CN113700251A - Construction method for mounting mirror glass wall surface - Google Patents

Construction method for mounting mirror glass wall surface Download PDF

Info

Publication number
CN113700251A
CN113700251A CN202111010925.0A CN202111010925A CN113700251A CN 113700251 A CN113700251 A CN 113700251A CN 202111010925 A CN202111010925 A CN 202111010925A CN 113700251 A CN113700251 A CN 113700251A
Authority
CN
China
Prior art keywords
glass
wood
wall
fixing
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111010925.0A
Other languages
Chinese (zh)
Inventor
王凯
马新生
冯瑞生
朱强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jinmao Architectural Decoration Co ltd
Original Assignee
Shanghai Jinmao Architectural Decoration Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jinmao Architectural Decoration Co ltd filed Critical Shanghai Jinmao Architectural Decoration Co ltd
Priority to CN202111010925.0A priority Critical patent/CN113700251A/en
Publication of CN113700251A publication Critical patent/CN113700251A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47GHOUSEHOLD OR TABLE EQUIPMENT
    • A47G1/00Mirrors; Picture frames or the like, e.g. provided with heating, lighting or ventilating means
    • A47G1/02Mirrors used as equipment
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0885Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements specially adapted for being adhesively fixed to the wall; Fastening means therefor; Fixing by means of plastics materials hardening after application
    • E04F13/0887Adhesive means specially adapted therefor, e.g. adhesive foils or strips
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0889Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements characterised by the joints between neighbouring elements, e.g. with joint fillings or with tongue and groove connections
    • E04F13/0891Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements characterised by the joints between neighbouring elements, e.g. with joint fillings or with tongue and groove connections with joint fillings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/14Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The invention discloses a construction method for mounting a mirror glass wall surface, which comprises construction preparation, a construction process, special condition treatment, quality standard and caution items. The construction method for installing the mirror glass wall surface comprises the steps of pre-embedding wood bricks when a wall or a column is built, wherein the positions of the wood bricks correspond to the transverse size and the vertical size of glass installation, the distance between the wood bricks is 500mm, hot asphalt is coated on the wall surface, 40mm or 50mm wood wall ribs are selected, the wood wall ribs are fixed on the wood bricks through iron nails, the positions of the transverse and vertical wood wall ribs are consistent with the positions of the wood bricks, and a leveling ruler is adopted to level the wood wall ribs, so that the construction of the wood wall ribs transversely, flatly and vertically passes through the construction method is realized, the construction steps and the construction process are optimized, systematic acceptance and detection are provided, planned new construction steps and materials are realized, the construction is more convenient, the preparation and operation of constructors are facilitated, meanwhile, the mirror surface installation is more stable and safer, and the possibility of falling is reduced.

