CN113832834A - 一种双壁空心墩柱与钢桥的固接节点及建造方法 - Google Patents
一种双壁空心墩柱与钢桥的固接节点及建造方法 Download PDFInfo
- Publication number
- CN113832834A CN113832834A CN202110992239.1A CN202110992239A CN113832834A CN 113832834 A CN113832834 A CN 113832834A CN 202110992239 A CN202110992239 A CN 202110992239A CN 113832834 A CN113832834 A CN 113832834A
- Authority
- CN
- China
- Prior art keywords
- steel
- section
- steel pipe
- pipe
- ring plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/30—Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110992239.1A CN113832834B (zh) | 2021-08-26 | 2021-08-26 | 一种双壁空心墩柱与钢桥的固接节点及建造方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110992239.1A CN113832834B (zh) | 2021-08-26 | 2021-08-26 | 一种双壁空心墩柱与钢桥的固接节点及建造方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113832834A true CN113832834A (zh) | 2021-12-24 |
CN113832834B CN113832834B (zh) | 2023-08-25 |
Family
ID=78961501
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110992239.1A Active CN113832834B (zh) | 2021-08-26 | 2021-08-26 | 一种双壁空心墩柱与钢桥的固接节点及建造方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113832834B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114277937A (zh) * | 2022-02-08 | 2022-04-05 | 华北理工大学 | 中空夹层钢管混凝土构件连接结构、组合结构及施工方法 |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007016595A (ja) * | 2006-10-27 | 2007-01-25 | Jfe Engineering Kk | 主桁と鉄筋コンクリート橋脚との接合構造及び接合方法 |
JP2009007746A (ja) * | 2007-06-26 | 2009-01-15 | Shimizu Corp | 杭頭部の接合構造 |
JP2009030350A (ja) * | 2007-07-27 | 2009-02-12 | Jfe Steel Kk | プレキャスト横梁およびそれを用いた橋脚 |
CN101818478A (zh) * | 2010-03-09 | 2010-09-01 | 河海大学 | 圆钢管混凝土墩柱与混凝土盖梁的连接结构 |
JP2013096095A (ja) * | 2011-10-28 | 2013-05-20 | Nippon Steel & Sumikin Engineering Co Ltd | 橋脚と橋桁の剛結構造および剛結方法 |
CN104612037A (zh) * | 2015-01-22 | 2015-05-13 | 宁波大学 | 一种附加耗能钢筋的法兰连接混凝土填充双壁钢管预制拼装桥墩 |
KR20160109629A (ko) * | 2015-03-12 | 2016-09-21 | 고려대학교 산학협력단 | 외부보강된 내부구속 중공 철근콘크리트 기둥-기초 접합부의 시공방법 |
CN107354862A (zh) * | 2017-06-30 | 2017-11-17 | 东北大学 | 预制夹层钢管混凝土与空心钢筋混凝土拼装桥墩 |
CN109235236A (zh) * | 2018-08-28 | 2019-01-18 | 中交第二公路勘察设计研究院有限公司 | 基于法兰连接的装配式空心管墩及其施工方法 |
CN111705632A (zh) * | 2020-06-01 | 2020-09-25 | 上海市城市建设设计研究总院(集团)有限公司 | 内侧钢筋交叉锚固的预制空心桥墩及其施工方法 |
CN112282214A (zh) * | 2020-09-21 | 2021-01-29 | 华南理工大学 | 预制装配式frp管-混凝土-钢管组合柱及其建造方法 |
CN212801178U (zh) * | 2020-06-29 | 2021-03-26 | 中国国家铁路集团有限公司 | 一种通过钢横梁与混凝土柱连接的框架桥墩 |
CN213508008U (zh) * | 2021-05-12 | 2021-06-22 | 三一筑工科技股份有限公司 | 一种盖梁与桥墩的连接结构 |
-
2021
- 2021-08-26 CN CN202110992239.1A patent/CN113832834B/zh active Active
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007016595A (ja) * | 2006-10-27 | 2007-01-25 | Jfe Engineering Kk | 主桁と鉄筋コンクリート橋脚との接合構造及び接合方法 |
JP2009007746A (ja) * | 2007-06-26 | 2009-01-15 | Shimizu Corp | 杭頭部の接合構造 |
JP2009030350A (ja) * | 2007-07-27 | 2009-02-12 | Jfe Steel Kk | プレキャスト横梁およびそれを用いた橋脚 |
CN101818478A (zh) * | 2010-03-09 | 2010-09-01 | 河海大学 | 圆钢管混凝土墩柱与混凝土盖梁的连接结构 |
JP2013096095A (ja) * | 2011-10-28 | 2013-05-20 | Nippon Steel & Sumikin Engineering Co Ltd | 橋脚と橋桁の剛結構造および剛結方法 |
CN104612037A (zh) * | 2015-01-22 | 2015-05-13 | 宁波大学 | 一种附加耗能钢筋的法兰连接混凝土填充双壁钢管预制拼装桥墩 |
KR20160109629A (ko) * | 2015-03-12 | 2016-09-21 | 고려대학교 산학협력단 | 외부보강된 내부구속 중공 철근콘크리트 기둥-기초 접합부의 시공방법 |
CN107354862A (zh) * | 2017-06-30 | 2017-11-17 | 东北大学 | 预制夹层钢管混凝土与空心钢筋混凝土拼装桥墩 |
CN109235236A (zh) * | 2018-08-28 | 2019-01-18 | 中交第二公路勘察设计研究院有限公司 | 基于法兰连接的装配式空心管墩及其施工方法 |
CN111705632A (zh) * | 2020-06-01 | 2020-09-25 | 上海市城市建设设计研究总院(集团)有限公司 | 内侧钢筋交叉锚固的预制空心桥墩及其施工方法 |
CN212801178U (zh) * | 2020-06-29 | 2021-03-26 | 中国国家铁路集团有限公司 | 一种通过钢横梁与混凝土柱连接的框架桥墩 |
CN112282214A (zh) * | 2020-09-21 | 2021-01-29 | 华南理工大学 | 预制装配式frp管-混凝土-钢管组合柱及其建造方法 |
CN213508008U (zh) * | 2021-05-12 | 2021-06-22 | 三一筑工科技股份有限公司 | 一种盖梁与桥墩的连接结构 |
Non-Patent Citations (2)
Title |
---|
汪碧云等: "钢管混凝土组合高墩在大跨径连续刚构桥梁中的应用", 《西南公路》 * |
汪碧云等: "钢管混凝土组合高墩在大跨径连续刚构桥梁中的应用", 《西南公路》, 31 August 2011 (2011-08-31), pages 108 - 115 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114277937A (zh) * | 2022-02-08 | 2022-04-05 | 华北理工大学 | 中空夹层钢管混凝土构件连接结构、组合结构及施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN113832834B (zh) | 2023-08-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108678218B (zh) | 基于多用途薄壁钢管的装配式混凝土剪力墙及其建造方法 | |
CN101457548A (zh) | 圆钢管混凝土柱与钢筋混凝土楼盖连接的节点及制作方法 | |
CN107190635B (zh) | 哑铃型钢管混凝土组合桥墩及与承台的连接结构和方法 | |
CN108867342B (zh) | 一种高耐久性抗地震倒塌的多柱墩体系及施工方法 | |
CN108867341B (zh) | 一种gfrp管-混凝土-型钢组合柱脚节点及其施工方法 | |
CN107386098B (zh) | 屈曲抑制圆端型钢管混凝土桥墩及与承台连接结构和方法 | |
CN201406767Y (zh) | 用于圆钢管混凝土柱与钢筋混凝土楼盖连接的节点 | |
CN113832834B (zh) | 一种双壁空心墩柱与钢桥的固接节点及建造方法 | |
CN111749346B (zh) | 一种含预制钢管混凝土芯柱构件的接长节点及施工方法 | |
CN113445670A (zh) | 一种预制装配复合钢管混凝土格构柱及施工方法 | |
CN108678164B (zh) | 连接梁式拼装建筑结构 | |
CN216552704U (zh) | 一种带支管的局部混凝土钢管柱 | |
CN114108808B (zh) | 一种连接节点可调节的pvc-frp管混凝土柱与混凝土叠合梁组合结构及其安装方法 | |
CN215759557U (zh) | 一种钢管混凝土柱-柱-钢梁预制组合连接节点 | |
CN214401388U (zh) | 一种优化后的frp索拱结构 | |
CN204825835U (zh) | 自复位导管架海洋平台 | |
CN211735762U (zh) | 一种钢管混凝土装配式建筑的结构 | |
CN113832833B (zh) | 一种双壁空心墩柱与盖梁的连接节点及建造方法 | |
CN114263093A (zh) | 一种全预制装配桥梁及施工方法 | |
CN108035605B (zh) | 一种装配式输电塔塔身连接节点及其制作方法 | |
CN112832385A (zh) | 一种装配式剪力墙的圆钢管混凝土纵向连接装置 | |
CN113374083A (zh) | 钢-再生混凝土组合梁与圆钢管高强混凝土柱的节点构造及其施工方法 | |
CN104912047A (zh) | 自复位导管架海洋平台及其制作方法 | |
CN114348192B (zh) | 装配式frp混凝土牵索塔式减震平台及其施工方法 | |
CN213329459U (zh) | 一种钢管混凝土梁节点连接结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Chen Guangming Inventor after: Lu Yichen Inventor after: Cheng Tong Inventor after: Lin Zuohong Inventor after: Xie Pan Inventor after: Li Xu Inventor after: Li Zhaobing Inventor after: Hu Funan Inventor after: Liu Weinan Inventor before: Chen Guangming Inventor before: Lu Yichen Inventor before: Li Xu Inventor before: Lin Zuohong Inventor before: Xie Pan Inventor before: Cheng Tong Inventor before: Li Zhaobing Inventor before: Hu Funan Inventor before: Liu Weinan |
|
CB03 | Change of inventor or designer information | ||
CB02 | Change of applicant information |
Address after: Room 601, No. 776, Dongfeng East Road, Yuexiu District, Guangzhou, Guangdong 510030 (for office use only) Applicant after: Guangzhou urban construction planning and Design Institute Co.,Ltd. Applicant after: SOUTH CHINA University OF TECHNOLOGY Address before: 510062 Room 601, No. 776, Dongfeng East Road, Yuexiu District, Guangzhou, Guangdong Applicant before: Guangzhou Public Utilities Planning and Design Institute Co.,Ltd. Applicant before: SOUTH CHINA University OF TECHNOLOGY |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |