CN209509544U - Protective device with shaped at a kind of assembled architecture work layer stair transformation platform - Google Patents

Protective device with shaped at a kind of assembled architecture work layer stair transformation platform Download PDF

Info

Publication number
CN209509544U
CN209509544U CN201821922027.6U CN201821922027U CN209509544U CN 209509544 U CN209509544 U CN 209509544U CN 201821922027 U CN201821922027 U CN 201821922027U CN 209509544 U CN209509544 U CN 209509544U
Authority
CN
China
Prior art keywords
bar
cross bar
upright
upright bar
cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821922027.6U
Other languages
Chinese (zh)
Inventor
张聪
王生玉
吴新星
向俊志
尹家武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN201821922027.6U priority Critical patent/CN209509544U/en
Application granted granted Critical
Publication of CN209509544U publication Critical patent/CN209509544U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses protective device with shaped at a kind of assembled architecture work layer stair transformation platform, A and facade is protected to protect B including facade, the facade protection A is vertical setting with facade protection B, and face protection A and facade protection B are welded to connect, the facade protection A includes upright bar one, upright bar two, cross bar one, cross bar two and cross bar three, the upright bar one is vertically disposed on the facade protection bottom A both ends with upright bar two, and the upright bar one and upright bar two are vertical setting, bar one is provided on the attached fixing piece, and the bar one is vertical setting with the cross bar six.The beneficial effects of the utility model are: the construction method that regularization is protected in the utility model, save the construction time for setting up conventional steel fastener type protective frame, it has saved artificial, material is also saved simultaneously, it is small to reduce costs occupied area, the utility model is easy to operate, firm and durable, with good social benefit, it is suitble to promote the use of.

