so that the arbor tree pit is more attractive, natural and ecological;
s9: and (4) performing daily maintenance on the arbor, and removing the fixed rod and the fixed frame after the root system stably grows to the original soil after the arbor is shaped 2-3 years after survival.
Further, the inner diameter of the planting ring 1 in the S1 is more than 15 times of the breast/ground diameter of the arbor, the ideal size is more than 20 times considering the tree growth and the supporting stability, and the size can be adjusted according to the site and the construction conditions.
On the basis of the scheme, the middle part of the planting soil in the S5 is required to be kept to be nearly inverted-cone-shaped (namely, the planting soil is consistent with the shape of the arbor soil ball, so that the arbor is convenient to plant and stabilize), and the depth of the planting soil is preferably 8-15cm larger than that of the arbor soil ball.
Compared with the prior art, the invention has the beneficial effects that:
1. according to the invention, through the matching use of the fixing rod and the fixing frame, the arbor can be fixed by the fixing frame after being planted, the arbor is prevented from inclining and falling after being planted, and the stability of arbor planting is improved.
2. According to the clamping device, the threaded rod and the clamping plate are matched for use, so that the clamping plate can move and contact with an arbor by rotating the fastening nut, the arbor is clamped, the contact area of the clamping plate and the arbor is increased, and the arbor is further fixed.
3. According to the invention, the hook and the steel wire are matched for use, so that after the arbor is planted, the steel wire can fix the arbor soil balls and soil in the planting circle, the arbor is prevented from shaking or lodging when wind blows, the loosening of the soil balls and soil is avoided, and the survival rate of arbor planting is improved.
4. According to the invention, the soil backfilling is carried out inside and outside the planting ring, so that after the planting ring is placed, the stability of the planting ring can be increased through soil backfilling, and the situation that the planting ring shakes due to arbor shaking is avoided.
5. According to the invention, the planting circle penetrates through the waterproof layer for installation, and the waterproof layer is laid on the top of the planting circle, so that the roots of the plants in the planting circle can be pricked into the original soil layer, the space of the trees is increased, and the stability of the trees is facilitated.
According to the method, the arbor can be fixed after the arbor is planted, the arbor is prevented from inclining and lodging, meanwhile, the arbor is clamped through the clamping plate, the arbor is further fixed, soil in the planting circle is fixed through the steel wire, the arbor is prevented from shaking when being blown by wind to drive the soil to shake, the survival rate of arbor planting is improved, and the stability of the planting circle is improved through soil backfilling inside and outside the planting circle.
Drawings
FIG. 1 is a schematic structural view of a construction apparatus for constructing an aquatic forest in a water environment according to the present invention;
FIG. 2 is a schematic structural view of a fixing mechanism of a construction device for constructing an aquatic forest in a water environment according to the present invention;
FIG. 3 is a schematic structural view of a fixing bolt of the construction device for constructing an aquatic forest in a water environment according to the present invention;
FIG. 4 is a schematic structural diagram of a fixing member of the construction device for constructing an aquatic forest in a water environment according to the present invention;
FIG. 5 is a schematic view of an installation section structure of a construction apparatus for constructing an aquatic forest in a water environment according to the present invention;
FIG. 6 is a schematic diagram of an early stage of tree planting for constructing an aquatic forest in a water environment according to the present invention;
FIG. 7 is a schematic view of a tree planting method for constructing an aquatic forest in a water environment according to the present invention after several years;
fig. 8 is a schematic top plan view of the water arbor planting method for constructing the water forest in the water environment according to the present invention.
