CN113605683A - Method for protecting free face of outer wall masonry under construction with climbing frame - Google Patents
Method for protecting free face of outer wall masonry under construction with climbing frame Download PDFInfo
- Publication number
- CN113605683A CN113605683A CN202110909660.1A CN202110909660A CN113605683A CN 113605683 A CN113605683 A CN 113605683A CN 202110909660 A CN202110909660 A CN 202110909660A CN 113605683 A CN113605683 A CN 113605683A
- Authority
- CN
- China
- Prior art keywords
- frame system
- connecting piece
- combined
- protection frame
- steel pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 36
- 230000009194 climbing Effects 0.000 title claims abstract description 22
- 238000000034 method Methods 0.000 title claims abstract description 22
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 38
- 239000010959 steel Substances 0.000 claims abstract description 38
- 230000001681 protective effect Effects 0.000 claims abstract description 35
- 238000009435 building construction Methods 0.000 claims abstract description 5
- 238000006243 chemical reaction Methods 0.000 claims abstract description 5
- 239000000463 material Substances 0.000 abstract description 5
- 230000007306 turnover Effects 0.000 abstract description 5
- 238000007789 sealing Methods 0.000 abstract description 3
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 238000009434 installation Methods 0.000 description 5
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/20—Movable forms; Movable forms for moulding cylindrical, conical or hyperbolical structures; Templates serving as forms for positioning blocks or the like
- E04G11/28—Climbing forms, i.e. forms which are not in contact with the poured concrete during lifting from layer to layer and which are anchored in the hardened concrete
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/32—Safety or protective measures for persons during the construction of buildings
- E04G21/3204—Safety or protective measures for persons during the construction of buildings against falling down
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/32—Safety or protective measures for persons during the construction of buildings
- E04G21/3204—Safety or protective measures for persons during the construction of buildings against falling down
- E04G21/3247—Storey high safety barrier hung from the facade and sliding up from level to level as work progresses
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/32—Safety or protective measures for persons during the construction of buildings
- E04G21/3261—Safety-nets; Safety mattresses; Arrangements on buildings for connecting safety-lines
- E04G21/3266—Safety nets
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
The invention discloses a method for protecting an empty face of an outer wall masonry along with climbing frame construction, which comprises the following steps: connecting the upper connecting piece of the combined protective frame system and the lower connecting piece of the combined protective frame system with a circle of frame beams around the main structure before the climbing frame is lifted; the steel pipes penetrate through the holes of the connecting pieces at the upper part of the combined protection frame system from top to bottom, and are fixed with the connecting pieces at the lower part of the combined protection frame system, and the steel pipes are arranged at intervals of 1.2m along the holes of the main body structure after the single combined protection frame system is built for the second time; sealing an area formed by the combined protection frame system by adopting a dense mesh net, and performing secondary structure building construction in the sealed area with protection; after this layer construction, can follow this floor layer and take off in proper order and to being about to construct the one deck conversion to the connecting piece that the one deck system will be assembled to the top plate layer to reach the material turnover, practiced thrift the purpose of cost of manufacture.
Description
Technical Field
The invention relates to the technical field of building construction, in particular to a method for protecting an empty face of an outer wall masonry along with climbing frame construction.
Background
The existing outer wall protection frame is constructed by adopting the integrated lifting operation platform, so that the integrated lifting operation platform is used for building a wall after climbing up, no safety protection is provided or one set of integrated lifting operation platform needs to be added again, and if the construction is asynchronous, the potential safety hazard is quite large. The bottom outer wall construction that integrated form lift operation platform covered must be accomplished before integrated form lift operation platform climbs at every turn, otherwise, after integrated form lift operation platform climbs, the main building outside will not have the protection of outrigger, and ten minutes is unsafe, moreover, if adopt the hanging flower basket to be the brickwork construction, the floor faces the limit and protects the problem, the object problem falls from the height, cross operation problem etc. and appears equally very easily, and total progress also can receive the influence moreover.
Disclosure of Invention
The invention aims to provide a method for protecting an empty face of an outer wall masonry along with climbing frame construction, which has the advantages of simple steps, simplicity in operation, economy and reasonability and is used for solving the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme:
a method for protecting the exposed surface of an outer wall masonry along with the construction of a climbing frame comprises a combined protection frame system, a combined protection frame system upper connecting piece, a combined protection frame system lower connecting piece, a main body structure and a frame beam, and comprises the following steps:
s1: connecting the upper connecting piece of the combined protective frame system and the lower connecting piece of the combined protective frame system with a circle of frame beams around the main structure before the climbing frame is lifted;
s2: the steel pipe penetrates through the hole of the connecting piece at the upper part of the combined protection frame system from top to bottom and is fixed with the connecting piece at the lower part of the combined protection frame system;
s3: after the single combined protection frame system is finished, arranging the combined protection frame system along the opening of the main body structure which is subjected to secondary building at intervals of 1.2 m;
s4: sealing an area formed by the combined protection frame system by adopting a dense mesh net;
s5: performing secondary structure building construction in the protected closed area;
s6: after this layer construction, can follow this layer floor layer and take off the connecting piece of combination protection frame system in proper order and to being about to construct the one deck conversion can to the top board layer.
Furthermore, in S1, the connection mode between the upper connection piece of the combined protection frame system and the lower connection piece of the combined protection frame system and the circle of frame beam around the main structure is expansion bolts or through holes reserved in the beam.
Furthermore, the upper connecting piece of the combined protection frame system and the lower connecting piece of the combined protection frame system are both of an angle steel structure, bolt holes are formed in the back faces of the upper connecting piece of the combined protection frame system and the lower connecting piece of the combined protection frame system, the bolt holes are fixedly connected with the frame beam through driven expansion bolts, through holes are reserved in the bottom face of the upper connecting piece of the combined protection frame system, a steel pipe base is arranged on the bottom face of the lower connecting piece of the combined protection frame system, and the outer diameter of the steel pipe base is smaller than the inner diameter of a steel pipe; the steel pipe penetrates through the through hole of the upper connecting piece of the combined protection frame system and is fixed by the steel pipe base on the bottom surface of the lower connecting piece of the combined protection frame system, and the bottom end of the steel pipe is sleeved on the steel pipe base.
Furthermore, the frame beam is fixedly connected with the main body structure.
Furthermore, the combined protection frame body is formed by assembling a plurality of independent structures on the frame beam.
Furthermore, the dense mesh net is detachably arranged on the combined protection frame systems, and forms a protection structure for the empty surfaces of the combined protection frame systems.
Compared with the prior art, the invention has the beneficial effects that:
1. according to the method for protecting the exposed surface of the exterior wall masonry along with the climbing frame construction, which is provided by the invention, the safety risk is reduced and the cost is saved, the construction and the installation of the combined protection frame system are realized through the upper connecting piece of the combined protection frame system, the lower connecting piece of the combined protection frame system and the steel pipe, so that the connection mode of the combined protection frame system and the frame beam is flexible and changeable, and the operation can be carried out according to the actual situation on site.
2. According to the method for protecting the exposed surface of the exterior wall masonry along with the climbing frame construction, during construction, a steel pipe penetrates through the upper connecting piece of the combined protection frame system from top to bottom and is fixed with the lower connecting piece of the combined protection frame system, the whole system is flexible, construction, installation and disassembly are simple and convenient, and the area formed by the combined protection frame system is sealed by a dense mesh net, so that the method is green and environment-friendly.
3. According to the method for protecting the exposed surface of the outer wall masonry along with the climbing frame construction, after the construction of the floor is finished, the connecting pieces of the combined protection frame system can be sequentially taken down from the floor layer to the top plate layer, and the construction is changed to the layer to be constructed, so that the material turnover is achieved, and the method is economical and reasonable.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a front exploded view of the assembled protective frame system of the present invention;
FIG. 3 is a rear exploded view of the modular safety frame system of the present invention;
FIG. 4 is an upper and lower connector installation view of the modular protective frame system of the present invention;
FIG. 5 is a side view of the upper and lower connectors of the modular protective frame system of the present invention;
FIG. 6 is a top view of the connector of the present invention;
FIG. 7 is a view of the structure of the lower connecting member of the combined protection frame system of the present invention.
In the figure: 1. a combined protective frame system; 2. an upper connecting piece of the combined protective frame system; 3. a lower connecting piece of the combined protective frame system; 4. a body structure; 5. a frame beam; 6. a steel pipe; 7. sealing the dense mesh net; 8. an expansion bolt; 9. perforating; 10. a steel pipe base; 11. bolt holes.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-7, in the embodiment of the present invention: the method for protecting the exposed surface of the exterior wall masonry along with the construction of the climbing frame comprises a combined protection frame system 1, a combined protection frame system upper connecting piece 2, a combined protection frame system lower connecting piece 3, a main structure 4 and a frame beam 5, and comprises the following steps:
the first step is as follows: before the climbing frame is lifted, connecting pieces 2 at the upper part of the combined protection frame system and connecting pieces 3 at the lower part of the combined protection frame system with a circle of frame beams 5 around a main structure 4; the connection mode of the upper connecting piece 2 of the combined protective frame system and the lower connecting piece 3 of the combined protective frame system and a circle of frame beams 5 around the main structure 4 is connected by expansion bolts 8 or reserved through holes 9 in the beams, the connection mode is flexible and changeable, and the operation can be carried out according to the actual situation on site;
the second step is that: the steel pipe 6 is penetrated from the hole of the upper connecting piece 2 of the combined protective frame system from top to bottom and is fixed with the lower connecting piece 3 of the combined protective frame system;
the third step: after the single combined protective frame system 1 is finished, arranging the combined protective frame system along the main body structure 4 at the hole opening interval of 1.2m for secondary masonry;
the fourth step: the area formed by the combined protection frame system 1 is sealed by a dense mesh 7, so that the environment is protected;
the fifth step: performing secondary structure building construction in the protected closed area;
and a sixth step: after this layer construction, can follow this floor layer and take off in proper order and to being about to construct the one deck conversion to the connecting piece that the one deck will make up protection frame system 1 to the top board layer to reach the material turnover, economy is reasonable.
In the above embodiment, the upper connecting piece 2 of the combined protection frame system and the lower connecting piece 3 of the combined protection frame system are both angle steel structures, bolt holes 11 are arranged on the back surfaces of the upper connecting piece 2 of the combined protection frame system and the lower connecting piece 3 of the combined protection frame system, the bolt holes 11 are fixedly connected with the frame beam 5 through the driven expansion bolts 8, through holes 9 are reserved on the bottom surface of the upper connecting piece 2 of the combined protection frame system, a steel pipe base 10 is arranged on the bottom surface of the lower connecting piece 3 of the combined protection frame system, and the outer diameter of the steel pipe base 10 is smaller than the inner diameter of the steel pipe 6; the steel pipe 6 penetrates through the through hole 9 of the upper connecting piece 2 of the combined protection frame system and is fixed by a steel pipe base 10 on the bottom surface of the lower connecting piece 3 of the combined protection frame system, and the bottom end of the steel pipe 6 is sleeved on the steel pipe base 10; wherein, the frame beam 5 is fixedly connected with the main structure 4; the combined protective frame system 1 is assembled on the frame beam 5 by a plurality of independent structures; the dense mesh net 7 is detachably mounted on the plurality of combined protection frame systems 1, and forms a protection structure for the empty surfaces of the plurality of combined protection frame systems 1.
The working principle is as follows: the invention provides a method for protecting an empty face of an outer wall masonry along with the construction of a climbing frame, which consists of three parts, namely a combined protection frame system upper connecting piece 2 with a through hole 9, a combined protection frame system lower connecting piece 3 with a steel pipe base 10 and a steel pipe 6; the connection modes of the upper connecting piece 2 of the combined protective frame system, the lower connecting piece 3 of the combined protective frame system and the frame beam 5 are flexible and changeable, and can be operated according to the actual situation on site, during construction, a steel pipe 6 penetrates through a through hole 9 of the upper connecting piece 2 of the combined protective frame system from top to bottom and is fixed with a steel pipe base 10 of the lower connecting piece 3 of the combined protective frame system, the whole system is flexible, construction, installation and disassembly are simple and convenient, and a dense mesh 7 is adopted to seal an area formed by the combined protective frame system 1, so that the environment is protected; after waiting this layer construction, can follow this layer floor layer and take off the connecting piece that makes up protection frame system 1 to the top board layer in proper order to being about to construct the one deck conversion, reached the material turnover, it is economical reasonable.
In summary, the following steps: the invention provides a method for protecting an empty face of an outer wall masonry along with climbing frame construction, aiming at reducing safety risk and saving cost, the construction and installation of a combined protection frame system 1 are realized through an upper connecting piece 2 of the combined protection frame system, a lower connecting piece 3 of the combined protection frame system and a steel pipe 6, so that the connection mode of the combined protection frame system 1 and a frame beam 5 is flexible and changeable, and the operation can be carried out according to the actual situation on site; after the construction of the floor layer is finished, the connecting pieces of the combined protective frame system 1 can be sequentially taken down from the floor layer to the top plate layer, and the floor layer is converted to the layer to be constructed, so that the material turnover is achieved, and the floor is economical and reasonable; the problem of among the prior art as integrated form go up and down to visit after the platform climbs, the main building outside will not have the protection of outrigger, very dangerous problem to and adopt the hanging flower basket to be the brickwork construction, the floor faces limit protection problem, eminence and falls thing problem, cross operation problem is solved.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be able to cover the technical solutions and the inventive concepts of the present invention within the technical scope of the present invention.
Claims (6)
1. The utility model provides an outer wall brickwork faces empty face protection method under with climbing frame construction, includes combination protection frame system (1), combination protection frame system upper portion connecting piece (2), combination protection frame system lower part connecting piece (3), major structure (4) and frame roof beam (5), its characterized in that includes following step:
s1: before the climbing frame is lifted, connecting the upper connecting piece (2) of the combined protective frame system and the lower connecting piece (3) of the combined protective frame system with a circle of frame beams (5) around the main structure (4);
s2: the steel pipe (6) penetrates through the hole of the upper connecting piece (2) of the combined protective frame system from top to bottom and is fixed with the lower connecting piece (3) of the combined protective frame system;
s3: after the single combined protection frame system (1) is finished, arranging the combined protection frame system along the opening of the main body structure (4) for secondary masonry at intervals of 1.2 m;
s4: the area formed by the combined protection frame system (1) is closed by a dense mesh net (7);
s5: performing secondary structure building construction in the protected closed area;
s6: after this layer construction, can follow this layer floor layer and take off in proper order and to being about to construct the one deck conversion to the connecting piece of top plate layer with combination protection frame system (1).
2. The method for protecting the exposed surface of the exterior masonry along with the scaffold climbing construction according to claim 1, wherein the method comprises the following steps: in the S1, the upper connecting piece (2) of the combined protective frame system and the lower connecting piece (3) of the combined protective frame system are connected with a circle of frame beams (5) around the main body structure (4) by expansion bolts (8) or reserved through holes (9) in the beams.
3. The method for protecting the exposed surface of the exterior masonry along with the scaffold climbing construction as claimed in claim 2, wherein: the upper connecting piece (2) and the lower connecting piece (3) of the combined protective frame system are both of an angle steel structure, bolt holes (11) are formed in the back faces of the upper connecting piece (2) and the lower connecting piece (3) of the combined protective frame system, the bolt holes (11) are fixedly connected with the frame beam (5) through driven expansion bolts (8), a through hole (9) is reserved in the bottom face of the upper connecting piece (2) of the combined protective frame system, a steel pipe base (10) is arranged on the bottom face of the lower connecting piece (3) of the combined protective frame system, and the outer diameter of the steel pipe base (10) is smaller than the inner diameter of the steel pipe (6); the steel pipe (6) penetrates through the through hole (9) of the upper connecting piece (2) of the combined protective frame system and is fixed by the steel pipe base (10) on the bottom surface of the lower connecting piece (3) of the combined protective frame system, and the bottom end of the steel pipe (6) is sleeved on the steel pipe base (10).
4. The method for protecting the exposed surface of the exterior masonry along with the scaffold climbing construction according to claim 1, wherein the method comprises the following steps: the frame beam (5) is fixedly connected with the main body structure (4).
5. The method for protecting the exposed surface of the exterior masonry along with the scaffold construction according to claim 1, wherein the combined protection frame system (1) is assembled on the frame beam (5) for a plurality of independent structures.
6. The method for protecting the exposed surface of the exterior wall masonry along with the scaffold climbing construction according to claim 1, wherein the dense mesh net (7) is detachably mounted on the plurality of combined protection frame systems (1) and forms a protection structure for the exposed surface of the plurality of combined protection frame systems (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110909660.1A CN113605683A (en) | 2021-08-09 | 2021-08-09 | Method for protecting free face of outer wall masonry under construction with climbing frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110909660.1A CN113605683A (en) | 2021-08-09 | 2021-08-09 | Method for protecting free face of outer wall masonry under construction with climbing frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113605683A true CN113605683A (en) | 2021-11-05 |
Family
ID=78340040
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110909660.1A Pending CN113605683A (en) | 2021-08-09 | 2021-08-09 | Method for protecting free face of outer wall masonry under construction with climbing frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113605683A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN208039787U (en) * | 2017-12-21 | 2018-11-02 | 中国建筑第二工程局有限公司 | High-altitude edge-facing operation assembly operation platform |
CN209942264U (en) * | 2019-04-04 | 2020-01-14 | 中国葛洲坝集团第五工程有限公司 | Movable house outer vertical surface protection system |
CN210177994U (en) * | 2019-04-12 | 2020-03-24 | 广西建工集团第四建筑工程有限责任公司 | Protection stores pylon of outer wall construction |
CN213297225U (en) * | 2020-08-14 | 2021-05-28 | 泰宏建设发展有限公司 | Assembled balcony is protection frame for construction |
-
2021
- 2021-08-09 CN CN202110909660.1A patent/CN113605683A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN208039787U (en) * | 2017-12-21 | 2018-11-02 | 中国建筑第二工程局有限公司 | High-altitude edge-facing operation assembly operation platform |
CN209942264U (en) * | 2019-04-04 | 2020-01-14 | 中国葛洲坝集团第五工程有限公司 | Movable house outer vertical surface protection system |
CN210177994U (en) * | 2019-04-12 | 2020-03-24 | 广西建工集团第四建筑工程有限责任公司 | Protection stores pylon of outer wall construction |
CN213297225U (en) * | 2020-08-14 | 2021-05-28 | 泰宏建设发展有限公司 | Assembled balcony is protection frame for construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103225423A (en) | Existing building surrounding type story-adding structure and construction method thereof | |
CN103397695B (en) | The concrete filled steel tube coupled column high-position conjoined structure of two-way steel truss is set | |
CN105442839A (en) | Erecting method of cantilever structure formwork bent | |
CN101191382A (en) | Steel pillar supporting type integral self-lifting steel platform scaffold template system and constructing method thereof | |
CN109653484B (en) | Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering | |
CN108756196A (en) | A kind of assembled architecture main body protective device and its construction method | |
CN112324066B (en) | Beamless and columnless stair and construction method | |
CN113605683A (en) | Method for protecting free face of outer wall masonry under construction with climbing frame | |
CN210483094U (en) | Inverted triangular pipe truss lifting device | |
CN105863236B (en) | For the construction method of the wall attaching parts of industrial premises exterior wall scaffold | |
CN102287022A (en) | Large-span heavy-load prestress groove-shaped laminated plate for civil defense basement ceiling plate | |
CN208950275U (en) | A kind of assembled architecture main body protective device | |
CN201190423Y (en) | Horizontal protection shed for tall building | |
CN110552495A (en) | assembled building combined tool type outer protective frame system and construction method thereof | |
CN110847662A (en) | Warehouse type ultra-deep underground three-dimensional intelligent garage and construction method thereof | |
CN204662926U (en) | A kind of operating platform for steel pipe column top construction operation | |
CN209509544U (en) | Protective device with shaped at a kind of assembled architecture work layer stair transformation platform | |
CN205577451U (en) | Instrument formula protection frame suitable for assemble integral concrete horizontal element | |
CN204754150U (en) | Dish -type node formula scaffold | |
CN210342719U (en) | Movable operation frame for quickly installing assembled inner wall plate | |
CN209293173U (en) | Module-type steel structure trestle external verandahs | |
CN102322136A (en) | Full-module-assembly adhesion type lifting scaffold | |
CN2276046Y (en) | Divided multistage automatic climbing external scaffold | |
CN207392709U (en) | A kind of ladder cage formula combined scaffold | |
CN206337800U (en) | Elevator shaft operating platform frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20211105 |