Description

Protective device with shaped at a kind of assembled architecture work layer stair transformation platform
Technical field
The utility model relates to a kind of protective device, determine at specially a kind of assembled architecture work layer stair transformation platform Type chemoprevention protection unit, belongs to protective device with shaped applied technical field.
Background technique
When assembled arthitecutral structure main body construction, unshielded state is usually at work layer stair conversion platform, and It is not easy to set up relative complex steel tube fastener protective frame herein, and area is smaller at work layer stair conversion platform, surrounding nothing Effective fixed point, if it is excessively complicated cumbersome to set up steel tube fastener protective frame, and influences prefabricated panel lifting and cast-in-place sleeper envelope mould, In the construction process, there are biggish security risks at work layer stair conversion platform, easily cause the generation of high pendant accident.
Utility model content
When the purpose of this utility model is that solve existing assembled arthitecutral structure main body construction, operation floor It is usually in unshielded state at terraced conversion platform, and is not easy to set up relative complex steel tube fastener protective frame herein, and Area is smaller at work layer stair conversion platform, around without effective fixed point, if it is excessively complicated numerous to set up steel tube fastener protective frame It is trivial, and prefabricated panel lifting and cast-in-place sleeper envelope mould are influenced, in the construction process, there are larger at work layer stair conversion platform Security risk, the problem of easily causing the generation of high pendant accident, and propose a kind of assembled architecture work layer stair transformation platform Locate protective device with shaped.
The purpose of this utility model can be achieved through the following technical solutions: a kind of assembled architecture work layer stair conversion Protective device with shaped at platform, including facade protection A and facade protect B, the facade protection A and facade protection B perpendicular Setting, and face protection A and facade protection B are welded to connect;
Facade protection A includes upright bar one, upright bar two, cross bar one, cross bar two and cross bar three, the upright bar one and upright bar Two are vertically disposed on the facade protection bottom A both ends, and the upright bar one and upright bar two are vertical setting, described Facade protects the length of upright bar and the upright bar of A to add 1200mm to floor face absolute altitude for terraced back absolute altitude, guarantees that effective protection is high Degree is 1200mm, the length of cross bar and stair it is of same size, the size of cross bar and cross bar between stair positioning bolt away from From playing the role of connecting upright pole and upright bar, combine protective action, and the cross bar one is arranged in upright bar one and upright bar two Between top, middle part is provided with cross bar three between the upright bar one and upright bar two, and facade protects B by upright bar and A vertical welding, Size should be noted that the link position of its attached movable fixing piece and cross bar should be according to pre- depending on on-site actual situations Depending on stair and partition wall processed position, and middle part is provided with cross bar two between the cross bar one and cross bar three, and the facade protects B packet Upright bar two, upright bar three, cross bar four, cross bar five, cross bar six and attached fixing piece are included, attached fixing piece adjustable is described vertical Bar two and upright bar three are disposed longitudinally on the facade protection bottom B both ends respectively, the setting of cross bar four the upright bar two with Top between the upright bar three, and middle part, the cross bar is arranged between the upright bar two and the upright bar three in the cross bar six Cross bar five is provided between six and cross bar four;
Wherein, bar one is provided on the attached fixing piece, and the bar one is vertical setting with the cross bar six, and institute It states one one end of bar and is provided with bar four, and four one end end vertical of the bar is provided with bar five, the one middle part side of bar is vertically set It is equipped with bar two, and is welded with bar three between two lower section of one other end end of the bar and the bar;
Wherein, six one end side wall middle part spaced set of cross bar has the bolt hole of several hollow circle configurations, institute It states one one end two sides of bar and passes through bolt and be fixedly connected with the bolt hole on cross bar six, lift it in work layer partition plate Before, attached fixing piece is perpendicular to the ground to be caught in lower layer's partition plate from top to bottom, is determined on cross bar with this pre- under the first state Stay the position of bolt hole;After the lifting of work layer partition plate, attached fixing piece position is adjusted, makes itself and ground level from side It is caught in the partition plate of this layer, the position of prepared screw-bolt hole under state in cross bar second is determined with this, facade protects B attached with it Movable attached fixing piece is connected by screw bolts, and the interconnection of remaining rod piece is all made of welding manner.
The further Technological improvement plan of the utility model is: described one one end of bar is vertical with six middle part of cross bar to be connect, And the tube wall two sides of one one end of bar are provided with the keyhole to match with bolt, and bolt-through keyhole, play bolt and keyhole one The junction at end is equipped with nut, and tube wall is prolonged four faces in the boom end of attached fixing piece and is separated, and guarantees separated tube wall It is mutually perpendicular to bar, bolt hole is opened on separated tube wall, bolt is then passed through to the bolt hole reserved on this bolt hole and cross bar, And fixed with nut, complete the interconnection of attached fixing piece and facade protection B.