In the figure: 1. planting in a circle; 2. a fixing bolt; 3. hooking; 4. a fixing mechanism; 5. a fixed mount; 6. a connecting buckle; 7. fixing the rod; 8. a steel wire; 9. a fixing member; 10. fastening a nut; 11. a threaded rod; 12. a fixed block; 13. a fixed seat; 14. a splint; 15. a rubber pad; 16. inserting a rod; 17. connecting blocks; 18. a jack; 19. base soil; 20. a waterproof layer; 21. and (5) backfilling the soil layer.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
Example one
Referring to fig. 1-8, a construction device for building an aquatic forest under water environment comprises base soil 19 and a planting ring 1, four fixing holes are formed in the top of the planting ring 1, fixing parts 9 are arranged in the fixing holes, each fixing part 9 comprises an insertion rod 16, the insertion rods 16 are fixed in the fixing holes through bolts, connecting blocks 17 are welded on the tops of the insertion rods 16, jacks 18 are formed in the tops of the connecting blocks 17, fixing rods 7 are fixed in the jacks 18 through bolts, the fixing parts 9 facilitate the installation and the fixing of the fixing rods 7, connecting buckles 6 are fixed on one sides of the tops of the fixing rods 7 through bolts, fixing frames 5 are fixed between the connecting buckles 6 through bolts, two fixing mechanisms 4 are symmetrically arranged on two sides of the fixing frames 5, each fixing mechanism 4 comprises a fixing block 12 and a clamping plate 14, the fixing block 12 is fixedly connected to one side of each fixing frame 5, and two threaded rods 11 are inserted into one side of the fixing block 12, there are two fixing bases 13 on one side of splint 14 through the bolt fastening, and the other end of threaded rod 11 rotates with fixing base 13 to be connected, threaded rod 11 is close to the equal threaded connection in one side of splint 14 has fastening nut 10, rotates one of them fastening nut 10, can make one side of splint 14 remove to one side of arbor, then rotates another fastening nut 10, makes the opposite side of splint 14 press from both sides tightly the arbor to increase the area of contact of splint 14 with the arbor, improve the stability that the arbor was planted.
Example two
Referring to fig. 1 to 8, the present invention provides a new technical solution: a construction device capable of building an overwater forest under a water environment comprises base soil 19 and a planting ring 1, wherein a waterproof layer 20 is arranged on the upper surface of the base soil 19, the planting ring 1 penetrates through the waterproof layer 20 and is fixed with the base soil 19, the waterproof layer 20 can prevent water loss, a backfill soil layer 21 is arranged on one side, away from the base soil 19, of the waterproof layer 20, the backfill soil layer 21 can press and fix the waterproof layer 20, four fixing holes are formed in the top of the planting ring 1, fixing pieces 9 are arranged in the fixing holes, each fixing piece 9 comprises an inserting rod 16, the inserting rods 16 are fixed in the fixing holes through bolts, connecting blocks 17 are welded on the tops of the inserting rods 16, jacks 18 are formed in the tops of the connecting blocks 17, fixing rods 7 are fixed in the jacks 18 through bolts, installation and fixation of the fixing rods 7 are facilitated through the fixing pieces 9, connecting buckles 6 are fixed on one side of the tops of the fixing rods 7 through bolts, the fixing frame 5 is fixed between the connecting buckles 6 through bolts, two fixing mechanisms 4 are symmetrically arranged on two sides of the fixing frame 5, each fixing mechanism 4 comprises a fixing block 12 and a clamping plate 14, a rubber pad 15 is adhered on one side of each clamping plate 14, a plurality of anti-skidding threads are arranged on one side of each rubber pad 15, the clamping plates 14 are prevented from damaging the outer skins of the trees through the rubber pads 15, the fixing blocks 12 are fixedly connected to one sides of the fixing frames 5, two threaded rods 11 are inserted into one sides of the fixing blocks 12, two fixing seats 13 are fixed on one sides of the clamping plates 14 through bolts, the other ends of the threaded rods 11 are rotatably connected with the fixing seats 13, fastening nuts 10 are respectively and rotatably connected to one sides, close to the clamping plates 14, of the threaded rods 11, one of the fastening nuts 10 can be rotated to enable one side of the clamping plates 14 to move towards one side of the trees, then the other fastening nut 10 is rotated to enable the other side of the clamping plates 14 to clamp the trees, thereby increase the area of contact of splint 14 with the arbor, improve the stability that the arbor was planted, a plurality of screw holes have been seted up to the circumference outer wall of planting circle 1, threaded hole equal threaded connection has gim peg 2, the other end of gim peg 2 has all welded couple 3, the routing has steel wire 8 between the couple 3, the staggered routing steel wire 8 is fixed the soil of planting in the circle 1 on couple 3, avoid the arbor to take place to rock when blowing and drive soil and rock, improve the survival rate that the arbor was planted.
The invention also provides a construction method for building the forest on water in the water environment, which comprises the following steps:
s1: selecting a proper planting circle 1 type according to the type, the breast/ground diameter and the water depth of the arbor, and conveying the arbor to a construction site;
s2: according to the positioning of a construction drawing, excavating, leveling and flattening the construction site of the peripheral site;
s3: hoisting the selected planting ring 1 to a pit dug in a construction ground, backfilling soil to fix the planting ring 1 at the outer wall of the planting ring 1, wherein the height of the backfilled external soil is 8-15cm lower than the top of the planting ring 1 so as to lay a waterproof layer 20 and backfill soil 21 for fixation, and then filling soil into the planting ring 1, wherein the filling height is half of the height of the planting ring 1;
s4: paving a waterproof layer 20 above the base soil 19, and paving the waterproof layer 20 to the top of the outer wall of the planting ring 1, wherein the actual finished surface is flush with the normal water level of the water body;
s5: backfilling planting soil into the planting circle 1, and reversely pushing the reserved depth of the backfilled soil according to the thickness of the tree soil ball;
s6: planting trees in the planting soil in the planting circle 1, backfilling the improved common planting soil around the soil balls of the trees, and winding and fixing soil-tree soil ball steel wires 8 between the hooks 3;
s7: fixing a fixing rod 7 on a fixing piece 9, then building a fixing frame 5, fixing a tree through a fixing mechanism 4, then adding root fixing water into the planting circle 1, tamping planting soil after the root fixing water is dried, and daily maintaining water again for several times until the tree body is stable;
s8: planting aquatic herbaceous plants around the arbor tree pit according to construction drawings to beautify the planting device, so that the arbor tree pit is more attractive, natural and ecological;
s9: and (3) performing daily maintenance on the trees, and removing the fixed rods 7 and the fixing frames 5 after the root systems stably grow to the original soil after the trees are shaped 2-3 years after the trees survive.
In the invention, it should be noted that the inner diameter of the planting circle 1 in the S1 is more than 15 times of the breast/ground diameter of the arbor, the ideal size is more than 20 times considering the growing and supporting stability of the arbor, the size can be adjusted according to the site and the construction conditions, the middle part of the planting soil in the S5 is required to be kept in a nearly inverted cone shape (i.e. consistent with the shape of the arbor soil ball, which is convenient for arbor planting and stabilizing), and the depth is preferably more than 8-15cm of the arbor soil ball.
The working principle is as follows: when the clamp is used, the planting ring 1 is placed in a hole which is dug, soil is backfilled inside and outside the planting ring 1, the planting ring 1 is fixed, then the waterproof layer 20 is laid above the base soil 19, the waterproof layer 20 is laid to the top of the planting ring 1, then the planting soil is backfilled in the planting ring 1, then a tree is planted in the planting soil, the planting soil is backfilled again to fix the tree, then the steel wire 8 is wound on the hook 3 in a staggered mode to fix the soil in the planting ring 1, then the fixing rod 7 is fixed in the connecting block 17, the connecting buckle 6 and the fixing frame 5 are installed between the fixing rods 7, then one fastening nut 10 is rotated, one side of the clamp plate 14 moves towards one side of the tree to clamp the tree, the other fastening nut 10 is rotated, the other side of the clamp plate 10 clamps the tree, and therefore the contact area of the clamp plate 14 and the tree is increased, the stability that the arbor was planted is improved, and the arbor is planted and is accomplished the back, adds the water of deciding root to planting in circle 1, then plants aquatic herbaceous plant in planting circle 1, 2-3 years after the arbor survived, and dead lever 7 and mount 5 are demolishd to the root system after the firm growth to the original soil.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (9)

