CN107130783B - The prefabricated sandwich heat preservation Side fascia of assembling type steel structure house protects frame construction method - Google Patents
The prefabricated sandwich heat preservation Side fascia of assembling type steel structure house protects frame construction method Download PDFInfo
- Publication number
- CN107130783B CN107130783B CN201710540312.5A CN201710540312A CN107130783B CN 107130783 B CN107130783 B CN 107130783B CN 201710540312 A CN201710540312 A CN 201710540312A CN 107130783 B CN107130783 B CN 107130783B
- Authority
- CN
- China
- Prior art keywords
- side fascia
- construction
- heat preservation
- sandwich heat
- support base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention relates to a kind of prefabricated sandwich heat preservation Side fascias of assembling type steel structure house to protect frame construction method, and construction protecting rack and girder steel are connected as one;The steel beam lifting for being connected with construction protecting rack is in place;Lift top Side fascia and lower part Side fascia;Girder steel and Side fascia construction finish Demolition Construction protective frame;When Demolition Construction protective frame, connector is separated first with support base, construction protecting rack is then lifted into ground and is connected with corresponding girder steel;Hole on exterior wall blocks sealant using Side fascia piece with Side fascia piece and blocks simultaneously.The prefabricated sandwich heat preservation Side fascia of assembling type steel structure house of the present invention protects frame construction method; it reduces fee of material, saved labour cost; improve the number of turnover of protective frame; protective frame is lifted simultaneously with girder steel, is installed; improve site operation speed; solve the problems, such as that Side fascia frame body reserved opening blocks and rain leakage, protection environment, advantageous civilized construction on site.
Description
Technical field
The present invention relates to a kind of construction techniques, in particular to a kind of prefabricated folder of assembling type steel structure house
Heart thermal insulation external wall panel protects frame construction method.
Background technique
In assembling type steel structure house, exterior wall protective frame mainly uses the modes such as floor scaffolding, builder's jack to take
If protection frame body and drawknot mainly use 48 steel pipe of φ, drawknot needs punch on wall, and protective frame needs a large amount of steel
The materials such as pipe, safety net, Dense mesh screen, springboard need largely manually set up, remove, and safety net, Dense mesh screen are easily damaged,
The number of turnover is low;Prefabricated sandwich heat preservation concrete external wall panel is used in steel house, using landing, builder's jack drawknot
It needs to stay on Side fascia and sets hole, cause Side fascia sealing hole after frame body dismounting, sealing hole position personnel operation is tired
Difficult and be easy infiltration, frame body, which is beaten, tears fee of material open and labour cost is costly, erection of frames speed is slow, influences the construction period.
Summary of the invention
In view of the deficiency of the prior art, it is simple to provide a kind of structure by the present invention, easy for assemble or unload, safely may be used
It leans on, reduces the prefabricated sandwich heat preservation Side fascia protection frame construction method of assembling type steel structure house of construction cost.
The technical solution used in the present invention is:
A kind of prefabricated sandwich heat preservation Side fascia protection frame construction method of assembling type steel structure house, including construction protecting rack,
Construction protecting rack is connected by attachment device with girder steel;
Construction protecting rack front end is provided with support column, and the support column is provided with mounting hole;
The attachment device includes the supporter being arranged in mounting hole;
Steel beam web plate is welded with support base;
Construction protecting rack is supporting intracorporal connector to be connected with support base by setting;
The front end of connector is provided with external screw thread;
Connector front end is connected with support base by screw thread;
Including following construction procedure;
Construction protecting rack and girder steel are connected as one;
Lift lower part sandwich heat preservation concrete external wall panel and top sandwich heat preservation concrete external wall panel;
The sandwich heat preservation concrete external wall panel lifting for being connected with construction protecting rack is in place;
The piece position of upper Side fascia and the piece position of lower Side fascia are provided with arc-shaped through-hole;
Girder steel and Side fascia construction finish Demolition Construction protective frame;
When Demolition Construction protective frame, connector is separated with support base first, it then will be with lower part sandwich heat preservation concrete
The construction protecting rack that Side fascia is connected is lifted into ground and is connected with corresponding girder steel;
Hole on exterior wall blocks sealant using Side fascia piece with Side fascia piece and blocks simultaneously.
The support base is setting 33 round steel pipe of internal thread φ;
Connector is 24 round steel pipe of φ;
Supporter is 33 round steel pipe of φ.
The connector passes through supporter and is connected with support base;
33 round steel pipe of φ and the end face for 33 round steel pipe of φ for constituting support base for constituting supporter fit.
Leaf central part is arranged outside concrete in the end of the support base.
The present invention compared with the prior art the utility model has the advantages that
The prefabricated sandwich heat preservation Side fascia of assembling type steel structure house of the present invention protects frame construction method, reduce fee of material,
Labour cost has been saved, the number of turnover of protective frame is improved, protective frame just just carries out frame body with girder steel before Side fascia installation
Connection, protective frame are lifted simultaneously with girder steel, are installed, and improve site operation speed, solve Side fascia frame body reserved opening envelope
Stifled and rain leakage problem protects environment, favorably civilized construction on site.
Detailed description of the invention
Fig. 1 is the construction protection of the prefabricated sandwich heat preservation Side fascia protection frame construction method of assembling type steel structure house of the present invention
The schematic view of the front view of frame;
Fig. 2 is the construction protection of the prefabricated sandwich heat preservation Side fascia protection frame construction method of assembling type steel structure house of the present invention
The overlooking structure diagram of frame;
Fig. 3 is the B-B schematic cross-sectional view of Fig. 2.
Main component symbol description in attached drawing:
In figure:
1, construction protecting rack 2, girder steel
3, support column 4, supporter
5, support base 6, connector
7, lower part concrete siphonal lobe 8, lower part insulation board
9, lower part concrete internal lobe
17, top concrete siphonal lobe 18, top insulation board
19, top concrete internal lobe.
Specific embodiment
Referring to the drawings and embodiment the present invention will be described in detail:
Attached drawing 1-3 it is found that a kind of prefabricated sandwich heat preservation Side fascia of assembling type steel structure house protects frame construction method, including
Construction protecting rack 1,
Construction protecting rack is connected by attachment device with girder steel 2;
Construction protecting rack front end is provided with support column 3, and the support column 3 is provided with mounting hole;
The attachment device includes the supporter 4 being arranged in mounting hole;
Steel beam web plate is welded with support base 5;
Construction protecting rack is supporting intracorporal connector 6 to be connected with support base 5 by setting;
The front end of connector 6 is provided with external screw thread;
6 front end of connector is connected with support base 5 by screw thread;
Including following construction procedure;
Construction protecting rack and girder steel are connected as one;
Lift lower part sandwich heat preservation concrete external wall panel and top sandwich heat preservation concrete external wall panel;
The sandwich heat preservation concrete external wall panel lifting for being connected with construction protecting rack is in place;
The piece position of upper Side fascia and the piece position of lower Side fascia are provided with arc-shaped through-hole;
Girder steel and Side fascia construction finish Demolition Construction protective frame;
When Demolition Construction protective frame, connector is separated with support base first, it then will be with lower part sandwich heat preservation concrete
The construction protecting rack that Side fascia is connected is lifted into ground and is connected with corresponding girder steel;
Hole on exterior wall blocks sealant using Side fascia piece with Side fascia piece and blocks simultaneously.
The support base is setting 33 round steel pipe of internal thread φ;
Connector is 24 round steel pipe of φ;
Supporter is 33 round steel pipe of φ.
The connector passes through supporter and is connected with support base;
33 round steel pipe of φ and the end face for 33 round steel pipe of φ for constituting support base for constituting supporter fit.
Leaf central part is arranged outside concrete in the end of the support base.
The prefabricated sandwich heat preservation Side fascia of assembling type steel structure house of the present invention protects frame construction method, reduce fee of material,
Labour cost has been saved, the number of turnover of protective frame is improved, protective frame just just carries out frame body with girder steel before Side fascia installation
Connection, protective frame are lifted simultaneously with girder steel, are installed, and improve site operation speed, solve Side fascia frame body reserved opening envelope
Stifled and rain leakage problem protects environment, favorably civilized construction on site.
The prefabricated sandwich heat preservation concrete external wall panel protective frame of the present invention: protective frame is overhanging type,
Each protective frame length be 1200mm, frame body total height be 1849mm, frame body clear span 600mm, each protective frame it
Between be connected with, protective frame returns 366mm under Side fascia piece position;Main material upright bar, bottom level bar use 50 × 50 × 4
Square steel tube, upright bar connect horizontal tube and use 33 round steel pipe of φ, and safety net uses 1250 × 400,1250 × 580 steel wires and steel pipe
Welding;
Protective frame is connect using screwed connection with Side fascia and girder steel, frame body one end with screw thread 24 round steel pipe of φ and
33 round steel pipe of φ connection with screw thread.
The 33 round steel pipe one end φ and steel beam web plate are welded to connect;Before frame body lifting, first the round steel pipe with screw thread is worn outer
The piece position of two Side fascias up and down of wallboard, Side fascia reserve circular arc formation circular hole and connect with steel beam web plate,
Then it will protect between frame body and girder steel and connected by being embedded in the steel pipe with screw thread of Side fascia siphonal lobe, protection
Frame and Side fascia form entirety, and overall stability is good.
After protective frame is removed, sealing hole is sealed using Side fascia piece plugging material sealant with Side fascia piece simultaneously
It is stifled.
Claims (4)
1. a kind of prefabricated sandwich heat preservation Side fascia of assembling type steel structure house protects frame construction method, including construction protecting rack,
It is characterized in that:
Construction protecting rack is connected by attachment device with girder steel;
Construction protecting rack front end is provided with support column, and the support column is provided with mounting hole;
The attachment device includes the supporter being arranged in mounting hole;
Steel beam web plate is welded with support base;
Construction protecting rack is supporting intracorporal connector to be connected with support base by setting;
The front end of connector is provided with external screw thread;
Connector front end is connected with support base by screw thread;
Including following construction procedure;
Construction protecting rack and girder steel are connected as one;
Lift lower part sandwich heat preservation concrete external wall panel and top sandwich heat preservation concrete external wall panel;
The sandwich heat preservation concrete external wall panel lifting for being connected with construction protecting rack is in place;
The piece position of upper Side fascia and the piece position of lower Side fascia are provided with arc-shaped through-hole;
Girder steel and Side fascia construction finish Demolition Construction protective frame;
When Demolition Construction protective frame, connector is separated with support base first, it then will be with lower part sandwich heat preservation concrete exterior wall
The construction protecting rack that plate is connected is lifted into ground and is connected with corresponding girder steel;
Hole on exterior wall blocks sealant using Side fascia piece with Side fascia piece and blocks simultaneously.