Description

Construction method for mounting mirror glass wall surface
Technical Field
The invention relates to the field of wall surface construction, in particular to a construction method for installing a mirror glass wall surface.
Background
The wall surface is an exterior facing of a wall body and is divided into an indoor wall surface and an outdoor wall surface. Wall finishing is an integral part of building design. The modern indoor wall surface beautifies the indoor environment and adjusts the illumination by using the change of color and texture, and various materials with easy cleaning and good physical properties are selected to meet the using functions in various aspects. The outdoor wall surface directly influences the appearance of a building and the appearance of a city, and materials with certain waterproof and weatherproof performance are selected according to the use requirements and technical and economic conditions of the building, so that the wall structure is protected, and the appearance is kept clean. The wall body built by clay bricks or natural stones with excellent quality has plain appearance and good weather resistance and pollution resistance, can not be used as a wall surface, and is called as a dry wall. The joint between the two ends of the dry wall is to be treated neatly and compactly to prevent rainwater from leaking. If a special template is selected for pouring the concrete wall, wood grains or various concave-convex geometric patterns and the like are left on the outer wall surface after the template is removed. Such walls are known as bare concrete walls.
The mirror surface wall surface is a special wall surface, namely a wall body for installing a mirror on the wall surface, but the existing mirror surface wall construction has the problem that the mirror surface falls off, so that a construction method for installing the mirror surface glass wall surface is provided to improve the construction method.
Disclosure of Invention
The invention aims to provide a construction method for installing a mirror glass wall surface, which aims to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme:
a construction method for installing a mirror glass wall surface comprises the following steps:
the method comprises the following steps: the construction preparation comprises material preparation and tool preparation, wherein the material preparation comprises glass material preparation, substrate material preparation and fixing material preparation, circular arc grooves are formed in the peripheries of the glass materials, the substrate materials comprise wood wall ribs, lining plates, substrate cushion blocks, waterproof materials and linoleum, the lining plates are wood plates or plywood, the waterproof materials comprise asphalt, waterproof coatings and waterproof cloth, the substrate cushion blocks comprise wood bricks, rubber, plastics and fibers, the fixing materials comprise screws, iron nails, glass cement, epoxy resin cement, battens, frame supports and lines, the battens and the frame supports are stone materials, wood materials, plastics and metal profiles, the lines are wood materials, and the tool preparation comprises glass blocks, glass suckers, leveling rulers, hammers and screwdrivers;
step two: the construction process comprises the following steps:
s1: cleaning a base layer;
s2: erecting ribs;
s3: paving a nail lining plate;
s4: mounting, cutting and fixing glass, wherein the cutting is to cut the glass into a designed size and shape, and the fixing comprises screw fixing, bonding fixing, pressing support fixing and bonding support fixing;
step three: special condition treatment, including bonding the combined glass and wall column corner edge folding;
step four: the quality standard comprises a main control project and a general project, wherein the main control project comprises product quality inspection and certification inspection, performance report inspection, entrance inspection and record inspection, installation effect observation, size inspection and installation stability inspection, and the general project comprises scratch inspection, damage inspection and dirt inspection;
step five: the method comprises the following steps of constructing according to a graph, preventing water at a water accumulation part, selecting the same batch of glass in the same area during glass installation, preventing chromatic aberration, storing the glass in a dry and ventilated room, and cleaning the surface of the glass by using a glass cleaner after the glass is installed.
As a further scheme of the invention: the waterproof material in the step is most preferably asphalt, the backing cushion block is most preferably wood brick, the batten and the frame support are most preferably stone, and the lining plate is most preferably plywood.
As a still further scheme of the invention: in the second step, the step S1 is to pre-embed wood bricks when building a wall or a column, the positions of the wood bricks correspond to the transverse dimension and the vertical dimension of glass installation, the distance between the wood bricks is 500mm, and hot asphalt is coated on the wall surface.
As a still further scheme of the invention: and step two, S2 erecting the ribs, selecting and selecting 40mm or 50mm wood wall ribs, fixing the wood wall ribs on the wood-wood bricks through iron nails, enabling the positions of the transverse and vertical wood wall ribs to be consistent with the positions of the wood bricks, and leveling the wood wall ribs by adopting a leveling ruler, so that the wood wall ribs are transversely flat and vertical.
As a still further scheme of the invention: s3 paves the nail welt in step two, selects 5mm plywood, passes through the iron nail with the plywood on the wooden wall muscle, and in the iron nail pin fin submerged in the plywood simultaneously, the concatenation of plywood was established in wooden wall muscle department, and the plywood face does not have the warpage, flushes and just levels clean.
As a still further scheme of the invention: in the second step, the screw fixation is adopted in S4 glass installation, and the screw fixation is suitable for being smaller than 1m2The glass is provided with a preset mounting hole, a screw with the diameter of 3-5mm is selected to pass through the lining plate through the mounting hole and be nailed into the wood wall rib, and the bonding fixation is suitable for being smaller than 1m2The glass is mainly used for column construction, the glass is bonded and fixed on the plywood by adopting epoxy resin glue, and the pressure support is fixed and is suitable for 2m2The glass is supported by the frame support, the glass is pressed on the plywood by the pressing strip, the bonding support is fixed, the bonding support is suitable for fixing larger glass, and a double fixing mode of bonding fixing and pressing support fixing is adopted.
As a still further scheme of the invention: the bonding combination glass in the third step means that small pieces of glass are bonded and fixed, the position of a preset elastic line of the mounting cover is bonded and fixed piece by piece from bottom to top, glass cement is coated between adjacent glass for reinforcement, the corner edge folding of the wall column surface comprises a line edge pressing method, a glass cement edge folding method and the combination of a glass mirror and a building base surface, a gap is reserved on the glass bonding surface by the line edge pressing method, the edge pressing and closing of the mounting line are fixed, the glass cement edge folding method is characterized in that glass cement is injected into the line or the diagonal direction of the glass for fixation, the combination of the glass mirror and the building base surface is constructed on the surface of an uneven wall surface, the flatness of the wall surface base surface needs to be detected and adjusted, wood wall ribs are brushed or adjusted again for leveling, and then glass installation is carried out.
Compared with the prior art, the invention has the beneficial effects that:
by the construction of the construction method, the construction steps and the construction process are optimized, the acceptance and detection of the system are provided, and new construction steps and materials are planned, so that the construction is more convenient, the preparation and the operation of constructors are facilitated, the mirror surface installation is more stable and safer, and the possibility of falling is reduced.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the embodiment of the invention, a construction method for installing a mirror glass wall surface comprises the following steps:
the method comprises the following steps: the construction preparation comprises material preparation and tool preparation, wherein the material preparation comprises glass material preparation, substrate material preparation and fixing material preparation, circular arc grooves are formed in the peripheries of the glass materials, the substrate materials comprise wood wall ribs, lining plates, substrate cushion blocks, waterproof materials and linoleum, the lining plates are wood plates or plywood, the waterproof materials comprise asphalt, waterproof coatings and waterproof cloth, the substrate cushion blocks comprise wood bricks, rubber, plastics and fibers, the fixing materials comprise screws, iron nails, glass cement, epoxy resin cement, battens, frame supports and lines, the battens and the frame supports are stone materials, wood materials, plastics and metal profiles, the lines are wood materials, and the tool preparation comprises glass blocks, glass suckers, leveling rulers, hammers and screwdrivers;
step two: the construction process comprises the following steps:
s1: cleaning a base layer;
s2: erecting ribs;
s3: paving a nail lining plate;
s4: mounting, cutting and fixing glass, wherein the cutting is to cut the glass into a designed size and shape, and the fixing comprises screw fixing, bonding fixing, pressing support fixing and bonding support fixing;
step three: special condition treatment, including bonding the combined glass and wall column corner edge folding;
step four: the quality standard comprises a main control project and a general project, wherein the main control project comprises product quality inspection and certification inspection, performance report inspection, entrance inspection and record inspection, installation effect observation, size inspection and installation stability inspection, and the general project comprises scratch inspection, damage inspection and dirt inspection;
step five: the method comprises the following steps of constructing according to a graph, preventing water at a water accumulation part, selecting the same batch of glass in the same area during glass installation, preventing chromatic aberration, storing the glass in a dry and ventilated room, and cleaning the surface of the glass by using a glass cleaner after the glass is installed.
Step one, the waterproof material is most preferably asphalt, the backing cushion block is most preferably a wood brick, the batten and the frame support are most preferably stone, and the lining plate is most preferably a plywood.
In the second step, S1 cleaning the base layer is to pre-embed wood bricks when building a wall or a column, the positions of the wood bricks correspond to the transverse dimension and the vertical dimension of glass installation, the distance between the wood bricks is 500mm, and simultaneously, the wall surface is coated with hot asphalt.
And step two, S2 erecting the ribs, selecting 40mm or 50mm wood wall ribs, fixing the wood wall ribs on the wood bricks through iron nails, enabling the positions of the transverse and vertical wood wall ribs to be consistent with the positions of the wood bricks, and leveling the wood wall ribs by adopting a leveling ruler, so that the wood wall ribs are transversely flat and vertical.
And S3 paving a nailed lining board in the second step, selecting a 5mm plywood, nailing the plywood on the wood wall ribs through iron nails, simultaneously immersing nail heads of the iron nails into the plywood, splicing the plywood out and arranging the plywood at the wood wall ribs, and enabling the surface of the plywood to be free of warping, flush and flat and clean.
In the second step, the screw fixation is adopted in S4 glass installation, and the screw fixation is suitable for being smaller than 1m2The glass is provided with a preset mounting hole, a screw with the diameter of 3-5mm is selected to pass through the lining plate through the mounting hole and be nailed into the wood wall rib, and the bonding fixation is suitable for being smaller than 1m2The glass is mainly used for column construction, and is bonded and fixed by epoxy resin glueOn the board, the pressing support is fixed, and the pressing support is fixed and applicable to 2m2The glass is supported by the frame support, the glass is pressed on the plywood by the pressing strip, the bonding support is fixed, the bonding support is suitable for fixing larger glass, and a double fixing mode of bonding fixing and pressing support fixing is adopted.
The bonding combination glass in the third step means that small pieces of glass are bonded and fixed, the position of a preset elastic line of a mounting cover is bonded and fixed from bottom to top one by one, glass cement is coated between adjacent glass for reinforcement, the corner edge folding of a wall column surface comprises a line edge pressing method, a glass cement edge folding method and the combination of a glass mirror and a building base surface, a gap is reserved on the glass bonding surface by the line edge pressing method, the mounting line edge pressing and closing are fixed, the glass cement edge folding method is characterized in that glass cement is injected into a line or the diagonal of the glass for fixation, the combination of the glass mirror and the building base surface is constructed on the surface of an uneven wall surface, the flatness of the wall surface base surface needs to be detected and adjusted, wood wall ribs are brushed or adjusted again for leveling, and then glass mounting is carried out.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that various changes in the embodiments and/or modifications of the invention can be made, and equivalents and modifications of some features of the invention can be made without departing from the spirit and scope of the invention.

Claims (7)

1. A construction method for installing a mirror glass wall surface is characterized in that: the method comprises the following steps:
the method comprises the following steps: the construction preparation comprises material preparation and tool preparation, wherein the material preparation comprises glass material preparation, substrate material preparation and fixing material preparation, circular arc grooves are formed in the peripheries of the glass materials, the substrate materials comprise wood wall ribs, lining plates, substrate cushion blocks, waterproof materials and linoleum, the lining plates are wood plates or plywood, the waterproof materials comprise asphalt, waterproof coatings and waterproof cloth, the substrate cushion blocks comprise wood bricks, rubber, plastics and fibers, the fixing materials comprise screws, iron nails, glass cement, epoxy resin cement, battens, frame supports and lines, the battens and the frame supports are stone materials, wood materials, plastics and metal profiles, the lines are wood materials, and the tool preparation comprises glass blocks, glass suckers, leveling rulers, hammers and screwdrivers;
step two: the construction process comprises the following steps:
s1: cleaning a base layer;
s2: erecting ribs;
s3: paving a nail lining plate;
s4: mounting, cutting and fixing glass, wherein the cutting is to cut the glass into a designed size and shape, and the fixing comprises screw fixing, bonding fixing, pressing support fixing and bonding support fixing;
step three: special condition treatment, including bonding the combined glass and wall column corner edge folding;
step four: the quality standard comprises a main control project and a general project, wherein the main control project comprises product quality inspection and certification inspection, performance report inspection, entrance inspection and record inspection, installation effect observation, size inspection and installation stability inspection, and the general project comprises scratch inspection, damage inspection and dirt inspection;
step five: the method comprises the following steps of constructing according to a graph, preventing water at a water accumulation part, selecting the same batch of glass in the same area during glass installation, storing the glass in a dry and ventilated room, and cleaning the surface of the glass by using a glass cleaner after the glass is installed in a vertical position.
2. A construction method for installing a mirror-finished glass wall surface according to claim 1, wherein: the waterproof material in the step is most preferably asphalt, the backing cushion block is most preferably wood brick, the batten and the frame support are most preferably stone, and the lining plate is most preferably plywood.
3. A construction method for installing a mirror-finished glass wall surface according to claim 1, wherein: in the second step, the step S1 is to pre-embed wood bricks when building a wall or a column, the positions of the wood bricks correspond to the transverse dimension and the vertical dimension of glass installation, the distance between the wood bricks is 500mm, and hot asphalt is coated on the wall surface.
4. A construction method for installing a mirror-finished glass wall surface according to claim 1, wherein: and step two, S2 erecting the ribs, selecting and selecting 40mm or 50mm wood wall ribs, fixing the wood wall ribs on the wood-wood bricks through iron nails, enabling the positions of the transverse and vertical wood wall ribs to be consistent with the positions of the wood bricks, and leveling the wood wall ribs by adopting a leveling ruler, so that the wood wall ribs are transversely flat and vertical.
5. A construction method for installing a mirror-finished glass wall surface according to claim 1, wherein: s3 paves the nail welt in step two, selects 5mm plywood, passes through the iron nail with the plywood on the wooden wall muscle, and in the iron nail pin fin submerged in the plywood simultaneously, the concatenation of plywood was established in wooden wall muscle department, and the plywood face does not have the warpage, flushes and just levels clean.
6. A construction method for installing a mirror-finished glass wall surface according to claim 1, wherein: in the second step, the screw fixation is adopted in S4 glass installation, and the screw fixation is suitable for being smaller than 1m2The glass is provided with a preset mounting hole, a screw with the diameter of 3-5mm is selected to pass through the lining plate through the mounting hole and be nailed into the wood wall rib, and the bonding fixation is suitable for being smaller than 1m2The glass is mainly used for column construction, the glass is bonded and fixed on the plywood by adopting epoxy resin glue, and the pressure support is fixed and is suitable for 2m2The glass is supported by the frame support, the glass is pressed on the plywood by the pressing strip, the bonding support is fixed, the bonding support is suitable for fixing larger glass, and a double fixing mode of bonding fixing and pressing support fixing is adopted.
7. A construction method for installing a mirror-finished glass wall surface according to claim 1, wherein: the bonding combination glass in the third step means that small pieces of glass are bonded and fixed, the position of a preset elastic line of the mounting cover is bonded and fixed piece by piece from bottom to top, glass cement is coated between adjacent glass for reinforcement, the corner edge folding of the wall column surface comprises a line edge pressing method, a glass cement edge folding method and the combination of a glass mirror and a building base surface, a gap is reserved on the glass bonding surface by the line edge pressing method, the edge pressing and closing of the mounting line are fixed, the glass cement edge folding method is characterized in that glass cement is injected into the line or the diagonal direction of the glass for fixation, the combination of the glass mirror and the building base surface is constructed on the surface of an uneven wall surface, the flatness of the wall surface base surface needs to be detected and adjusted, wood wall ribs are brushed or adjusted again for leveling, and then glass installation is carried out.
CN202111010925.0A 2021-08-31 2021-08-31 Construction method for mounting mirror glass wall surface Pending CN113700251A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111010925.0A CN113700251A (en) 2021-08-31 2021-08-31 Construction method for mounting mirror glass wall surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111010925.0A CN113700251A (en) 2021-08-31 2021-08-31 Construction method for mounting mirror glass wall surface

Publications (1)

Publication Number Publication Date
CN113700251A true CN113700251A (en) 2021-11-26

Family

ID=78657851

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111010925.0A Pending CN113700251A (en) 2021-08-31 2021-08-31 Construction method for mounting mirror glass wall surface

Country Status (1)

Country Link
CN (1) CN113700251A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100605538B1 (en) * 2006-02-23 2006-07-31 (유)베토코리아 Color glass tile for wet process of construction
CN203755488U (en) * 2013-12-31 2014-08-06 重庆工程职业技术学院 Coreboard wall and wooden door and window frame connecting structure
CN106245826A (en) * 2016-08-13 2016-12-21 黄志巍 Non-bearing indoor separation wood wall and construction method thereof
CN108071203A (en) * 2016-11-16 2018-05-25 刘应华 The technique quickly constructed in furniture construction of hydropower to plank base
CN109424130A (en) * 2017-08-25 2019-03-05 成都美吉房地产营销策划有限公司 The technique of plank base construction efficiency is improved in construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100605538B1 (en) * 2006-02-23 2006-07-31 (유)베토코리아 Color glass tile for wet process of construction
CN203755488U (en) * 2013-12-31 2014-08-06 重庆工程职业技术学院 Coreboard wall and wooden door and window frame connecting structure
CN106245826A (en) * 2016-08-13 2016-12-21 黄志巍 Non-bearing indoor separation wood wall and construction method thereof
CN108071203A (en) * 2016-11-16 2018-05-25 刘应华 The technique quickly constructed in furniture construction of hydropower to plank base
CN109424130A (en) * 2017-08-25 2019-03-05 成都美吉房地产营销策划有限公司 The technique of plank base construction efficiency is improved in construction

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
主编:冯翔、副主编:张建英 牟杨: "《建筑装饰施工》", 30 September 2016, 中国轻工业出版社 *

Similar Documents

Publication Publication Date Title
CN208105573U (en) A kind of walling system
CN104790595A (en) Construction method for adjustable tile hanging system of pitched roof
CN106049539A (en) Building project construction method
CN103437521A (en) Plastic external corner angle bead for inner wall of building and construction method for internal and external corners of inner wall of building
CN114109030A (en) Construction method of special-shaped structure of bare concrete diaphragm wall
CN106836718A (en) Precast floor system and its assembly method
CN113006397A (en) Construction method for square leveling of kitchen and bathroom space
CN101105070A (en) Polyphenyl board exterior wall outer thermal insulation construction method
JP2002161623A (en) External-facing backing structure and external-facing backing construction method
CN113653289A (en) Floor anti-cracking method based on concrete shrinkage theory
CN113700251A (en) Construction method for mounting mirror glass wall surface
CN111910842A (en) Anti-aging rigid waterproof layer separation seam layered fine-work construction process
CN117266386A (en) Construction method of ultrathin vacuum insulation panel heat preservation system of building outer wall
CN111255191A (en) Semi-pre-pasted ceramic tile and paving method thereof
CN208347208U (en) A kind of new indoor walling system
CN221372722U (en) Calcium silicate board base layer local putty cracking-resistant system for interior wall
CN108978851A (en) A kind of improvement room finishing system and decoration method
CN210887932U (en) Grindstone terrace
CN218492950U (en) Warm up backfill type gypsum from levelling structure
KR200317571Y1 (en) skirt or moulding for building
CN114775880B (en) Construction method for dry-hanging archaized small green tiles on pitched roof with angle larger than 45 DEG
CN207812907U (en) A kind of anticollision wallboard of inner wall of building
CN213391209U (en) Novel supporting system for ribbed floor formwork
CN220100348U (en) Integrated heat-insulating board and roof with same
CN113389287A (en) Construction method of autoclaved aerated concrete precast slab

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20211126

RJ01 Rejection of invention patent application after publication