1. A construction device capable of building an overwater forest under a water environment comprises base soil (19) and a planting ring (1), and is characterized in that four fixing holes are formed in the top of the planting ring (1), fixing pieces (9) are arranged in the fixing holes, each fixing piece (9) comprises an insertion rod (16), the insertion rods (16) are fixed in the fixing holes through bolts, connecting blocks (17) are fixedly connected to the tops of the insertion rods (16), jacks (18) are formed in the tops of the connecting blocks (17), fixing rods (7) are fixedly connected in the jacks (18), connecting buckles (6) are fixedly connected to one sides of the tops of the fixing rods (7), fixing frames (5) are fixedly connected between the connecting buckles (6), two fixing mechanisms (4) are symmetrically arranged on two sides of each fixing frame (5), each fixing mechanism (4) comprises a fixing block (12) and a clamping plate (14), fixed block (12) fixed connection is in one side of mount (5), peg graft in one side of fixed block (12) has two threaded rods (11), two fixing base (13) of one side fixedly connected with of splint (14), and the other end and fixing base (13) of threaded rod (11) rotate and are connected, threaded rod (11) are close to the equal threaded connection in one side of splint (14) and have fastening nut (10).
2. The construction device for building the forest on water under the water environment according to claim 1, wherein a plurality of threaded holes are formed in the circumferential outer wall of the planting ring (1), fixing bolts (2) are connected in the threaded holes in a threaded mode, hooks (3) are fixedly connected to the other ends of the fixing bolts (2), and steel wires (8) for fixing arbor soil balls are connected between the hooks (3) in a winding mode.
3. A construction equipment for building forest on water in water environment as claimed in claim 1, characterized in that a rubber mat (15) is fixedly connected to one side of said plywood (14).
4. The construction device for building the forest in the water environment as claimed in claim 3, wherein a plurality of anti-slip lines are formed on one side of the rubber mat (15).
5. A construction equipment for constructing an aquatic forest in a water environment as claimed in claim 1, wherein said foundation soil (19) is provided at its upper surface with a waterproof layer (20), and said planting circle (1) passes through the waterproof layer (20) and is connected and fixed with the foundation soil (19).
6. A construction equipment for creating an aquatic forest in a water environment according to claim 5, characterized in that the side of the waterproof layer (20) remote from the substrate soil (19) is provided with a backfill layer (21) to stabilize the waterproof layer (20).
7. A method as claimed in any one of claims 1 to 6, wherein the method comprises the steps of:
s1: selecting a proper type of planting ring (1) according to the type, the breast/ground diameter and the water depth of the arbor, and conveying the arbor to a construction site;
s2: leveling the surrounding field according to the positioning of the construction drawing;
s3: hoisting the selected planting ring (1) to a dug pit on a construction ground, backfilling soil to fix the planting ring (1) at the outer wall of the planting ring (1), wherein the height of the backfilled external soil is 8-15cm lower than the top of the planting ring (1) so as to lay a waterproof layer (20) and fix backfill soil (21), and then filling soil into the planting ring (1);
s4: a waterproof layer (20) is laid above the base soil (19), the waterproof layer (20) is laid to the top of the outer wall of the planting ring (1), and the actual finished surface is flush with the normal water level of the water body;
s5: backfilling planting soil into the planting circle (1), and reversely pushing the reserved depth of the backfilled soil according to the thickness of the tree soil ball;
s6: planting trees in planting soil in the planting circle (1), backfilling the improved planting soil around soil balls of the trees, and winding and fixing tree soil ball steel wires (8) between the hooks (3);
s7: fixing a fixing rod (7) on a fixing piece (9), then building a fixing frame (5), fixing a tree through a fixing mechanism (4), then adding root fixing water into the planting circle (1), then tamping planting soil after the root fixing water is dried, and daily maintaining water again, and repeating for several times until the tree body is stable;
s8: planting aquatic herbaceous plants around the arbor tree pit according to construction drawings to beautify the planting device, so that the arbor tree pit is more attractive, natural and ecological;
s9: and (3) performing daily maintenance on the trees, and removing the fixed rods (7) and the fixing frames (5) after the roots stably grow to the original soil after the trees are shaped 2-3 years after the trees survive.
8. The method as claimed in claim 7, wherein the inner diameter of the planting circle 1 in S1 is 15 times or more of the diameter of tree breast/ground, and the size of the planting circle is 20 times or more in consideration of the stability of the tree to grow and support, and is adjustable according to the ground and construction conditions.
9. The method as claimed in claim 7, wherein the planting soil is backfilled at S5 with a depth of 8-15cm greater than that of the arbor soil ball.
CN202111295544.1A 2021-11-03 2021-11-03 Construction device and method capable of building forest on water in water environment Pending CN113841542A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111295544.1A CN113841542A (en) 2021-11-03 2021-11-03 Construction device and method capable of building forest on water in water environment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111295544.1A CN113841542A (en) 2021-11-03 2021-11-03 Construction device and method capable of building forest on water in water environment