2. the prefabricated sandwich heat preservation Side fascia of assembling type steel structure house protects frame construction method according to claim 1, special
Sign is:
The support base is setting 33 round steel pipe of internal thread φ;
Connector is 24 round steel pipe of φ;
Supporter is 33 round steel pipe of φ.
3. the prefabricated sandwich heat preservation Side fascia of assembling type steel structure house protects frame construction method according to claim 2, special
Sign is:
The connector passes through supporter and is connected with support base;
33 round steel pipe of φ and the end face for 33 round steel pipe of φ for constituting support base for constituting supporter fit.
4. the prefabricated sandwich heat preservation Side fascia of assembling type steel structure house protects frame construction method according to claim 2, special
Sign is:
Leaf central part is arranged outside concrete in the end of the support base.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710540312.5A CN107130783B (en) | 2017-07-05 | 2017-07-05 | The prefabricated sandwich heat preservation Side fascia of assembling type steel structure house protects frame construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710540312.5A CN107130783B (en) | 2017-07-05 | 2017-07-05 | The prefabricated sandwich heat preservation Side fascia of assembling type steel structure house protects frame construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107130783A CN107130783A (en) | 2017-09-05 |
CN107130783B true CN107130783B (en) | 2019-03-19 |
Family
ID=59736733
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710540312.5A Active CN107130783B (en) | 2017-07-05 | 2017-07-05 | The prefabricated sandwich heat preservation Side fascia of assembling type steel structure house protects frame construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107130783B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107762000A (en) * | 2017-10-31 | 2018-03-06 | 中国二十二冶集团有限公司 | Three layers of composite steel column sandwich heat preservation Side fascia method for blocking of assembling type steel structure |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104074358B (en) * | 2014-07-02 | 2016-11-16 | 中铁二局工程有限公司 | The construction method of prefabricated building |
CN204899179U (en) * | 2015-09-10 | 2015-12-23 | 安徽宇辉新型建筑材料有限公司 | Prefabricated concrete structure goes along with sb. to guard him an equipment bearing structure outward |
CN205421880U (en) * | 2015-12-17 | 2016-08-03 | 上海建工五建集团有限公司 | Instrument formula protection frame suitable for assemble integral concrete outer wall board |
CN106677509A (en) * | 2017-02-14 | 2017-05-17 | 中天建设集团有限公司 | Design finalization external protective frame system used for assembly type building construction |
-
2017
- 2017-07-05 CN CN201710540312.5A patent/CN107130783B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN107130783A (en) | 2017-09-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207620351U (en) | A kind of attachment type raise scaffold | |
CN110725597A (en) | Construction platform erection structure and method for ring beam at top of concrete silo | |
CN107524284A (en) | A kind of regularization pylon protection system and installation method | |
CN211499713U (en) | All-steel attached lifting scaffold | |
CN107130783B (en) | The prefabricated sandwich heat preservation Side fascia of assembling type steel structure house protects frame construction method | |
CN109113335B (en) | Parapet wall formwork support and construction method | |
CN210084736U (en) | A portable lifting hook for installation of people's air defense door | |
CN211038675U (en) | Quickly-assembled supporting shed frame | |
CN205713096U (en) | A kind of roofing cantilevered structure form bracing system | |
CN218149656U (en) | Operating platform in lighting well | |
CN208502103U (en) | A kind of sizing awning | |
CN206448505U (en) | Adjustable draw and insert-type all steel attachment type raise scaffold back cover panel assembly | |
CN204662926U (en) | A kind of operating platform for steel pipe column top construction operation | |
CN205206162U (en) | Cornice structure | |
CN206360392U (en) | Attachment type raise scaffold periphery protecting wire net | |
CN113756558A (en) | High-rise assembled steel structure system externally hung hanging basket installation structure and construction method thereof | |
CN207469752U (en) | A kind of venthole non-dismantling formwork | |
CN208039787U (en) | The assembled operating platform of side operation is faced in a kind of high-altitude | |
CN205421316U (en) | Tower jack -up lattice column steel platform welding basis | |
CN110778095A (en) | External protection frame of assembled structure | |
CN218912340U (en) | Building construction protector | |
CN217601447U (en) | Foundation pit supporting structure of bridge pier steel sheet pile engineering | |
CN213865133U (en) | Tower crane attaches wall and increases formula steel construction system | |
CN218091511U (en) | Large decoration structure of glass curtain wall | |
CN204370784U (en) | A kind of tool-type construction elevator discharging platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |