CN113668391A - 一种中承式钢箱提篮拱桥双幅拱肋同步安装方法 - Google Patents
一种中承式钢箱提篮拱桥双幅拱肋同步安装方法 Download PDFInfo
- Publication number
- CN113668391A CN113668391A CN202110885860.8A CN202110885860A CN113668391A CN 113668391 A CN113668391 A CN 113668391A CN 202110885860 A CN202110885860 A CN 202110885860A CN 113668391 A CN113668391 A CN 113668391A
- Authority
- CN
- China
- Prior art keywords
- arch
- arch rib
- ribs
- double
- rib sections
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D4/00—Arch-type bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/30—Metal
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明涉及一种中承式钢箱提篮拱桥双幅拱肋同步安装方法,将双幅拱肋节段通过手拉葫芦连接并保持一较小间距,两侧缆索吊将双幅拱肋同时起吊,空中移动过程中可从已安装完成的两幅拱肋的扣索之间通过,从而避免与前序扣索发生冲突;拱肋节段起吊到位后,逐渐放松手拉葫芦,使两拱肋节段的间距逐渐增大,同步移动到待安装位置与已安装拱肋对接,从而实现拱肋节段准确定位和同步安装。
Description
技术领域
本发明属于钢箱拱桥施工技术领域,具体涉及一种采用缆索吊安装中承式钢箱提篮拱桥拱肋节段时,对双幅拱肋同步安装的方法。
背景技术
如图1所示,中承式钢箱提篮拱桥的拱肋1通常采用缆索吊分节段吊装,施工过程中,需要在已安装完成的拱肋节段上安装扣索2以保持拱肋的线型。由于拱肋向桥内侧有一定的倾斜角度,被起吊的待安装节段3与待安装位置不在一个竖向断面内,需要牵引待安装节段横向移动到安装位置,但空中定位难度较大;缆索吊起吊待安装节段在空中移动过程中,容易发生横向摆动并与前序节段上的扣索发生冲突,影响正常施工;而且传统的施工方法是两侧缆索吊分别单独吊装两侧拱肋,同步性不易控制。
发明内容
本发明的目的是针对上述问题,提供一种中承式钢箱提篮拱桥双幅拱肋同步安装方法,降低拱肋节段空中定位难度,并在后续节段吊装时避免与前序节段扣索冲突。
本发明将双幅拱肋节段通过手拉葫芦连接并保持一较小间距,缆索吊将双幅拱肋同时起吊,空中移动过程中可从已安装完成的两幅拱肋的扣索之间通过,从而避免与前序扣索发生冲突;拱肋节段起吊到位后,逐渐放松手拉葫芦,使两拱肋节段的间距增大,同步移动到待安装位置与已安装拱肋对接,实现空中准确定位和同步安装。
附图说明
图1是现有技术中的拱肋节段吊装状态示意图;
图2是本发明将两幅拱肋节段通过手拉葫芦连接并起吊的状态示意图;
图3是缆索吊起吊拱肋节段移动的侧视图;
图4是缆索吊起吊拱肋节段通过已安装拱肋扣索之间的状态示意图;
图5是两幅拱肋节段起吊到已安装拱肋前方的状态示意图;
图6是两幅拱肋同步释放到安装位置的状态示意图。
具体实施方式
本发明的具体实施方式如下:
(1)如图2所示,在拱肋节段起吊区,将两个待安装的拱肋节段3并列放置,两拱肋节段的间距小于已安装的两幅拱肋1的扣索2的间距;两拱肋节段相对侧分别焊接两个耳板4,采用两个手拉葫芦5通过耳板将两拱肋节段3连接,并收紧手拉葫芦;
(2)如图2、图3、图4、图5所示,通过桥两侧的缆索吊6同步起吊两拱肋节段3,并沿已安装的两幅拱肋的扣索2之间滑行到已安装拱肋前方,然后将拱肋节段下降到安装高度;图中箭头方向为缆索吊携带拱肋移动方向;
(3)如图6所示,缓慢释放手拉葫芦5,使两拱肋节段依靠重力向两侧张开,分别与两侧拱肋对齐,然后将两拱肋节段3与两侧拱肋对接,并安装扣索;
(4)缆索吊返回起吊区,按上述步骤(1)到(3)起吊并安装后续节段。
Claims (1)
1.一种中承式钢箱提篮拱桥双幅拱肋同步安装方法,其特征在于,包括以下步骤:
(1)将两个待安装的拱肋节段并列放置,并使两拱肋节段的间距小于已安装的两幅拱肋的扣索间距;两拱肋节段相对侧分别焊接两个耳板,采用手拉葫芦通过耳板将两拱肋节段连接,并收紧手拉葫芦;
(2)两侧缆索吊同步起吊两拱肋节段,并沿已安装的两幅拱肋的扣索之间滑行到已安装拱肋前方;
(3)缓慢释放手拉葫芦,使两拱肋节段依靠重力向两侧张开,分别与两侧拱肋对齐,然后将两拱肋节段与两侧拱肋对接,并安装扣索;
(4)缆索吊返回起吊区,按上述步骤(1)到(3)起吊并安装后续节段。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110885860.8A CN113668391A (zh) | 2021-08-03 | 2021-08-03 | 一种中承式钢箱提篮拱桥双幅拱肋同步安装方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110885860.8A CN113668391A (zh) | 2021-08-03 | 2021-08-03 | 一种中承式钢箱提篮拱桥双幅拱肋同步安装方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113668391A true CN113668391A (zh) | 2021-11-19 |
Family
ID=78541229
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110885860.8A Pending CN113668391A (zh) | 2021-08-03 | 2021-08-03 | 一种中承式钢箱提篮拱桥双幅拱肋同步安装方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113668391A (zh) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101476293A (zh) * | 2009-01-16 | 2009-07-08 | 广东省长大公路工程有限公司 | 大型桥梁拱肋无支架施工方法 |
CN106087752A (zh) * | 2016-06-30 | 2016-11-09 | 中国化学工程第三建设有限公司 | 多跨提篮拱桥施工方法 |
CN108797336A (zh) * | 2018-06-12 | 2018-11-13 | 株洲时代新材料科技股份有限公司 | 一种桥梁检查车 |
CN109914259A (zh) * | 2019-04-09 | 2019-06-21 | 中铁十八局集团第二工程有限公司 | 起吊平台受限的钢桁拱吊装方法 |
CN110080083A (zh) * | 2019-06-10 | 2019-08-02 | 中铁十八局集团第二工程有限公司 | 安装提篮式钢桁拱主弦杆的方法 |
CN110230262A (zh) * | 2019-05-31 | 2019-09-13 | 中铁五局集团有限公司 | 提篮式钢管拱桥主拱肋半整体吊装结构及对接方法 |
US20210164176A1 (en) * | 2020-11-12 | 2021-06-03 | China Railway No.3 Engineering Group Co.Ltd | Method For Installing Steel Tube Arches |
-
2021
- 2021-08-03 CN CN202110885860.8A patent/CN113668391A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101476293A (zh) * | 2009-01-16 | 2009-07-08 | 广东省长大公路工程有限公司 | 大型桥梁拱肋无支架施工方法 |
CN106087752A (zh) * | 2016-06-30 | 2016-11-09 | 中国化学工程第三建设有限公司 | 多跨提篮拱桥施工方法 |
CN108797336A (zh) * | 2018-06-12 | 2018-11-13 | 株洲时代新材料科技股份有限公司 | 一种桥梁检查车 |
CN109914259A (zh) * | 2019-04-09 | 2019-06-21 | 中铁十八局集团第二工程有限公司 | 起吊平台受限的钢桁拱吊装方法 |
CN110230262A (zh) * | 2019-05-31 | 2019-09-13 | 中铁五局集团有限公司 | 提篮式钢管拱桥主拱肋半整体吊装结构及对接方法 |
CN110080083A (zh) * | 2019-06-10 | 2019-08-02 | 中铁十八局集团第二工程有限公司 | 安装提篮式钢桁拱主弦杆的方法 |
US20210164176A1 (en) * | 2020-11-12 | 2021-06-03 | China Railway No.3 Engineering Group Co.Ltd | Method For Installing Steel Tube Arches |
Non-Patent Citations (2)
Title |
---|
李彩霞等: "大跨度钢管砼拱桥拱肋预制与吊装的线形控制", 《湖北工业大学学报》 * |
袁长春: "主跨270m提篮式钢管混凝土拱桥拼装施工技术", 《铁道标准设计》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105317008A (zh) | 一种钢桁梁斜拉桥钢桁梁节段的整体吊运方法 | |
CN109944166B (zh) | 一种超长大倾角隧道锚大吨位散索鞍下滑及安装系统及操作方法 | |
CN110760634A (zh) | 一种高炉炉壳安装方法 | |
CN110407078B (zh) | 一种多吊点的闸门节段转体吊装施工方法 | |
CN108946475B (zh) | 一种用于卧式设备的翻转吊装系统及吊装方法 | |
CN113668391A (zh) | 一种中承式钢箱提篮拱桥双幅拱肋同步安装方法 | |
CN102826459A (zh) | 一种用于海洋平台的水下结构件吊装装置及吊装方法 | |
CN210795496U (zh) | 双向液压调节吊具 | |
CN205241086U (zh) | 模板吊装和安拆用炮车 | |
CN210068210U (zh) | 采用钢丝绳起吊的管片吊运系统 | |
CN2644490Y (zh) | 大吨位拱肋吊装调整装置 | |
CN208183540U (zh) | 钢箱梁安装用桥面吊机 | |
CN106968371B (zh) | 一种幕墙结构高空飘翼分节结构的施工方法 | |
CN214733817U (zh) | 门式启闭机 | |
CN115339992A (zh) | 一种轨枕模具用的吊具系统及吊装方法 | |
CN113800411A (zh) | 一种用浮吊进行fpso火炬塔吊装的方法 | |
CN111620237B (zh) | 吊车梁内管道安装装置和安装方法 | |
CN113503047A (zh) | 钢结构提升过程中牵引调整高空位置偏移的方法 | |
CN210286532U (zh) | 一种液压拖曳起升式双梁钢丝绳吊机 | |
CN112377672A (zh) | 旧厂房除尘管道改造安装方法及其专用的管道移动吊装装置 | |
CN104709813A (zh) | 一种利用横吊梁进行高炉框架结构安装方法 | |
CN205346600U (zh) | 一种大板梁吊装专用工具 | |
CN106979019B (zh) | 一种用于分片预制装配化地下管廊的管片拼装舱结构 | |
CN211945963U (zh) | 一种车载卸装装置 | |
CN209721378U (zh) | 一种新泽西护栏吊装机具 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20211119 |