Publications (1)

Publication Number Publication Date
CN113841542A true CN113841542A (en) 2021-12-28

Family

ID=78983915

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111295544.1A Pending CN113841542A (en) 2021-11-03 2021-11-03 Construction device and method capable of building forest on water in water environment

Country Status (1)

Country Link
CN (1) CN113841542A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115428664A (en) * 2022-09-30 2022-12-06 中国电建集团成都勘测设计研究院有限公司 Device of arbor is planted under water

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115428664A (en) * 2022-09-30 2022-12-06 中国电建集团成都勘测设计研究院有限公司 Device of arbor is planted under water
CN115428664B (en) * 2022-09-30 2024-01-23 中国电建集团成都勘测设计研究院有限公司 Device for planting arbor under water

Similar Documents

Publication Publication Date Title
CN108605788B (en) Large tree high survival rate full-crown transplanting system and construction method
CN113841542A (en) Construction device and method capable of building forest on water in water environment
CN107182699A (en) Monoblock type arbor ground prop construction
CN112144552A (en) Damaged mountain ecological vegetation restoration structure, implementation method and application thereof
CN109729904A (en) A kind of method and device for planting landscape trees in pond
CN206052761U (en) A kind of marine wind electric field single-pile foundation
CN212612526U (en) Be used for steep slope grid beam to plant grass supporting construction in
CN216314202U (en) Can build construction equipment of forest on water under water environment
CN217608546U (en) Torrent type river submerged plant solid planting structure
CN114790751B (en) Fruit and mud composite ecological slope protection structure and construction method thereof
CN107223509B (en) Construction method for soil in-situ improvement and restoration by arbor tree ball isolated island method
CN211322333U (en) Plant fixing device
CN111727871A (en) Hard substrate anchoring type aquatic plant rapid field planting method
CN214961679U (en) Liftable ecological recovery unit of stereoplasm revetment
CN215602328U (en) Improve planting device of afforestation arbor out of season survival rate
CN211690196U (en) Ecological slope protection system for side slope of hard river channel
CN211185088U (en) Based on lake ecological remediation with benthophyte planting device
CN210857107U (en) Hanging type greening plate and rock slope ecological slope protection system
CN112997851A (en) Support is planted to raspberry with retaining filtration irrigation function
CN112655414A (en) Ecological greening structure of high and steep rocky slope and construction method thereof
CN112385442A (en) Vertical rock wall greening device for abandoned mine and installation method thereof
CN218072743U (en) Plant surrounding and fixing device with diameter adjustable mechanism for barren mountain restoration
CN111074843A (en) Ecological slope protection system for hard riverway side slope and construction method thereof
CN109618793A (en) A method of in strand, tidal zone constructs the ecosystem
CN218911259U (en) Novel hydraulic engineering environmental protection ecological wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination