CN113668391A - 一种中承式钢箱提篮拱桥双幅拱肋同步安装方法 - Google Patents

一种中承式钢箱提篮拱桥双幅拱肋同步安装方法 Download PDF

Info

Publication number
CN113668391A
CN113668391A CN202110885860.8A CN202110885860A CN113668391A CN 113668391 A CN113668391 A CN 113668391A CN 202110885860 A CN202110885860 A CN 202110885860A CN 113668391 A CN113668391 A CN 113668391A
Authority
CN
China
Prior art keywords
arch
arch rib
ribs
double
rib sections
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110885860.8A
Other languages
English (en)
Inventor
周建军
张�杰
孙艺
张梵
王锦超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Road and Bridge East China Engineering Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Road and Bridge East China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, Road and Bridge East China Engineering Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN202110885860.8A priority Critical patent/CN113668391A/zh
Publication of CN113668391A publication Critical patent/CN113668391A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D4/00Arch-type bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及一种中承式钢箱提篮拱桥双幅拱肋同步安装方法,将双幅拱肋节段通过手拉葫芦连接并保持一较小间距,两侧缆索吊将双幅拱肋同时起吊,空中移动过程中可从已安装完成的两幅拱肋的扣索之间通过,从而避免与前序扣索发生冲突;拱肋节段起吊到位后,逐渐放松手拉葫芦,使两拱肋节段的间距逐渐增大,同步移动到待安装位置与已安装拱肋对接,从而实现拱肋节段准确定位和同步安装。

Description

一种中承式钢箱提篮拱桥双幅拱肋同步安装方法
技术领域
本发明属于钢箱拱桥施工技术领域,具体涉及一种采用缆索吊安装中承式钢箱提篮拱桥拱肋节段时,对双幅拱肋同步安装的方法。
背景技术
如图1所示,中承式钢箱提篮拱桥的拱肋1通常采用缆索吊分节段吊装,施工过程中,需要在已安装完成的拱肋节段上安装扣索2以保持拱肋的线型。由于拱肋向桥内侧有一定的倾斜角度,被起吊的待安装节段3与待安装位置不在一个竖向断面内,需要牵引待安装节段横向移动到安装位置,但空中定位难度较大;缆索吊起吊待安装节段在空中移动过程中,容易发生横向摆动并与前序节段上的扣索发生冲突,影响正常施工;而且传统的施工方法是两侧缆索吊分别单独吊装两侧拱肋,同步性不易控制。
发明内容
本发明的目的是针对上述问题,提供一种中承式钢箱提篮拱桥双幅拱肋同步安装方法,降低拱肋节段空中定位难度,并在后续节段吊装时避免与前序节段扣索冲突。
本发明将双幅拱肋节段通过手拉葫芦连接并保持一较小间距,缆索吊将双幅拱肋同时起吊,空中移动过程中可从已安装完成的两幅拱肋的扣索之间通过,从而避免与前序扣索发生冲突;拱肋节段起吊到位后,逐渐放松手拉葫芦,使两拱肋节段的间距增大,同步移动到待安装位置与已安装拱肋对接,实现空中准确定位和同步安装。
附图说明
图1是现有技术中的拱肋节段吊装状态示意图;
图2是本发明将两幅拱肋节段通过手拉葫芦连接并起吊的状态示意图;
图3是缆索吊起吊拱肋节段移动的侧视图;
图4是缆索吊起吊拱肋节段通过已安装拱肋扣索之间的状态示意图;
图5是两幅拱肋节段起吊到已安装拱肋前方的状态示意图;
图6是两幅拱肋同步释放到安装位置的状态示意图。
具体实施方式
本发明的具体实施方式如下:
(1)如图2所示,在拱肋节段起吊区,将两个待安装的拱肋节段3并列放置,两拱肋节段的间距小于已安装的两幅拱肋1的扣索2的间距;两拱肋节段相对侧分别焊接两个耳板4,采用两个手拉葫芦5通过耳板将两拱肋节段3连接,并收紧手拉葫芦;
(2)如图2、图3、图4、图5所示,通过桥两侧的缆索吊6同步起吊两拱肋节段3,并沿已安装的两幅拱肋的扣索2之间滑行到已安装拱肋前方,然后将拱肋节段下降到安装高度;图中箭头方向为缆索吊携带拱肋移动方向;
(3)如图6所示,缓慢释放手拉葫芦5,使两拱肋节段依靠重力向两侧张开,分别与两侧拱肋对齐,然后将两拱肋节段3与两侧拱肋对接,并安装扣索;
(4)缆索吊返回起吊区,按上述步骤(1)到(3)起吊并安装后续节段。

Claims (1)

1.一种中承式钢箱提篮拱桥双幅拱肋同步安装方法,其特征在于,包括以下步骤:
(1)将两个待安装的拱肋节段并列放置,并使两拱肋节段的间距小于已安装的两幅拱肋的扣索间距;两拱肋节段相对侧分别焊接两个耳板,采用手拉葫芦通过耳板将两拱肋节段连接,并收紧手拉葫芦;
(2)两侧缆索吊同步起吊两拱肋节段,并沿已安装的两幅拱肋的扣索之间滑行到已安装拱肋前方;
(3)缓慢释放手拉葫芦,使两拱肋节段依靠重力向两侧张开,分别与两侧拱肋对齐,然后将两拱肋节段与两侧拱肋对接,并安装扣索;
(4)缆索吊返回起吊区,按上述步骤(1)到(3)起吊并安装后续节段。
CN202110885860.8A 2021-08-03 2021-08-03 一种中承式钢箱提篮拱桥双幅拱肋同步安装方法 Pending CN113668391A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110885860.8A CN113668391A (zh) 2021-08-03 2021-08-03 一种中承式钢箱提篮拱桥双幅拱肋同步安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110885860.8A CN113668391A (zh) 2021-08-03 2021-08-03 一种中承式钢箱提篮拱桥双幅拱肋同步安装方法

Publications (1)

Publication Number Publication Date
CN113668391A true CN113668391A (zh) 2021-11-19

Family

ID=78541229

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110885860.8A Pending CN113668391A (zh) 2021-08-03 2021-08-03 一种中承式钢箱提篮拱桥双幅拱肋同步安装方法

Country Status (1)

Country Link
CN (1) CN113668391A (zh)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101476293A (zh) * 2009-01-16 2009-07-08 广东省长大公路工程有限公司 大型桥梁拱肋无支架施工方法
CN106087752A (zh) * 2016-06-30 2016-11-09 中国化学工程第三建设有限公司 多跨提篮拱桥施工方法
CN108797336A (zh) * 2018-06-12 2018-11-13 株洲时代新材料科技股份有限公司 一种桥梁检查车
CN109914259A (zh) * 2019-04-09 2019-06-21 中铁十八局集团第二工程有限公司 起吊平台受限的钢桁拱吊装方法
CN110080083A (zh) * 2019-06-10 2019-08-02 中铁十八局集团第二工程有限公司 安装提篮式钢桁拱主弦杆的方法
CN110230262A (zh) * 2019-05-31 2019-09-13 中铁五局集团有限公司 提篮式钢管拱桥主拱肋半整体吊装结构及对接方法
US20210164176A1 (en) * 2020-11-12 2021-06-03 China Railway No.3 Engineering Group Co.Ltd Method For Installing Steel Tube Arches

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101476293A (zh) * 2009-01-16 2009-07-08 广东省长大公路工程有限公司 大型桥梁拱肋无支架施工方法
CN106087752A (zh) * 2016-06-30 2016-11-09 中国化学工程第三建设有限公司 多跨提篮拱桥施工方法
CN108797336A (zh) * 2018-06-12 2018-11-13 株洲时代新材料科技股份有限公司 一种桥梁检查车
CN109914259A (zh) * 2019-04-09 2019-06-21 中铁十八局集团第二工程有限公司 起吊平台受限的钢桁拱吊装方法
CN110230262A (zh) * 2019-05-31 2019-09-13 中铁五局集团有限公司 提篮式钢管拱桥主拱肋半整体吊装结构及对接方法
CN110080083A (zh) * 2019-06-10 2019-08-02 中铁十八局集团第二工程有限公司 安装提篮式钢桁拱主弦杆的方法
US20210164176A1 (en) * 2020-11-12 2021-06-03 China Railway No.3 Engineering Group Co.Ltd Method For Installing Steel Tube Arches

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李彩霞等: "大跨度钢管砼拱桥拱肋预制与吊装的线形控制", 《湖北工业大学学报》 *
袁长春: "主跨270m提篮式钢管混凝土拱桥拼装施工技术", 《铁道标准设计》 *

Similar Documents

Publication Publication Date Title
CN105317008A (zh) 一种钢桁梁斜拉桥钢桁梁节段的整体吊运方法
CN109944166B (zh) 一种超长大倾角隧道锚大吨位散索鞍下滑及安装系统及操作方法
CN110760634A (zh) 一种高炉炉壳安装方法
CN110407078B (zh) 一种多吊点的闸门节段转体吊装施工方法
CN108946475B (zh) 一种用于卧式设备的翻转吊装系统及吊装方法
CN113668391A (zh) 一种中承式钢箱提篮拱桥双幅拱肋同步安装方法
CN102826459A (zh) 一种用于海洋平台的水下结构件吊装装置及吊装方法
CN210795496U (zh) 双向液压调节吊具
CN205241086U (zh) 模板吊装和安拆用炮车
CN210068210U (zh) 采用钢丝绳起吊的管片吊运系统
CN2644490Y (zh) 大吨位拱肋吊装调整装置
CN208183540U (zh) 钢箱梁安装用桥面吊机
CN106968371B (zh) 一种幕墙结构高空飘翼分节结构的施工方法
CN214733817U (zh) 门式启闭机
CN115339992A (zh) 一种轨枕模具用的吊具系统及吊装方法
CN113800411A (zh) 一种用浮吊进行fpso火炬塔吊装的方法
CN111620237B (zh) 吊车梁内管道安装装置和安装方法
CN113503047A (zh) 钢结构提升过程中牵引调整高空位置偏移的方法
CN210286532U (zh) 一种液压拖曳起升式双梁钢丝绳吊机
CN112377672A (zh) 旧厂房除尘管道改造安装方法及其专用的管道移动吊装装置
CN104709813A (zh) 一种利用横吊梁进行高炉框架结构安装方法
CN205346600U (zh) 一种大板梁吊装专用工具
CN106979019B (zh) 一种用于分片预制装配化地下管廊的管片拼装舱结构
CN211945963U (zh) 一种车载卸装装置
CN209721378U (zh) 一种新泽西护栏吊装机具

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20211119