The further Technological improvement plan of the utility model is: the bar two is set in parallel with bar five, and bar one, bar Triangular structure is formed between two and bar three, it is firm to guarantee that the device is more consolidated when working and using, improves the peace used The service life of full property and device.
The further Technological improvement plan of the utility model is: the both ends of the cross bar one, cross bar two and cross bar three point It is not vertical setting with upright bar one and two side wall of upright bar, and cross bar one, cross bar two are set in parallel between any two with cross bar three, Guarantee that each component connection support on the device is stronger, improves the intensity when device integrally uses.
The further Technological improvement plan of the utility model is: the both ends of the cross bar four, cross bar five and cross bar six point It is not vertical setting with upright bar two and three side wall of upright bar, and cross bar four, cross bar five are set in parallel between any two with cross bar six.
The construction method of protective device with shaped, this method are specific at a kind of assembled architecture work layer stair transformation platform The following steps are included:
Step 1: before work layer prefabricated part hanging, protective frame being hoisted at stair conversion platform, by one He of upright bar Stair positioning bolt is injected in upright bar two, while attached fixing piece is perpendicular to the ground and is caught in lower layer's partition plate;
Step 2: before floor ladder partition plate lifting, attached fixing piece is unloaded;
Step 3: the lifting of newel wall plate is completed;
Step 4: going to prepared screw-bolt hole position under second of state for fixing piece, attached fixing piece and ground level, The partition plate of this layer is caught in from side, blending bolt is fixed;
Step 5: every layer of layer reuse of assembly, until main structure construction is completed;
Step 6: after a building main building structure construction is completed, it is spare by shielded frame to be hoisted to transfer place using tower crane, Other main buildings suitable for subsequent construction.
Compared with prior art, the utility model has the beneficial effects that
1, protective frame is the protection of monoblock type regularization square steel tube, and production is simple, and normalized form can be according to on-site actual situations Change, overall performance is good, can be used in turn by tower crane, saves the duration, reduces construction cost.
2, in the utility model regularization protect use, solve at assembled architecture work layer stair conversion platform without The problem of protection, eliminates great security risk, ensure that the personal safety of worker.
3, the use that regularization is protected in the utility model, is rationally utilized stair spacer bar in assembled architecture, saves The space occupied for setting up conventional steel fastener type protective frame herein has been saved, has been provided for subsequent lifting, reinforcing bar, form work engineering construction Bigger operating space and better construction environment, effectively improve site operation progress.
4, the construction method that regularization is protected in the utility model, peace is torn open fast and simple, is saved and is set up conventional steel button It the construction time of part formula protective frame, has saved artificial, while having also saved material, reduced costs that occupied area is small, this is practical Novel operating is convenient, firm and durable, has good social benefit, is suitble to promote the use of.
Detailed description of the invention
In order to facilitate the understanding of those skilled in the art, the utility model will be further described below with reference to the accompanying drawings.
Fig. 1 is the schematic perspective view under the first state of the utility model.
Fig. 2 is the schematic perspective view under second of state of the utility model.
Fig. 3 is the front view under the first state of the utility model.
Fig. 4 is the front view under second of state of the utility model.
Fig. 5 is the right view under the first state of the utility model.
Fig. 6 is the right view under second of state of the utility model.
Fig. 7 is the top view under the first state of the utility model.
Fig. 8 is the top view under second of state of the utility model.
Fig. 9 is top view when the utility model is installed before partition plate lifting at work layer stair conversion platform.
Figure 10 is top view when the utility model is installed after partition plate lifting at work layer stair conversion platform.
Figure 11 is right view when the utility model is installed before partition plate lifting at work layer stair conversion platform.
Figure 12 is front view when the utility model is installed after partition plate lifting at work layer stair conversion platform.
Figure 13 is that the movable attached fixing piece of the utility model connect amplification sectional view with cross bar six.
Figure 14 is that the movable attached fixing piece of the utility model connect enlarged side view with cross bar six.
In figure: 1, upright bar one;2, upright bar two;3, cross bar one;4, cross bar two;5, cross bar three;6, upright bar three;7, cross bar four; 8, cross bar five;9, cross bar six;10, bar one;11, bar two;12, bar three;13, bar four;14, bar five.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with embodiment, it is clear that described Embodiment be only the utility model a part of the embodiment, instead of all the embodiments.Based on the reality in the utility model Example is applied, all other embodiment obtained by those of ordinary skill in the art without making creative efforts all belongs to In the range of the utility model protection.
It please refers to shown in Fig. 1-14, protective device with shaped at a kind of assembled architecture work layer stair transformation platform, packet Facade protection A and facade protection B are included, facade protects A to be vertical setting with facade protection B, and face protection A and facade protection B weldering It connects in succession;
Facade protection A includes upright bar 1, upright bar 22, cross bar 1, cross bar 24 and cross bar 35, upright bar 1 and upright bar two 2 are vertically disposed on the facade protection bottom A both ends, and upright bar 1 and upright bar 22 are vertical setting, facade protection A The length of upright bar 1 and upright bar 2 adds 1200mm to floor face absolute altitude for terraced back absolute altitude, guarantees that effective protection height is 1200mm, the length of cross bar 3 and stair it is of same size, the size of cross bar 4 and cross bar 5 between stair positioning bolt away from From playing the role of connecting upright pole 1 and upright bar 2, combine protective action, and cross bar 1 is arranged in upright bar 1 and upright bar two Top between 2, middle part is provided with cross bar 35 between upright bar 1 and upright bar 22, and facade protects B to pass through upright bar 2 and A vertical welding It connects, size should be noted that its attached movable fixing piece and the link position of cross bar 9 answer root depending on on-site actual situations Middle part is provided with cross bar 24 depending on precast stair and partition wall position, and between cross bar 1 and cross bar 35, and facade protects B packet Upright bar 22, upright bar 36, cross bar 47, cross bar 58, cross bar 69 and attached fixing piece are included, attached fixing piece adjustable is stood Bar 22 and upright bar 36 are disposed longitudinally on the facade protection bottom B both ends respectively, the setting of cross bar 47 upright bar 22 and upright bar 36 it Between top, and cross bar 69 be arranged between upright bar 22 and upright bar 36 middle part, be provided with cross bar between cross bar 69 and cross bar 47 58;
Wherein, bar 1 is provided on attached fixing piece, and bar 1 is vertical setting with cross bar 69, and bar 1 End is provided with bar 4 13, and 4 13 one end end vertical of bar is provided with bar 5 14, and one 10 middle part side of bar is vertically installed with bar two 11, and bar 3 12 is welded between two lower section of one 10 other end end of bar and bar;
Wherein, 69 one end side wall middle part spaced set of cross bar has the bolt hole of several hollow circle configurations, bar 1 One end two sides pass through bolt and are fixedly connected with the bolt hole on cross bar 69, and before the lifting of work layer partition plate, attached consolidates Determine that part is perpendicular to the ground to be caught in lower layer's partition plate from top to bottom, prepared screw-bolt hole under the first state is determined on cross bar 9 with this Position;After the lifting of work layer partition plate, attached fixing piece position is adjusted, itself and ground level is made to be caught in this layer from side Partition plate, determines the position of prepared screw-bolt hole under state in cross bar 9 second with this, and facade protects movable attached attached with it of B Belong to fixing piece to be connected by screw bolts, the interconnection of remaining rod piece is all made of welding manner.
As a kind of technical optimization scheme of the utility model, one 10 one end of bar is vertical with 69 middle part of cross bar to be connect, and bar The tube wall two sides of one 10 one end are provided with the keyhole to match with bolt, and bolt-through keyhole, play bolt and keyhole one end Junction nut is installed, tube wall is prolonged into four faces in 10 end of bar of attached fixing piece and is separated, and guarantees separated tube wall It is mutually perpendicular to bar 10, bolt hole is opened on separated tube wall, bolt is then passed through into bolt reserved on this bolt hole and cross bar 9 Hole, and fixed with nut, complete the interconnection of attached fixing piece and facade protection B.
As a kind of technical optimization scheme of the utility model, bar 2 11 is set in parallel with bar 5 14, and bar 1, bar Triangular structure is formed between 2 11 and bar 3 12, it is firm to guarantee that the device is more consolidated when working and using, improves use Safety and device service life.
As a kind of technical optimization scheme of the utility model, the both ends of cross bar 1, cross bar 24 and cross bar 35 respectively with Upright bar 1 and 22 side wall of upright bar are vertical setting, and cross bar 1, cross bar 24 are set in parallel between any two with cross bar 35 It sets, guarantees that each component connection support on the device is stronger, improve the intensity when device integrally uses.
As a kind of technical optimization scheme of the utility model, the both ends of cross bar 47, cross bar 58 and cross bar 69 respectively with Upright bar 22 and 36 side wall of upright bar are vertical setting, and cross bar 47, cross bar 58 are set in parallel between any two with cross bar 69 It sets.
The construction method of protective device with shaped, this method are specific at a kind of assembled architecture work layer stair transformation platform The following steps are included:
Step 1: before work layer prefabricated part hanging, protective frame being hoisted at stair conversion platform, by upright bar 1 Stair positioning bolt is injected with upright bar 22, while attached fixing piece is perpendicular to the ground and is caught in lower layer's partition plate;
Step 2: before floor ladder partition plate lifting, attached fixing piece is unloaded;
Step 3: the lifting of newel wall plate is completed;
Step 4: going to prepared screw-bolt hole position under second of state for fixing piece, attached fixing piece and ground level, The partition plate of this layer is caught in from side, blending bolt is fixed;
Step 5: every layer of layer reuse of assembly, until main structure construction is completed;
Step 6: after a building main building structure construction is completed, it is spare by shielded frame to be hoisted to transfer place using tower crane, Other main buildings suitable for subsequent construction.
The preferred embodiment in the utility model disclosed above is only intended to help to illustrate the utility model.Preferred embodiment is simultaneously There is no the details that detailed descriptionthe is all, also not limiting the utility model is only the specific embodiment.Obviously, according to this theory The content of bright book can make many modifications and variations.These embodiments are chosen and specifically described to this specification, is in order to preferably The principles of the present invention and practical application are explained, so that skilled artisan be enable to better understand and utilize this Utility model.The utility model is limited only by the claims and their full scope and equivalents.

Claims (5)

1. protective device with shaped at a kind of assembled architecture work layer stair transformation platform, including facade protection A and facade are prevented Protect B, it is characterised in that: the facade protection A is vertical setting with facade protection B, and facade protection A and facade protection B welding Connection;
Facade protection A includes upright bar one (1), upright bar two (2), cross bar one (3), cross bar two (4) and cross bar three (5), described Upright bar one (1) and upright bar two (2) are vertically disposed on the facade protection bottom A both ends, and the upright bar one (1) and upright bar Two (2) are vertical setting, and top, the upright bar is arranged between upright bar one (1) and upright bar two (2) in the cross bar one (3) Middle part is provided with cross bar three (5) between one (1) and upright bar two (2), and middle part is set between the cross bar one (3) and cross bar three (5) It is equipped with cross bar two (4);
Facade protection B includes upright bar two (2), upright bar three (6), cross bar four (7), cross bar five (8), cross bar six (9) and attached Fixing piece, the upright bar two (2) and upright bar three (6) are disposed longitudinally on the facade protection bottom B both ends, the cross bar four respectively (7) top is set between the upright bar two (2) and the upright bar three (6), and the cross bar six (9) is arranged in the upright bar two (2) middle part between the upright bar three (6), is provided with cross bar five (8) between the cross bar six (9) and cross bar four (7);
Wherein, be provided with bar one (10) on the attached fixing piece, and the bar one (10) with the cross bar six (9) is perpendicular sets It sets, and the bar one (10) one end is provided with bar four (13), and the bar four (13) one end end vertical is provided with bar five (14), Side is vertically installed with bar two (11), and two lower section of the bar one (10) other end end and the bar in the middle part of the bar one (10) Between be welded with bar three (12);
Wherein, described cross bar six (9) one end side wall middle part spaced set has the bolt hole of several hollow circle configurations, described Bar one (10) one end two sides pass through bolt and are fixedly connected with the bolt hole on cross bar six (9).
2. protective device with shaped at a kind of assembled architecture work layer stair transformation platform according to claim 1, It is characterized in that, described bar one (10) one end is vertical in the middle part of cross bar six (9) to be connect, and the tube wall two sides of bar one (10) one end are all provided with It is equipped with the keyhole to match with bolt, and bolt-through keyhole, the junction for playing bolt and keyhole one end is equipped with nut.
3. protective device with shaped at a kind of assembled architecture work layer stair transformation platform according to claim 1, It is characterized in that, the bar two (11) is set in parallel with bar five (14), and shape between bar one (10), bar two (11) and bar three (12) At triangular structure.
4. protective device with shaped at a kind of assembled architecture work layer stair transformation platform according to claim 1, Be characterized in that, the both ends of the cross bar one (3), cross bar two (4) and cross bar three (5) respectively with upright bar one (1) and upright bar two (2) side Wall is vertical setting, and cross bar one (3), cross bar two (4) are set in parallel between any two with cross bar three (5).
5. protective device with shaped at a kind of assembled architecture work layer stair transformation platform according to claim 1, Be characterized in that, the both ends of the cross bar four (7), cross bar five (8) and cross bar six (9) respectively with upright bar two (2) and upright bar three (6) side Wall is vertical setting, and cross bar four (7), cross bar five (8) are set in parallel between any two with cross bar six (9).
CN201821922027.6U 2018-11-21 2018-11-21 Protective device with shaped at a kind of assembled architecture work layer stair transformation platform Expired - Fee Related CN209509544U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821922027.6U CN209509544U (en) 2018-11-21 2018-11-21 Protective device with shaped at a kind of assembled architecture work layer stair transformation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821922027.6U CN209509544U (en) 2018-11-21 2018-11-21 Protective device with shaped at a kind of assembled architecture work layer stair transformation platform

Publications (1)

Publication Number Publication Date
CN209509544U true CN209509544U (en) 2019-10-18

Family

ID=68190022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821922027.6U Expired - Fee Related CN209509544U (en) 2018-11-21 2018-11-21 Protective device with shaped at a kind of assembled architecture work layer stair transformation platform

Country Status (1)

Country Link
CN (1) CN209509544U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109518981A (en) * 2018-11-21 2019-03-26 中国建筑第四工程局有限公司 Protective device with shaped and its construction method at a kind of assembled architecture work layer stair transformation platform

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109518981A (en) * 2018-11-21 2019-03-26 中国建筑第四工程局有限公司 Protective device with shaped and its construction method at a kind of assembled architecture work layer stair transformation platform
CN109518981B (en) * 2018-11-21 2024-04-02 中国建筑第四工程局有限公司 Shaping protection device at building ladder conversion platform of fabricated building operation and construction method thereof

Similar Documents

Publication Publication Date Title
CN102383588B (en) Lifting platform for protecting safety of high-level construction
CN104947942B (en) Hypervelocity arch grid structure architecture computer controls the installation method extending out accumulation lifting
CN207048306U (en) Sliding formwork flexibility platform
CN207260338U (en) Pseudo-classic architecture wood sets of brackets on top of the columns roofing and concrete main body frame connecting structure
CN113152873A (en) Heightening hanging basket system
CN207017483U (en) The full precast shear wall structural system of regenerative steel skeleton
CN106759909B (en) Bearing structure system and its construction method are hung up under one kind
CN209509544U (en) Protective device with shaped at a kind of assembled architecture work layer stair transformation platform
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN218149656U (en) Operating platform in lighting well
CN202090577U (en) Template supporting construction platform for lift wells in high-rise buildings
CN201610632U (en) Self-climbing construction platform
CN201190423Y (en) Horizontal protection shed for tall building
CN109518981A (en) Protective device with shaped and its construction method at a kind of assembled architecture work layer stair transformation platform
CN202831219U (en) Large-span precast monolithic concrete structure
CN201943350U (en) Supporting steel frame for die holder of high-altitude large span overhanging structure
CN208396133U (en) A kind of combined hollow grillage structure
CN207749859U (en) A kind of trestle support system for structure floor operation in Large-scale Hoisting equipment
CN107130783B (en) The prefabricated sandwich heat preservation Side fascia of assembling type steel structure house protects frame construction method
CN208039787U (en) The assembled operating platform of side operation is faced in a kind of high-altitude
CN207244453U (en) A kind of suspension bridge light anchorage mast apparatus
CN214656461U (en) Assembled hanging basket high-altitude operation protection device
CN110331854A (en) Combined steel formwork
CN214169865U (en) High-altitude large-cantilever structure assembled lower-support type formwork-supporting decoration integrated operation platform
CN204876576U (en) Building construction system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191018

Termination date: 20201121

CF01 Termination of patent right due to non-payment of annual fee